Loading...
HomeMy WebLinkAbout20181037 Ver 1_Letter of Intent to Fund_20180725Water Infrastructure ENVIRONMENTAL OUALITV ROY COOPER Governor MICHAEL S. REGAN Secretary KIM H. COLSON Director February 1, 2017 Honorable Jacqueline Sergent, Mayor City of Oxford PO Box 1307 Oxford, NC 27565 Subject: Letter of Intent to Fund 2017 Sewer Line Replacements September 2016 Application Cycle Project No.: E -SRP -W-17-0035 Dear Mayor Sergent: The Division of Water Infrastructure has reviewed your application, and the State Water Infrastructure Authority has approved your project as eligible to receive funding. The State Reserve Project Grant will be 75% of eligible project costs up to a maximum of $2,940,750. The associated state loan will be $980,250 at zero interest. A grant fee of 1.5% and a loan fee of 2% will be invoiced after bids have been received. Please note that this intent to fund is contingent on approval of the loan through the Local Government Commission and on meeting all of the following milestones: Milestone Date Engineering Report Submittal June 1, 2017 Engineering Report Approval November 1, 2017 Bid and Design Package Submittal May 1, 2018 Bid and Design Package Approval September 4, 2018 Advertise Project, Receive Bids, Submit Bid Information, and Receive Authority To Award January 4, 2019 Execute Construction Contract(s) February 4, 2019 The first milestone is the submittal of an Engineering Report by close of business on June 1, 2017. The Engineering Report must be developed using the guidance found on our website (http://portal.ncdenr.org/web/wi/home). Failure to meet any milestone may result in the forfeiture of funding for the proposed project. Upon detailed review of the project during the funding process, it may be determined that portions of your project are not eligible for funding and the total loan amount may be reduced. Additionally, changes in the scope or priority points awarded — based on additional information that becomes apparent during project review — may also result in changes to the total loan amount and loan terms. Nothing Compares, State of North Carolina I Environmental Quality I Water Infrastructure 512 N. Salisbury Street, Raleigh, North Carolina 27604 1 1633 Mail Service Center, Raleigh, North Carolina 27699-1633 919 707 9160 Honorable Jacqueline Sergent, Mayor February 1, 2017 Page 2 of 2 General Assembly Notification Requirements In accordance with G.S. 120-157.1 through 157.9, enacted on June 24, 2011, local government units with projects that require debt to be issued greater than $1,000,000 must submit a letter to Committee Chairs, Committee Assistant, and the Fiscal Research Division of the General Assembly at least 45 days prior to presentation before the Local Government Commission. You are responsible for submitting this letter and providing a copy to the Division of Water Infrastructure upon receipt of this approval letter. If you have questions, please contact Seth Robertson, PE, Chief, State Revolving Fund Section at 919-707-9175. Sincerely, Kim H. Colson, P.E. CC: R.J. Mozeley, PE, McGill Associates, Hickory Anita E. Reed, PE Mark Hubbard, PE Project File (COM_LOIF)