Loading...
HomeMy WebLinkAboutNCS000386_MCSWS Cover Letter and Report_20140826Charlotte -Mecklenburg �, ,� vs u`. 1 J♦z August 26, 2014 Jamie Watts, EH&S Delivery Leader Rohm and Haas Chemicals, LLC 6101 Orr Road Charlotte, NC 28213 Subject: Industrial Facility Inspection Rohm and Haas Chemical, LLC Dear Mr. Watts: 700 North Tryon Street Charlotte, NC 28202 Fax 704.336.4391 On August 20, 2014, Jonathan Beller of Charlotte -Mecklenburg Storm Water Services (CMSWS) conducted an inspection of the above referenced facility as a requirement of the City of Charlotte's NPDES Permit, NCS000240, Part II Section H. Inspection authority is granted by Charlotte City Code Chapter 18, Article III, Section 18-82. At the time of inspection, the facility was observed to be in compliance with the City of Charlotte Storm Water Pollution Control Ordinance. The inspection was also conducted as part of a cooperative working agreement between Mecklenburg County and the North Carolina Department of Environment and Natural Resources (NCDENR) — Division of Energy, Mineral and Land Resources (DEMLR). NCDENR — DEMLR has been copied on this report and made aware of the following observations regarding the facility's NPDES stormwater permit: 1) Stormwater Pollution Prevention Plan (SPPP) A Stormwater Pollution Prevention Plan (SPPP) has been developed, recorded, and implemented. 2) Qualitative Monitoring Qualitative monitoring has been conducted and recorded. 3) Analytical Monitoring Analytical monitoring has been conducted and recorded. Temperature of pH sample is not to be adjusted prior to analysis. See attached "Technical Assistance for Field Analysis of pH" document for procedures. Thank you for the assistance and cooperation with the site inspection. The att ached report provides details about inspection observations and should be self-explanatory. Please contact me at 980-721-9361 if you have any questions or need additional information. For questions specifically regarding your NPDES stormwater permit, please contact Donna Hood with NCDENR — DEMLR at (704) 663-1699.Wm • To report pollution or drainage problems, call: 311 http://s tormti�ater.charmeak.org �' cennr cn11r. vh,. Jamie Watts Page 2 8/26/14 Sincerely, p3L�_ Jonathan Beller Sr. Environmental Specialist Charlotte -Mecklenburg Storm Water Services cc: Craig Miller, Charlotte Storm Water Services Erich Schweiber , NCDENR — DEMLR Attachment: Technical Assistance for Field Analysis of pH North Tryon Street STORM r , ME WATER Eadlitv lnoaectim 1 4.336,4391 Facility Name: Rohm And Haas Chemicals LLC s To report pollution 5 Inspection ID: 15226 Contact: James Watts Permit #: NCS000386 Inspector: Jonathan Beller Receiving Stream: BRIAR Inspection Date: 08120/2014 Entry Time: 9:00 am Exit Time: 12:30 pm sic #: Facility Description: Rohm and Haas Chemicals LLC operates a ten -acre manufacturing plant that manufactures water-based emulsions of vinyl acetate, acrylic homopolymers, copolymers and thickeners. Wastewater is collected; treated, and discharged to the sanitary sewer. File Review/History: A review of CMSWS databases and files was conducted prior to the inspection. The facility was last inspected by CMSWS on April 10, 2010. No violations were noted during the previous inspection. Inspection Summary: Please see the recommendations in the report. Site`Inspection`De%ficiencyComment' Stormwater system (catch basins, No inlets, outfalls, etc.) Erosion issues No Structural stormwater BMPs No Two retention basins are located on the property where storm water is collected prior to being released via outfall 001. Illicit discharges/connections No Aboveground storage tank(s) - list No tank sizes & contents Underground storage tank(s) - fill No port area; list tank sizes & contents Outdoor material storage area(s) Recommendation CMSWS recommends the facility move their 275 gallon intermodal containers to an area on the property that would drain to the facilities wastewater pre-treatment system if compromised. Outdoor processing area(s) No Loading/unloading area(s) Recommendation Service the rail car loading arm to prevent product from dripping onto the gravel railway. Product was observed solidified on the gravel near the rail car loading area. This would not be considered a threat to stormwater based on the nature of the product. Vehicle/equipment area(s) - fueling, No Gear box maintenance is performed primarily done indoors. washing, storage, etc. No deficiencies were observed. Oil/water separator and/or No pretreatment Waste storage/disposal area - No dumpsters, scrap metal bins, etc. Food service area(s) No or drainage problems call: 311 http://stormwater.charmeck.org .`,��° CRARLOTTIij,. a126/2014 2:06:04PM Page 1 of 3 Sitelnspection % "Deficiency Comment Indoor material storage area(s) Recommendation Water was present on the floor of the storage area due to a small leak in the roof. There was a berm at the entry point of the storage area to prevent spills from leaving the building. A hole was also observed at the rear of the building near floor level. CMSWS recommends that the roof be repaired to prevent water ponding in the containment area and that the hole in the back of the building be sealed to prevent a by-pass of the containment area. Indoor processing area(s) No Floor drains No Floor drains are connected to onsite wastewater pretreatment system. Spill response equipment No Stormwater Pollution Plan Observed %Comment Does the facility have a stormwater Yes pollution prevention plan? General location (USGS) map Yes Narrative description of practices Yes Detailed site map Yes List of significant spills (past 3 years) Yes Non-stormwater discharge Yes evaluation of outfall(s) Feasibility study Yes All necessary secondary Yes containment provided Collected water evaluated and Yes documented prior to release BMP Summary Yes Spill prevention and response plan Yes Preventative maintenance and good Yes housekeeping plan Facility provides and documents Yes employee training List of responsible parties Yes Reviewed and updated annually Yes Stormwater facility inspection Yes program conducted semi-annually Qualitative/Analytical Monit%oring . Ob%served%%, Comment Qualitative monitoring conducted Yes semi-annually Analytical monitoring conducted Yes Temperature of pH sample is not to be adjusted prior to semi-annually analysis. See attached "Technical Assistance for Field Analysis of pH" document for procedures. Analytical monitoring from vehicle N/A maintenance Permit and Outfalls :% %%Observed '%% Comment , Copy of permit and certificate of Yes coverage onsite All outfalls observed Yes No issues observed at outfall 001 or outfall 002. Representative outfall status N/A documented by NCDWQ Annual no -exposure self N/A re -certification documented Additional Findings Observed Comment Observation(s) No • To report pollution or drainage problems call: 311 http:!lstormwater.charmeck.org ``,lr�b CUMLOTTE. 8/26/2014 2:06:04PM Page 2 of 3 Additional Findings: ' Ob%served ..% Com%ment Observation(s) No pollution Observation(s) INo or Phase IhP%eemit Require%ments%% Obse%rved% %Comment Wastes removed from the MS4 N/A 311 properly disposed http://stormwater.charmeck.org Public transportation (roadway) N/A projects constructed within the last year Curb miles and parking lots swept N/A documented Catch basin and storm drain pipe N/A cleaning documented Records of pesticide/herbicide N/A applicator licenses maintained for staff and contractors If pesticide treatment areas N/A exceeded, was permit application submitted? Pesticide limitations in Goose Creek N/A Watershed followed To report pollution or drainage problems call: 311 http://stormwater.charmeck.org 8/26/2014 2:06:04PM Page 3 of 3 This document is intended to provide technical assistance and guidance for the measurement of pH. This is not meant to be a substitute for the method, but is offered as a guide to the method. HOLDING TIME: • Samples must be analyzed within 15 minutes of collection. METER CALIBRATION: • The meter must be calibrated prior to the analysis of samples. • If compliance samples are analyzed throughout the day, a post calibration check (e.g., 7 buffer) must be analyzed mid- day and at the end of the run (i.e., roughly every 4 hours based on an eight hour day). For routine work, use a pH meter accurate and reproducible to 0.1 pH unit with a range of 0 to 142 equipped with a temperature compensation device. Follow all manufacturers' recommendations for the calibration of the meter each analysis day. In all cases, the meter must be calibrated with at least two buffers. Calibrating with the pH 4 and pH 10 buffers meets standard methods requirements and brackets the pH range for most monitoring (with the exception of sludge) scenarios. The calibration; however, must bracket the range of the samples being analyzed. In addition to the calibration standards, the meter must be verified with a third calibration standard (e.g., pH 7 buffer). • In order to meet the above-specified criteria, the standard must read within a range of pH 6.9 to 7.1 to be acceptable. General Information: • Samples shall be gently stirred during measurement. • The electrode must be rinsed and blotted dry between measurements. All thermometers and temperature measuring devices must be checked every 12 months against a NIST certified or NIST traceable thermometer and the process documented even if the instrument is not used for reporting temperature results. To check a thermometer or the temperature sensor of a meter, read the temperature of the thermometer/meter against a NIST certified or NIST traceable thermometer and record the two temperatures. The thermometer/meter readings must be less than or equal to 1•C from the NIST certified or NIST traceable thermometer reading. The documentation must include the serial number of the NIST certified thermometer or NIST traceable thermometer that was used in the comparison. Also document any correction that applies on both the thermometer/meter and on a separate sheet to be filed. (NOTE: Other certified laboratories may provide assistance in meeting this requirement.) The following must be documented whenever sample analysis is performed. 1. Time and date of sample collection 2. Time of calibration 3. Time and date of analysis (to verify 15 minute holding time is met) 4. Collector's/analyst's name 5. Value of buffers used for calibration 6. Value obtained for check buffer (e.g., pH 7 buffer) 7. Sample location/site 8. Post calibration checks (if applicable) 9. Report all data values to the nearest 0.1 pH unit. 10. The temperature correction (even if it is zero) must be posted on the meter as well as in hard copy format (to be retained for 5 years). 11. Traceability for chemicals, reagents, standards and consumables Ref: Standard Methods, 18th Edition -Method 4500-H* B. Ref: Standard Methods, 18th Edition -Method 2550 B. Rev. 07/2010