From: Doug Johnson <diohnson@b|uehdgeenergy.com>
Sent: Monday, July l6'ZUl84:Z4PK4
To: Anninc\ Amy K4
Subject: [External] RE: DVVR 2018'0801 Shoreline Stabilization Add -Info Request
Kim"
Hi Amy, Please see my answers below in red.
Thanks,
Doug
moumJo*msom
CHIEF EXECUTIVE OFFICER
1z1sBLOWING ROCK BLVD ms
pnBOX 11z"LEmn|R,mczus4*
Ph: 828-759-8999
mue,idoeene,m.cum
From: Annin4Amy M[mai|toumyannino@ncdencgov
Sent: Monday, July 16,ZU1O4:U6PM
To: Doug Johnson xdjohnson@b|ueridgeenergycom>
Subject: DWR 2018-0891 Shoreline Stabilization Add -Info Request
EXTERNAL EMAIL: Please be careful with attachments or links
OnJune Z7 2018, the Division of Water Resources (Division) received your application dated June 21, 2018, requesting a
401 Water Quality Certification from the Division for the subject project. The Division has determined that your
application isincomplete and cannot be processed. The application ison hold until all ofthe following items are
addressed:
Please clarify if the shoreline will be graded back to a gentler slope. Yes, as we began dock construction we
found out that there was significant erosion into the shoreline bank. We will have tacave in the land that has
been undermined which will create a much gentler slope. The area we did for the dock construction is good
representation ofhow the rest will bestabilized, and | will behappy tasend you apicture ifthat would be
*
Please clarify the extent of shoreline stabilization above and below the full pond level you are proposing on
Gunpowder Creek in the backwaters of Lake Hickory (ex: 2' height above x 200'|enf¢h).The information you
provided inyour application was not clear.
It is one foot or less below water and 4-6 feet afsloped bank with rack. Bank height varies some because of
terrain differences. I will be happy to send you a picture of what we did for the dock construction if that would be
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the
proper consideration of the application. Please provide a response by August 17, 2018.
Please contact me if you have any questions or concerns.
Sincerely,
Amy Annino
Environmental Specialist —Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4656 office
g.ML.aiiiiiiiiiiopiiicdeiiiir.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28711