Loading...
HomeMy WebLinkAbout20180891 Ver 1_More Info Received_20180716 (3)Strickland, Bev From: Doug Johnson <diohnson@b|uehdgeenergy.com> Sent: Monday, July l6'ZUl84:Z4PK4 To: Anninc\ Amy K4 Subject: [External] RE: DVVR 2018'0801 Shoreline Stabilization Add -Info Request Kim" Hi Amy, Please see my answers below in red. Thanks, Doug moumJo*msom CHIEF EXECUTIVE OFFICER 1z1sBLOWING ROCK BLVD ms pnBOX 11z"LEmn|R,mczus4* Ph: 828-759-8999 mue,idoeene,m.cum From: Annin4Amy M[mai|toumyannino@ncdencgov Sent: Monday, July 16,ZU1O4:U6PM To: Doug Johnson xdjohnson@b|ueridgeenergycom> Subject: DWR 2018-0891 Shoreline Stabilization Add -Info Request EXTERNAL EMAIL: Please be careful with attachments or links OnJune Z7 2018, the Division of Water Resources (Division) received your application dated June 21, 2018, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application isincomplete and cannot be processed. The application ison hold until all ofthe following items are addressed: Please clarify if the shoreline will be graded back to a gentler slope. Yes, as we began dock construction we found out that there was significant erosion into the shoreline bank. We will have tacave in the land that has been undermined which will create a much gentler slope. The area we did for the dock construction is good representation ofhow the rest will bestabilized, and | will behappy tasend you apicture ifthat would be * Please clarify the extent of shoreline stabilization above and below the full pond level you are proposing on Gunpowder Creek in the backwaters of Lake Hickory (ex: 2' height above x 200'|enf¢h).The information you provided inyour application was not clear. It is one foot or less below water and 4-6 feet afsloped bank with rack. Bank height varies some because of terrain differences. I will be happy to send you a picture of what we did for the dock construction if that would be Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide a response by August 17, 2018. Please contact me if you have any questions or concerns. Sincerely, Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4656 office g.ML.aiiiiiiiiiiopiiicdeiiiir.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 x x: EFn7 itoi'r s1,)om en to amY ffom this aYY Yr ss is subiect to the lVoill`r Camlina Public ReconYs Law amY rr7a�Yisclose� Y to thi Y 1,)ailies