Site 1- WK Roadway � Yes � Corps
� P❑ T Construction Riverine � No ❑ DWQ 0.108
Site 1— WK Construction � Yes � Corps
❑ P� T Access Riverine � No ❑ DWQ 0.011
Site 2- WJ Roadway � Yes � Corps
� P❑ T Construction Riverine � No ❑ DWQ 0.022
Site 3- WI Roadway � Yes � Corps
� P❑ T Construction Riverine � No ❑ DWQ 0.118
Construction
Site 3- WI � Yes � Corps
❑ P� T Access/Temporary Riverine � No ❑ DWQ 0.008
Tree Clearing
Site 4- WG Roadway � Yes � Corps
� P❑ T Construction Riverine � No ❑ DWQ 0.170 (+0.003)
�e�s#rus�ien p
�ite-4--W� n^ro���Torv,.,,,r,n, ❑ Yes ❑ Cor s 9-9-(-9-993}
R;"�"•.,o ❑ No ❑ DWQ
8-��-� Troo !'`loori.,n
�,s
Site 5- WF Roadway � Yes � Corps
� P❑ T Construction Riverine � No ❑ DWQ 0.072
Site 6- WE Roadway � Yes � Corps
� P❑ T Construction Riverine � No ❑ DWQ 0.117 (+0.003)
Site 6- WE Construction � Yes � Corps
❑ P� T Access/Temporary Riverine � No ❑ DWQ 0.008 (-0.001)
Tree Clearing
Site 7- WB Roadway � Yes � Corps
� P❑ T Construction Riverine � No ❑ DWQ 0.090 (+0.002)
Site 7- WB Construction � Yes � Corps
❑ P� T Access/Temporary Riverine � No ❑ DWQ 0.007 (-0.002)
Tree Clearing
Site 8- WA Roadway � Yes � Corps
� P❑ T Construction Riverine � No ❑ DWQ 0.271
Site 8- WA Construction � Yes � Corps
❑ P� T Access Riverine � No ❑ DWQ 0.052 (-0.055)
0.968 acres
2g. Total wetland impacts (Permanent)
0.086 acres
(Temporary)
2h. Comments: Unavoidable impacts to riparian wetlands within the project corridor will result from the construction of the
proposed roadway. Temporary impacts will result due to construction access for roadway construction equipment and temporary
tree clearing. Tree clearing areas will not be maintained and will be allowed to revegetate with woody vegetation.
Page 5 of 13
PCN Form — Version 1.3 December 10, 2008 Version
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact length
number - (PER) or (Corps - 404, 10 stream (linear feet)
Permanent (P) intermittent DWQ - non-404, width
or Temporary (INT)? other) (feet)
(T)
Site 2- SH Roadway Stream SH � PER � Corps
� P❑ T Construction (UT to Stirrup � INT ❑ DWQ 3 64
Iron Creek)
Stream SH Non-
Site 2- SH Roadway 404 ❑ PER ❑ Corps 3 92
� P❑ T Construction (UT to Stirrup � INT � DWQ
Iron Creek)
Site 2- SH Stream SH � PER � Corps
� P❑ T Bank Stabilization (UT to Crabtree � INT ❑ DWQ 3 15
Creek)
Site 2- SH Construction Stream SH � PER � Corps
❑ P� T Access (UT to Crabtree � INT ❑ DWQ 3 11
Creek)
Site 3- SG Stream SG � PER � Corps
� P❑ T Bank Stabilization (UT to Stirrup � INT ❑ DWQ 3 �
Iron Creek)
Site 3- SG Construction Stream SG � PER � Corps
❑ P� T Access (UT to Stirrup � INT ❑ DWQ 3 10
Iron Creek)
Site 4- SE Stream SE � PER � Corps
� P❑ T Bank Stabilization (UT to Crabtree � INT ❑ DWQ 3 58
Creek)
Stream SE
Site 4- SE Construction ❑ PER � Corps
❑ P� T Access (UT to Crabtree � INT ❑ DWQ 3 10
Creek)
Stream SF
Site 5- SF Roadway ❑ PER � Corps
� P❑ T Construction (UT to Crabtree � INT ❑ DWQ 4 74
Creek)
Site 5- SF Stream SF � PER � Corps
� P❑ T Bank Stabilization (UT to Crabtree � INT ❑ DWQ 4 19
Creek)
�iti,1� -��� �e�as#ruc-taar� �krear�-�� e-P--EF� �-�erps
B-P---�-� Aecess �reek) �-IN� 8-�1A/Q 4 �3
Site 7- SD Roadway Stream SD � PER � Corps
� P❑ T Construction (UT to Crabtree � INT ❑ DWQ 4 209
Creek)
Site 7- SD Stream SD � PER � Corps
� P❑ T Bank Stabilization (UT to Crabtree � INT ❑ DWQ 4 26
Creek)
Site 7- SD Construction Stream SD � PER � Corps
❑ P� T Access (UT to Crabtree � INT ❑ DWQ 4 14
Creek)
472' (P)
3h. Total stream and tributary impacts 92' (Non-404 P)
45' (T)
Page 6 of 13
PCN Form - Version 1.3 December 10, 2008 Version
3i. Comments: Unavoidable impacts to jurisdictional streams will result from the proposed roadway construction. Impacts to
streams will result from the installation of culverts to carry the streams beneath the McCrimmon Parkway roadway corridor.
Mitigation is proposed for permanent stream impacts resulting from Road Construction.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the
U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact (if applicable) Type of impact Waterbody type Area of impact (acres)
number —
Permanent
(P) or
Temporary
(T)
01 ❑P❑
T
4f. Total open water impacts 0
4g. Comments: No open water impacts will result from the proposed project.
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland (acres)
Pond ID Proposed use or
number purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
Sf. Total
5g. Comments: No ponds or lakes will be constructed as a result of the proposed project.
5h. Is a dam high hazard permit required?
❑ Yes � No If yes, permit ID no: n/a
5i. Expected pond surface area (acres): n/a
5j. Size of pond watershed (acres): n/a
5k. Method of construction: n/a
Page 7 of 13
PCN Form — Version 1.3 December 10, 2008 Version
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an im acts require miti ation, then you MUST fill out Section D of this form.
6a.
� Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number — Reason Buffer Zone 1 impact Zone 2 impact
Permanent for Stream name mitigation (square feet) (square feet)
(P) or impact required?
Temporary
(T
Site 1 Road Stream SH � Yes
� P❑ T Crossing (UT to Stirrup Iron Creek) ❑ No 26,709 13,182
Site 2 Road Stream SE ❑ Yes
� P❑ T Crossing (UT to Crabtree Creek) � No 3,495 3,939
Site 3 Road Stream SD � Yes
� P❑ T Crossing (UT to Crabtree Creek) ❑ No 18,383 13,319
6h. Total buffer impacts 48,587 30,440
6i. Comments: Unavoidable impacts to the riparian buffers of streams SD, SE, and SH will result from the road construction. The
riparian buffers will be crossed perpendicularly to minimze impacts. According to the NRB Buffer Rules, impacts at Site 2 are
"allowable" (road crossings that impact greater than 40 LF but equal to or less than 150 LF), and impacts at Sites 1 and 3 are
"allowable with mitigation" (road crossings that impact greater than 150 LF or 1/3rd-acre of riparian buffer).
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Impacts to jurisdictional wetlands, streams, and riparian buffers have been avoided and minimized to the extent practical. The
alignment will tie into the existing section of McCrimmon Parkway to minimize new construction length and impacts. The
alignment has been located along the topographic ridge as much as practical to avoid larger stream and wetland systems
located in the bottomlands adjacent ot the project area. The alignment was also located intentionally to minimize earthwork and
grading required, reducing the required fill slopes along the alignment and limiting stream and wetland impacts.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Impacts to streams within the corridor will be minimized to the extent practical throughout the construction process by avoiding
stream and wetland features where practical. Equipment staging and construction access will be located in upland areas
throughout the corridor, and silt fencing will be installed around the permitted limits of distrubance to ensure all equipment is
located within the project corridor at all times near stream and wetland areas. Sediment control measures will be used to reduce
stormwater impacts to receiving waters and minimze runoff from the construction sites.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for � Yes ❑ No
impacts to Waters of the U.S. or Waters of the
State?
2b. If yes, mitigarion is required by (check all that apply): � DWQ � Corps
� Mitigation bank
2c. If yes, which mitigation option will be used for this
project? ❑ Payment to in-lieu fee program
� Permittee Responsible Mitigation
Page 8 of 13
PCN Form — Version 1.3 December 10, 2008 Version
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: EBX-Neuse Neu-Con Wetland & Stream Umbrella Mitigation Bank - Arrington Bridge III Site
3b. Credits Purchased (attach receipt and letter) Type Riparian Quantity 1.92 acres
Wetlands
3c. Comments: Mitigation credits for unavoidable impacts to riparian riverine wetlands in the project corridor have been reserved
with RES, LLC from the Arrington Bridge III Site located in Neuse HUC 03020201. See attached Statement of Availability Letter
for more information.
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Mitigation credits for the proposed project will be provided from the "Morrisville Community Park Stream & Riparian Buffer
Mitigation Site" as discussed with the USACE and NCDWR and multiple meetings and in communications through late 2016
and early 2017. The mitigation site will provide 694 linear feet of stream mitigation credits, and will provide 175,028 square
feet of riparian buffer mitigation credits.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that � Yes ❑ No
requires buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 Road Construction 45,092 3(2 for Catawba) 135,276
Zone 2 Road Construction 26,501 1.5 39,752
6f. Total buffer mitigation required: 175,028
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
Mitigation for unavoidable impacts to riparian buffers of stream SD and SH will be provided by the "Morrisville Community
Park Stream & Riparian Buffer Mitigation Site". The mitigation site will provide 175,028 riparian buffer credits as discussed
outlined in the NCDWR closeout documentation for the mitigation site and as confirmed by NCDWR at various meetings and
in conversations held in late 2016 and early 2017. Mitigation credits have been fully constructed and closed out with
NCDWR and the USACE.
6h. Comments: n/a
Page 9 of 13
PCN Form — Version 1.3 December 10, 2008 Version