Loading...
HomeMy WebLinkAbout20180969 Ver 1_WTIM_20180711Impacts Table Impact ID Wetland (sq. ft) Stream Buffers (sq. ft) Impact Impact Temporary Permanent Temporary Permanent W1 3,885 OV W2 J 216 00 O M B1 UQ O 206 • B2 _ 3 1A AN04 O 1= 36 I= B3 M04N V • 1,161 = B4 • 70 M . M E a'o g Tota 1 0 sq ft 4,101 sq ft 1,473 sq ft 0 sq ft 0.00 ac 0.094 ac 0.03 ac 0.00 ac Legend .0■■. ■■_■■. Project Study Limits - 127.5 Acres r LOD -1 Limits of Disturbance - 57.5 Acres o ao1 Wetland Impact Stream Buffer Impact 50' Neuse River Buffer •♦♦.♦.♦♦♦.♦, Permanent I • Impact Stream Buffer Impacts Palustrine Forested (PFO) Wetland r Perennial Stream (R3) Intermittent Stream (R4) Zone A: 1 % Annual Chance Flood Hazard 1' Topographic Contours Major Crantock- PROJECT NAME & LOCATION C � Q D oC O Z OV J D 00 O M • UQ O w+ • _ 3 1A AN04 O 1= • I= M04N V • O = 3Qo c • i W M . M E a'o g Z 00 -asW 3 • O U a o�3 • Z m • O c � �� � y_ ~ \1■ � `fir � f_ 'y - -- - _ _ / � _ � fY O 126 , �♦ PROJECT NAME & LOCATION C � Q D oC O Z OV J D 00 O M • UQ O w+ • _ 3 1A AN04 O 1= • I= M04N V • O = 3Qo c • i W M . M E a'o g Z 00 -asW 3 • O U a o�3 • Z m • O c O fY O PROJECT NAME & LOCATION � Q Z Z J D 00 Z UQ ZU I= O = LL Z =0 OZ DATE 07/05/2018 PROJECT NUMBER 39765 PROJECT NAME FAIRWINDS DESIGNED BY I DRAWN BY L. WHEELER 1. Waters of the U.S. within the project study limits have been located using submeter, Bluetooth GPS antennas by Timmons Group. 2.Waters of the U.S. have not been confirmed by the U.S. Army Corps of Engineers. 3. Project limits are approximate. 4. Topography based on USGS LiDAR. 5. Cowardin Stream Classifications are based solely on field observations. No formal Stream assessment methodology was completed to determine these Cowardin Classifications. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP 41 SCALE (FEET) 0 150 300 PLANS PRINTED AS 11X17 ARE HALF SCALE SCALESHEET NUMBER H:1 " = 150' 1 of 3 R:\805\39765 Fair Winds\GIS\Wetland Impacts\39765-WTIM.mxd PROJECT NAME & LOCATION C oC O Z O J D 00 Q M z Ua O • _ 3 1A AN04 O 1= • OC ~ l�0 N tip V • O � 3Qo c > • i N E0 a00E_ ZW QE -JW 3 • O U Q off~ 3 • Z m • 0 0 Q oc o PROJECT NAME & LOCATION I— z Z J D 00 z Ua zU OC O = U� =0 Oz DATE 07/05/2018 PROJECT NUMBER 39765 PROJECT NAME FAIRWINDS DESIGNED BY / DRAWN BY L. WHEELER 1. Waters of the U.S. within the project study limits have been located using submeter, Bluetooth GPS antennas by Timmons Group. 2.Waters of the U.S. have not been confirmed by the U.S. Army Corps of Engineers. 3. Project limits are approximate. 4. Topography based on USGS LiDAR. 5. Cowardin Stream Classifications are based solely on field observations. No formal Stream assessment methodology was completed to determine these Cowardin Classifications. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP 41 SCALE (FEET) 0 50 100 PLANS PRINTED AS 11X17 ARE HALF SCALE SCALESHEET NUMBER H:1"=50' 2of3 R:\805\39765 Fair Winds\GIS\Wetland Impacts\39765-WTIM.mxd PROJECT NAME & LOCATION CLfn oC O Z O J D 00 Q M z Ua O • _ 3 A1n NO1= • OC ~ l�0 N tip V • O � 3Qo c > • i N E0 a00E_ ZW QE -JW 3 • O U Q off~ 3 • Z m • 0 0 Q oc o PROJECT NAME & LOCATION I— z Z J D 00 z Ua zU OC O = U� =0 Oz DATE 07/05/2018 PROJECT NUMBER 39765 PROJECT NAME FAIRWINDS DESIGNED BY / DRAWN BY L. WHEELER 1. Waters of the U.S. within the project study limits have been located using submeter, Bluetooth GPS antennas by Timmons Group. 2.Waters of the U.S. have not been confirmed by the U.S. Army Corps of Engineers. 3. Project limits are approximate. 4. Topography based on USGS LiDAR. 5. Cowardin Stream Classifications are based solely on field observations. No formal Stream assessment methodology was completed to determine these Cowardin Classifications. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP 41 SCALE (FEET) 0 50 100 PLANS PRINTED AS 11X17 ARE HALF SCALE SCALESHEET NUMBER H:1 = 50' 3 of 3 R:\805\39765 Fair Winds\GIS\Wetland Impacts\39765-WTIM.mxd