Loading...
HomeMy WebLinkAbout20180891 Ver 1_Memo to file_2018081508-15-2018 Phone conversation with Doug Johnson re. DWR 2018-0891 All shoreline stabilization to occur on Lot 29. Approximately 200 feet of shoreline stabilization will take place. Approximately 50 feet of bank will be graded to a 2:1 slope where the shoreline was collapsing. Mulch will be applied to the land above the shoreline stabilization area.