HomeMy WebLinkAbout20180705 Ver 1_Lumbee PCN_REV Additional Impact_20180705PCN REVISION for Proposed Impacts Inventory
Project Name: Lumbee Tribe Cultural Center Lake Dam Repair
Original PCN Submitted Online — May 22, 2018
Submitted by: Amy Black, PE
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
Wetlands Streams — tributaries Buffers ✓Open Waters Pond Construction
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then indivi ually list all open water impacts below.
4a.
4b.
4c.
4d.
4e.
Open water
Name of waterbody
impact number
(if applicable
Type of impact
Waterbody
Area of impact (acres)
Permanent (P) or
type
Temporary T
01 -Temporary
Cultural Center Lake
Staging Area
LAKE
0.5 acres
02 -Permanent
Cultural Center Lake
Expanding slope of dam
LAKE
1.1 acres
4f. Total open water impacts
0
4g. Comments:
Dam elevation is being raised to a consistent 169.5 and dam face will be constructed to a 3:1 slope. Footprint expansion will be
on the downstream side where possible, but will be on the upstream side along the southern end of the dam where existing
buildings and Terry Sanford Drive prohibit any expansion. The lake is currently drained in preparation for this work.