Loading...
HomeMy WebLinkAbout20180865 Ver 1_B5503_Permit Package Buffer_20180619_20180621BUFFER IMPACTS PERMIT MARTIN COUNTY BRIDGE NO. 53 OVER COLLIE SWAMP ON GRADING, DRAINAGE, PAVING AND STRUCTURE 5 20 10 D T V = = = = = = 3200 4800 10 60 3 50 % % MPH ADT ADT 2015 2040 % * DUAL 2 * TTST =1 FUNC CLASS = MinorCollector DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED K COLLI E SWAMPTo Williamston To NC 9034 -L- DEWAYNE L. SYKES, PE BRYAN E. HOUGH, PE TOTAL LENGTH OF TIP PROJECT B-5503 = .175 MILES LENGTH OF STRUCTURE TIP PROJECT B-5503 = .026 MILES LENGTH OF ROADWAY TIP PROJECT B-5503 = .149 MILES 1142 903 1155 1147 1142 1154 1157 903 PROJECT PI TT COUNTYM ARTI N COUNTYVICINITY MAP PRISON CAMP ROAD NC 125 (SR 1142) 1. THIS PROJECT IS NOT WITHIN MUNICIPAL BOUNDARIES. 5012.525 12.525 50 1148 1113 OFFSITE DETOUR 1153 0 0 0 PROFILE (HORIZONTAL) 55003.1.FR1 PE BRSTP-0125(6) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. 2012 STANDARD SPECIFICATIONS PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/99B-5503 DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 See Sheet 1-A For Index of Sheets 3/19/2018B5503_Hyd_prm_buf_psh_01.dgnjharveyCONTRACT:TIP PROJECT:B-5503 ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NAREGIONAL TIER 2. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.75% PLANSPrepared in the Office of: KCI http://www.kci.com Fax (919) 783-9266 Phone (919) 783-9214 Raleigh, NC 27609 Suite 400 4505 Falls of Neuse Road KCI Associates of N.C., P.A. DIVISION OF HIGHWAYS Plans Prepared For: Raleigh NC, 27610 1000 Birch Ridge Dr. -L- STA 21+60.69 BEGIN BRIDGE -L- STA 22+98.31 END BRIDGE 55003.1.FR1 BRSTP-0125(6)R/W & UTIL. See Sheet 1B For Conventional Symbols FEBRUARY 28, 2018 -L- POT STA 18+10.00 BEGIN STATE TIP PROJECT B-5503 -L- STA 27+30.00 END STATE TIP PROJECT B-5503 NSRS 2007NAD 83/ BUFFER DRAWING SHEET 1 OF 4 COLLI E SWAMPDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 4 B-5503 6/19/2018B5503_Hyd_prm_buf_psh_04.dgnjharvey8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PAVEMENT REMOVAL FOR -L- PROFILE, SEE SHEET NO. 5 BRIDGE APPROACH SLAB -L- TYPE-III TYPE-III TYPE-III 0404RELATIONSHIP OF BRIDGE TO PROPOSED PAVEMENT 8:1 8:1 8:1 8 :112'12'4'PS4'PSRALEIGH, NORTH CAROLINA 27606 TEL (919) 859-2243 FAX (919) 859-6258 SUNGATE DESIGN GROUP, P.A. ENG FIRM LICENSE NO. C-890 905 JONES FRANKLIN ROAD4'12'4'12'MIN.MIN.-L- TYPE-III 4'PS12'12'4'PS-L- STA 21+49.65 BEGIN APPROACH SLAB Fax (919) 783-9266 KC I 4505 Falls of Neuse Road, Suite 400 Raleigh, NC 27609-6270 Phone (919) 783-9214http://www.kci.com Engineers Planners Scientists Construction Managers -L- STA 21+60.69 BEGIN BRIDGE -L- STA 22+98.31 END BRIDGE -L- STA 23+09.35 END APPROACH SLAB SITE 1 SITE 2 SITE 4 SITE 3 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2NSRS 2007NAD 83/WOODS WOODS WOODS WOODS CULT CULT SR 1142 (PRI SON CAM P RD) 23' BSTMTL GUARDRAIL MTL GUARDRAIL MTL GUA RDRA IL MTL GUA RDRA IL N 32°23'42" WS 33°18'38" EDB 24 PG 916NYSSA BURDICK ETALS DB 24 PG 587KIMBERLY WARRENWORLEY MOORE & DB 4 PG 421DOROTHY MIZELLE HEIRS DB 24 PG 919NYSSA BURDICK ETALS SC A T TE R ED TR EE S-L- POT STA 18+10.00 BEGIN STATE TIP PROJECT B-5503 -L- -L-15202530-L- STA 27+30.00 END STATE TIP PROJECT B-5503 1 2 4 3 +52 END SBG +50 END SBG TO BE REMOVED EXTG BRIDGE ELEV. 33.9 (TYP.) CLASS II RIP RAP UP TO GTD GTD GTD GTD GTD GTD GTD w/ NSFG TB 2GI w/ NSFG TB 2GI w/ NSFG TB 2GI EST 7 SY GF EST 2 TONS CL B RIP RAP EST 7 SY GF EST 2 TONS CL B RIP RAP 18"w/ NSFG TB 2GI 18 " RCP-IV 18" RCP-IV (TYP.)+39(TYP.)+22w/ NSFG TB 2GI18" 18" RCP-IV SEE DETAIL 1 EST. 300 SY GEOTEXTILE EST. 62 TONS CL B RIP-RAP w/ CL B RIP-RAP TOE PROTECTION Fill Slope2:1 or Flatter Type of Liner= CL B RIP-RAP DETAIL 1 Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile d=1.5 Ft. FROM STA. 18+50 -L- TO STA. 21+39 -L- LT FFFFF F F C F C F C F C F C F C F C F C F C F C F C F F F F BUFFER DRAWING SHEET 2 OF 4 SiteStationStructureNo. (From/To)Size / Type1 20+78 to 21+70-L-LT ROADWAY FILL1125 726 1851HAND CLEARING674 798 14722 21+60 to 22+11-L-RT ROADWAY FILL9797HAND CLEARING163 108 2713 22+92 to 24+19-L-LT ROADWAY FILL3095 1782 4877HAND CLEARING167 113 2804 22+91 to 23+51-L-RT ROADWAY FILL68 35 103HAND CLEARING145 128 2735534 3690 922400000NOTES:Revised 2018 Feb SHEET 3 OF 4BUFFER REPLACEMENTIMPACTSRIPARIAN BUFFER IMPACTS SUMMARYNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSTOTALS*:ROAD CROSSINGBRIDGEPARALLEL IMPACTZONE 1(ft2)ZONE 2(ft2)TYPEMARTIN COUNTY B-550355003.1.FR1ALLOWABLEMITIGABLE4-30-18ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2) ZONE 1 (ft2)ZONE 2 (ft2)1 20+78 to 21+70-L-LT1785 14902 21+60 to 22+11-L-RT370 1833 22+92 to 24+19-L-LT3675 21984 22+91 to 23+51-L-RT318 2616148 4132Revised 2018 Feb SHEET 4 OF 4WETLANDS IN BUFFER IMPACTS SUMMARY55003.1.FR1NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS6-19-18MARTIN COUNTYB-5503WETLANDS IN BUFFERSSITE NO. STATION (FROM/TO)TOTAL: