Loading...
HomeMy WebLinkAbout20180891 Ver 1_Shoreline Stabilization_20180627O a 9 1 State of North Carolina fir, 2 8 Department of ErWir� Int and Natural Resources inion of Water Resources DW -" 15A NCAC 02H .0500 - Water ification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: _ Division of Water Resources �/ 401 & Buffer Permitting Unit 1617 Mail Service Center JUN 2 7 2018 Raleigh, NC 27699-1617 _ np A,,, - I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name:A- n(,� Mailing Address: �3O 0 14�2 IN cc, �C Telephone Number: �u%1^/- I Fax Number: E-mail Address: I e r i & P 2r_e C` % t_ C. r»"n 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/PoEtaIsdocs/Permits SAM ENT AU 0R17..A.R'_ndf) must be attached if the Agent has signed thi ication form. Name: Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Person to rec ive the Certification Approval: Fax Number: II. Project Information [15A NCAC 02H .0502 a) & h)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the prttoperty (where work is to be conducted County: (20—' C1\ J e.l Nearest Town: s- V'or,�k + e_ Fa, ( 1 Subdivision name or site address (include phase/lot number): Directions to site - please include road names and numbers, landmarks, etc.: F j v - r\ - Latitude (in decimal (decimal degrees)e10� 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): (,. CN e / ( f ea 6. Property size (acres): / O - b? `/ 7. Lake/ river/ ocean adjacent to property: 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): ` -L,, ►` i ►nom _ y-\ 9. Will work be conducted from land? 0-" From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: r --)n i . ":� CJI i_ 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake levAl/ Normal Water Level and 50 feet land -ward in square feet or acres: 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Own r/Age �reis ture [15 . i . �E-�C 0=_U5,� X11 Date Agent's s' lid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Full Pond/ Normal Water Level Shoreline La ke (At Full Pond/ Normal Water Level) CD �GoNSr¢vcn.�//. Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 m �i 4 4- -- All