Loading...
HomeMy WebLinkAboutNCS000517_2015 Annual Report SWMPA_20150701N.C. Division of Energy, Mineral and Land Resources (DEMLR) Stormwater Management Program Assessment 512 N.Salisbury Street , Raleigh NC 27604 Contained In this Report - Permit Number :NCS000517 Permit Number:NCS000517 County:Chowan WashingtonRegion: The Fund For Sandy Point NC LLC 2015 Report Number:NCS000517_2015 Background Information SW100010 APPLICANT STATUS INFORMATION SW100020 Name of Public Entity Seeking Permit Coverage The Fund for Sandy Point North Carolina, LLC SW100060 Jurisdictional Area (square miles) 1.45 square miles SW100070 Population Permanent 0 SW100080 Population Seasonal (if available) 0 SW100110 RPE / MS4 SYSTEM INFORMATION SW100120 Storm Sewer Service Area (square miles) 0.94 square miles SW100130 River Basin(s) Pasquotank SW100150 Estimated percentage of jurisdictional area containing the following four land use activities SW100160 Residential 47.4% SW100170 Commercial 5.3% SW100180 Industrial 0% SW100190 Open Space 47.3% SW100210 Do you have an inventory of storm water inlets, pipes, ditches, and open channels? No Comments:Upland construction has not started yet. No stormwater infrastructure exists at this point. SW100220 Do you know how many outfalls your city discharges to and where they are located? Yes Comments:Upland construction has not started yet. No stormwater infrastructure exists at this point. SW100260 EXISTING LOCAL WATER QUALITY PROGRAMS 3Page Number: SW100270 "Complete a table below for each river basin within the MS4 service area. The web sites and resource contacts listed below under Information Sources will help you locate the information you need. Storm water programs should be designed to address the specific needs of the community and water resources they are intended to protect. If you haven't done so already, collect information on your city's receiving waters and what pollutants and sources are impacting those waters. You should also know the various uses of your receiving waters so you can design a program to protect those uses. Complete a table below for each river basin within the MS4 service area. The web sites and resource contacts listed below under Information Sources will help you locate the information you need. " SW100280 River Basin SW100283 Program 1 SW100290 Receiving Stream Name Unnamed tributary to Albemarle Sound SW100300 Stream Segment 30 SW100310 Water Quality Classification SB SW100320 Use Support Rating SW100325 TMDL No SW100331 Program 2 SW100332 Receiving Stream Name Unnamed tributary to Albemarle Sound SW100333 Stream Segment 30 SW100334 Water Quality Classification SB SW100335 Use Support Rating SW100336 TMDL No SW100337 Program 3 SW100338 Receiving Stream Name Albemarle Sound SW100339 Stream Segment 30 SW10033A Water Quality Classification SB 4Page Number: SW10033B Use Support Rating SW10033C TMDL No SW10033D Program 4 SW100400 Your river basin table should list the primary streams that receive stormwater runoff from the MS4 jurisdictional area. Primary streams are those that are shown on a USGS topo maps or SCS map. Streams that are shown on the USGS or SCS maps but do not have a name shall be listed as an unnamed tributary to the nearest named downstream receiving water body. SW10033E Receiving Stream Name n/a SW10033F Stream Segment n/a SW10033G Water Quality Classification n/a SW10033H Use Support Rating SW10033I TMDL No SW100340 Local Nutrient Sensitive Waters Strategy No SW100350 Local Water Supply Watershed Program No SW100360 Delegated Erosion and Sediment Control Program No SW100370 CAMA Land Use Plan No SW100440 River basin you are in: http://h2o.enr.state.nc.us/basinwide/whichbasin.htm SW100450 Stream Index Numbers: http://h2o.enr.state.nc.us/bims/Reports/reportsWB.html SW100460 Water Quality Classifications: http://h2o.enr.state.nc.us/bims/Reports/reportsWB.html SW100470 Basinwide Water Quality Plans: http://h2o.enr.state.nc.us/basinwide/index.html SW100480 303(d) List: http://h2o.enr.state.nc.us/mtu/download.html SW100490 CO-PERMIT APPLICATION STATUS INFORMATION (Complete this section only if co-permitting) SW100500 Do you co-permit with a permitted Phase I entity? No 5Page Number: SW100510 If so, provide the name of that entity: n/a SW100550 Other Entity n/a SW100560 Have legal agreements been finalized between the co-permittees? No SW100570 RELIANCE ON ANOTHER ENTITY TO SATISFY ONE OR MORE OF YOUR PERMIT OBLIGATIONS SW100580 Do you intend that another entity perform one or more of your permit obligations? No SW100590 If yes, identify each entity and the element they will be implementing SW100600 Name of Entity n/a SW100610 Element they will implement n/a SW100620 Contact Person n/a SW100630 Contact Address n/a SW100640 Contact Telephone Number n/a SW100650 Are legal agreements in place to establish responsibilities? No SW100660 PERMITS AND CONSTRUCTION APPROVALS SW100700 State or NPDES Stormwater Permit Number (s) issued to the permittee NPDES Phase II Permit # NCS000517, NCDENR State Stormwater Permit #SW7060113 SW100920 MS4 CONTACT INFORMATION SW100930 Provide the following information for the person/position that will be responsible for day to day implementation and oversight of the stormwater program. SW100940 Name Sam Young SW100950 Title President, The Fund for Sandy Point North Carolina, LLC SW100960 Street Address 1820 Sandy Point Road 6Page Number: SW100970 PO Box PO Box 789 SW100980 City Edenton SW100990 State North Carolina SW101000 Zip 27932 SW101010 Telephone 252-562-3812 SW101020 Fax 252-491-8146 SW101030 E-Mail sam@dpz.com SW101040 "Permittee's Website" http://www.sandypoint.us SW101050 BMPs SW101060 Do you plan to add any new BMPs? Yes Comments:New BMP's are proposed to be installed with each new phase of construction. Typically, these BMP's will consist of integrated bioretention swale and infiltration trench systems flowing in a stepped manner to downstream bioretention parks and wetponds. These entities will be permitted with each phase of construction via NCDENR Coastal Stormwater permitting process with construction certified in accordance with the permit requirements and continued maintenance in accordance with permit and any permit conditions prescribed as a part of the Coastal Stormwater Permit Process. SW101070 Do you plan to amend any existing BMPs? No SW101080 If yes, please provide a BMP description, measurable goal, and implementation schedule for each new or amended BMP. If further space is needed, attach additional sheets. 7Page Number: Information specifically regarding the permit SW101460 Permitting Information SW101490 Does the Stormwater Management Program provide an organizational chart that shows where the responsible parties fit into the structure of the permittee's organization? Yes 8Page Number: Co-Permitting Information SW101570 Contract Operations SW101630 Does the Stormwater Management Program identify contract operations (i.e., Transit Authorities, Pesticide Application, Construction Projects, Street Washing, Maintenance of right-a-ways, GIS Mapping, Monitoring, Stream Restorations, Litter or Solid Waste Pickup, Recycling, Household Waste)? No Root Cause :Best Management Practice is not established Plan of Action:Upland development has not yet begun. Responsibility for all of these services remains with The Fund for Sandy Point, LLC at this time. Contracts for relevant services will be let as those services become necessary. 9Page Number: Public Education and Outreach SW101690 Public Education and Outreach SW101700 Does the Stormwater Management Program summarize what best management practices will be used, the frequency of the BMP, the measurable goals for each BMP, the implementation schedule, and the responsible person or position for implementation? Yes Comments:All of these elements are outlined in the Coastal Stormwater Permit for each phase. SW101710 Does the Stormwater Management Program identify the target audiences likely to have significant storm water impacts (including commercial, industrial and institutional entities) and why those target audiences were selected? Yes Comments:Upland construction has not yet begun. Population is currently zero. Anticipated target audience is identified in the Stormwater Management Program Outline and will be refined as Sandy Point is populated. SW101720 Does the Stormwater Management Program identify what target pollutant sources the permittee's public education program is designed to address and why those sources are an issue? Yes Comments:Upland construction has not yet begun. Population is currently zero. Anticipated target pollutant sources is identified in the Stormwater Management Program Outline and will be refined as Sandy Point is populated. SW101730 Does the Stormwater Management Program describe the permittee'ls outreach program (i.e., how the permittee plans to inform individuals and households about the steps they can take to reduce storm water pollution and how the permittee plans to inform individuals and groups on how to become involved in the storm water program? Yes Comments:Upland construction has not yet begun. Population is currently zero. Outreach program is outlined in the Stormwater Management Program Outline and will be refined as Sandy Point is populated. SW101750 Has the permittee develop general stormwater educational material to appropriate target groups? Instead of developing its own materials, the permittee may rely on state-supplied Public Education and Outreach materials, as available, when implementing its own program. Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. As Sandy Point is populated, the Stormwater Management Program will utilized state-supplied public education outreach materials. SW101760 Does general stormwater educational material include information on the following topics: SW101770 Household Hazardous Waste Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. It is anticipated that as Sandy Point is populated, the Stormwater Management Program will utilize state-supplied public education materials on Household Hazardous Waste. SW101780 Pet Waste Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. It is anticipated that as Sandy Point is populated, the Stormwater Management Program will utilize state-supplied public education materials on Pet Waste. 10Page Number: SW101790 Septic Systems Not Applicable Comments:There will be no individual septic systems within Sandy Point. SW101800 Lawn and Gardening Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. It is anticipated that as Sandy Point is populated, the Stormwater Management Program will utilize state-supplied public education materials on Lawn and Gardening methodologies. SW101810 Vehicle Washing Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. It is anticipated that as Sandy Point is populated, the Stormwater Management Program will utilize state-supplied public education materials on Vehicle Washing. SW101820 Erosion Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. It is anticipated that as Sandy Point is populated, the Stormwater Management Program will utilize state-supplied public education materials on Erosion Prevention. SW101830 Stream Buffers Not Applicable Comments:Sandy Point is a New Urban Waterfront and subsequently, there are no stream buffers associated with the development. SW101840 Flooding Not Applicable Comments:Flooding is addressed within the design of the stormwater management system of Sandy Point. Any adverse effects to that system resulting from unusual rainfall events will be the responsibility of the Sandy Point community maintenance entity. SW101850 Litter Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. It is anticipated that as Sandy Point is populated, the Stormwater Management Program will utilize state-supplied public education materials on Litter. SW101860 List any additional topics not identified above. N/A SW101870 Does the permitteenulls outreach program include: SW101880 Distributing printed educational material to general public through utility mail outs? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero, so no educational materials have been distributed. It is anticipated that as Sandy Point is populated, there will be opportunities to distribute materials with water and sewer bills. 11Page Number: SW101890 Distributing printed educational material to general public through special events (i.e., Information booth at festivals and fairs)? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero, so no educational materials have been distributed. It is anticipated that as Sandy Point is populated, there will be opportunities to distribute materials at special events. SW101900 Distributing printed educational material to business / industry? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. It is anticipated that as Sandy Point is populated, printed educational material will be distributed to businesses with the development. This process will be defined in greater specifics as businesses move into Sandy Point. SW101910 Presentations to local community groups? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. It is anticipated that as Sandy Point is populated, the Stormwater Management Program will include presentations to local community groups as those groups are established. SW101920 Stormwater programs/presentations for elementary or middle schools? Not Applicable Comments:While this element may be included in any given year, presentation to elementary or middle schools are not anticipated to be part of the Sandy Point outreach program since school-age children will attend larger Chowan County Schools outside of the community and will likely be a minority of the population at those schools. SW101930 Local TV or radio spots? Not Applicable Comments:Sandy Point will be a small community relative to most communities covered by the Phase II permits. There are no television or radio stations based from Sandy Point and more direct dissemination of education materials and bulletins via the Community Center, the Community Website, Newsletter, etc., are more appropriate to the scale of Sandy Point. SW101940 Print Media - Ads / Articles / Newsletters? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. It is anticipated that as Sandy Point is populated, the Stormwater Management Program will distribute information via the community website/newsletter. SW101950 Posters? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. It is anticipated that as Sandy Point is populated, the Stormwater Management Program will post notices and information in the Community Center. SW101960 Storm drain stenciling Not Applicable Comments:Upland construction has not yet begun. Where sensible, storm sewers will be stenciled with appropriate warnings/information. 12Page Number: SW101970 Other environmental education programs (i.e., Designate a "Keep SW Clean" month)? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. Potentially, Sandy Point's Community Center may be made available to groups such as the NC State Cooperative Extension Service or the Coastal Studies Institute for environmental education programs or workshops. SW101980 Workshops Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. Potentially, Sandy Point's Community Center may be made available to groups such as the NC State Cooperative Extension Service or the Coastal Studies Institute for environmental education programs or workshops. SW101990 Stream basin signage? Not Applicable SW102000 Has the permittee developed an internet web site for newsletter articles on stormwater, information on water quality, stormwater projects and activities, and ways to contact stormwater management program staff? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. A community website will be developed as the first properties are sold and stormwater information and links will be integrated into the website. SW102020 Does the permittee maintain an internet web site for newsletter articles on stormwater, information on water quality, stormwater projects and activities, and ways to contact stormwater management program staff? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. A community website will be developed as the first properties are sold and stormwater information and links will be integrated into the website. SW102060 Classroom Outreach SW102070 The number of educational materials distributed to schools. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102080 The number of schools that participate in municipal-sponsored storm water workshops or activities. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no workshops have been held. SW102090 The number of students that participate in municipal-sponsored storm water workshops or activities. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no workshops have been held. SW102100 The number of workshops held for teachers. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no workshops have been held. 13Page Number: SW102110 The number of certificates or other rewards given out to schools, classes, or students participating in storm water education. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material or certificates/awards have been distributed. SW102120 The number of students receiving storm water education as a regular part of the school curriculum. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102130 Displays, Signs, Presentations, Welcome Packets, and Pamphlets SW102150 The number of stormwater related displays at special events or meetings. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102160 The number of people at events who saw the display or took a pamphlet/booklet. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102170 Number of new homeowner welcome packets containing storm-water-related information. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102180 The number of signs and billboards with stormwater related messages. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102190 The number of stormwater related presentations at special events or meetings. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed or presented at special events. SW102200 Commercial Outreach SW102210 The number of educational materials that were distributed to business owners and operators. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102220 The number of businesses trained under the stormwater program. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational or training material has been distributed or training workshops been held. SW102310 Pet Waste Management 14Page Number: SW102320 The number of "clean up after your pet" signs posted in parks and neighborhoods. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no signs have been posted. SW102330 The number of dog-walking designated areas in parks. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no park areas have been designated as dog-walking areas at this time. SW102340 The number of posters/brochures put up in pet supply stores. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102350 The number of educational materials given out to pet owners. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102360 Promotional Giveaways SW102370 The number of items given out. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102380 The number of events attended (to give out items). 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational events have been held for promotional giveaways. SW102390 The number of partnerships for promotions (radio, TV, Businesses). 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102400 Proper Disposal of Household Hazardous Waste SW102410 The number of household hazardous waste curbside pickup days. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102420 The number of educational materials distributed to homeowners. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. 15Page Number: SW102430 The number of partnerships established with businesses. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no businesses are established to develop partnerships with at this time. SW102440 Outreach Programs to Minority and Disadvantaged SW102450 The number of brochures/posters created in non-English languages. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102460 The number of educational materials distributed in non-English languages. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102470 The number of partnerships established with minority organizations. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed to minority organizations. SW102480 The number of educational materials distributed to low-income neighborhoods. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102490 Attendance at workshops or public meetings held in low-income or minority neighborhoods. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no there are no existing neighborhoods to hold workshops or public meetings in at this time. SW102540 Using the Media SW102550 The number of public service announcements made on radio and TV. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102560 The number of stormwater related press releases/advertising. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102570 The number of stormwater related articles published. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102580 Water Conservation for Home Owners 16Page Number: SW102590 The number of partnerships established with local water utilities. 0 Comments:Upland construction has not yet begun. Population is currently zero. As the development is populated, water service will be provided by Chowan County and sewer service will be provided by The Fund for Sandy Point North Carolina, LLC. SW102600 The number of water conservation or stormwater related utility inserts that are distributed with utility bills. 0 Comments:Upland construction has not yet begun. Population is currently zero, so no educational material has been distributed. SW102610 A survey of homeowners about their water conservation behavior before and after the message is delivered. 0 Comments:Upland construction has not yet begun. Population is currently zero, so there are no existing homeowners to survey. 17Page Number: Public Involvement and Participation SW102620 Public Involvement and Participation SW102630 Does the Stormwater Management Program summarize what best management practices will be used, the frequency of the BMP, the measurable goals for each BMP, the implementation schedule, and the responsible person or position for implementation? Yes Comments:All of these elements are outlined in the Coastal Stormwater Permit for each phase. SW102640 Does the Stormwater Management Program identify the target audiences of the permitteenulls public involvement program, including a description of the types of ethnic and economic groups engaged? Yes Comments:Upland construction has not yet begun. Population is currently zero. Target Audiences have been identified in outline format. The outline will be refined as Sandy Point is populated. SW102650 Permittee are encouraged to actively involve all potentially affected stakeholder groups, including commercial and industrial businesses, trade associations, environmental groups, homeowners associations, and educational organizations, among others. SW102660 Does the Stormwater Management Program describe how the permittee will involve the public in the development and implementation of the permittee's storm water management program and the types of public involvement activities included in the permittee's program that the permittee plans to use to educate local community groups? Yes Comments:Upland construction has not yet begun. Population is currently zero. Public Involvement has been identified in outline format. The outline will be refined as Sandy Point is populated. SW102670 Has the permittee provided for the means to involve the public in the development and implementation of the permittee's storm water management program through: SW102680 Public Hearings, stakeholder meetings, or other meetings? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. SW102690 A Stormwater Steering Committee (or similar advisory group)? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. SW102700 Stream clean-up events? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. SW102710 Adopt-a-stream, Adopt-a-drain, Adopt-a-highway or Adopt-a-trail program? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. SW102720 Reforestation programs or wetland planting programs? Yes Comments:Working within the construct of the US Army Corps of Engineers Permit. The Fund for Sandy Point North Carolina, LLC has installed a breakwater to create a low-energy shallow water habitat for the establishment of submerged aquatic vegetation and has subsequently planted the low-energy area and has continued to monitor and maintain the planted area over the past six years. 18Page Number: SW102730 A stormwater hotline? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. SW102740 Volunteer monitoring programs? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. SW102750 Storm drain stenciling? Not Applicable Comments:Upland construction has not yet begun. No Storm drain infrastructure exists at this time. As stormwater infrastructure is installed, stenciling will be incorporated, as appropriate. SW102760 Encourage neighborhood coordinators to become active in the program? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. SW102770 Regional workshops? Yes Comments:Upland construction has not yet begun. Even though no infrastructure has been installed, The Fund for Sandy Point North Carolina, LLC has developed a presentation about the stormwater management system. This presentation was not utilized in the past year, but has been presented to a student group from NC State as well as the NC Clean Water Management Trust Fund Innovation Committee in past years. The presentation remains available for use in the future. SW102780 Telephone/Web/Mall surveys? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. SW102790 Working with citizen volunteers willing to educate others about the program? Not Applicable Comments:Upland construction has not yet begun. Population is currently zero. SW102830 Adopt-A-Stream Program SW102840 The number of participants in Adopt-A-Stream, Adopt-a-drain, Adopt-a-highway or Adopt-a-trail programs. 0 Comments:Upland construction has not yet begun. Population is currently zero. SW102850 The quantity of trash and debris removed by Adopt-A-Stream, Adopt-a-drain, Adopt-a-highway or Adopt-a-trail volunteers (in tons). 0 Comments:Upland construction has not yet begun. Population is currently zero. SW102860 Surveys SW102870 The number of citizens solicited to complete surveys. 0 Comments:Upland construction has not yet begun. Population is currently zero. 19Page Number: SW102880 The number of completed surveys. 0 Comments:Upland construction has not yet begun. Population is currently zero. SW102890 Hotlines SW102900 The number of calls received by a hotline(s). 0 Comments:Upland construction has not yet begun. Population is currently zero. SW102910 The number of problems/incidents remedied as a result of hotline calls. 0 Comments:Upland construction has not yet begun. Population is currently zero. SW102920 Reforestation Programs SW102930 The number of volunteer tree planters. 0 Comments:Upland construction has not yet begun. Population is currently zero. SW102940 The number of trees planted. 0 Comments:Upland construction has not yet begun. Population is currently zero. SW102950 The number of acres planted with trees. 0 Comments:Upland construction has not yet begun. Population is currently zero. SW102960 Public Hearings, stakeholder meetings, or other meetings SW102970 The number of meetings held. 0 Comments:Upland construction has not yet begun. Population is currently zero. SW102980 The number of attendees. 0 Comments:Upland construction has not yet begun. Population is currently zero. SW102990 The number of actions taken as a result of stakeholder meetings. 0 Comments:Upland construction has not yet begun. Population is currently zero. SW103000 Storm Drain Stenciling SW103010 The percent of drains stenciled. 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, stenciling will be incorporated, as appropriate. 20Page Number: SW103020 The number of stenciling volunteers. 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, stenciling will be incorporated, as appropriate. SW103030 The number of drains stenciled. 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, stenciling will be incorporated, as appropriate. SW103040 Stream Cleanup SW103050 The number of stream cleanups. 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, stream cleanup programs will be incorporated, as appropriate. SW103060 The number of cleanup participants. 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, stream cleanup programs will be incorporated, as appropriate. SW103070 The quantity of waste collected as a result of cleanup efforts (in tons). 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, stream cleanup programs will be incorporated, as appropriate. SW103080 The number of stream miles cleaned. 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, stream cleanup programs will be incorporated, as appropriate. SW103090 Volunteer Monitoring SW103100 The number of volunteers participating in monitoring programs. 0 Comments:Upland construction has not yet begun. Population is currently zero. SW103110 The frequency of monitoring in the watershed (D-Daily, W-Weekly, B-Bimonthly, M-Monthly, Q-Quarterly and A-annually). 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, watershed monitoring programs will be incorporated, as appropriate. 21Page Number: SW103120 The number of volunteer monitoring stations established in the watershed. 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, watershed monitoring programs will be incorporated, as appropriate. SW103130 The number of volunteer monitoring training sessions held. 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, watershed monitoring programs will be incorporated, as appropriate. SW103140 The number of actions that were taken as a result of the monitoring data -collected by volunteers. 0 Comments:Upland construction has not yet begun. No storm drain infrastructure exists at this time. As stormwater infrastructure is installed, watershed monitoring programs will be incorporated, as appropriate. SW103150 Wetland Plantings SW103160 The acres of land planted. 0-N/A Comments:Introducing new wetlands is not part of the Sandy Point Stormwater Management Program. Significant acreage of existing wetlands are being preserved within Sandy Point. SW103170 The number of volunteers that participated in planting. 0-N/A Comments:Introducing new wetlands is not part of the Sandy Point Stormwater Management Program. Significant acreage of existing wetlands are being preserved within Sandy Point. SW103180 The number of planting events held. 0-N/A 22Page Number: Illicit Discharge Detection and Elimination SW103190 Illicit Discharge Detection and Elimination SW103200 Does the Stormwater Management Program summarize what best management practices will be used, the frequency of the BMP, the measurable goals for each BMP, the implementation schedule, and the responsible person or position for implementation? Yes Comments:All of these elements are defined in the NCDENR Coastal Stormwater Management Permit for each phase of the project. SW103210 Stormwater Map SW103220 Has the permittee will developed or the in the process of developing a storm sewer map showing the location of all outfalls and the names and location of all receiving waters? Yes Comments:Upland construction has not yet begun. Drainage areas are mapped in the construction plans which are permitted for each phase through NCDENR Coastal Stormwater Permit Process. SW103260 Does stormwater mapping include drainage areas? Yes Comments:Upland construction has not yet begun. Drainage areas are mapped in the construction plans which are permitted for each phase through the NCDENR Coastal Stormwater Permit Process. Outside of extreme rainfall conditions, there are no direct discharges (outfalls) to surface waters. SW103270 Does stormwater mapping include receiving streams? Yes Comments:Upland construction has not yet begun. Drainage areas are mapped in the construction plans which are permitted for each phase through the NCDENR Coastal Stormwater Permit Process. Outside of extreme rainfall conditions, there are no direct discharges (outfalls) to surface waters. SW103280 Does stormwater infrastructure mapping include outfalls? Yes Comments:Upland construction has not yet begun. Drainage areas are mapped in the construction plans which are permitted for each phase through the NCDENR Coastal Stormwater Permit Process. Outside of extreme rainfall conditions, there are no direct discharges (outfalls) to surface waters. SW103290 Estimated or actual number of outfalls. 0 Comments:Upland construction has not yet begun. Drainage areas are mapped in the construction plans which are permitted for each phase through the NCDENR Coastal Stormwater Permit Process. Outside of extreme rainfall conditions, there are no direct discharges (outfalls) to surface waters. SW103300 Does stormwater infrastructure mapping include sewer pipes? Yes Comments:Upland construction has not yet begun. Proposed sewer locations are mapped in the construction plans which are permitted for each phase through the NCDENR Coastal Stormwater Permit. SW103310 Does stormwater infrastructure mapping include structures (e.g., detention ponds and other structural BMPs? Yes Comments:Upland construction has not yet begun. Proposed BMP's are mapped in the construction plans which are permitted for each phase through the NCDENR Coastal Stormwater Permit. 23Page Number: SW103320 Estimated or actual number of structural BMPs? 0-n/a Comments:Upland construction has not yet begun. BMP design is included in the Construction Plans which are permitted for each phase through the NCDENR Coastal Stormwater Permit Process. The actual number of BMP's will be a function of the detailed design of each phase. No stormwater infrastructure has been installed at this time. SW103330 Percent of outfall mapping complete. 0-n/a Comments:Upland construction has not yet begun. Stormwater mapping is included in the construction plans which are permitted for each phase through the NCDENR Coastal Stormwater Permit Process. Outside of extreme rainfall conditions, there are no direct discharges (outfalls) to surface waters. SW103340 Does the Stormwater Management Program describe the mechanism (ordinance or other regulatory mechanism) the permittee will use to effectively prohibit illicit discharges into the MS4 and why the permittee chose that mechanism? Yes Comments:Prohibition of illicit discharges shall be formalized via inclusion in the homeowner's documents. SW103350 Does the Stormwater Management Program describe the permittee's plan to ensure appropriate enforcement procedures and actions such that the permittee's illicit discharge ordinance (or other regulatory mechanism) is implemented? Yes Comments:All homeowners document, community documents, and deed restrictions are enforceable, ultimately via court action. The management of Sandy Point will issue notices of violation, where necessary, without the court's involvement in order to bring violators into compliance. SW103360 Does the Stormwater Management Program describe the permittee's plan to detect and address illicit discharges to the permittee's system, including discharges from illegal dumping and spills? Yes SW103370 The permittee must implement an inspection program to detect dry weather flows at system outfalls and, at a minimum, must address the following: SW103380 Procedures for locating priority areas. SW103390 Procedures for tracing the source of an illicit discharge, including the specific techniques permittee will use to detect the location of the source. SW103400 Procedures for removing the source of the illicit discharge. SW103410 Procedures for evaluation of the plan to detect and eliminate illicit discharges. SW103420 Does the Stormwater Management Program address the following categories of non storm water discharges or flows (i.e., illicit discharges) only if permittee identify them as significant contributors of pollutants to the permitteenulls small MS4: Yes SW103430 landscape irrigation; SW103440 water line flushing; SW103450 diverted stream flows; SW103460 uncontaminated groundwater infiltration; 24Page Number: SW103470 discharges from potable water sources; SW103480 air conditioning condensate (commercial/residential); SW103490 springs; SW103500 footing drains; SW103510 residential and charity car washing; SW103520 dechlorinated swimming pool discharges; SW103530 rising groundwaters; SW103540 uncontaminated pumped groundwater; SW103550 foundation drains; SW103560 irrigation waters (does not include reclaimed water as described in 15A NCAC 2H .0200); SW103570 water from crawl space pumps; SW103580 lawn watering; SW103590 flows from riparian habitats and wetlands; SW103600 street wash water; SW103610 flows from emergency fire fighting. SW103620 The permittee may also develop a list of other similar occasional, incidental non-storm water discharges that will not be addressed as illicit discharges. SW103630 These non-storm water discharges must not be reasonably expected (based on information available to the permittees) to be significant sources of pollutants to the Municipal Separate Storm Sewer System, because of either the nature of the discharges or conditions the permittee has established for allowing these discharges to the permittee's MS4 (e.g., activity with appropriate controls on frequency, proximity to sensitive waterbodies, BMPs). SW103640 Does the Stormwater Management Program document local controls or conditions placed on discharges and a provision prohibiting any individual non-storm water discharge that is determined to be contributing significant amounts of pollutants to the permittee's MS4? Yes Comments:Illicit unpermitted discharges will be prohibited via homeowner's document, community documents, and/or deed restrictions. This language will be developed or inclusion in these documents prior to the first Sandy Point properties being sold. SW103650 In addition to conducting training for selected staff on detecting and reporting illicit discharges," does the Stormwater Management Program describe how the permittee plans to inform businesses and the general public of hazards associated with illegal discharges and improper disposal of waste? Yes Comments:This is covered under "Public Education and Outreach". SW103700 Does the Stormwater Management Program establish and publicize a reporting mechanism for the public to report illicit discharges? Yes 25Page Number: SW103710 Does the Stormwater Management Program establish an illicit discharge management tracking system? Yes SW103720 Does the Stormwater Management Program establish a stormwater incident response program? Yes SW103730 Does the Stormwater Management Program provide for an illicit discharge brochure, poster or other educational material development and distribution? Yes SW103740 Does the Stormwater Management Program provide for a septic system program in conjunction with the Health Department? Not Applicable Comments:Sandy Point will have no individual septic systems. SW103750 Does the Stormwater Management Program provide street sweeping, inspecting and cleaning inlets and outfalls? Yes SW103760 Does the Stormwater Management Program establish procedures to coordinate efforts to eliminate illicit discharge cross connections between sanitary and storm sewers? Yes Comments:All construction within Sandy Point will be performed as a part of a master development plan and will be subjected to construction inspections and on-site management to ensure compliance. SW103770 Does the Stormwater Management Program establish procedures to maintain the sanitary sewer system? Not Applicable Comments:The Sanitary Sewer System has been permitted with NCDENR and will be managed in accordance with that permit. The management entity has been established as a public utility. SW103780 Does the Stormwater Management Program establish a Household Waste Recycling Program? Yes SW103850 Identifying Illicit Connections SW103860 The number of sites prioritized for inspection. 0 Comments:Upland construction has not yet begun. Current population is zero. SW103870 The number of illicit connections reported by citizens. 0 Comments:Upland construction has not yet begun. Current population is zero. SW103880 The number of illicit connections found. 0 Comments:Upland construction has not yet begun. Current population is zero. SW103890 The number of illicit connections repaired/replaced. 0 Comments:Upland construction has not yet begun. Current population is zero. 26Page Number: SW103900 The number of illicit connection referrals. 0 Comments:Upland construction has not yet begun. Current population is zero. SW103910 Illegal Dumping SW103930 The number of illegal dumps reported by citizens. 0 Comments:Upland construction has not yet begun. Current population is zero. SW103940 The number of penalties enforced upon the participants of illegal dumps. 0 Comments:Upland construction has not yet begun. Current population is zero. SW103950 The number of illegal dump or sit-out clean-ups completed. 0 Comments:Upland construction has not yet begun. Current population is zero. SW103970 Industrial or Business Connections SW103980 The number of dry weather tests/inspections completed. 0 Comments:Upland construction has not yet begun. Current population is zero. SW103990 The number of high-risk connections prioritized. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104000 The number of illicit connections reported by employees or businesses. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104010 The number of illicit connections found. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104020 The number of illicit connections repaired/replaced. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104030 Recreational Sewage SW104040 The number of pump-out stations. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104050 The number of no-discharge areas created. 0 Comments:Upland construction has not yet begun. Current population is zero. 27Page Number: SW104060 The number of new signs added to inform users of dumping policies and alternatives. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104070 The number of enforced cases of recreational dumping. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104080 The number of citizen complaints made reporting illegal action. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104090 Sanitary Sewer Overflows (SSO) SW104100 The number of overflows reported. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104110 The number of overflow causes that were identified during inspections. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104120 The number of sites repaired. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104130 Wastewater Connections to the Storm Drain System SW104140 The number of rerouted connections. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104150 The number of dry weather monitoring activities performed. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104160 The number of unwarranted connections reported. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104170 The number of unwarranted connections found. 0 Comments:Upland construction has not yet begun. Current population is zero. SW104180 The number of unwarranted connections repaired/replaced. 0 Comments:Upland construction has not yet begun. Current population is zero. 28Page Number: Construction Site Stormwater Runoff Control SW104190 Construction Site Stormwater Runoff Control SW104200 Does the permittee rely on the NCDENR Division of Land Resources (DLR) Erosion and Sediment Control Program to comply with this minimum measure for private development? (If no, go to SW104220) Yes SW104210 If the permittee relies on the NCDENR Division of Land Resources (DLR) Erosion and Sediment Control Program to comply with this minimum measure for private development, than the NCDENR Division of Land Resources Erosion and Sediment Control Program effectively meets the requirements of the Construction Site Runoff Controls by permitting and controlling development activities disturbing one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development. SW104220 Does the permittee rely on rely on a locally delegated program to meet the minimum measure for private development requirements? (If no, go to SW104300) Yes Comments:Additionally, Sandy Point has developed a specific Erosion Control Specification which all Contractors working within Sandy Point will be required to conform with. This Erosion Control Specification has been reviewed by NCDENR as part of the Erosion Control Plan Approval as well as part of the Coastal Stormwater Permit Application. SW104230 If the permittee relies on a local government to comply with this minimum measure, does the permittee conduct random inspections of local land disturbing activities that have a sediment and erosion control permit, issued by local government? Not Applicable SW104250 If the permittee relies on a local government to comply with this minimum measure, does the permittee report sites that are not in compliance with their sediment and erosion control permits to the local government? Not Applicable SW104260 If the permittee relies on a local government to comply with this minimum measure, does the permittee report unresolved concerns to the local government? Not Applicable SW104270 If the permittee relies on a local government to comply with this minimum measure, does the permittee maintain a record of unresolved concerns reported to the local government? Not Applicable SW104300 Does the permittee have a delegated program to meet the requirements of an Erosion and Sediment Control Program for private development? (If no go to SW104450) Yes Comments:Additionally, Sandy Point has developed a specific Erosion Control Specification which all Contractors working within Sandy Point will be required to conform with. This Erosion Control Specification has been reviewed by NCDENR as part of the Erosion Control Plan Approval as well as part of the Coastal Stormwater Permit Application. SW104310 Does the Stormwater Management Program summarize what best management practices will be used, the frequency of the BMP, the measurable goals for each BMP, the implementation schedule, and the responsible person or position for implementation? Not Applicable 29Page Number: SW104320 Does the Stormwater Management Program describe the mechanism (ordinance or other regulatory mechanism) the permittee will use to require erosion and sediment controls at construction sites and why the permittee chose that mechanism? Not Applicable SW104330 If permittee needs to develop this mechanism, the permittee's plan should describe the plan and a schedule to do so. SW104340 Does the Permittee conduct site plan review(s), including the review of pre-construction site plans, which incorporate consideration of potential water quality impacts? Not Applicable SW104350 The Stormwater Management Program must describe procedures and the rationale for how permittee will identify certain sites for site plan review, if not all plans are reviewed and describe the estimated number and percentage of sites that will have pre-construction site plans reviewed. SW104360 Does the Stormwater Management Program describe the permittee's plan to ensure compliance with the permittee's erosion and sediment control regulatory mechanism, including the sanctions and enforcement mechanisms permittee will use to ensure compliance? Not Applicable SW104370 The Stormwater Management Program must describe the permittee's procedures for when the permittee will use certain sanctions. Possible sanctions include non-monetary penalties (such a stop work orders), fines, bonding requirements, and/or permit denials for non-compliance. SW104380 Does the Stormwater Management Program describe the permittee's procedures for site inspection and enforcement of control measures, including how the permittee will prioritize sites for inspection? Not Applicable SW104430 Does the Stormwater Management Program require construction site operators to implement erosion and sediment control BMPs and to control construction site wastes that may cause adverse water quality impacts? Not Applicable SW104440 Does the Stormwater Management Program require construction site operators to control waste such as discarded building materials, concrete truck washout, chemicals, litter, and sanitary waste at the construction site that may cause adverse impacts to water quality? Not Applicable SW104450 Does the permittee provide and promote a means for the public to notify the appropriate authorities of observed erosion and sedimentation problems? Yes Comments:This is addressed under "Public Education and Outreach". SW104460 Consider coordinating this requirement with the permittee's public education program. Publicize the procedures and contact information. The procedures must lead directly to a site inspection or other timely follow-up action. The permittee may implement a plan promoting the existence of the NCDENR, Division of Land Resources "Stop Mud" hotline to meet the requirements of this paragraph. SW104470 Staff Training and Certification SW104480 The number of training and certification programs offered to staff. 0 Comments:Upland construction has not yet begun. Current population of Sandy Point is zero. 30Page Number: SW104490 The number of trained staff inspectors. 0 Comments:Upland construction has not yet begun. Current population of Sandy Point is zero. SW104500 The number of certified staff inspectors. 0 Comments:Upland construction has not yet begun. Current population of Sandy Point is zero. SW104510 The number of certified contractors by permittee. 0 Comments:Upland construction has not yet begun. Current population of Sandy Point is zero. SW104520 Inspection and Enforcement SW104530 The number of plans reviewed greater than one acre. 0 Comments:Upland construction has not yet begun. Current population of Sandy Point is zero. SW104590 The number of enforcement actions or NOVs taken. 0 Comments:Upland construction has not yet begun. Current population of Sandy Point is zero. 31Page Number: Post-Construction Storm Water Management in New Development and Redevelopment SW104890 Post-Construction Storm Water Management in New Development and Redevelopment SW104900 Does the Stormwater Management Plan summarize what best management practices will be used, the frequency of the BMP, the measurable goals for each BMP, the implementation schedule, and the responsible person or position for implementation? Yes Comments:All of these elements are outlined in the Coastal Stormwater Permit for each Phase of development. SW104910 Does the Stormwater Management Program describe how the permittee will develop an ordinance or other regulatory mechanism to implement and enforce a program to address post construction runoff from new development and redevelopment projects? Yes Comments:Essentially, the NPDES Permit and it's associated processes and procedures define the mechanism and the program to address post-construction runoff from newly developed areas and redevelopment projects. All of Sandy Point fall under the maintenance responsibility of The Fund for Sandy Point North Carolina, LLC. SW104920 The permittee's ordinances, and subsequent modifications, will be reviewed and approved by DWQ prior to implementation. The approval process will establish subsequent timeframes when DWQ will review performance under the ordinance(s). The reviews will occur, at a minimum, every five years. Regulated public entities without ordinance making powers must demonstrate similar actions taken in their post construction stormwater management program to meet the minimum measure requirements. SW104930 Does the Stormwater Management Program describe how the permittee will ensure the long-term operation and maintenance (O&M) of BMPs? Yes SW104940 Options to help ensure that future O&M responsibilities are clearly identified include an agreement between the permittee and another party, such as the post-development landowners or regional authorities. Yes SW105000 Does the Stormwater Management Program explain how the permittee will control the sources of fecal coliform to the maximum extent practicable? Yes SW105010 Do new development and redevelopment codes allow for the following: SW105020 Bioretention basins? Yes Comments:Sandy Point is being developed as an entirely new development utilizing community stormwater treatment consisting primarily of infiltration trenches, bioretention basins, and wet ponds. Some other elements may be incorporated into the design of individual phases. Future development/redevelopment options will only be limited by NCDENR permitting and engineering judgment (as reviewed by The Fund for Sandy Point's Engineer). SW105030 Alternative pavers? Yes SW105040 Buffer zones? Yes 32Page Number: SW105050 Dry ponds? Not Applicable SW105060 Wet ponds? Yes SW105070 Alternatives to curb and gutter? Yes SW105080 Grass swales? Yes SW105090 Grassed filter strips? Yes SW105100 Green parking lots? Yes SW105110 In-line storage systems? Yes SW105120 Infiltration basins? Yes SW105130 Infiltration trenches? Yes SW105140 Manufactured products installed in storm water inlets? Not Applicable SW105150 Developments and redevelopments that use narrow streets? Yes SW105160 On-lot treatment? Yes SW105170 Open space design? Yes SW105180 Sand and organic filters? Yes SW105190 Porous pavement? Yes SW105200 Stormwater wetlands? Yes SW105210 Urban forestry? Yes 33Page Number: SW105220 Does the Stormwater Management Program, in coordination with the County Health Department, ensure proper operation and maintenance of on-site wastewater treatment systems for domestic wastewater? Not Applicable Comments:There will be no septic systems in Sandy Point. SW105230 Does the Stormwater Management Program provide training for staff and developers/builders? Not Applicable Comments:Upland construction has not yet begun. Current population of Sandy Point is zero. SW105260 BMP Inspection and maintenance SW105270 Are annual inspection reports required of permitted structural BMPs performed by a qualified professional? Not Applicable Comments:Upland construction has not yet begun. No infrastructure exists at this time. Inspections will be conduced in accordance with the maintenance schedule approved with NCDENR Coastal Stormwater Permit by qualified personnel once BMP's have been installed. SW105280 The number of BMP inspections and/or maintenance activities. 0 Comments:Upland construction has not yet begun. No infrastructure exists at this time. Inspections will be conduced in accordance with the maintenance schedule approved with NCDENR Coastal Stormwater Permit by qualified personnel once BMP's have been installed. SW105290 The number of problems that were identified and remedied. 0 Comments:Upland construction has not yet begun. Current population of Sandy Point is zero. SW105300 New Development and Redevelopment BMP Summary SW105310 The number of development/redevelopment projects regulated for post-construction stormwater control. 0 Comments:Upland construction has not yet begun. Current population of Sandy Point is zero. SW105550 Evaluation of Post-construction Stormwater Management Program Measures SW105560 Model Practices: For those areas within the jurisdictional area of the permittee that are not subject to the post-construction stormwater management provisions of another existing state stormwater management program, does the permittee's Post-construction Stormwater Management Program equal or exceed the stormwater management and water quality protection provided by the following model practices: SW105570 Does the permittee issue local stormwater management permits to new development or redevelopment projects as either a low density project or a high density project? Not Applicable Comments:All infrastructure will ball under the coverage of NCDENR Coastal Stormwater Permits for each phase. All other construction (homes on individual lots, etc.) will be required to conform to the Construction Specifications and Stormwater Maintenance Specifications for Sandy Point which have been reviewed and approved by NCDENR. 34Page Number: SW105580 Do projects permitted as a low density projects meet the following criteria: Not Applicable Comments:Upland construction has not yet begun. No infrastructure exists at this time. When low-density areas of the west side of Sandy Point are permitted, they will conform fully to low density requirements. SW105590 No more than two dwelling units per acre or 24% built-upon area; and, SW105600 Use of vegetated conveyances to the maximum extent practicable? SW105610 Are projects permitted as high density projects meet the following requirements: Yes Comments:Upland construction has not yet begun. No infrastructure exists at this time. Phase one of Sandy Point has been permitted and conforms completely to requirements outlined. Each subsequent phase will also adhere to the same requirements. SW105620 The stormwater control measures control and treat the difference between the pre-development and post-development conditions for the 1-year 24-hour storm. Runoff volume draw-down time must be a minimum of 24 hours, but not more than 120 hours; SW105630 All structural stormwater treatment systems are designed to achieve 85% average annual removal of total suspended solids; and SW105640 Stormwater management measures comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c); SW105650 Are deed restrictions and/or protective covenants required by the locally issued permit and incorporated by the development to ensure that subsequent development activities maintain the development (or redevelopment) consistent with the approved plans? Not Applicable Comments:Upland construction has not yet begun. No infrastructure exists at this time. There are a series of covenants, as outlined in this report and as required by stormwater permits, current and future, that will be incorporated into ownership document for each property within Sandy Point. SW105660 Are all built-upon areas at least 30 feet landward of perennial and intermittent surface waters? Not Applicable Comments:As a "New Urban Waterfront", Sandy Point is permitted to build within the 30 foot buffer with appropriate stormwater infrastructure and management practices. This NPDES permit is a part of these requirements which allow the construction within the buffer. All stormwater requirements of the "New Urban Waterfront" rules have been satisfied. SW105670 Watershed Protection Plans: Has the Permittee developed, adopted, and implemented a comprehensive watershed protection plan to meet part, or all, of the requirements for post-construction stormwater management? Yes Comments:Project is subject to Coastal State Stormwater Program as well as this NPDES permit, which is specific to the development. SW105680 Areas within the jurisdictional area of the permittee that are already subject to the existing state stormwater management programs are deemed compliant with the post-construction stormwater management model practices identified in (a). The programs are: the Water Supply Watershed protection programs for WS-I – WS-IV waters, the HQW and ORW waters management strategies, the Neuse River Basin Nutrient Sensitive Waters (NSW) Management Strategy, the Tar-Pamlico River Basin Nutrient NSW Strategy, and the Randleman Lake Water Supply Watershed program. 35Page Number: SW105690 A regulated entity may develop its own comprehensive watershed plan, use the model ordinance developed by the Commission, design its own post-construction practices based on the Division’s guidance and engineering standards for best management practices, or incorporate the post-construction model practices to satisfy, in whole or in part, the requirements for post-construction stormwater management. SW105700 Additional Requirements for Trout Waters: Has the permittee developed, adopted, and implemented an ordinance (or similar regulatory mechanism) to ensure that the best management practices selected do not result in a sustained increase in the receiving water temperature? Not Applicable SW105710 Additional Requirements for Nutrient Sensitive Waters SW105720 Has the permittee developed, adopted, and implemented an ordinance (or similar regulatory mechanism) to ensure that the best management practices for reducing nutrient loading is selected? Yes Comments:BMP's for the entire development fall under the permitting requirements for each phase of the development and will be reviewed and approved by NCDENR. SW105730 Has the permittee developed and included a nutrient application (fertilizer and organic nutrients) management program in the Post-construction Stormwater Management Program? Yes Comments:Initial fertilization in order to establish vegetation is covered in the Sandy Point Construction Specifications. Common areas will be maintained by a landscape professional hired by The Fund for Sandy Point. BMP's will be maintained in accordance with the maintenance requirements approved by NCDENR with each phase of construction. Maintenance of individual lawns will be left up to the homeowner, but proper fertilization techniques will be a component of the public outreach and education efforts as outlined earlier in this report. SW105740 In areas where the Environmental Management Commission has approved a Nutrient Sensitive Water Urban Stormwater Management Program, the provisions of that program fulfill the nutrient loading reduction requirement. 36Page Number: Pollution Prevention/Good Housekeeping for Municipal Operations SW105750 Pollution Prevention/Good Housekeeping SW105760 Does the Stormwater Management Program summarize what best management practices will be used, the frequency of the BMP, the measurable goals for each BMP, the implementation schedule, and the responsible person or position for implementation? Yes Comments:All of these elements are outlined in the Coastal Stormwater Permit for each phase. SW105770 Does the Stormwater Management Program list the permittee’s municipal operations that are impacted by this operation and maintenance program? Yes SW105780 The permittee must also include a list of industrial facilities the permittee owns or operates that are subject to NPDES Stormwater General Permits or individual NPDES permits for discharges of storm water associated with industrial activity that ultimately discharge to the permittee’s MS4, including the permit number and certificate of coverage number for each facility. SW105790 Municipal Operations include: SW105800 Transfer Station No SW105810 Fleet Maintenance No SW105820 Airport No SW105830 Animal Shelters No SW105840 Waste Water Treatment Plan Yes SW105850 Water Plants No SW105860 Construction Debris Site No SW105870 Transit Authority No SW105880 Public Works Operations Yes Comments:It is anticipated that there may be a "public works" type facility for the maintenance of Sandy Point. When such a facility is established, it will be incorporated into the design and NCDENR permitting of the appropriate phase. SW105890 Prisons No 37Page Number: SW105900 Emergency Service Facilities No SW105910 Fire Stations No SW105920 Landfills No SW105930 Schools No SW105940 Parks Yes Comments:Most of the parks within Sandy Point are anticipated to also serve as BMP facilities for surrounding developed areas. All of these parks will be included in the NCDENR Coastal permitting for the phase in which they are located. SW105950 Waste Recycling Centers No SW105960 Vehicle Maintenance Operations No SW105970 Vehicle Wash Operations No SW105980 Pump Stations or Lift Stations Yes SW105990 Other: N/A SW106000 In addition to conducting staff training on stormwater pollution prevention and good housekeeping procedures, does the Stormwater Management Program describe any government employee training program the permittee will use to prevent and reduce storm water pollution from activities such as park and open space maintenance, fleet and building maintenance, new construction and land disturbances, and storm water system maintenance? Not Applicable Comments:Upland construction has not yet begun. Current population is zero and there are no on-site staff. Sandy Point staff will be trained appropriately on good housekeeping procedures relative to the work they are responsible for performing. SW106010 Does the Stormwater Management Program describe any existing, available training materials the permittee plans to use? Not Applicable Comments:Upland construction has not yet begun. Current population is zero and there are no on-site staff. Sandy Point staff will be trained appropriately on good housekeeping procedures relative to the work they are responsible for performing. SW106030 Does the Stormwater Management Program describe maintenance activities, maintenance schedules, and long-term inspection procedures for controls to reduce floatables and other pollutants to the permittee’s MS4? Yes 38Page Number: SW106050 Does the Stormwater Management Program describe the permittee’s procedures for the proper disposal of waste removed from the permittee’s MS4 and the permittee’s municipal operations, including dredge spoil, accumulated sediments, floatables, and other debris? Yes SW106110 Industrial Activities SW106120 Did the permittee conduct annual review of the industrial activities with a Phase I NPDES stormwater permit owned and operated by the permittee? Not Applicable SW106130 Did the permittee review the Stormwater Pollution Prevention Plan, the timeliness of any monitoring reports required by the Phase I permit, and the results of inspections and subsequent follow-up actions at the facilities. Not Applicable SW106160 Does the permittee have a Used Oil Recycling Program? Not Applicable Comments:Upland construction has not yet begun. Current population is zero. SW106170 Does the permittee have a street sweeping program? Yes SW106180 Does the permittee have a program to clean catch basins, storm lines, and ditches? Yes SW106190 Does the permittee review fertilizer and pesticide use programs? Not Applicable Comments:Upland construction has not yet begun. Current population is zero. SW106200 Does the permittee have spill prevention plans at city facilities? Yes Comments:A draft spill prevention plan has been established for the harbor. Spill prevention plans for other facilities will be tailored specifically for those facilities as they are permitted. SW106210 City Facilities Inspections SW106220 Does the permittee inspect vehicle washing fueling, storage and maintenance areas? Not Applicable Comments:Upland development has not yet begun. Current population is zero. SW106230 Does the permittee inspect material storage areas (i.e., storage areas for sand, salt, fertilizers, pesticides and other chemicals)? Not Applicable Comments:Upland development has not yet begun. No infrastructure has been installed at this time. Once a maintenance facility is established, inspectors of practices will include inspections of the maintenance facility and BMP's. SW106240 Does the permittee inspect stormwater outfalls? Not Applicable Comments:Upland development has not yet begun. No infrastructure has been installed at this time. With the exception of extraordinary rainfall events, no discharges will occur to surface waters (i.e., no outfalls). 39Page Number: SW106250 Does the permittee inspect culverts? Not Applicable Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106260 Does the permittee inspect swales/ditchs? Not Applicable Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106270 Does the permittee inspect catch basins, inlets, and grates? Not Applicable Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106280 Does the permittee inspect MS4 pipes? Not Applicable Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106290 Does the permittee inspect solid and hazardous waste management facilities and recycling centers? Not Applicable Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106300 Does the permittee inspect animal shelters and pounds? Not Applicable Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106310 Does the permittee inspect parking lots? Not Applicable Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106320 Does the permittee inspect parks and open spaces? Not Applicable Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106330 The number of inspections conducted. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106400 Automobile Maintenance SW106410 The number of employees trained in preventing pollution from automobile maintenance activities. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106420 The number of sites rewarded as being a “clean site” under a rewards program. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106430 The number of spills reported. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. 40Page Number: SW106440 The number of educational materials distributed at garages, auto shops, and other automobile-related businesses. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106450 Hazardous Materials Storage SW106460 The total number of storage facilities equipped to store hazardous materials. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106470 The number of regularly inspected storage units. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106480 The number of employees trained in hazardous material storage and maintenance. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106490 Illegal Dumping SW106500 The number of “no dumping” signs posted. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106510 The number of educational materials distributed. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106520 The number of reports of illegal dumping received. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106530 The number of dump sites and/or illegal sit-outs cleaned up. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106540 The number of sites improved to eliminate as target dumping spots. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106550 The number of enforcement actions pertaining to illegal dumping. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106560 Landscape and Lawn Care, and Pest Control SW106570 The number of stores/gardens participating in education programs. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. 41Page Number: SW106580 The number of residents trained by the permittee in safe landscaping, lawn care, and pest management techniques. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106590 The number of classes/seminars offered by the permittee in landscaping and lawn care. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106610 The number of municipal employees trained in integrated pest management. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106620 Parking Lot and Street Cleaning SW106630 The number of parking lots. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106640 The number of scheduled parking lot and/or road cleanings. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106650 Pet Waste SW106660 The number of dog parks. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106670 The number of "pooper-scooper" stations installed 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106680 The number of educational materials distributed. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106690 Road Salt Application and Storage SW106700 The number of storage facilities included in a regular inspection and maintenance program. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. It is not anticipated that this will ever be a component of Sandy Point. SW106710 The number of employees trained in road salt application. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. It is not anticipated that this will ever be a component of Sandy Point. 42Page Number: SW106720 The quantity of salt applied to roadways (in tons). 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. It is not anticipated that this will ever be a component of Sandy Point. SW106730 The quantity of alternative products used (in tons). 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. It is not anticipated that this will ever be a component of Sandy Point. SW106800 Spill Response and Prevention SW106810 The number of leak detection devices installed at municipal facilities. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106820 The number of preventative maintenance procedures performed on tanks, valves, pumps, pipes, and other equipment. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106830 The number of personnel trained in spill response. 0 Comments:Upland construction has not yet begun. Current population is zero. SW106840 The number of regularly inspected high-risk facilities. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106850 The number of educational materials distributed to municipal employees. 0 Comments:Upland construction has not yet begun. Current population is zero. SW106860 Storm Drain System Cleaning SW106870 The number of outfalls cleaned regularly. 0 Comments:Upland construction has not yet begun. Current population is zero. The stormwater management system proposed for Sandy Point will only overflow in the event of an extreme flood event; therefore, there are no distinct "outfalls" proposed. SW106880 The number of storm drains cleaned regularly. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106890 The amount of trash, sediment, and other pollutants removed during cleaning (in tons). 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106900 Used Oil Recycling 43Page Number: SW106910 The number of gallons of used oil collected from municipal operations. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106920 The number of recycling facilities that collect oil from municipal operations. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106930 The number of educational materials distributed to municipal employees. 0 Comments:Upland construction has not yet begun. Current population is zero. SW106940 Vehicle Washing SW106950 The number of educational materials distributed to municipal employees. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. SW106960 The number of designated municipal vehicle washing areas. 0 Comments:Upland construction has not yet begun. No infrastructure has been installed at this time. 44Page Number: Program Accomplishments SW106970 Staff and Capital Improvement Projects SW106980 The number of staffed stormwater management position(s). 0 Comments:Upland development has not yet begun. No infrastructure has been installed at this time and the current population of Sandy Point is zero. Sam Young, President of The Fund for Sandy Point North Carolina, LLC is coordinating the development of the Stormwater Management Program. Details of BMP's, systems, processes, and permits for Sandy Point are being handled by staff members of Quible & Associates, P.C. SW106990 The number of new stormwater management position(s) created or staffed for the reporting year. 0 Comments:Upland development has not yet begun. No infrastructure has been installed at this time and the current population of Sandy Point is zero. Sam Young, President of The Fund for Sandy Point North Carolina, LLC is coordinating the development of the Stormwater Management Program. Details of BMP's, systems, processes, and permits for Sandy Point are being handled by staff members of Quible & Associates, P.C. SW107000 Total annual budget (excluding Capital Improvement Projects) for the NPDES stormwater management program for the reporting year. N/A Comments:Upland development has not yet begun. No infrastructure has been installed at this time and the current population of Sandy Point is zero. SW107010 The number of Capital Improvement Projects planned. 0 Comments:Waterward channels have been dredged and jetties have been installed. Upland construction is not planned to commence within the coming year. SW107020 The number of Capital Improvement Projects active. 0 SW107030 The number of Capital Improvement Projects completed. 0 SW107040 Total annual budget for Capital Improvement Projects for the reporting year. N/A 45Page Number: Ordinance, Legal or Regulatory Authority SW107050 Ordinance, Legal or Regulatory Authority SW107060 Illicit Discharge Detection & Elimination Drafted SW107070 Erosion & Sediment Control Reviewed SW107080 Post-Development Stormwater Management Reviewed SW107090 Stormwater Ordinance Not Applicable SW107100 Unified Development Ordinance Not Applicable SW107110 Flood Damage Protection Ordinance Not Applicable SW107120 Other: Not Applicable SW107130 Other: Not Applicable SW107140 Other: Not Applicable 46Page Number: