Loading...
HomeMy WebLinkAbout20181031 Ver 1_Meeting Notes_20180802Date * 8/2/2018 Site Type Stream Prepared By* Mac H. Sponsor/Provider DMS- KCI Project Name * Round Hill Branch NCDMS ID # USACE ID # DWR 20181031 Version* 1 ID#* HUC 05 Basin French Broad County* Buncombe Coordinates Degrees North Degrees West Attendees KCI- Tim, Adam, Charley DMS- Paul, Matthew, Periann, Tim COE- Todd Notes and Sketch, etc Small stream project. Considerable Rain today and previous day Started at barn and walked down Round Hill Branch. Ag field, hay? Adjacent to stream. All reaches proposed as R. Lower Round Hill Branch- reach somewhat incised (1.3-1.7), no riparian woodies but did have extensive herbaceous which made seeing the stream difficult. Pretty clear the stream needed work. No evidence of typical bedform seen, sand and silt dominated. T2- walked upstream to road. Similar to Round Hill but stream condition not as bad. Again, difficult to see with herb layer. T1 and Upper Round Hill Branch- these areas of stream did not seem as unstable as other reaches. Herb layer still masked channel to a degree. Todd has issues with R in these two reaches. Upper Round Hill may be more like E1 or 2. Todd somewhat animated in his case that the areas he was seeing are approved of at closeouts, so why is this a restoration site? Not sure I completely agreed with him on this one. Eventually, general approach was accepted. Action Items