Loading...
HomeMy WebLinkAboutSW5180401_AddInfoRequest2_20180531Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY May 31, 2018 Mr. Gary J. McCabe, PE Red Line Engineering, PC 1401 Aversboro Road Garner, NC 27529 Subject: Request for Additional Information Stormwater Permit No. SW5180401 Duncan Industrial Park — Fuquay-Varina, NC Harnett County Dear Mr. McCabe: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. TOBY VINSON, JR. Interim Director The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on April 26, 2018 and additional information on May 18, 2018. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: The calculation for the volume of the main pool must not include the volume of the forebay. 2. The proposed volume of the main pool is less than the calculated required volume (17,106 cf). 3. In accordance with Wet Pond MDC 2, the average depth of the main pool must be between 3 and 8 feet. Please provide calculations using either Equation 2 or Equation 3 on Page 8 of Chapter C-3 of the Stormwater Design Manual, which can be found at this link: C-3: Wet Pond. 4. In accordance with Wet Pond MDC 7, the design volume must draw down the design volume to the permanent pool in between 2 and 5 days. Please provide calculations that show that the wet pond will meet this requirement. 5. Please add a note to Sheet C-8 that the dam and the dam embankment slopes shall be vegetated with non -clumping turf grasses and that trees and woody shrubs shall not be allowed (See Wet Pond MDC 11: Vegetation). 6. Please provide calculations to show that the inlet and outlet rip rap aprons will be sufficient to prevent erosion during the peak flow from the 10 -year storm. 7. Please provide the original signed copy of the application form and the Operation and Maintenance Agreement. 8. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: hqps:Hedocs.deg.nc.gov/Forins/SW ProjectSubmittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 30, 2018, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW5180401 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Corey.Anen(cncdenr.gov or (919) 807-6378. cc: Fayetteville Regional Office Ronald Currin – RP One, LLC Sincerely, G&% X'— Corey Anen Environmental Engineer Stormwater Program Nothing Compares. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 512 N. Salisbury Street 1 1612 Maii Service Center I Raleigh, Nort hCaroiina27699-1612 919 707 9200