HomeMy WebLinkAboutWQ0037783_Issuance of Permit_20180920ROY COOPER Governor i Water Resources Environmental Quality September 20, 2018 Heath Jenkins, Town Manager Town of Stanley P.O. Box 279 Stanley, NC 28164 MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director Subject: Permit No. WQ0037783 MODIFICATION Town of Stanley Stanley Sewer Interconnect Phase 2, aka Wastewater Collection System Rehab. Wastewater Collection System Extension Permit Gaston County Dear Mr. Jenkins: In accordance with your application received September 7, 2018, we are forwarding herewith Permit No. WQ0037783 MODIFICATION dated September 20, 2018, to the Town of Stanley (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, shall void Permit No. WQ0037783 issued January 4, 2016, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. This permit was originally issued on June 15, 2015, but was modified on January 4, 2016 to increase capacity of both proposed pump stations and modification in the project alignment. This current modification is for 6065 linear feet of 8-inch gravity sewer and 550 linear feet of 10-inch gravity sewer to replace old lines tributary to this system. No new flow is being added. Please pay particular attention to the following conditions contained within this permit: Condition 1.1: Variance approval related to gravity sewer and manhole separations. See Condition 1.1 for additional details. Condition 1.3: No wastewater flow shall be made tributary to the subject sanitary sewer system until the Stanley Sewer Interconnect (Permit Number: WQ0036829) is constructed, operational, and the engineer's certification has been received by the Division. Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition IIA: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. ---Nothing C:ompares7_,._,_ State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Barry Love at (704) 235-2143 or via e-mail at barry.love@ncdenr.gov. Sincerely, DocuSigned by: A14CC681 AF27425... byW. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ cc: R.J. Mozeley, P.E. (e-copy) Regional Office Files Water Resources Central Files PERCS (e-copy) 2 Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Town of Stanley Gaston County for the construction and operation of approximately 6,065 linear feet of 8-inch gravity sewer, 550 linear feet of 10-inch gravity sewer and 12,330 linear feet of 12-inch gravity sewer; a 725—gallon per minute pump station (Meadow Pump Station) with duplex pumps, on -site audible and visual high water alarms, telemetry, and a permanent generator with automatic transfer switch; as well as approximately 7,300 linear feet of 8-inch force main; a 310 gallon per minute pump station (Buckeye Pump Station) with duplex pumps, on -site audible and visual high water alarms, telemetry, and a permanent generator with automatic transfer switch; as well as approximately 7,100 linear feet of 6-inch force main; all part of the Stanley Sewer Interconnect Phase 2 project, and the discharge of 200,000 gallons per day of collected wastewater into the Town of Stanley's and Two Rivers Utilities existing sewerage system, pursuant to the application received December 7, 2015, and in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit was originally issued on June 15, 2015, but was modified on January 4, 2016 to increase capacity of both proposed pump stations and modification in the project alignment. This current modification is for 6065 linear feet of 8-inch gravity sewer and 550 linear feet of 10-inch gravity sewer to replace old lines tributary to this system. No new flow is being added. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. DocuSigned by: (� byW. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0037783 MODIFICATION Permit Issued: September 20, 2018 Treatment Facility: Long Creek WWTF (NC0020184) 3 SUPPLEMENT TO PERMIT COVER SHEET Town of Stanley is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Two Rivers Utilities Long Creek Wastewater Treatment Plant in accordance with Permit Number NC0020184. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS A variance is granted for the construction of gravity sewer and associated manholes referenced on the construction plans that do not meet separation requirements associated with 15A NCAC 02T.0305(f). Construction for these items shall adhere to the plans and specifications. [15A NCAC 02T .0105(n)] 2. This permit shall become voidable unless the agreement between the Town of Stanley and Two Rivers Utilities for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 02T.0304(h)] 3. No wastewater flow shall be made tributary to the subject sanitary sewer system until the Stanley Sewer Interconnect (Permit Number: WQ0036829) is constructed, operational, and the engineer's certification has been received by the Division. [15A NCAC 02T .0116] II. STANDARD CONDITIONS 1. This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other 4 supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected everyday (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 5 For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. R A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greaterthan ten percent below the minimum required slope perthe Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North 7 Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S. 143- 215.1(b)] 13. The Permittee shall provide for the pump station and force main the following items: a. Pump Station Reliability [15A NCAC 02T .0305(h)(1)]: 1. Pump stations, except when exempted by Subparagraph (j)(2) of 15A NCAC 02T.0305, shall be designed with multiple pumps such that peak flow can be pumped with the largest pump out of service. 2. A standby power source or pump is required at all pump stations except for those pump stations subject to Subparagraph (j)(2) of 15A NCAC 02T.0305. Controls shall be provided to automatically activate the standby source and signal an alarm condition. 3. As an alternative to Part (c) for pump stations with an average daily design flow less than 15,000 gallons per day as calculated using 15A NCAC 02T.0114, a portable power source or pumping capability may be utilized. It shall be demonstrated to the Division that the portable source is owned or contracted by the permittee and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. 4. As an alternative to Part (ii) for pump or vacuum stations connecting a single building to an alternative sewer system, wet well storage requirements shall be documented to provide 24-hours' worth of wastewater storage or, exceed the greatest power outage over the last three years or the documented response time to replace a failed pump, whichever is greater. Documentation shall be required pursuant to the permit application. b. All pump stations designed for two pumps or more shall have a telemetry system to provide remote notification of a problem condition to include power failure and high water alarm. [15A NCAC 02T .0305(h)(1)(E)] c. High water audio and visual alarm. [15A NCAC 02T .0305(h)(1)(F)] d. Pump stations shall have a permanent weatherproof sign stating the pump station identifier, 24- hour emergency number and instructions to call in case of emergency. [15A NCAC 02T .0305(h)(2)] 0 e. Screened vents for all wet wells. [15A NCAC 02T .0305(h)(3)] f. The public shall be restricted access to the site and equipment. [15A NCAC 02T .0305(h)(4)] g. Air relief valves shall be provided at all high points along force mains where the vertical distance exceeds ten feet. [15A NCAC 02T .0305(h)(5)] 0 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Town of Stanley PERMIT#: WQ0037783 MODIFICATION PROJECT: Stanley Sewer Interconnect Phase 2, aka Wastewater Collection System Rehab. ISSUE DATE: September 20, 2018 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. ............................................... North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Officel 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704 663 1699