Loading...
HomeMy WebLinkAbout20180865 Ver 1_B5503_ArchReport_NoSrvyReqd_20180621Project Tracking No.: 15-03-0021 -o����� NO ARCHAEOLOGICAL SURVEY REQUIRED FORM � � ,Q;,. Q.�,�, ,�.,.: ���� This form only pertains to ARCHAEOLOGICAL RESOURCES for this project. It is not �f:'�.:' �� t �" � t'yJn�` l ! O +�`��`� valid for Historic Architecture and Landsca es. You must consult se aratel with the + -��a �': � t� . ; p P Y `�. ' <..., ;. ,,.�t �,a�•... ... (4y '�.,._�'�. �` Historic Architecture and Landscapes Group. '�ti���. PROJECT INFORMATION Project No: WBS No F.A. No: B-5503 �XYIDx�i �_y;il BRSTP-0125(6) Federal Permit Required? County: Document: Martin MCS Funding: ❑ State � Federal � Yes ❑ No Permit Type: unspecified Project Description: T/iis project proposes to repince Bridge No. 53, w/�ic/: carries NC125 (Prison Camp Rd) over CoUie Creek in Martin County, Nortl: Carolina. According to tl:e environmental input request, tl:e undertaking involves tl:e in place replacement of tfie structure along tl:e e.zisting alignment, thereby minimizing potential surface and subsurface distu�bances nt tl:is locntion. An off-site detour route or stagerl construction effo�t is anticipate�/ T/:e arcl�aeological Area of Potentia[ Effects (APE) is centered upon Bridge 53 and measures 1400jt in lengt{: (700f[ from each bridge end point) nnrl l SOf1 in widt/: (7Sj[ from eacl: side of tl:e NC125 center-line). SUMMARY OF CULTURAL RESOURCES REVIEW Brief description of review activities, results of review, and conclusions: First, permitting and funding information was reviewed for determining the level of archaeological input required by state and federal laws. Section 106 of the National Historic Preservation Act will apply since this is a Federal Highway Administration (FHwA) project utilizing a United States Army Corp of Engineers (USACE) permit. Next, construction design and other data was examined (when applicable) to define the character and extent of potential impacts to the ground surfaces embracing the improvement work. Once an APE was outlined, a map review and site file search was conducted (3/9/2015) at the Office of State Archaeology (OSA). No previously documented archaeological sites are located within or directly adjacent to the project APE. An inspection of National Register of Historic Places (NRHP), State Study Listed (SL), Locally Designated (LD), Determined Eligible (DE), and Surveyed Site (SS) properties employing resources available on the NCSHPO website confirmed an absence of historic sites with potential archaeological deposits in the project area. Historic maps of Martin County were appraised for former/past structure locations, land use patterns, or other confirmation of historic occupation in the project vicinity and archaeological/historical reference materials were inspected as well. In general, the cultural portion of the review confirmed that no known cemeteries, significant historic structures, or documented archaeological sites are present in the APE. Further, topographic, geologic, and NRCS soil survey maps (Ly, Bb, Ba) were referenced to evaluate pedeological, geomorphological, hydrological, and other environmental determinants that may have resulted in past occupation within the project location. Aerial and on-ground photographs (NCDOT Spatial Data Viewer) and the Google Street View map application (when amenable) were also examined/utilized for the assessment of disturbances, both natural and human induced, which compromise the integrity of archaeological sites. erief Exp/anation of why the available information provides a reliable basis for reasonably predicting that there are no unidentified historic properties in the APE: The APE contains no documented cultural resources. Examination of soil data, on-ground and aerial imagery confirm the presence of wetlands underlain by poorly drained soils characterizing the majority of the project location. Because the potential impacts are relegated to a relatively diminutive area surrounded by swamp and wetlands, significant archaeological and cultural resources are unlikely to be affected. A finding of "no survey required" is deemed appropriate for the undertaking. "No ARCHAEOLOGY SURVEY REQUIRED" form for Minor Transportarion Projects as Qualified in the 2007 Programmatic Agreemem. 1 of 2 SUPPORT DOCUMENTATION See attached: � Map(s) � Previous Survey Info ❑ Photocopy of County Survey Notes FINDING BY NCDOT ARCHAEOLO�'i1ST O ARCHAEOLOGY SURVEY RE UIRED � Photos Other: Project Tracking No.: ❑Correspondence "No ARCHAEOI.OGY SURVEY REQUIRED "form for Minor Transportation Projects as Qualifted in the 2007 Programmalic Agreement. 2of2 �., 1 inch = 2,000 feet � - ' \ ' '�, �;� ' ' e� ` �� 4 � 4 �''� `'' �! 111\ '� � ;%'�/ / ,; '� �\' � D � �:,� J ✓ �- r .�_.. `\ ` � . , •'.� �`��, .`1j. . ;'l /��� . � .. .,C9lil i �� �]� - � � �} ' _, � - I 1 �$1 ' �— . _ 1 v •A _ r. � � l x?0.0 I . - �\ '-.\ ./ �\ _ 1 ,',i, ? . . � ,�� � y � � ras , `\�� ,� � 1� ��' \ ` � ,' ` .� � _ _. � � � � 'i _~� ' �►... ' - ---�-" - , —' •y - _ `'� � ,.--- 1- - - _ _ j - _ � —.._.— i6em 4 r _ �.� rso . �- � Rxk Hill � . �� ''I ~ � � I � Ch �""` -� f � � �� - 1 1 /�'-'�m ' . ;s I�rd0v_�-_. _ C@t0 ' � -�-.�`��""'_-�� �^� o U � ... • � /, _ `} � -7�-� -,. � /� , - � ! �-7 1I1Z " .,. - � a •`��111 ^.l �. ,.�^• ^��� . .. , '': C�monl � .. " J �� � � . I n � � �.� . . 15 � i` , �� I «.l ` � / � I _ : �-� -._ --/. ✓Cem Cem \f� �� ' �' �_ t - . _ - .. — _ _ _ _' _". _ �� _. _ �...�J� _ ./ , ._.,-- � �� - ' �,�.+ ��� ,��--� �w . — _ �_--t; — . -_ _ -- .- ��-- - .. . - (? / . N' � 1. • / - ` � �'�J�� � � � / .�•• �r' ,1 - r _1- ,� II I �' ^�. -- r ' , : - ` ` ,/ �' / - ��/ � r � - , � �is.i ��� �� , � � . i cs � _ A � -" `�'�°. � . � I .__, 1 �,, i � � I iw ' � ; ... - 11.5 \ �I ` .. . . \ . �% , � . , , `� .� � . A .. .. � \ � � �� ,. � � �- i i�S jP __ __ � - , \\� �.+. �. _ .. y. T 1 � _�--- tRs (>Cem _ ----___ .. �-. � ^ `. — - -- ' �as '�� r ( �— . �: �-'�" _. �� � � �� �/ . , � , '��Il�_ - i . � \ -�� �� - / � rfi — �. . .$'_ \o , % � ,, i-�., � `,r _ ._� _` .` . , � , „ , �� .,�g�+ i \ � �". _ • � , / /' ' _ ;; ; ', �� . - '�'' _`, — � •�_ tr % ) � . � ' �' II ,I' � +� � � � � 1 ` 't � � �+ � �I % � �/tcG p .. .,w ,`�� \ �1 _. � �, <ea6. � � � _- ��p � � .,� �i � _ . , � l � l /! /f \, � -- -- " `, _ � - � ' _.��,-- — — - � Y i ' `,t ao � `3 _ ,' Y� . . ' `. ' � ,� i'� -', � _�"�i12, ; " % '� \ ,r11 ' 11.6 � � � �� � � _ - �' � ��. - I,I ��. . . I 4� ,, � �� � % <�. ` �� ��'�\ - I �L-- �� ,��,�� i '.`_�-�_�1, ��_ 1 - �_ 09 �,, � �. ; ifu; � j� �:�:!_!/ '�RTj �-��_y ``°" � �-� � ` _ ( li �\ � 4cem � _�'�i'r �Cp -� � ... � � � .� ��. �ro.s / �� �`� �' � �. j , w � �j' ���� � � � �� ,.,as II ` , � i , ' � 1, � . . � , � . _ .. 9�� - � — - �--- �.__ - 'I �-- . _._.. -•N � �. �i ' . � ..l- t5. —�y- �� � i�� �' �. i __ �.\ -� � � 1 j�. � . � ��. - , - ti `�., 1. � �N�TMc , r ��' �� NORTH CAROLINA DEPARTMENT OF 9 • � '�� �-�f TRANSPORTATION � � DIVISION OF HIGHWAYS Oak Grovt�� . COngIBtQh � +'+ l � PROJECT DEVELOPMENT & I Ch' � ��� + I ENVIRONMENTALANALYSIS UNIT am � �,,, �;�s.,/ � . �J" ��, I -� „ � �' � - _ - �� I MARTIN COUNTY �r Congleton C •� � `.r ;' REPLACE BRIDGE NO. 53 �" � ON NC 125 OVER COLLIE CREEK ` TIP PROJECT B-5503 USGS 1:24,000 Topographic Map(s). Quad(s): Robersonville East (1982) Ly—Lynchburg fine sandy loam Map Unit Setting • National map unitsymbol: 3qmy • Elevation: 20 to 330 feet • Mean annual precipitation: 38 to 55 inches • Mean annual air temperature: 59 to 70 degrees F • Frost-free period: 200 to 280 days • Farmland classification: Prime farmland if drained Map Unit Composition • Lynchburg, drained, and similarsoils: 85 percent • Lynchburg, undrained, and similar soils: 5 percent • Minor components: 7 percent • Estimates are based on observations, descriptions, and transects of the mapunit. Description of Lynchburg, Drained Setting • Landform: Broad interstream divides on marine terraces, flats on marine terraces • Landform position (two-dimensional): Summit • Down-slope shape: Concave • Across-slope shape: Linear • Porent material: Loamy marine deposits Typical profile • Ap - D to 9 inches: fine sandy loam • E- 9 to 14 inches: sandy loam • Btg -14 to 65 inches: sandy clay loam • Cg - 65 to 80 inches: clay Properties and qualities • Slope: 0 to 2 percent • Depth to restrictive feature: More than 80 inches • Natural drainage class: Somewhat poorly drained • Runoff class: Low • Capacity of the most limiting /ayer to transmit water (KsatJ:Moderately high to high (0.20 to 1.98 in/hr) • Depth to water tab/e: About 6 to 18 inches • Frequency of flooding: None • Frequency of pondinq: None • Available waterstorage in profile: Moderate (about 7.4 inches) Bb—Bibb loam, frequently flooded Map Unit Setting • National map unitsymbol: 3qmh • Elevation: 20 to 160 feet • Mean annual precipitation: 40 to 55 inches • Mean annual air temperature: 59 to 70 degrees F • Frost free period: 200 to 280 days • Farmland classification: Not prime farmland Map Unit Composition • eibb, undrained, and similarsoils: 65 percent • lohnston, undrained, and similarsoils: 20 percent • Estimates are based on observations, descriptions, and transects of the mapunit. Description of eibb, Undrained Setting • Landform: Flood plains • Landform position (two-dimensionalJ: Toeslope • Down-slope shape: Concave • Across-slope shape: Linear • Parent material: Sandy and loamy alluvium Typical profile • A- 0 to 6 inches: loamy sand • Cg1 - 6 to 60 inches: sandy loam • Cg2 - 60 to 80 inches: loamy sand Properties and qualities • Slope: 0 to 1 percent • Depth to restrictive feature: More than 80 inches • Natural drainage class: Poorly drained • Runoff class: High • Capacity of the most limiting layer to transmit water (KsatJ: High (1.98 to 5.95 in/hr) • Depth to water table: About 0 to 12 inches • Frequency of flooding: Frequent • Frequency of ponding: None • Available waterstorage in profile: Moderate (about 7.2 inches) Ba—Bethera loam Map Unit Setting • National map unitsymbol: 3qmg • Elevation: 20 to 160 feet • Mean annual precipifation: 40 to 55 inches • Mean annual air temperature: 59 to 70 degrees F • Frost free period: 200 to 280 days • Farmland classification: Farmland of statewide importance Map Unit Composition • Bethera, drained, and similarsoils: 80 percent • eethera, undrained, and similarsoils: 10 percent • Estimates are based on observations, descriptions, and transects of the mapunit. Description of eethera, Drained Setting • Landform: Depressions, flats • Down-slope shape: Linear • Across-s/opeshape: Linear • Parent material: Clayey alluvium and/or clayey marine deposits Typical profile • Ap - 0 to 4 inches: loam • E- 4 to 7 inches: loam • Btg - 7 to 68 inches: clay • Cg - 68 to 94 inches: clay Properties and qua�ities • Slope: 0 to 2 percent • Depth to restrictive feature: More than 80 inches • Natura/ drainage class: Poorly drained • Runoff class: Very low • Capacity of the most limiting /ayer to transmit water (KsatJ: Very low to moderately high (0.00 to 0.57 in/hr) • Depth to water table: About 0 to 12 inches • Frequency of flooding: None • Frequency of ponding: None • Available waterstorage in profile: High (about 9.4 inches) a % _ -- - . . ; . ,, _ ._ . .__ . _ p. . _ _ =..t _ Keei,q_. � �� -1"--- _ _�r' i .;; � _� M�� 1 M�o� a - - ior�, �� L 1 up�l 8 �O� � . � z �f N � . 1 � 1' C` � � . � - . _ _ �.�� i . . . � - j. . ,�i � �� F��" C vi' � , � �', �; � � I � � , v,� i_ � ; . � ; � �f ;,- � Sam Everett Rd �� a`' � ` - ' � ° - _ *�,, ( � _ r � ��' j ._,a�, .,, �i o ''' ' � � , � . l� � r � -I � .. . . --..� i . , .� ' ti , � . _ �nkno i — , . ,.. , , N , . - �. �• � , wn �t� . . p7. . ... . I . _''.,._ ._ .'___ . -�.__, . , . _�._' , '�r.--,. _': ._..___..._ i 'r..'�' "—'_.�..._ ._... .' '_`_ ��'_"__ _ ...____ . __ ... t ' _.__.. _ � �� 1 , I ,F'r I �', � . � .�. i .-i . . -i . � , � � (�0 . . . , +t , � � f ` ..., .,.� �� � 4 i I K � `, pN �, I � �. (O � --1 . � � � ' _ . �� I i _ � ,'� - � � - . . � � F ` � . W., - � � � .. .- .. \� - i , - 1 �1 3 -��_ .�� �,a >��• I�� , � '�, � Unkno n ' � �, _. a -- � - ,.y'� -� , I ! ,»°,.�.' ' � G). �, � ; ._ i �y � � z � ' � , ; _' � ,,;� ,_. - _ � .- -. _ _ _- - --�- ; -. . .o __ ,ti � � _ �s a _ .t . .- C • i -_ �- a � � � . ,,... � ,�_ 4nsp Ad �s��w Eru � � � �¢ P-�a� _.. n,,, fve ' � : ',_ � , �h rett Cr o. i � eek I + � � ' ce", �� � Rq Churcl - , . _ _ � ` ,.. , , 'ry'- �.: . � i . �.e ,� . , j. s :> � .,.5 ''Grosan j `:� � _. !U �1 C f[-I'> i J .�i .. � '' � 0 1 . . � I-.. I , . % IE I - Helmnnt ���• , . . i _ �m ._ • Ch . . � Ni � .. . i. . � . . ' r � . .: - � � ���I. , i .. . . i � �.i fe ., r ras . J�� �dF... . _� � _ . ,:. � F: . - ' -�..:� �`, . I f i ., : .i .a^ , I . .._.._ ._ '.. ' i . ..._,..� .. ..... . . .. . .. . . .. - fi�..- � . .__. . .. . . . .._ ..�... � . .... ." _"" " ._ r _ . � J� ��. �I �. , �, '--' �, '� � , . � ; , . '�S. � � � y,�: ,t � � �,.. � - ��� _ . . ' . �� . �.. .� �'� � �,.+ � � . ' , ._ eetQa�`� - �,, Roper'�onvitle��ast � ,� ` j'r , �.+}; •� � ' „s � �' o,� i _ �;' ' � 00 ; � o� �y,� ' . , ��' I . . ^/I5 � , � 1 � I � i � ii � i : G , � , � ,- � , , _ , _ _ ,_ , - ._ �_ ,. _ . _. _ ._ __ ,. , � _ j , � . i , �o� , , � _ ., tPa . _,�fdre i � ' , , � r e - �a�d` �S;9h� : . ��r 4 ; _ � • i , a� dy90 +�h� � in ,o +: � i � P� , ,,, . , ,_ , � ` - i {{ . �! i i ;r � ,' `' I. � ��. . , - .. . � . . _ � . �� ' �I' > ! � `� . � �; Q 7 I ' . -\ . � I � '- _.� . �Q .135 . .. .... . _ _ ,. _ . _. . . � .. ' . �_ . _. - . .i .. ..:.__. __—__ . . . _ .. _ __._._.. O.r� . ... - . _._.___ .'__' � ; r � �.. j - . . . � �� .. . . - � i �:i� ..� � r {. .., 1 {� ���� . . . . , .��� . _ - , - . r � i . , , ' . .-�' , �` ( , . . . . ' .. . . .. � /� ' " �._ J , S• � J ' 1 . ,n � `�� :� ��RTl� � �� y _ w, ����� ; ; u �'! � � ,. � � ' � T ���C) t r ws i�+ '\._��ckf.:r, � �t� � � � . , �� ., . . . � . �Y I �� : `�. � . .��p� . , � ; ,' � �' .._ . . _ .. . . . . . }ra.s. , -, : . � � _ . .. . . .. - - - � .. . ... ._ . ._ ,�.e. :-_. +.'_. _ �_ _.__ - . ' . - � - --- i _ . i a t; i, .. �,_ I � .. . ,} � �. . ' . � E�� _ ` i i . . � , � �, : � , -.._ s '; � --�, O k��Gru�v i Con leton � . -. �`- . . C �. • �,+,. �• , cr''j' . . . . -1 G; �, ' „w. . �, ., ., . - � � � . ��, i ., „. ; � _. - ... , ., . . , . ,- � . �, . r. - _. _ . ..__ _. , ;. .. , _. . .� � .1. '� ' '� � �� � ` �- � ��. ' ' ' , . [ " ' ` '' - ' .. .:t, . '_ '. .._. . ...._ . _ ... �__ .^�^'_ :� . � . _ . � i ;. � ... ,... . � � - �'` - j , ��_. _. _ . . - . ... . . �-. :, _ �. !-�'v; F _ .�; i: J.�� ited, and published by the Geological Survey .., _:,. o: GS. NOSiNQA,\, aud N��rtl� Ccnolina Geodeticr 5uney S�:iLF 1:24 Q�� C' w y , �F�� � � ? �� K1LDhifTCHS � ' J 1�Imtogrammetric n�ethods hom a�rial pholograpAe .1 �cy '-CIJQ ` - � � �� . .. . =ield checke<1 1978. Map edired 19N1 � � A,EIERS ti 5 G 1D,UU0-f�wt grtd ticks; North Ca�rulina coordmate . � MfIES !rt cnnformal conic) " r` �t � �tts Crossrmads � .. iCOJ _ 2(KlV .s0�7 4JC0 90IXI � 601m � 701 � .�r�.� �iversal Transverac Merc.itor grid. ronc l8 ... � ' -�- � � fEET - . -... --.. nericnn Datum CO;V'�UIIFi iN'fFRVAL '1 DIETEIiS e predi�ted Nurlh American lletum lyg3 � .. .5lJPPLEMENTAI{1' COUTG.IR INTFiRI'r�L I MhITFR .,.�I.son ;�ornp Rtl ass H'o�e y �4ii�.'�i�$ f%'Cw'R�Y/�i11118Tb l90ROEPI3�� C �D. V i4rr_— arra�� �;o�a<_ �.� , (fufT�D3r`0 Ea✓ar.-it�obrs;,rt FarmFno�.e t Qt�'o ._ '_; MARTIN� iY�T��.�..�.. F!UtfSE J q J C S �a ^,e Q�,� _ . WI'f037?, Belrtoortt Esptst �huach - mo` J``., 9r ���' �� hti�3T2P.eebu�a-Ro6r�sor.FsamT993 �,q, _. �`, �, . h.LfD4t5 CRsstiar. ,^.hspel �hrstisr._('�.huach F� ^,,c — . :;- ��ahfCO3?7 :,�rsort-Rcebudc Far�rhmuze �% e`� �.iTii4'�8 f��CbET5DM11361�6-�t�� F9PT. C' :9 s f N � ��.� k., t ,� �v �..F..r.-�..� . . i � t,l I I € : �����i Y�! ' !{�'•��'.� ��.. `;2. � . ., i� Y =. � . �N� � + ��� �� � 3 .�;� �� �� a���.��.�. y �,�� . s '� ��r��._ '��'7� ���•:�. ��� t�k � � •� ` �� � #� � �� r�_- `E'; ��"� � t �-i: `;_ ��'�� � ' s. :� �• ; � -��,, ;r� � . - .��: . ° r�� s � �i ":..- �S i ` t T F-^x '" �u,�".� r'�+i �.,.Nyr .. ' � �� � h�, , > �'t ` � � � {! r �� � I � � ��� i I� rS� f •.� � , � r `� �' �' � � a I ����' , e+ Y�i�tn �?. i f ; ��"- , � �� 4'i -� � ^y lyp�'� k r�. � __,_,,,,� - - !� a r hy 4 '�`�.y fl'j����py, VL S'�k' ��'�. i _ f. ,(''r ""i@1^�C�� N * �y:� Y97'$ril�d Ri ` � K �;i �.�9y� S � � fI` T�';�'T � .�1 �YY n�� c'y� 1 y� �F ���;�f°c� �' ,��+4 ?'�` � , t. w'� _ -:. ..�., - ,;t a rt,:�,�, � • 'ap� � { ��.3 . ",�'� ,t ,� �����i� ��a �YZ�4 ���;.. 9.,�r M� I. ?' �h 3n,: �91 �? ,if � 1 �� � ��' I .��' +` `�_ .r-'': §�.. �' . �6:"� . . � M� � s� �'� _ � -�y �. ..�: �,�,,•� : ; ^�' �. � n'WC N � � 11� 3' �,i i � : �� d'A� ' .� ..�- �� ,-. . . . . ... J � � i#�` . � . �k. :�,. ,:n j _ � ='h �G14 � _4 _ .,:_ �. .t .�:..;:_.. ' � �� ....�: ._,_ „� .. .., _-. , `.....'� .:`..: ."_ 4 _ YI J �_ .. -± .. :.'' � ,r`�� �S�'=f . ��w ,�` K '�'�" � �, �. — _ _. �_ - t� �;'�� '� �.E� i : r `�. ;�'t� .� � _. e ,. .. _ �' Si +,.. ... r .., . . . � \.%3�:- : r,:_ .. .ir: . 4n - ' �^C71 'i t � `• '+ `-'a � 6 , c:�a i: � � � a.'' `� � �. = � .. 1 �r'- t �, 4 .r. a �� ���; � � � � a Y� i c z s t'ti�' ; i�1t �� � � .. r��$' 4 , ����+ � F � � \. � _ �..i �'_M"9if � .af�}y'i�j� � �� , i : d�8 6 � [ V K 2 1 i _ . .. .. ���,n ,-� ., . �i . _ �' � ��: �� a -y ra�.r'� �� ,`G <`s � � � �� � � 1 -A.f � E,:�; � � � a x � � �� � ��� �(,; �:3 � � .. �_' Q,���- ig �j ,`.�, . � . " - ,_ �i:F,� y � � �,��' . � �� s:�_�.. „ _. .. . 1 REQUEST FOR CULTURAL RESOURCES REVIEW FORM Project Tracking No. (Internal UseJ ��. p3P o o Z/ MEMORANDUM TO: Drew Joyner, Human Environment Sectiori 1598 Mail Service Center, Raleigh, NC 2769����� MAf� (� � Send Electronic Submittals to: PAtracker@nc 201� ATTENTION: Matt Wilkerson, Archaeology Supervisor Mary Pope Furr, Historic Architecture & Lands s�G� �c��r ���r � _ . . ., ..�.�:..�. �..��,� FROM: Kim Gillespie, Proiect Development En�ineer DATE: February 24, 2015 PROJECT INFORMATION ��� � �i ���� ' �� �.�:] �I " 1���'�'' �M�� �.►�l rMM4Ar�r�w. Project No: B-5503 County: Martin WBS No"": 55003.1.FR1 Document PCE or CE T e: Fe� Aid No: BRSTP-0125(6) Funding: ❑ State � Federal USGS Quud Robersonville East Project ROW: 2018 Nume: Schedule: CoNST:2019 Pro%ect Descript[on: Replace Bridge no. 53 on NC 125 (Prison Camp Road) over Collie Creek "` Work cannot begin until a charge number is provided that can be b111ed to by statt m the Human Environment Section. DESIGN INFORMATION Project Length: Approx. 1400' Detour TBD Route ": Existing ROW: Assume 60' Proposeri 100' ROW.� ExistingX- 2-lane ProposedX- 2-lane section: section: Structure to be Bridge Structure 1968 Re laced: Build Dute: Additionul Desi�n Information: Overlaps with TIP Project R-4705 *Please refer to study area map for possible detour.