Loading...
HomeMy WebLinkAboutNCG551599_Compliance Evaluation Inspection_20180607 meg' . ROY COOPER te Governor : n Dechlorination: Your system was installed after August 1, 2007, so must have a means of dechlorination located downstream of the chlorinator and its contact chamber. See Disinfection paragraph above. Please submit a schedule to this office within 20 calendar days of receipt of this letter stating your plan for correcting this deficiency. n Pumping the septic tank: You are required to mspect the septic tank at least yearly to determine if solids must be removed or if other maintenance is necessary. Septic tanks should be pumped out every five years or when the solids level is found to be more than 1/3 of the liquid depth in the septic tank compartment A pumping company can check the status periodically and -- --determine-when-pumping-is-required—Within 45-days-of-receiving-this-letter;please-let-this-office--___________ know the date the septic tank was last pumped out. Ei Failure to analyze the effluent: Part 1. A.,Effluent Limitations and Monitoring Requirements, within General Permit NCG550000 requires a permittee to sample and analyze the effluent leaving his/her treatment system prior to discharge annually. Parameters to be sampled and analyzed include Flow,BOD (Biochemical Oxygen Demand),TSS (Total Suspended Solids) Fecal Coliform and Total Residual Chlorine. Please let this office know if you have monitored your effluent discharge within the last 12 months, and provide this office with a copy of the lab results if you have. If you have not monitored your effluent within the last year,then please collect a sample of the effluent,have it analyzed be a certified commercial laboratory and submit the results to this office no later than July 31,2018. n Locations of treatment units are unknown: Determine this and report to this office within 30 days of receipt of this letter with a sketch or map. in Other: Any person who discharges or who proposes to discharge pollutants (domestic wastewater)to the surface waters of the state or onto the surface is required to secure a permit. It is recommended that you consult with an engineer who is familiar with the design and permitting of single family wastewater treatment and disposal systems. I have provided a Permit Name/Ownership Change Form. Please complete the highlighted areas and make sure the _,:„,_ information is correct before signing. Return the form to the address on the back within 30-days of receiving this letter. If you have questions or comments about this inspection or the requirements to take corrective action, please contact Jane Bernard or me at 919-791-4200 Licensed plumbers should be used to make plumbing changes within your home. Contractors for installing disinfection or other equipment may be found in the Yellow Pages under Environmental Consultants. Sincrely, 4..5,,e >� (5)--77V S.Daniel Smith, Supervisor Water Quality Regional Supervisor Raleigh Regional Office Attachments: Inspection Reports cc: RRO/SWP Files Charles Weaver,NPDES Permitting Unit w/o attachments P i :;'�.�ua„�,�- � _i^'` }=�,ro�,a �a�-� „s`.,_r`r4x �, ?��' '-�> .�. �-.' - - -,� _ . ��r, �='�` - --- >, ,xis. �'Y�,i°�x'���'.'��,9��,i.°G"�u�o�'Ss';�r,5 a",'S�r" r �'r--��t-� .. .--. x-ma�ga� �. =' "E.;, .�v=+�.: :