Pl�as� s�� th� �mail b�low form Cary Fin�, PE, th� R�sid�nt Engin��r for th� R-2536
proj�ct, addr�ssing your conc�rns.
I will forward pictur�s to you as I r�c�iv� th�m.
�
From: Fine, Cary A
Sent: Wednesday, August 29, 2018 9:00 AM
To: King, Art C
Cc: Harper, Aaron A
Subject: RE: R-2536 Asheboro Bypass Compliance Inspections on 8-23-2018
�
Pl�as� I�t April know that th� contractor is curr�ntly working on addr�ssing th�s� issu�s
and I will forward you pictur�s of th� corr�ctions onc� I r�c�iv� th�m. As for Sit� 5, th�
contractor will most lik�ly pursu� th� work in this p�rmitt�d ar�a in approx. 2
months. Also pl�as� I�t April knovv that sh� can call m� n�xt tim� sh� vvould lik� to do a
r�vi�vv and I vvill b� mor� than happy to h�lp h�r navigat� th� proj�ct. Pl�as� I�t m�
knovv if you n��d anything furth�r.
�
Cary Fine, PE
Resident Engineer
NCDOT Highway Division 8
Asheboro Resident Engineer's Office
336 318 4020 office
336 225 4237 mobile
cafine .ncdot.qov
300 DOT Drive
Asheboro, NC 27204
a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`��
�'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�.
From: King, Art C
Sent: Monday, August 27, 2018 3:02 PM
To: Fine, Cary A <cafine@ncdot.gov>
Cc: Harper, Aaron A <aaharper@ncdot.gov>
Subject: FW: R-2536 Asheboro Bypass Compliance Inspections on 8-23-2018
Importance: High
�
�
From: Norton, April R
Sent: Friday, August 24, 2018 2:35 PM
To: King, Art C
Cc: a:in�..r.,�..irew.oe.o_wil.lia:irm�s.7:.��ya��.ceoairirm�. oy irm�il
Subject: R-2536 Asheboro Bypass Compliance Inspections on 8-23-2018
A rt,
Compliance inspections at the Asheboro Bypass were conducted on Sites 2, 3, 4A, 4B,
4C, 4D, 4E, 6A and 6B. Please address the below issues noted at approximate locations.
Site 3— Stream appears very turbid. See Site 3 photo.
Site 4B —The silt fence is failing and a blowout seems to have occurred at this site. See
Site 4B photos.
Site 6A—The skimmer does not appear to function as intended. Please see Site 6A
photo. Adjacent to this site is a slope which is not covered. See Soil Stabilization photo.
Site 6B — Riprap is located within the stream, which does not appear to be according to
plan.
Also, could you provide the construction timeframe for Site 5?
Please let me know if you have any questions.
Thanks,
April
April R. Norton
Environmental Senior Specialist
Transportation Permitting Unit
Division of Water Resources
NC Department of Environmental Quality
919-707-9111 office
919-710-6516 mobile
a.�a_ri.l..:_nca.rtcr n_..�`_�.._n�d_e_n_r:.�.crv
512 North Salisbury Street, 12t" Floor (physical)
1617 Mail Service Center (mailing)
Raleigh, NC 27699
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl
I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a,
I�arti��,