Loading...
HomeMy WebLinkAbout20071915 Ver 1_DCM Permit_20090615.nr ... Nib .:nif..:rr?..>*N+'• ??.P;dri•}7?'?.!-4rt.Y5.6+v.+*<.S.rK:?M?.'.e;.J^Y<?'/aYGrfi?O.C•:^nM':.CK?nh ?Ni...S?>.:.-„eGM1:'uJV,?..rr:.:...i^0-...r F.?J-'.ca?.:wrr. r r. .. =}+r nv-,.W`n'... Xtis. •.wrnGC.?.OrtN•.'v„]... _. _ ,a -?i.r+.r ?Wie:., } _P°rmit Cass O rT _ t p1 , G.? P:Ixmit Number NEW 79-09 STATE OF NORTH CAROLINA ?A) Department of Environment and Natural Resources and Coastal Resources Commission iknut"t for X Major Development in an Area of Environmental Concern pursuant to NC GS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Smithwick Enterprises c/o Lee Sheppard, 806 Swan Point Drive, Washington, NC 27889 Authorizing development in Beaufort County adj. to Paradise Cove, at 980 US Hwy 17S, near the city of Washington , as requested in the permittee's application dated 516/09. including the attached workplan drawing (2 , dated revised 5/5/09 and 7/12/07 This permit, issued on June 10, 2009 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) Unless specifically altered herein, this permit authorizes only the removal and construction of the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. #?W@ZR78Uf (See attached sheets for Additional Conditions) JU L, N 1 a 2009 WEn.. DEIyR. w.T,-_ This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. "'•"'tRBR ,`? Signed by the authority of the Secretary of DENR anc'Z Chairman of the Coastal Resources Commission. James regson, Director Division of Coastal Management All work must cease when the permit expires on December 31, 2012 This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. - Signature of Permittee < r.. . ..s h. , rv ..' ? ..rv.... i. _ , . ` 4. „s}r n .'?A'.>PT?-. ?>.>:.C..- . ,. ? ,.. `nr" M.v"..._ .... +v a .. r. r...... .: J.,.x. ., u r Y.. >. rv .-. wv" ti.N .... n.a...RWC.-vwMn".. Smithwick Enterprises c/o Lee Sheppard Permit # 79-09 Page 2 of ADDITIONAL CONDITIONS } 2) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor. This corridor is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel lire that .f intersects with the shore at the point where the upland property line meets the water's edge. 3) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 6) This permit does not autborize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7) The permittee must install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 8) This permit authorizes a maximum of ten formalized boat slips. NOTE: Any proposal to add one or more additional boat slips to the authorized 10-slip facility will require that the docking facility be classified as a marina, and will therefore require a review under the N.C. Environmental Policy Act (NCEPA). Excavation 9) In order to protect juvenile shrimp and finfish populations, no excavation shall be permitted between February 15th and June 30`h of any year without the prior approval of the Division of Coastal Management, in consultation with the Division of Marine Fisheries. 10) Excavation shall not exceed -5.0 feet below the normal water level. In no case shall the depth of excavation exceed the depth of connecting waters. 11) No vegetated wetlands shall be excavated or filled outside the area indicated on the attached workplan drawings. 12) The temporary placement or double handling of excavated materials within waters or vegetated wetlands is not authorized. ° pard rises c/o Lee She ithwick Enter S permit # 79-09 s p p m Page 3 of 5 ADDITIONAL CONDITIONS Spoil Disposal 13) All excavated materials shall be confined above normal water and landward of regularly or irregularly flooded wetlands behind adequate dikes or other retaining structures to prevent spillover of solids into any wetlands or surrounding waters. 14) No spoil material is to be placed within 30 feet of the normal water line. 15) Any change in the spoil disposal area shall require additional authorization from the Division of Coastal Management. Shoreline Stabilization 16) The authorized bulkhead and boat ramp wing-wall shall adhere to the alignment depicted on the attached workplan drawings. 17) The alignment of the authorized bulkhead shall be staked by the permittee and approved by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of any construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions shall require the alignment to be restaked by the permittee and re-approved by DCM within a maximum of 30 days prior to the new expected start of construction. 18) The bulkhead shall be constructed prior to any backfilling activities. 19) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 20) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Department personnel. 21) All backfill material shall be clean and free of any pollutants except in trace quantities. 22) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 23) No backfill material is to be placed within 30 feet of the normal water line, except that which will be used to backfill the area behind the permitted bulkhead. 24) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead. T. > a.K?... ?>+r.< q .Y+.tY.,J n .^x.•}14.. Smithwick Enterprises c/o Lee Sheppard Permit # 79-09 } Page 4 of 5 S ADDITIONAL CONDITIONS Boat Ramp 25) The authorized boat ramps stall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. Upland Development 26) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including but not limited to the dry stack storage facility, buildings, townhomes, above ground storage tank, community swimming pool, all roads, sidewalks, utilities, and infrastructure associated with the development of the above referenced property, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a modification of this permit. Contact a Division of Coastal Management representative at (252) 946-6481 for this determination. Sedimentation and Erosion Control NOTE: An Erosion and Sedimentation Control Plan will be required for this project. The plan shall be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Land Quality Section, 943 Washington Square Mall, Washington, NC 27889. 27) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 28) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. Stormwater Management 29) The Division of Water Quality approval of this project under stormwater management rules of the Environmental Management Commission is covered by way of Stormwater Permit No. SW7080720, which was issued on 2/17/09. Any violation of the permit approved by the DWQ will be considered a violation of this CAMA permit. General 30) The authorized project is located in an inland PNA, as designated by the Wildlife Resources Commission. Therefore, in accordance with T15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation within the PNA shall be permitted. New dredging in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. s.nN... ?vrty}??Y?i.rn??i.'.W,^?;^?'?F?hw+L+ka}?v«:.'.rnA-.d,Y.? ?.o??*:?^,CC?n.;? }i+:+-i.. ?: ;? .ro. +r. .-. vS.?i '.tir: i.?n:.Y)C^i`.? .. ... .>.x -.r.`.Yi.f?nN;.?:... n. .. .v..+r ?;-...,o.n ?K?•.c:er Yx . it # 79 09 P r Smithwick Enterprises c/o Lee Sheppard - erm Page 5 of 5 s v ADDITIONAL CONDITIONS 31) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 32) No open water areas shall be excavated or filled, even temporarily. NOTE: This project area may affect existing potable water distribution and/or service lines in the area. The permittee should contact the Beaufort County Water Department to arrange a site visit to confirm any water line locations prior to construction. NOTE: Plans and specifications for new or relocated water distribution lines must be prepared by a professional engineer registered to practice in NC, for approval by the Plan Review unit of this section. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, but not limited to a driveway connection permit from the N.C. Department of Transportation NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division of Coastal Management at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that, in accordance with the rules of the Environmental Management Commission, many non-water dependent activities are not authorized within 50 feet of the normal water level or landward edge of any coastal wetlands, which ever is more restrictive. Contact the Division of Water Quality at (252) 946-6481 for project specific clarification. NOTE: It is strongly recommended that the permittee exercise all available precautions in the day-to-day operation of the facility to prevent facility waste from entering the adjacent waters. Such discharge, either directly or indirectly, to adjacent waters could contravene state water quality standards, thereby violating state law. NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No. 07-1915. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW-2008-00156.