Loading...
HomeMy WebLinkAboutSW6180602_Sheet 14_2018070614 SECTIONS NTS ACCESS DRIVE SECTION NTS 3-INCH ABC STONE (COMPACTED IN PLACE AND PROOF-ROLLED) YARD SECTION 3-INCH #57 STONE COMPACTED STRUCTURAL FILL WHERE REQUIRED TO 98% 12-INCH ABC STONE (COMPACTED IN PLACE AND PROOF-ROLLED). PLACE IN SEPARATE 2 EQUAL 6-INCH THICK LIFTS. INSTALL 6-INCH DEPTH DURING INITIAL GRADING OPERATIONS, AND INSTALL REMAINING 6-INCH DEPTH DURING FINE GRADING OPERATIONS. 3-INCH ABC STONE (COMPACTED IN PLACE AND PROOF-ROLLED) (SUBGRADE) GRAVEL YARD GATE EDGE OF STONE EDGE OF GRADE/EDGE OF ABC STONE SHOULDER FENCE EDGE OF ABC DRIVE SECTION C-C 1" = 10' HORIZ. 1" = 1' VERT. 3" #57 STONE ON TOP OF 3" ABC STONE ON TOP OF 3" ABC STONE SUBGRADE GRASS 15' FENCE X X X 6' OUTSIDE FENCE GRAVEL YARD 3" COMPACTED ABC STONE (SUBGRADE) 1 30 1 6 3" COMPACTED ABC STONE 3" #57 STONE 12" ABC STONE ACCESS DRIVE ABC STONE TO TRANSITION FROM ACCESS DRIVE ELEVATION TO GRAVEL YARD FINISHED GRADE ELEVATION COMPACTED SUBGRADE FINISHED GRADE (FG) ELEVATION PROFILE VIEW PLAN VIEW ACCESS DRIVE TRANSITION ABC DRIVE TO GRAVEL YARD NTS ASPHALT PAVEMENT SECTION 3-INCH SURFACE COURSE ASPHALT PAVEMENT (S9.5B). PLACE IN 2 EQUAL 1.5-INCH THICKNESS LIFTS. 8-INCH ABC STONE (COMPACTED IN PLACE AND PROOF-ROLLED) COMPACTED SUBGRADE TO 100% FOR UPPER 8-INCHES AND 95% BELOW UPPER 8-INCHES COMPACTED SUBGRADE TO 98% COMPACTED STRUCTURAL FILL WHERE REQUIRED TO 98% COMPACTED SUBGRADE TO 98% SUBGRADE (SG) APP.CK.BY LOCATION SCALE DRAWN DATE CHK. DWG. NO. APP. SCALE RATIO 1:1 MM JSS NO.DATE REVISION AS NOTED RDC-73163 SHT OF 17 HARNETT COUNTY, NORTH CAROLINA LINDEN 230kV SUBSTATION 801 JONES FRANKLIN RD, SUITE 300 RALEIGH, NC 27606 (919)851-6866 (919) 851-7024 FAX LICENSE # F-0672 PROJECT NUMBER: 178451074 05-25-2018 CALL 1-800-632-4949 IT'S THE LAW ! BEFORE YOU DIG ! RSJ100% SUBMITTAL FOR PERMITTING NOT FOR CONSTRUCTION NTS SHOULDER/PERIMETER DRIVE/LAYDOWN AREA SECTION COMPACTED STRUCTURAL FILL WHERE REQUIRED TO 98% 6-INCH ABC STONE (COMPACTED IN PLACE AND PROOF-ROLLED). COMPACTED SUBGRADE TO 98% 160N NONWOVEN POLYPROPYLENE GEOTEXTILE PRODUCT FROM MIRAFI OR APPROVED EQUAL. ABC STONE 20' 6' 6' 6' GRASS 15' NTS 4-INCH #4 WASHED STONE WITH LESS THAN 2.0% FINES PASSING THE ASTM NO. 200 SIEVE, COORDINATE DELIVERY OF WASHED STONE WITH DUKE ENERGY IN ORDER TO VERIFY STONE HAS BEEN WASHED STONE DITCH SECTION 6-INCH CLEAN WASHED SAND SUBGRADE (UNCOMPACTED), SCARIFY THE SURFACE OF THE SUBGRADE WITHIN STONE DITCH AREA TO FACILITATE INFILTRATION PROVIDE GRASS SEED AS AN EXPERIMENT TO TRY AND GET GRASS TO GROW WITHIN STONE DITCH AREA, COORDINATE WITH DUKE ENERGY NOTES: CLEAR AND EXCAVATE THE AREA OF THE STONE DITCH WHILE PROTECTING AND MAINTAINING SUBGRADE INFILTRATION RATES FOLLOWING THESE STEPS: 1.EXCAVATE IN DRY SUBGRADE CONDITIONS AND AVOID EXCAVATING IMMEDIATELY AFTER STORMS WITHOUT A SUFFICIENT DRYING PERIOD. 2.DO NOT ALLOW EQUIPMENT TO CROSS THE STONE DITCH AREA AFTER EXCAVATION HAS BEGUN. OPERATE EXCAVATION EQUIPMENT FROM OUTSIDE THE STONE DITCH AREA OR FROM UNEXCAVATED PORTIONS OF THE AREA USING AN EXCAVATION STAGING PLAN. 3.USE EQUIPMENT WITH TRACKS RATHER THAN TIRES TO MINIMIZE SOIL COMPACTION WHEN EQUIPMENT ON THE SUBGRADE SURFACE IS UNAVOIDABLE. 4.DIG THE FINAL 9 TO 12 INCHES BY USING THE TEETH OF THE EXCAVATOR BUCKET TO LOOSEN SOIL AND DO NOT SMEAR THE SUBGRADE SOIL SURFACE. FINAL GRADING OR SMOOTHING OF THE SUBGRADE SHOULD BE DONE BY HAND IF POSSIBLE. 5.MINIMIZE THE TIME BETWEEN EXCAVATION AND PLACEMENT OF THE SAND AND STONE AGGREGATE. THE FINAL SUBGRADE SLOPE SHALL NOT EXCEED 0.5%. THE SLOPE OF THE SUBGRADE SHALL BE CHECKED BEFORE PROCEEDING. WHERE POSSIBLE, EXCAVATE SOIL FROM THE SIDES OF THE STONE DITCH AREA TO MINIMIZE SUBGRADE COMPACTION FROM EQUIPMENT. AFTER VERIFYING THE SUBGRADE SLOPE, SCARIFY THE SOIL SUBGRADE SURFACE APPROXIMATE 2 INCH DEPTH TO MAINTAIN THE SOIL'S PRE-DISTURBANCE INFILTRATION RATE AND POSSIBLY IMPROVE THE SOIL'S INFILTRATION RATE. SCARIFYING THE SUBGRADE MUST OCCUR WHILE THE SOIL IS DRY. TO SCARIFY THE SUBGRADE, USE BACKHOE BUCKET'S TEETH TO RAKE THE SURFACE OF THE SUBGRADE . BOTTOM WIDTH TOTAL WIDTH (STONE) SIDE SLOPE SEEDED SLOPES (TYPICAL) 1 RSJJSS17-5-18 PER DEQ REVIEW COMMENTS, CHANGED STONE SECTION REQUIREMENTS JSS