HomeMy WebLinkAboutWQCS00054_DV-2018-0059 Response_20180829 Public Works 4600 Goldmine Rd Monroe NC 28110 Union County - --- T. 704-289-1434 www.unioncountync.gov EST. 1842 August 29, 2018 Steven Lewis PERCS Unit Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Notice of Violation &Assessment of Civil Penalty Case# DV-2018-0059 Collection System Permit—WQCS00054 Union County Dear Mr. Lewis: We are submitting payment for the assessed penalty of Case #DV-2018-0059. We have responded to the Notice of Intent Tracking # NOV-2018-DV-0184 on July 2, 2018 which is attached for the record. We assure you Union County takes sanitary sewer overflows seriously responding as quickly as possible should they occur as well as committing significant financial resources to upgrade our facilities and conduct I&I evaluations. If further information is required, please feel free to contact me at 704-296-4215. Thank you for your consideration on this issue. Sincerely, ZL/LLfi Andrew Neff, PE Water/Wastewater Division Director cc: Barry Gullet, PE, PW Executive Director Josh Brooks,Assistant Director,Water/Wastewater Operations Greg Morgan, Utility Field Services Superintendent/ORC Mr. W. Corey Basinger, Regional Supervisor inm ,14.10 2 Q, CCAS` 1 Public Works 500 North Main Street Suite#600 Union County ,;, Monroe,NC 28112 .•e_,r! " f �, T.704-296-4210 EST. 18-12 — www.unioncountync.gov July 2,2018 Mr.W. Corey Basinger Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 Subject: Notice of Violation & Intent to Issue Civil Penalty Tracking#: NOV-2018-DV-0184 Sanitary Sewer Overflows—May 2018 Collection System Permit—WQCS00054 Union County Dear Mr. Basinger: Union County has received the NOV referenced above for collection system overflows. Explanations of the overflows were on the BIMS Overflow Reporting Forms submitted by Union County Public Works (UCPW)to the NCDEQ. However, we have added a few additional facts in the explanations below: Incident# Date Location Response The SSO is a result of heavy rain impacting our collection system causing the WRF lift station and associated collection system to become overwhelmed.The pumps at the CCWRF influent lift station were running at max capacity,however with the rainfall and I&I the collection system upstream was surcharged.Once the rain and flooding receded,the collection system recovered shortly thereafter. 201800735 5/16/2018 4004 Sardis Church Union County Public Works has underwent a comprehensive Master 201800823 5/29/2018 Road(Across from CCWRF) Plan(Black&Veatch)and improvements strategy in efforts to better identify areas of improvement within the Crooked Creek basin. Efforts such as smoke testing,manhole inspections,flow monitoring studies(CDM Smith/Hydrostructures and Frazier Engineering)to identify areas of inflow and infiltration,capacity assessments of the CCWRF and associated lift stations,and lift station assessments to Identify aging infrastructure,among others. N*co o��� 4e.): cAA9/s As a result of these studies, UCPW has developed a CIP plan to address certain areas of concern. • CCWRF is undergoing a significant plant upgrade which includes new headworks,a 3MG EQ basin,and process improvement. Total cost is$7.775M that includes constructing a new 10.3 MGD influent PS,new headworks containing new bar screens,compactor,and grit removal/dewatering,3MG EQ basin,and relocation of 1200' of 18"gravity sewer.CDM Smith is the design engineer. MB Kahn is the general contractor. o Partial Substantial Completion of the plant upgrades was issued on June 27,2018 • 3 MG EQ basin is online • New in-plant lift station is online • Headworks including new bar screens, compactor,and grit removal,is online o The relocation of 1200'of 18"gravity sewer is scheduled to begin September 2018 with completion by October 2018. • I&I flow studies have been conducted by CDM Smith (Hydrostructures)and Frazier Eng. These studies have narrowed the basin into concentrated sub-basins to target I&l reduction.The resulting investigations determined a point repair list of the system. o 5/31/2018-RFP for I&l Sewer Repair and Rehab Services was issued. o 6/21/2018- UCPW received and reviewed proposals from two firms(Bionomics and AM- Liner) o 6/28/2018-UCPW is currently in contract negotiation with AM-Liner with a notice to proceed to be issued soon. In addition to the information provided above, the event that occurred on May 29, 2018 (Incident #20180023) resulted from large amounts of rain during a Severe Natural Condition. The severe natural condition was ratified by an issuance of Executive Order No. 44 declaring Union County, NC in a State of Emergency by Gov. Roy Cooper. UCPW has an aggressive Capital Improvement Program throughout the next 5 years. The projects include: > Crooked Creek Basin Improvements-$24,259,922.00 > Crooked Creek Interceptor Improvements Ph. 1 -$9,915,500.00 Suburban Estates PS and FM -$1,000,000.00 ➢ Waxhaw Interceptor—3,200,000.00 • > WW PS Improvements-$3,600,000.00 > Collection System SSES & Rehab—$2,080,000 (not including $85k annually in Operations) > PS Upgrades-$300,000 annually mr (•J „ „e„„ \yoW1 Page UCPW's current CIP projects are also ongoing with projects including: > Waxhaw Sewer Improvements-$295,000.00 > Blythe Creek Sewer Improvements-$3,083,200.00 • Forest Park PS Replacement& Interceptor Improvements-$2,540,000.00 > Crooked Creek I&I Study& Remediation -$2,538,300.00 > Suburban Estates PS replacement-$933,000.00 Union County Public Works continues to invest funds into SSES work, capital improvements, maintenance and operations to improve the wastewater collection system. If further information or details regarding the CCWRF Improvements, as well as, the CIP projects listed above are required, please feel free to contact Greg Morgan, Superintendent/ORC, at 704-289-3288 or myself at 704-296-4215. Thank you for your consideration on this issue. Sincerely, aticL ItJai( Andrew Neff, PE WateriWastewater Division Director cc: Barry Gullet, PE, PW Executive Director Josh Brooks,Assistant Director,Water/Wastewater Operations Greg Morgan, Utility Field Services Superintendent/ORC j ..,-&A cot,,, 4 I f* (--.7 t *F 116 ` ,Z' Page 3