Loading...
HomeMy WebLinkAbout20160299 Ver 1_FW R-2536 Asheboro Bypass Compliance Inspections on 8-23-2018_20180829Carpenter,Kristi From: King, Art C Sent: Wednesday, August 29, 2018 9:09 AM To: Norton, Apri) R Subject: FW: R-2536 Asheboro Bypass Compliance Inspections on 8-23-2018 � Pl�as� s�� th� �mail b�low form Cary Fin�, PE, th� R�sid�nt Engin��r for th� R-2536 proj�ct, addr�ssing your conc�rns. I will forward pictur�s to you as I r�c�iv� th�m. � From: Fine, Cary A Sent: Wednesday, August 29, 2018 9:00 AM To: King, Art C Cc: Harper, Aaron A Subject: RE: R-2536 Asheboro Bypass Compliance Inspections on 8-23-2018 � Pl�as� I�t April know that th� contractor is curr�ntly working on addr�ssing th�s� issu�s and I will forward you pictur�s of th� corr�ctions onc� I r�c�iv� th�m. As for Sit� 5, th� contractor will most lik�ly pursu� th� work in this p�rmitt�d ar�a in approx. 2 months. Also pl�as� I�t April knovv that sh� can call m� n�xt tim� sh� vvould lik� to do a r�vi�vv and I vvill b� mor� than happy to h�lp h�r navigat� th� proj�ct. Pl�as� I�t m� knovv if you n��d anything furth�r. � Cary Fine, PE Resident Engineer NCDOT Highway Division 8 Asheboro Resident Engineer's Office 336 318 4020 office 336 225 4237 mobile cafine .ncdot.qov 300 DOT Drive Asheboro, NC 27204 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. From: King, Art C Sent: Monday, August 27, 2018 3:02 PM To: Fine, Cary A <cafine@ncdot.gov> Cc: Harper, Aaron A <aaharper@ncdot.gov> Subject: FW: R-2536 Asheboro Bypass Compliance Inspections on 8-23-2018 Importance: High � � From: Norton, April R Sent: Friday, August 24, 2018 2:35 PM To: King, Art C Cc: a:in�..r.,�..irew.oe.o_wil.lia:irm�s.7:.��ya��.ceoairirm�. oy irm�il Subject: R-2536 Asheboro Bypass Compliance Inspections on 8-23-2018 A rt, Compliance inspections at the Asheboro Bypass were conducted on Sites 2, 3, 4A, 4B, 4C, 4D, 4E, 6A and 6B. Please address the below issues noted at approximate locations. Site 3— Stream appears very turbid. See Site 3 photo. Site 4B —The silt fence is failing and a blowout seems to have occurred at this site. See Site 4B photos. Site 6A—The skimmer does not appear to function as intended. Please see Site 6A photo. Adjacent to this site is a slope which is not covered. See Soil Stabilization photo. Site 6B — Riprap is located within the stream, which does not appear to be according to plan. Also, could you provide the construction timeframe for Site 5? Please let me know if you have any questions. Thanks, April April R. Norton Environmental Senior Specialist Transportation Permitting Unit Division of Water Resources NC Department of Environmental Quality 919-707-9111 office 919-710-6516 mobile a.�a_ri.l..:_nca.rtcr n_..�`_�.._n�d_e_n_r:.�.crv 512 North Salisbury Street, 12t" Floor (physical) 1617 Mail Service Center (mailing) Raleigh, NC 27699 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. I rr�7all �:urrc,��u � � � � � � � � y I�c rli��;lu�e,rl �u �C�h•ih�rl I i� ci��;e, Cu ai� rur°r7 �mii;, ;;e,i� cr i;, ;;u� ��;� �u Cmie, ,..,u� i�; ta�:ur�: ;, ..,aw ai� ir7a, I�arti��,