HomeMy WebLinkAbout20090697 Ver 1_Application_20090616~`J
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
BEVERLY EAVES PERDUE
GovEwm
June 2, 2009
Mr. William Wescott
U.S. Army Corps of Engineers
Washington Regulatory Field Office
Post Office Box 1000
Washington, North Carolina 27889-1000
Mr. Robert Ridings
Wetlands/401 Unit
NC DENR Division of Water Quality
2321 Crabtree Blvd
Raleigh, NC 27604
®9®697
SUBJECT: NWP3 and WQC # 3687 request in order to place riprap in Little Cokey
Swamp to stop scour and undercutting at crossline under SR 1157
(Sutton Road) in Edgecombe County.
Dear Sirs:
The North Carolina Department of Transportation (NCDOT) proposes to line banks and
stream bed of Little Cokey Swamp at outlet of crossline under SR 1157 in order to stop
scour and undercutting at crossline. This activity proposes to permanently impact a total
of 25 linear feet of stream channel downstream of crossline. The NCDOT anticipates that
this stream stabilization activity will be authorized under Nationwide Permit 3 (NWP 3).
This application is also intended as a request for written authorization from the NC
Division of Water Quality to proceed with a stream cleanout under General Water Quality
Certificate # 3494 (NWP 3).
No sites eligible for listing on the National Register, occur within the area of potential
effect. This project will not affect fisted or eligible historic properties.
JR.
MINIMIZATION INFORMATION
Impacts will be minimized by strict enforcement of Best Management Practices for the
protection of surface waters and wetlands, restrictions against the staging of equipment in
V
D ?G?I ?Ov
bit 60'??? O
4b?p? 9
(252) 237-6164 x 3532 ccoggins@ncdot.gov
Post Office Box 3165, Wilson, North Carolina 27895-3165
waters of the US, and coordination (including a pre-construction meeting) with the
Division Environmental Officer.
If you have any questions or need any additional information, please contact Chad
Coggins, Division Environmental Officer at (252) 296-3532. Your time and effort are
appreciated.
Respectfully yours,
1 l?
R. Jr., PE
Division Engineer
(252) 237-6164 x 3532 ccoggins@ncdot.gov
Post Office Box 3165, Wilson, North Carolina 27895-3165
0, VqAr?,
-4 09 ?6
Olliii? -
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
Ia . Type(s) of approval sought from the
Corps: ® Section 404 Permit ? Section 10 Permit
tb . Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number:
lc. Has the NWP or GP number been verified by the Corps? ? Yes ONO
1d. Type(s) of approval sought from the DWQ (check all that apply):
N 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ® Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes N No For the record only for Corps Permit:
? Yes N No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ONO
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. ? Yes ONO
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ONO
2. Project Information
2a. Name of project: SR 1157 (Sutton Rd)
2b. County: Edgecombe
2c. Nearest municipality! town: Rocky Mount
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state
project no:
3. Owner Information
3a. Name(s) on Recorded Deed:
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 1 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ® Agent ? Other, specify:
4b. Name: Ricky E. Greene Div. 4 Engineer
4c. Business name
(if applicable):
NCDOT Div. of Highways
4d. Street address: PO Box 3165
4e. City, state, zip: Wilson, NC 27895-3165
4f. Telephone no.: 252-237-6164x3501
4g. Fax no.: 252-234-6174
4h. Email address: rgregneCafncdot.oov
5. Agent/Consultant Information (if applicable)
5a. Name: Chad Coggins
5b. Business name
(if applicable):
NCDOT Div. 4 Environmental Officer
5c. Street address: same
5d. City, state, zip: same
5e. Telephone no.: 252-296-3532
5f. Fax no.: 252-234 6174
5g. Email address: ccogginsAncdotgov
Page 2 of 11
B. Project Information and Prior Project History
1. Property Identification
la. Property identification no. (tax PIN or parcel ID):
1b. Site coordinates (in decimal degrees): Latitude: 35.9160 Longitude: - 77.8051
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: Little Cokey Swamp
2b. Water Quality Classification of nearest receiving water: C NSW
2c. River basin: Tar
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Urban area, water is currently piped under road and train trestle for a couple 100 feet until it empties out into stream
channel.
3b. List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
3d. Explain the purpose of the proposed project:
Due to the fact that pipes are perched and most of the water in the system is from urban runoff stream has downcut and
scoured and has begun to uncut pipes and roadway. We propose to line banks and stream bottom with riprap to stop
erosion and stabilize stream and protect roadway..
3e. Describe the overall project in detail, including the type of equipment to be used:
Use mechanical highway equipment working from current roadway to place riprap along banks and stream bottom to stop
erosion and stabilize stream and protect roadway..
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments: shown on topo map and pits included
? Yes ®No ? Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
? Preliminary[] Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? Yes
®No ? Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
is a phased project? Yes ®No
F
s, explain.
Page 3 of 11
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
I a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ® Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? PEI T ? Yes ? Corps
? No ? DWQ
W4 ? PEI T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? PEI T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ®P ? T Fill (riprap) Little Cokey
Swamp ® PER
? INT ® Corps
? DWQ 4 25
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
54 ? P ? T ? PER ? Corps
? INT ? DWQ
SS El P ? T ? PER ? Corps
[E:1 INT ? DWQ
S6 [] P ? T E] PER El Corps
? INT ? DWQ
3h. Total stream and tributary impacts 25
3i. Comments:
Page 4 of 11
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individual list all open water impacts below.
4a.
Open water
impact number -
Permanent (P) or
Tem ora 4b.
Name of waterbody
(if applicable) 4c.
Type of impact 4d.
Waterbody type 4e.
Area of impact (acres)
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a.
Pond ID
b 5b.
Proposed use or purpose 5c.
Wetland Impacts (acres) 5d.
Stream Impacts (feet) 5e.
Upland
(acres)
num
er of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
Sf. Total
5g. Comments:
5h. Is a dam high hazard permit required? ? Yes
? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
Page 5 of 11
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ®Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number- Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact re uired?
Riprap
B1 ®P ? T Slope
Protect Little Cokey Swamp ® Nos 1000
on
B2 ?P?T ?Yes
? No
B3 ?P?T ?Yes
? No
6h. Total buffer impacts 1000
6i. Comments: Riprap to prevent additional erosion and sedimentation
Page 6 of 11
D. Impact Justification and Mitigation
1. Avoidance and Minimization
I a . Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Strict enforcement of Best Management Practices for sediment and erosion control, the protection of wetlands and
surface waters will be enforced.
1b . Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Strict enforcement of Best Management Practices for sediment and erosion control, the protection of wetlands and
surface waters will be enforced. .
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ®No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c.
If yes, which mitigation option will be used for this
project? ? Mitigation bank
El Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Pennittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 8 of 11
tormwater Management and Diffuse Flow Plan (required by DWQ)
Diffuse Flow Plan
F Does the project include or is it adjacent to protected riparian buffers identified
i [0 Yes ? No
thin one of the NC Riparian Buffer Protection Rules?
. f yes, then is a diffuse flow plan included? If no
explain why.
,
Comments: only a maintenance activity not changing stormwater input ? Yes No
2. Stormwater Management Plan
2a . What is the overall percent imperviousness of this project? 0%
2b . Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 0% change in impervious surface..
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
® DWQ 401 Unit
3. Certified Loral Government Stormwater Review
3a. In which local governments jurisdiction is this project?
? Phase 11
3b. Which of the following locally-implemented stormwater management programs ? NSW
? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
4a.
Which of the following state-implemented stormwater management programs apply ? HQW
? ORW
(check all that apply): ? Session Law 2006-246
® Other: NPDES permit
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 9 of 11
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
I a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federallstate) land?
1b. If you answered 'yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
I c. If you answered 'yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
l
? Yes
? No
etter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H.0500), Isolated
Wetland Rules (15A NCAC 2H.1 300), DWQ Surface Water or Welland Standards, ? Yes ®No
or Riparian Buffer Rules (15A NCAC 28 .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ®No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Page 10 of 11
PCN Form - Version 1.3 December 10, 2008 Version
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ®No
habitat.
'
5b. Have you checked with the USFWS concerning Endangered Species Act El Yes 10 No
impacts.
5c. If yes, indicate the USFWS Field Office you have contacted. ?
Raleigh
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
NHP GIS data layer Urban site no mussel habitat
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
AFSA GIS layer and the fact that the base flow is only 6 inches deep with numerous obstruction within downstream
reach.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ®No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Only working in stream channel within existing ROW
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? NC flood Map
Applicant/Agent's Printed Name AnUAgent's Sig ature Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.
Pagel 1 of 11
ACME Mapper 2.0 - 22 km S of Rocky Mount NC
Page l of 1
L?s- 't(',
tti, f? r> +? 41 f r: yy
11' U31
0 11
;Mater ask
kl.l JO
wr 1,
.' ! J ' ?` Y/YI `tii?1l y r. i¦ ii + 1 ??• r r.:;' , „ i:3 u tj
_
•+r?l46USGS : .•,f^?..1v 'tt ?'I?U$G$= is 1V14t', r.!'+i+ '' -LUIS GS=
• ?? - _ ~?J. •i?•- 1 w ::? _ ?- -?i `?- -ii;7 ,l*?'•+iI?.S? 1:' ,` :'•f .Y ?1i• 1,L??
/,fir:=--
. ?.?i ?• ,+„k ?rT.';.?5?-~-_ _ t?' I+ ?I, 11
' • - Vii:. `?? r t • ., , r J71
It-
46 K?.
:]Td
USGS i U$GS i
7.4
? • + H Ji?.•? I f.
XIMS
ILISGS
Nmr- nn-
Can
Imagery by USGS / Service by TerraServer -
http://mapper.acme.com/ 6/2/2009
- ?' III?.fr ; ,.
Lr if 17
?y Y1 7( ?l
47
Figure 1 Outlet in of Crossline under SR 1 157 (Sutton Road) . Proposing to riprap bank
and bed in stabilize site due to perched pipe and flashv urban runoff.