Loading...
HomeMy WebLinkAboutNCG550591_Compliance Evaluation Inspection_20180713 ROY COOPER Nz Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director Water Resources ENVIRONMENTAL QUALITY July 13, 2018 RECEIVED/DENRIDW Donald F Burgin JUL18 2018 6918 Innsesbrook Way Water Resources Bahama,NC 27503 Permitting Section Subject: Compliance Evaluation Inspection Single Family Wastewater Treatment System 6918 Innesbrook Way,Bahama,NC Certificate of Coverage (CoC)NCG550591 Durham County Dear Mr. Burgin: On June 14, 2018 Jason Robinson and Jeremiah Dow from the Raleigh Regional Office visited your single-family residence (SFR) wastewater treatment system at 6918 Innesbrook Way., Bahama,NC to evaluate compliance with the above Certificate of Coverage to discharge wastewater. We appreciate your help and cooperation during the inspection. Please note the following, based on the inspection and our conversation: 1. Sample/Analyze the Effluent: As you are aware,this is an atypical system in that your wastewater system is connected to at least two of your adjacent neighbors' wastewater systems. This is problematic because your permit requires each system to be sampled annually. In order to comply with the sampling requirements in the permit, you will need to ensure that sampling is conducted after all treatment units (septic tank, sand filter, chlorination and chlorine contact chamber), but before your neighbor's wastewater is introduced into the system. If this cannot be accomplished with the current system's configuration, a plumber should install an adequate sampling port on your property, most likely before the first concrete pump tank. This may also require adding a chlorinator and chlorine contact chamber before the concrete pump tank on your property, as it appears that the concrete pump tank also currently serves as the chlorinator and chlorine contact chamber for this system. Please determine if sampling can be properly conducted with the current configuration(after all treatment units but before your neighbors' wastewater is introduced), or if not please provide documentation within 90 days of receipt of this letter and a sampling port has been installed. 2. Disinfection/Chlorine Tablets: You are responsible for always having chlorine tablets and dechlorination tablets (if a required part of your system) in place. They must be the kind for wastewater treatment and not for swimming pools. Division of Water Resources,Raleigh Regional Office,Water Quality Operations Section www ncwaterquality.org 1628 Mail Service Center,Raleigh,NC 27699-1628 Phone:(919)791-4200 Location: 3800 Barrett Drive,Raleigh,NC 27609 Fax:(919)788-7159 An Equal Opportunity\Affirmative Action Employer—Made in part by recycled paper You mentioned during the inspection that chlorine tablets were placed in a tube that is in standing water in the first pump tank. As described Item#1 above, it may be beneficial to have a plumber install a chlorinator(chlorine tubes), a chlorine contact chamber and a dechlorinator in the line prior to the first pump tank(as well as sampling port prior to the first pump tank). Then you would just have to drop the chlorine tablets into the tubes instead of having to put them down into the concrete tank. 3. Pumping the Septic Tank: Please continue to pump the septic tank as least every 3-5 years. Thanks again for your assistance and cooperation. Please respond to how you will address the underlined items in Item#1 above via email or a written letter within 30 days of receiving this letter. Please email your response to Jason.T.Robinson@ncdenr.gov or to Jason Robinson's attention at the address at the bottom of the first page of this letter. Thank you for your cooperation. Sincerely,- /� 57 ev--77,--1-7-- -77-2 S. Daniel Smith, Supervisor Water Quality Regional Supervisor Raleigh Regional Office Attachments: Compliance Inspection Report Pictures cc: RRO/SWP Files NPDES Permitting Unit, Charles Weaver 2