Loading...
HomeMy WebLinkAboutWQ0040097_Application_2018062500% JUN 2 12018 WOROS MOORFSVILLI Fir:(IIONAL Opp,., Man Vlou� I 4 1 'YV- i rr) I I C) C, ( ut� r) see-, '-lUVIV3" U o k (P Wil � v--, McKIM&CREED 8020 TOWER POINT DRIVE, CHARLOTTE, NC 28227 TEL (704) 841-2588 • FAX (704) 841-2567 LETTER OF TRANSMITTAL ADDRESS: NCDEQ/DWR 512 N. Salisbury Street, Suite 925 Raleigh, NC 27604 ATTENTION: Water Quality Permitting PERCS Unit DATE: 06/07/2018 PROJECT a: 01432-0071 TASK #: 400 RE: McAlpine Creek Relief Sewer - Phase 4 TRANSMITTALti: PAGE OF WE ARE SENDING: ® Originals ® Prints ❑ Shop Drawings ❑ Samples ® Specifications ® Calculations ❑ Other - Quantity Drawing No. Rev. Description Status 1 Cover Letter G 1 Original Signed Application Form SSEA 04-16 G 1 Copy of Signed Application Form SSEA 04-16 G 1 Check for the Application Fee in the amount of $480.00 G 2 Flow Tracking/Acceptance Form FTSE 04-16 G 2 Plans, Final Design — Not for Construction G 2 Specifications, Final Design — Not for Construction G 2 USGS Quadrangle Map of Project Location G 2 FONSI for the Project 2 Engineering Calculations G Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3.Other 4. Amend & Resubmit 5. Rejected - See Remarks REMARKS: R E D JUN 00 2018 DENR-LAND QUALITY STORMWATER PERMITTINd CC: Amy Vershel, PE McKIM & CREED, INC. Charles E. Shue, PE Signed acha rammel, PE State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources ,,vv``,,� //^^ SSEA 04-16 & SUPPORTING DOCUMENTATION Application Numberl''� //�LtNM6? (to be completed byDWR) I. APPLICANT INFORMATION: 1. Applicant's name: Charlotte Water 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State M Municipal ❑ County 3. Signature authority's name: Joseph C. Wilson per 15A NCAC 02T .0106(b) RECEIVEDINCDENRIDWR Title: Chief Engineer JUN ; 1 2018 4. Applicant's mailing address: 5100 Brookshire Boulevard City: Charlotte State: NC Zip: 28216-3371 WOROS 5. Applicant's contact information: MOORESVILLE REGIONAL OFFICE Phone number: (704) 391-5145 Email Address: It. PROJECT INFORMATION: 1. Project name: McAlpine Creek Relief Sewer - Phase 4 2. Application/Project status: M Proposed (New Permit) ❑ Existing Permit/Project 3. If a modification, provide the existing permit number: W000 and issued date: 4. If new construction but part of a master plan, provide the existing permit number: W000 5. County where project is located: Mecklenburg 6. Approximate Coordinates (Decimal Degrees): Latitude: 35.16090 Longitude:-80.7346o 111. CONSULTANT INFORMATION: 1. Professional Engineer: Charles E. Shoe License Number: 10142 Firm: McKim & Creed, Inc. Mailing address: 8020 Tower Point Drive City: Charlotte State: NC Zip: 28227-7726 Phone number: (704) 841-2588 Email Address: Cshue@mckimereed.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: I. Facility Name: McAlpine Creek W WMF Permit Number: NCO024970 Owner Name: Charlotte Water V. RECEIVING DOWNSTREAM SEWER INFORMATION: I. Permit Number(s): W00035676 System Wide Collection System Permit Number(s): WQCS00001 Owner Name(s): Charlotte Water FORM: SSEA 04-16 Page I of 6 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been submitted? ❑ Yes [:]No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been submitted? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been submitted? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ® Retail (stores, centers, malls) ❑ Car Wash ® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ® School / preschool / day care ❑ Medical / dental / veterinary facilities ® Swimming Pool /Clubhouse ❑ Food and drink facilities ® Church ❑ Swimming Pool/Filter Backwash ® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Is/was an Environmental Assessment required under 15A NCAC 0IC? ® Yes ❑ No If yes, submit the appropriate final environmental document (FONSI, ROD, etc.) 6. Nature of wastewater: 100 % Domestic/Commercial % Other waste — specify: _ Industrial (See 15A NCAC 02T .0103(20)) 7. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0114) Has a flow reduction been approved under 15A NCAC 02T .0I 14(f)? ❑ Yes ® No If yes, provide a copy of flow reduction approval letter 8. Summarize wastewater generated by project: Establishment Type Daily Design Flow "b No. of Units Flow gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total GPD a See 15A NCAC 02T .0114(b), (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified below shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. FORM: SSEA 04-16 Page 2 of 6 VII. GRAVITY SEWER DESIGN CRITERIA - 15A NCAC 02T.0305: 1. Summarize Gravity Sewer to be permitted: Size (inches) Length (feet) Material 36 6,047 PVC, DIP, FRPMP 30 10,504 PVC, DIP, FRPMP Vill. PUMP STATION DESIGN CRITERIA— 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. What is the nearest 100-year flood elevation to the facility? feet mean sea level. Source: Is any of the proposed project located within the 100-year flood plain? ❑ Yes ❑ No 4. If Yes, are the following items provided per 15A NCAC 02T .0305(e): Water -tight seals on all station hatches and manholes; and Control panels vents extend two feet above the 100-year flood plain elevation? ❑ Yes ❑ No ❑ N/A If No, what measures are being taken to protect them against flooding? 5. Finish grade elevation of the pump station: 6. Design flow of the pump station: millions gallons per day (firm capacity) 7. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 8. Number of pumps provided: 9. Number of pump cycles at average daily flow: cycles per hour 10. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: SSEA 04-16 Page 3 of 6 Vill. PUMP STATION DESIGN CRITERIA (continued) 11. Summarize the pump station design elements: Design Element Plan Sheet Reference Specification Reference Power Reliability Source and Associated Elements Screened Wet Well Vent Check Valves, Gate Valves, etc. Control Panel Restricted Access Elements (Fence, Wet Well Lock, etc) Audible and Visual Alarms Telemetry/SCADA Level Controls Weatherproof Sign with Required Information Air Relief Valves 12. Summarize the force main to be permitted: Size (inches) Length (feet) Material High Elevation (feet) Discharge Elevation (feet) Pump -Off Elevation (feet) 13. Air release valve station locations per 15A NCAC 02T .0305(i): Air Release Valve # Station Plan Sheet Reference FORM: SSEA 04-16 Page 4 of 6 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(fl & (g) ➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any wimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 021,9305(e) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Streaiii classifications can be identified using the Division's NC Surface Water Classifications webnaee ➢ Ifno`ncompliance with 02T.0305(f) or (a). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes [-]No ❑ N/A ➢ See the Division"s draft separation requirements for situations where separation cannot be meet ➢ No variance is lequireO ifthe alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: SSEA 04-16 Page 5 of 6 IX. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, C k t I• le' C , Shw ei attest that this application for (Professional Engineer's name from Application Item 111.1.) Me A,Io *tee_ C?oe- L RPIio C o�vqix)er — name from AnDlication Item II. has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with this application package and its instructions, as well as all applicable regulations and statutes. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant� Certification per 15A NCAC 02T .0106(b): attest that this application for (Signature Authority's name & title from Application Item I.3.) (Facility name from Application Item II.1.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not e�ce�e $10,000 as well as civil penalties up to $25,000 per violation. Signature, � / Date: FORM: SSEA 04-16 Page 6 of 6 v� MCIQM&CREED June 7, 2018 NCDEQ/DWR Water Quality Permitting PERCS Unit 512 N. Salisbury St., Suite 925 Raleigh, NC 27604 ENGINEERS S U R V E Y O R S P L A N N E R 5 r 01432-0071 REC�1VFD JIIN 08 1DiD STORMWq ER PERTY I MTTING RE: Application for Permit SSEA 04-16 McAlpine Creek Relief Sewer - Phase 4 Charlotte Water Project No. 7030600020-16-505 Dear Water Quality Reviewer: On behalf of Charlotte Water we are submitting plans, specification and other supporting documentation for the construction of the McAlpine Creek Relief Sewer - Phase 4 for review and approval. The project consists of approximately 17,000 linear feet (LF) of 36-inch to 30-inch relief sewer along McAlpine Creek, beginning near Independence Boulevard (US HWY 74) and extending upstream to Lawyers Road (SR 3128). This project will provide added hydraulic capacity to handle system growth and wet weather flows, including the elimination of several existing aerial sewer crossings. We are including the following: 1) Original and one copy of the application form SSEA 04-16 2) $480.00 application fee 3) Two copies of Flow Tracking/Acceptance for Sewer Extension Permit Applications from Charlotte Water 4) Two sets of plans and specifications 8020 Tower Po i n I U r i v e 5) Two copies of the USGS Topo Quadrangle Map showing the location of the project Charlotte, NC 28227 6) Two copies of the FONSI for the project 7) Engineering Calculations 704. 841.2588 Fax 704.841.2567 ..,.m.a,cklmcreed. corn Interconnections to the proposed relief sewer from existing smaller diameter tributary sewers will also be constructed as part of this project and are being permitted locally with Charlotte Water. Plan sheets showing the detailed plans for these interconnections have been omitted from this submittal for this reason. If you have questions or need additional information, please feel free to contact me at 704-841-2588 or by e-mail at ZTrammel@mckimcreed.com. We look forward to your prompt review and approval of these documents. Respectfully, M�cKIM &CREED, Inc. a�G c ammel, PE Project Engineer cc: Amy Vershel, PE Charlotte Water Charles E. Shue, PE McKim & Creed, Inc. 49� MCKIM&CREED State of North Carolina Department of Environmental Quality Division of Water Resources „ , _„ Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Charlotte Water Project Name for which flow is being requested: McAlpine Creek Relief Sewer Phase 4 More than one FTSE may be required for a single project if the owner afthe PVWTP is not responsible far all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek WWTP b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937 All flows are in MGD c. WWTP facility's permitted flow 99.000 d. Estimated obligated flow not yet tributary to the WWTP 12.614 e. WWTP facility's actual avg. flow 65.432 f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 0.000 78.047 78.8% It. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. 'tributary Flow Plus (Name or Capacity, * (Firm / pi), Daily Flow, Daily Flow, Obligated Available Number) MOD MGD MGD MOD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum slrall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is <0. Downstream Facility Name (Sewer): McAlpine Creek Relief Sewer Ph III Downstream Permit Number: WQ 0035676 Page I of 6 FTSE 04-16 III. Certification Statement: I Carl Wilson certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Jgffieial Signature Page 2 of 6 FTSF. 04-16 MEMO11(E(�(R U.S. DEPARTMENT OF THE INTERIOR MINT HILL QUADRANGLE U.S.GfOLOGICACSURNEY .lUSTopo ,.,MXUT[[[P 11 "18 `A� 2 p 'JI wi ry 4Y'.V:. m•i r.y. 9 IYA: c 'v, a > g a, t [ A u f e Project Alignment / d r I •a' purer if MILL :.t L • e y Downstream Connection Point Permit Number: WQ0035676 r[ s , ♦' AIATPIIEl1'S - - /- jt . i 3 bTA1.1.16C9 ' 5 2 � / aax�wpun unxw�nG.egw mm[ S(LE 1.24 W] 0 w. F-1 I;4n..[W MINT HILL. HC •. 3o1e FINDING OF NO SIGNIFICANT IMPACT Environmental Assessment for the McAlpine Creek Relief Sewer Charlotte -Mecklenburg Utilities Pursuant to the requirements of the North Carolina Environmental Policy Act (N.C.G.S. § 113A-1, et seq.), an environmental assessment (EA) has been prepared for the construction of a gravity relief sewer to serve the McAlpine, Six Mile, Four Mile, and Crooked Creek Basins in Mecklenburg County, Governmental bodies with jurisdiction over the service area include Charlotte -Mecklenburg County, and the Towns of Mint Hill and Matthews. The project consists of the following major elements: installation of approximately 79,000 linear feet of sewer along McAlpine Creek, elimination of a force main and pump station at the Four Mile Creek confluence, and elimination of approximately 31 existing lateral sewer aerial crossing of McAlpine Creek. The proposed relief sewer will convey wastewater to the McAlpine Creek Wastewater Treatment Plant. The project is necessary to reduce/eliminate wet -weather overflows in the existing system and to accommodate predicted growth. Although adjacent to basins identified as having habitat suitable for the Carolina Heelsplitter, a federally listed freshwater mussel, Charlotte Mecklenburg Utilities has no specific plans to provide service to such areas via the project at present. The "no -action" alternative was eliminated from consideration, since it would not be, reasonable or feasible given the insufficient capacity of the existing system, ongoing impacts of sanitary sewer overflows, and anticipated growth in the service area. During the project preliminary design phase a review of various alignment alternatives were reviewed to minimize construction impacts and maximize project benefits. Detailed information about the project's alignment and configuration are contained within the EA. The project has been aligned taking into account associated engineering design requirements and the avoidance and/or minimization of environmental constraints as well as cultural constraints. During construction, an approved Sediment and Erosion Control Plan will be utilized to prevent exceedences of the established turbidity water quality standard. Following completion of construction activities, the project area will be restored. Efforts will be made to minimize the removal of trees from the project area. Detailed discussion of the project's direct impacts and efforts to mitigate them are included in the EA. Secondary and cumulative environmental impacts may result from the McAlpine Creek Relief Sewer project. Mitigation for such impacts will be provided by various ordinances and land development regulations implemented and enforced by the aforementioned local government jurisdictions. These include, stormwater, floodplain management, and riparian buffer protection measures. All measures are described in detail within the EA. Based on the findings of the EA and on the impact avoidance/mitigation measures contained therein, the Division of Water Quality has concluded that the proposed project will not result in significant impacts to the environment. This EA and Finding of No Significant Impact are prerequisites for the issuance of Division of Water Quality permits necessary for the project's construction. An Environmental Impact Statement will not be prepared for this project. This FONSI completes the environmental review record, which is available for inspection at the State Clearinghouse. North Carolina Department of Environment and Natural Resources Division of Water Quality 10 March 2006 McAlpine Creek Relief Sewer — Phase 4 Sewer Calculations April 2018 1) Manhole Buoyancy Calculations 2) Pipe Buoyancy Calculations 3) Sanitary Sewer Hydraulics 3.a) Existing Outfall Sewer 3.b) Relief Sewer 3.c) Downstream Sewer (WQ0035676) ��.•"SH CAgp'�.. 1•0' FESSi'•��Y Oel. 9 �'•.�'9�fS� E .5 ��.•'. Manhole Buoyancy Calculations Job: McAlpine Creek Relief Sewer - Phase 4 Manhole Type: Deepest 5' diameter manhole in project - See MH#61 on Plan Sheet 4 Worst case scenario: Groundwater level at surface MH#61 MH MH Depth Density of Density of Dry Density MH Dia. MH Dia. Bottom MH Base Below Concrete Water of Soil (Inside-ft) (Outside-ft) Height (ft) (ft) Diameter Surface ft (lb/ftA3) (lb/ftA3) (Ibs/ftA3) 5 5.833 35.8 0.5 6.833 33.7 150 1 62.4 96.8 Find Total Uplift Force U = void space x density of water MH Hydrostatic Uplift Force, U1 56,233.57 Ibs Base Hydrostatic Uplift Force, U2 1,144.22 Ibs U = total Uplift Force (U1+U2) 57,377.79 Ibs Find Total Weight of Manhole and Soil, W Weight of Manhole, W1 38,083.15 Ibs W1 = 4' Dia. Manhole, including base Dry Unit Weight of Soil, W2 32,472.46 Ibs W2 = Soil Overburden on MH base lip Concrete Bench, W3 4,417.86 Ibs W3 = Concrete bench for a 36-inch dia. Pipe Total W = 74,973.47 Ibs Results Difference W - U 17,595.68 Ibs Safety Factor 1.31 *Therefore Manhole is sufficient to resist hydrostatic uplift Manhole Buoyancy Calculations Job: McAlpine Creek Relief Sewer - Phase 4 Manhole Type: Square Diversion Structure near Lawyers Rd - See Plan Sheet 18 & Detail Sheet C Worst case scenario: Groundwater level at surface Diversion Structure MH MH MH MH Depth Density of Density of Dry Density Width Length/th/Width Leng Bottom MH Base Below Concrete Water of Soil (Inside-ft) (Outside-ft) Height (ft) (ft) Length/Width Surface (ft) (Ib/ftA3) I Ib/ftA3 (Ibs/ftA3) 8 9.333 11.9 1 10.333 8.6 150 62.4 96.8 Find Total Uplift Force U = void space x density of water MH Hydrostatic Uplift Force, U1 46,747.31 Ibs Base Hydrostatic Uplift Force, U2 6,662.93 Ibs U = total Uplift Force (U1+U2) 53,410.24 Ibs Find Total Weight of Manhole and Soil, W Weight of Manhole, W1 57,339.33 Ibs W1 = 8' diameter diversion Structure, including base Dry Unit Weight of Soil, W2 16,372.11 Ibs W2 = Soil Overburden on MH base lip Concrete Bench, W3 14,400.00 Ibs W3 = Concrete bench for a 36-inch dia. Pipe Total W = 88,111.44 Ibs Results Difference W - U 34,701.20 Ibs Safety Factor 1.65 'Therefore Diversion Structure is sufficient to resist hydrostatic uplift Pipe Buoyancy Calculations Job: McAlpine Creek Relief Sewer - Phase 4 Pipe Diameter: 30-Inch PVC Gravity Sewer Pipe Given Info: Worst case scenario: Groundwater level at surface 30-Inch Pipe, Wpipe (lb/ft) = 88.49 *ejprescott.com & jmeagle.com - C900 DR 25 Unit weight of water, b (lb/ftA3) = 62.4 Wet unit weight of soil, bw (Ib/ftA3) = 120 Dry unit weight of soil, bd (lb/ftA3) = 96.8 Outside Diameter, D (inches) = 32 *dpcpipe.com & jmeagle.com Depth of dry soil, Hdry (ft) = 0 *Unit weights for soil from LAW report Find: Hydrostatic uplift force, U Weight of soil overburden (lb/If), Wsoil Depth of submerged soil over top pipe (ft), Hsub Calculations: U = (3.14*DA2)/4*62.4 = 348.51 Find minimum cover to prevent uplift. From equation Wsoil=6d*Hdry*D+(6w-6)(Hsub+0.1073D)D Breakdown 1 bd*Hdry*D = 0.00 (bw-b)D = 153.60 (Hsub+0.1073D) = 0.29 Breakdown 2 153.60 (Hsub+0.1073D) = 153.60 Hsub+ 43.95 Wsoil = 153.60 Hsub+ 43.95 Wsoil + Wpipe = U Wsoil = U - Wpipe Wsoil = 260.02 Hsub = 1.41 Minimum cover in feet to prevent hydrostatic uplift * With lower limit covers near 7' hydrostatic uplift is negligible Pipe Buoyancy Calculations Job: McAlpine Creek Relief Sewer - Phase 4 Pipe Diameter: 36-Inch PVC Gravity Sewer Pipe Given Info: Worst case scenario: Groundwater level at surface 36-Inch Pipe, Wpipe (lb/ft) = 128.41 *ejprescott.com & jmeagle.com - C900 DR 25 Unit weight of water, b (lb/ftA3) = 62.4 Wet unit weight of soil, bw (lb/ftA3) = 120 Dry unit weight of soil, 6d (lb/ftA3) = 96.8 Outside Diameter, D (inches) = 38.3 *dpcpipe.com & jmeagle.com Depth of dry soil, Hdry (ft) = 0 *Unit weights for soil from LAW report Find: Hydrostatic uplift force, U Weight of soil overburden (lb/If), Wsoil Depth of submerged soil over top pipe (ft), Hsub Calculations: U = (3.14*DA2)/4*62.4 = 499.24 Find minimum cover to prevent uplift. From equation Wsoil=6d*Hdry*D+(6w-6)(Hsub+0.1073D)D Breakdown 1 bd*Hdry*D = 0.00 (6w-6)D = 183.84 (Hsub+0.1073D) = 0.34 Breakdown 2 183.84 (Hsub+0.1073D) = 183.84 Hsub+ 62.96 Wsoil = 183.84 Hsub+ 62.96 Wsoil + Wpipe = U Wsoil = U - Wpipe Wsoil = 370.83 Hsub = 1.67 Minimum cover in feet to prevent hydrostatic uplift With lower limit covers near 7' hydrostatic uplift is negligible I�" p m N _M O m m ^ n YI fm0 n 10 n O b N r 0 Iml lunll . �g.y �omr $AA p$pepp� pm_ppppmp n 3 8 S 0 0 0 O O S 0 0 0 0 0 0 0 0 0 0 a3M3S do UO1S 8 8 8 8 o S o o S o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w 0 J m N m m n m M O b m m n m fV N n m n o °-' w� a mm �u, ommr 'id z Iu) �o.m e�i,nM ewimomgm < gg Q (V J O m of n VN e M m N N n m YI YI CJ lh OO OO 0 n .q A3130N3 83MOl g m n e m m. m . m 'm m b b m m b b e N N���� vO1i vi n n n n vmi v� w O m'Yim ev n�wo �o+, ro m'o mrn 0O1 mi=� m 000`"rvn lul 'A313 ON3 a3ddn u°in m m m m m m m m b m m m b b d0a01a3AN13l0HNVW Iz (up H1d30 MOId NOIS30 (s/a) A110019A MOId NOIS30 of U N a a a i 0 M03HO NOI110NOO �1 w 0 (pBw) ALIOtldtlO NO1530 A�y pB ' MOI(d NO)w IS30 a W W(pBw) N N J MOld ll.00tl MV3d 1�1 W J Q LL O 8010VA ONIMtl3d MOId 11.00tl Y W W V{ U J (pBw) W Z N �1 a " O w w MOId 11.00tl f EMOId Z N FFF---111 X (pBw) 3Stl8 Mtl3d HMOtld ONI IV3d MOId 3sve (pBw) V{ MOId 3Stl0 (siu)lend p ONIMOId A1I0013A 6 Q U (pBw) AiI3VdV3 llnd SONINNVW (ul) 2yy a H313Wtl103dld Wd �S �., t (u) U H1ON3I O i HW MMUSNM00 & O 01 w Hw wtl38lsdn N N N .rl1 V N O " n rn ry m v e n N m P v n M e u N n o M o o a m y ryNa vmi i0 N m�LLmp'Mq "� O N N M evi a v a n�i, N f'O' n m Q m n I I m m p m pm nyy o n m n .- pp ry r m �- N- m n o . . . n m O O O C O G G O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . •' f f f- fo- f f f f f- 0 0, n M t7 8 0 P P Ym11fO t0 N r n m b 0S 0 0 N N N N N N N 8 0 0 0 0 0 0 0 o c c o 0 0 0 0 0 0 0 0 6 0 0- M � OOO O O OO N N'' ymj„�. Yml O � T O+OI OI OI mO�m NM ry N N N N N N ry r ry ry N N N N N N ry NNN ry N N ry ry ry ry ry n ry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d��wcQi� o O1 MervM�mmo QmrMr"'inN `� nnMvn N cl N J Q M l7 l7 m N M n O1 Q m C �p y mm N M N r N o, n m, ry ? � � N N � Q Q P N Q e P m �d M e N CO m- m. m. M. m. m. m. m. n. n. n-n.. M M M M M M M n. m o 0 0 0 0 0 0 0 0 0 0 0 0 0 'o 'o 'o 0 0 0 0 0` o K o o c c c o 0 0 o c 0 0 0 0 6 0 d o 0 0 0 o c o0 d 6 0 6 6 0 p m m m m m m m mm m m m m m m m m m m m m m m m m Y N N N m m e N N N O� o o N IOV Cn01 N N N N N `� 8 N� OI Onl OI O. Q� W {y M N in N o m n n n n m r Oi 8 'O a` Ni "P oyy (llN) lmV qQ gym m ... 8 do 8 0 8. o. So 'do 8. o ... o. L3M3S d03dOlS 0 7 . . . . . . . . . . . . . . . . . . . . . . . 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W 'A313 ON3 H3M01 J$ h h h m y m h h m m n N m . . . . . . . . . . . . . . . . . . . . . . agi$8Nr$'$'$r$8$`c4`F�,Fi,��88m88 la) n 'A3130N3 113ddn dodo ib3AN131OHNVW . . . . . . . . . . . . . . . . . . . . . . 8 m m v o o m m a io, o n ry n o (u!) H1d30 m ry m m r N N - O `V MOId NOIS30 ` ` ` ` ` pp rOI r N NI N N O m N N P P l9nU P N m m N A1I3013A MOIi NOIS30 N33HO NOLLIONOO IPBwI m P N.W m m AllOtldVO N01930 O w m mNl. n mry N P Q P Q P Q Q P m n m gg,m $v a'. $1p�s's$ � I O Idd w 8 mm m v� MoldNOIS30 n1 vil nry n ri w �wIN vi�oQ PQ 6 v Q Q vi vi v� vi (pow) a " $ `.° MOId 11.00V Ntl3d ,., ,., ,., o, o, o, o, o, o, o o, o, o 0 0 0 0, o, o, o, o, o, o 0 0, o, X010tld 9ND1V3d $ MOId11,00V ` '- - - ` ` - ` ` - ` - - - - ` N - r O Y 1mO ^O N m O O �� m O. m m m m m (PBw) rrvi, `8,m m M8M Mold 11.00tlmm�nminma%r%n`ai, MOId 3SVS NV3d o' "' N N ry ry ry ry ry n n N N M m n n rmi ry N lV N N H010Vi 0NINV3d MOIi 3Stl8 m N N N N N N N N N N N N N N N N N N N N N N m m m m m m m m m m (PBw) MOId 3sve (sM) llnd v m m e ONIMOId ALI3013A o Q Q a .n d d ry id d d N d vi d m (PBw) `O i` m A11OVdV011ni n m m m m Nry N N 0 N. m n N N n m N N m m m o, o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . . . . . . . . . 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m m m ry r ry ry N ry ry n ry ry n'ry ry ry n n ry ry ry o 'ON SONINNtlW � NO a L313WVIO 3dld Oo1sm (4) HION31 J mo b N Q4 ry O N N 0 QCI N N tV m N N N o ry n io io iu io m w w w m m m m w 8 HW WV3N1SNM00 m` . Q. Q. .. . �. . m.. w 8 to1Sd0 Ol HW Wtl3N � — — a 0 F O Z N am N cD a (Ulu) m N n P A n n 0. m m � . A I m N b m g mg q mq yNy m m m ' m 0 0 m m 0 b m ``� �`�o ``gdB$ myy m 8888yy yy y^ny ym ym oog So So So 0 o"dob°88'So' 93M3S dO 3do1S S 6 6 E S S S o 0 0 8. 0 0 0 0 0 0 0 o . .. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 m N N, m tn+j N f01 $2 0 Nm e � "�i i0 m- M N- m b- Q b M m mm (U) 'A3130N383MOl o oVf mp y m n vi o n vi of o p� p�p m ri N n �ri O Nm m 10 N N W InJ N M 0 Q, m 0 n 17 [nV fml, rp N m Q 0 M r N Q (NI 'A313 N y�y� o vppi vpi rpi pp m r v� N N o r m n o of vi "d g m UN3 83ddn m m m b D (O rp �p ip ip m m m b m m m m m 10 f0 m N N m N N m m (N) d0tl01N3AN131OHNtlW Z NO H1d30 MOId N01930 n'�`�mn mn mrm �wm m rn'�nry oo$ N�om m m n�mnnm��'Ai (9/4) AlI0013A MOld N01S30 > 6 "' Vf U a a H Z NO3H0 NOLLIONOO a w O (PBW) A113tldV3 NOIS90 A (pow) MOId Noma Nx MOIi 1L1.GO00tl Ntl3d r7 `W H010tld ONINtl3d MOIi 11,(30tl (pow) 0 MOId 11.00tl w (PBW) aW Q. MOIi 3Stl9 Ntl3d F ~ 8MOVA ONINtl3d Mold 3Stl9 PBW) Vi MOIi 3Stl9 (m) ilnd O ONIMOIi A110013A n (pow) u�. AllOtldv3 llnd 'ON SONINNtlW lul) Qw Z n 9313Wtl103did Wi 8 a Wg N (�".. 3 L (U) VZ H10N31 U w G w �? rc UO HW Wtl391SNM00 j a J t�i U1,W Ol HW WVMISdn Omi N N O N t0 N m m O O n Cml N N M d d 6 Q e Q vim m m m m m m m ... m m m m m m n nnn n n r r r r f f f o o m o 0 0 0, O O, o, o, o 0 f f o 0 0 0 0.0, o o, o o 0 0 0 J io io iu lO m3m m� N fl P hm0 n m m� M O N O �mO Oml OI )3 O � � N N N Q Q Q Q Q O m m m N m ul N YI mm m m m m m m td b n 1� r r r r r r IA n O 4 m n n N N N y m m CJ N O 00 g g N N N N N N m m m N N O e m r m 0 b b ; `b m m a v a o o v n n n n n n n n t0 Y) V) .O 10 U) 1G Id Id b b b b n LL N N N N N N N ry N N ry ry ry N N ry N N N N N N N ry ry N N N N N N N N N o 0 0 0 o N N m m m Q em N m m m m m O �- � O 'J 3 0 0 m N m VI N N YI YI N N m m m N [QV T N N N N N VN] N C�i� ONi O�i ONi g A T T T N W n N N N N N m N N N N N N N N N N N N Nmm N N N N N N N 6 6 6 6 6 6 6 0 W o o d o 0 0 o d o o c o 0 0 o c o 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 J W O0 0 O� O� O� T A O� UNI ONI OI Q mm m b !O m m m Nm m m m m.. n IN r r N N O U3M39 iO3dOls d o o c c o c o A3130N3 H3M01 J q�pp� ry$ h N h h {{Nyy 'A313 UN3 U3ddn Vl m N r h YI N dOU01U3AN131OHNVW (w) H1d30 MOIi NOIS30 11 !7 n N n n P P (SM) A113013A MOld NOIS30 M33H0 NOI110N00 (PBw) O o6do a a A110tldtl0 N01930 v. o. o N Wr o om �n n (PBw) MOId NOIS30 d o a o c a 6 a a o < m (pow) a Mold 11.00V MV3d MMOtld 9NIMV3do,. Mold li.0atl o o a< m m m m m (PBw) Mold 1L00tl mm m mmm (Pfiw) MOId 3SV8 MV3d H vt°i v`�i v`�i m in in �n m U010Vd ONIMtl3d MOIi 3SVS (PBw) MOIi 3StlS N N N N N N N n (sM)llnd � ONIMOId A.U3013A v v v v r r r r (PBw) ALIOtldtlO find o m m m m m ro r n m m m 'ON SONINNtlW .. o 0 0 o 0 0 0 o d o o'o 0 0 (VI 9 p b Irl Iml 11 l7�17 t7 b U313Wtl1 0 3did HION31 n d a oo d vyyi m m b m N fO HW WV3H1SNM00 Ol HW Wtl3Uisdn b b b b b 3 W UPSTREAM MH m x x x x x x x x x x x x x x x x x s x x x x x x x x x x x x x x x x x x x x x x x x D F �� u u EllJ m io m TO A c 1p y 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 x _ y v m Z u u u A A A DOWNSTREAM MH m N N a N N n'S n i n u w LFi n nog g % g%%% 9 u `A" A9 n" m' m A m n o m N w m N w J 10 >, F _I m _ D o 0 y I LENGTH O o n - D �' /� o m m m m m m m A m m m m m m m m m m N v N iAi N N N ri'i y PIPE DIAMETER y m n� v m (I�) a mmo wA awWwwwwmwomwwwwwwwow owwwwww0WwowowwWmww x MANNING$ No. A Dm " m m m m m m m m w m m m e" w `d m N o FULL CAPACITY m o (mSd) c N o Sao o 'm a m N u a v W a c`Oi m m u m m u U u n' `J' 'm m uo. `�° m m0 y D s A A P A A n A A A A A A n A A o A n P A o A n P A A o o A n P A n P A n A A A A J m A VELOCITY FLOWING O m J N o o m m o N m m m o W u N m rn W a J a a w a m a a W a J m J m m J J W a m m FULL (Ws) A m 0 0 o o A BASE FLOW r^ I o ', o a Imedl VI 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 o 0 0 BASE FLOW 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 o m PEAKING FACTOR . Cw G 9 0 o v PEAK BASE FLOW (m9d) w u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m m m D 0 00 00 00 00 00 00 0 o w o O ADD'TL FLOW" (m9d) CA N ti y ADD'TL FLOW /I 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 R PEAKING FACTOR y`�1 PEAK AFLOW M o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 o S o 0 0 0 0 0 0 o a o a m9d) (.9d) T i 1 a ala a�a�N' I IW w I 'o, lm"'� DESIGN FLOW NIA, m'm� 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o (m9d) rV Fd P p DESIGN CAPACITY u A P m (m9d) m G z r CONDITION CHECK � M A n p A A p A n o p n P A n P A n A n DESIGN FLOW VELOCITY u w m m m o o a J v m� rn m u w O w w� N rn N N� N A N N o N m m m m J m m m u m m IR/sl DESIGN FLOW DEPTH wi`La'`b,'�P'Gw' n Ln"taJ n`dJ'ma �o`� a Xis �`�m`m"`�,''SN'`�w' UPPER END ELEV. mJ �O"N�`�J'v W b v N A U A O+ W N+ (N) W O W A W A m J N W w J U m N A J A N P LOWER END ELEV. a a SLOPE OF SEWER as g as (R/N) .tp. COST PER FOOT v A A C A A A A A A A v A N A P A A N 0 n IErc�I N N N N v N N v N v N T N N N N u m m COST PER REACH UPSTREAM MH # R L #O # TO $ �, �� u a a x x xx s 3 x N u u v DOWNSTREAM MN LENGTH ornrrm u&i if N omoTS' . .m mm. am mme m mam r In) PIPE DIAMETER PM . _.. 0 0 0 0 0 0 0 0 0 0 0 o 0 MANNINGS No. 9tAttt9tttA'" Jo FULL CAPACITY �mm$ov O (mStl) u a ou�Nifiu VELOCITY FLOWING w w w w om� Jwomo�$u m�m`�"o" FULL(ftla) a u $ nag ^ N O BASE FLOW Im9tl) J m BASE FLOW m m o 0 0 0 o m o 0 0 0 0 0 0 0 0 0 . . . . . . . . . . . . . . . . . . "R PEAKING FACTOR IJ N N N N IJ N N PEAK BASE FLOW N 0 J J U g (mgtl) 0 ADD'TL FLOW gy0g,o gg}Qg�gg�ggS Qyg}Qg(JQg(gg g oS oowwoo8888SS8S 0S (mgtl) - y ADD'TL FLOW b o 0 0 0 0 0 o m a o 0 0 0 0 0 o 0 PEAKING FACTOR m PEAK ADD'TL FLOW o S o o 00000........... o (mgtl) U�-0 o N o DESIGN FLOW (metl) g v ^ v DESIGN CAPACITY o (mgtl) Sir 8 0 0 o a ov ow .. CONDITION CHECK a a a a a a a p a a DESIGN FLOW VELOCITY IWO a a a a a " " m g as as S DESIGN FLOW iai iau DEPTH (In) UPPEREND ELEV. u m m a W N J m m m m O m m N m wPnmmg`U'S���BY'uw,oml'$IH`m' lPo 0 0 0 0 0 0 0 0 0 0 0 0 0 o m SLOPE OF SEWER 6 m N 4mi $ g$ N m T m Lai e U I") COST PER FOOT COST PER REACH J u o N u n u N am u N o vffgg'"'$'s: y c C