Loading...
HomeMy WebLinkAboutNCS000315_Nexeo Solutions CMSWS Inspection 2014_20140331C iarllofte-Afecklenh arg 7 0 0 North Tryon Street STORM Charlotte, NC 28202 FA= E'ER Facility Inspection Fax: 7 0 4.3 3 6.4 3 9 1 Services - Facility Name: Nexeo Solutions, LLC (Formely Ashland Inc.) Inspection ID: 12667 Contact: Mike Trull Permit #: NCS000315 Inspector: Ryan Spidel Receiving Stream: IRWIN Inspection Date: 03/31/2014 Entry Time: 9:00 am Exit Time: 11:45 am SIC #: 5169 Wr Facility Description: Nexeo Solutions is located at 3930 Glenwood Drive in Charlotte, NC on 12.9 acres of land in the Stewart Creek Watershed with approximately 68% impervious area. The facility receives, repackages, and distributes hazardous and non -hazardous materials. File Review/History: CMSWS previously inspected Nexeo Solutions/Ashland Distrubution on January 22, 2009. A compliant inspection report was issued by NCDENR-Division of Water Quality. Inspection Summary: During the site inspection on March 31, 2014 Nexeo Solutions was observed to be in compliance with NPDES Stormwater Permit NCS000315 and the City of Charlotte Storm Water Pollution Control Ordinance. Site Inspection Deficiency Comment Stormwater system (catch basins, No Outfall 1 had a dry weather flow during the inspection, but the inlets, outfalls, etc.) facility had recently discharged their evaluated stormwater from the secondary containment area. Erosion issues No Minor erosion was noticed at the outfalls. Rip -rap was recently installed at outfall 2 due to erosion. Structural stormwater BMPs No The facility has a stormwater detention basin located in the southeast corner of the property. The basin has a valve that stays in the closed position and rain infiltrates the ground without being discharged. This basin is used for possible spill containment at the railroad bulk loading location. Illicit discharges/connections No Groundwater seepage was observed entering a catch basin located adjacent to the east tank farm. Aboveground storage tank(s) - list No A list of tank sizes, contents, and secondary containment tank sizes & contents information is located within the facility's SPPP and SPCC. The facility has a combined aboveground storage tank capacity of 508,700 gallons, however tanks are never filled past 75% capacity. The facility routinely has --2500-3500, 55 -gallon barrels of assorted hazardous and non -hazardous materials stored in the warehouse. The storage warehouse has automated secondary containment dikes to prevent spills from leaving the facility. Underground storage tank(s) - fill port N/A All USTs were removed in the 1980s. area; list tank sizes & contents Outdoor material storage area(s) No Outdoor processing area(s) No Specific chemicals are loaded into barrels under a covered area at the "Acid Pad". This area has secondary containment and no areas are exposed to stormwater. Loading/unloading area(s) No Bulk material is unloaded from rail cars and tractor trailers in covered areas with secondary containment. • ob CHARLOTTE - To report pollution or drainage problems call: 311 http://stormwater.charmeck.org 0 4/4/2014 8:48:59AM Page 1 of 3 Site Inspection Deficiency Comment Vehicle/equipment area(s) - fueling, N/A washing, storage, etc. Oil/water separator and/or N/A pretreatment Waste storage/disposal area - No The facility has one general waste dumpster and appeared to dumpsters, scrap metal bins, etc. be in good condition. Food service area(s) N/A Indoor material storage area(s) No Fifty-five gallon barrels of hazardous and non -hazardous product are stored indoors. The warehouses have automated secondary containment dikes to prevent any spills from discharging outside. Indoor processing area(s) No Barrel loading area appeared to be in good condition with necessary secondary containment and Best Management Practices being used in these areas. Floor drains N/A Spill response equipment INo I Spill kits are located throughout the facility in strategic areas. Stormwater Pollution Plan Observed Comment Does the facility have a stormwater Yes pollution prevention plan? General location (USGS) map Yes The facility needs to create a general location map similar to the one provided to them in their NPDES permit (Part I, Page 2 of 2) and needs to include the latitude and longitude of all of the facility's outfalls. Narrative description of practices Yes Detailed site map Yes The facility's site map needs to be updated to include the receiving streams, and the percentage of impervious area for each outfall. List of significant spills (past 3 years) Yes Non-stormwater discharge evaluation Yes of outfall(s) Feasibility study No All necessary secondary containment Yes Discharge valves for secondary containment areas were not provided secure. Collected water evaluated and Yes Monthly logs are maintained for the discharge of stormwater documented prior to release from secondary containment areas. BMP Summary Yes Spill prevention and response plan Yes Included in SPPP and SPCC. Preventative maintenance and good Yes housekeeping plan Facility provides and documents Yes Annual training is conducted electronically and digital employee training documentation is available upon request. Training was last conducted in February and March 2014. List of responsible parties Yes Reviewed and updated annually Yes Stormwater facility inspection Yes The facility conducts weekly checks and the stormwater program conducted semi-annually system is included in this program. Qualitative/Analytical Monitoring Observed Comment Qualitative monitoring conducted Yes Qualitative monitoring has been properly conducted and semi-annually documented. The facility should ensure that they are using the most current NCDENR qualitative monitoring form. • obTo report pollution or drainage problems call: 311 �� http://stormwater.charmeck.org x� C[IARLOTTL� 4/4/2014 8:48:59AM Page 2 of 3 Qualitative/Analytical Monitoring Observed Comment Analytical monitoring conducted Yes Analytical monitoring has been properly conducted and semi-annually documented. The facility should ensure that they are using the appropriate NCDENR Discharge Monitoring Report form when submitting analytical results. Analytical monitoring from vehicle N/A maintenance Permit and Outfalls Observed Comment Copy of permit and certificate of Yes coverage onsite All outfalls observed Yes Outfall 1 had a dry weather flow during the inspection, but the facility had recently discharged their evaluated stormwater from the secondary containment area. Representative outfall status N/A documented by NCDWQ Annual no -exposure self N/A re -certification documented Additional Findings Observed Comment Observation(s) Observation(s) Observation(s) Phase II Permit Requirements Observed Comment Wastes removed from the MS4 N/A properly disposed Public transportation (roadway) N/A projects constructed within the last year Curb miles and parking lots swept N/A documented Catch basin and storm drain pipe N/A cleaning documented Records of pesticide/herbicide N/A applicator licenses maintained for staff and contractors If pesticide treatment areas N/A exceeded, was permit application submitted? Pesticide limitations in Goose Creek N/A Watershed followed • ob CHARLOTTE To report pollution or drainage problems call: 311 http://stormwater.charmeck.org 4/4/2014 8:48:59AM Page 3 of 3