20180719
DUPE @ 0 V C
0
MAY 2 3 2018
DEO-W ER RESOURCES
401 & BUFFER
TO: Karen Higgins
401 & Buffer Permitting Unit
DWR/Water Quality Permitting
ROY COOPER
Govemor
MICHAEL S. REGAN
Secretary
BRAXTON DAVIS
Director
FROM: Heather Coats, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 heather. coats@_ncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA Application Review
Applicant: Fred Baldino
Project Location: 719 Shoreline Dr., W., adjacent to the AIWW, in Sunset Beach,
Brunswick County
Proposed Project: to construct a new private docking facility
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Heather Coats at the address above by June 13, 2018. If you have any
questions regarding the proposed project, contact Tara MacPherson at (910) 796-7425 when appropriate
in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached**
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATED
State of North Carolina I Environmental Quality j Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
910-796-7215
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Fred Baldino c/o Southern Environmental Group, Inc.
2. LOCATION OF PROJECT SITE: 719 Shoreline Dr. W. adjacent to the AIWW in Sunset Beach, Brunswick
County
Photo Index - 2006: 2-6207, 24-J
Lat:33°52'38.68"N Long: 78°32'05.26"W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 5/9/18
Was Applicant Present No
5. PROCESSING PROCEDURE: Application Received -04/24/2018, Complete 5/14/18
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Brunswick County
Land Classification from LUP — Conservation
(B) AEC(s) Involved: ES, EW, CW, PTA
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing — None
Planned - None
(F) Type of Structures: Existing — Single Family Residence
Planned — New private docking facility
(G) Estimated Annual Rate of Erosion: N/A
Source — N/A
HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands (Coastal Wetlands)
1,872 sq. ft.
(shaded)
(B) Non -Vegetated Wetlands
976 sq. ft.
Open Water
(incorporated)
(C) Other
102 sq. ft.
Uplands
(shaded)
(D) Total Area Disturbed: — 2950 sq. ft. (0.07 acres)
(E) Primary Nursery Area: Yes
(F) Water Classification: SA; HQW Open: No
8. PROJECT SUMMARY: The applicant proposes to construct a private pier and docking facility capable of
accommodating of up to three (3) vessels.
Fred Baldino c/o Southern Environmental Group, Inc. Page Two
9. PROJECT DESCRIPTION
The applicant's property is located at 719 Shoreline Dr. W., adjacent to the AIWW in the town of Sunset Beach,
Brunswick County. Directions from Highway 17 south of Shallotte: Turn Left onto Seaside Rd. SW/NC-904 and
travel approximately 3.60 miles. Turn right onto Sunset Blvd N/NC -179 Bus and travel approximately 1.7 miles.
Take the 2nd exit at the traffic circle to stay on Sunset Blvd N. and turn right onto Shoreline Drive West. The
project site will be located on the left-hand side of the street.
The project site measures approximately .5 acres in area and is currently developed with a single-family
residence. The property has approximately 80 feet of shoreline frontage with an existing bulkhead and maintains
an elevation approximately 10 ft. above Normal High Water (NHW). High ground vegetation consists mainly of
hardwoods, including live oaks, which transitions to Section 404 Wetlands and Coastal Wetlands. The Coastal
Wetland area extends approximately 470 ft. waterward of the NHW mark and consists primarily of Bullrush
(Scirpus sp.), Black Needlerush (Juncus roemerianus), Spike Grass (Distichlis spicata) and Smooth Cord Grass
(Spartina alterniflora). There is a drainage way on the western side of the property and NHW extends almost to
Shoreline Drive West in this area.
The waters of the AIWW are classified SA; HQW by the Division of Water Resources and ARE designated as a
Primary Nursery Area (PNA) by the N.C. Division of Marine Fisheries. They are CLOSED to the harvest of
shellfish.
10. PROPOSED PROJECT:
The applicant proposes to construct a private pier and docking facility capable of accommodating of up to three
(3) vessels. The proposed project would consist of a pier measuring approximately 4 ft. in width by 650 ft. in
length, which would span an area of Coastal Wetlands measuring approximately 470 ft. in width. The pier would
terminate at a covered gazebo measuring approximately 10 ft. in width by 10 ft. in length (See Dock Plan 1 of 2).
A floating dock measuring approximately 6 ft. in width by 12 ft. in length is proposed to extend off the eastern
comer of the platform and run parallel to the shoreline approximately 7 ft. off the riparian corridor setback line. A
boatlift measuring 12 ft in length by 12 ft. in width is proposed off the western side of the gazebo approximately
1 ft. from the riparian corridor setback line.
According to the application, water depths in the vicinity of the proposed slips range from approximately -2.1 ft.
to -3 ft. @ Normal Low Water (NLW). NOTE: These depths have not been verified by DCM Fisheries at this
time. The proposed docking facility would extend a total distance of approximately 165 ft. into a water body
measuring approximately 575 ft. in width. As proposed, the docking facility would exceed'/4 width of the AIWW,
which is 144 ft. from the edge of wetlands, but would not exceed 1/3 of the waterbody width. The proposed
docking facility would be approximately 33 ft. from the U.S. Army Corps of Engineers 80' Federal Channel
Setback. The docking facility, as proposed, would not exceed the established pier head line.
11. ANTICIPATED IlVIPACTS
The proposed docking facility would incorporate approximately 952 sq. ft. of Estuarine and Public Trust Area and
would shade approximately 1,872 sq. ft. of Coastal Wetlands in a designated Primary Nursery Area. Minor
increases in turbidity should be expected during construction. The proposed configuration of the docking facility
would provide docking space for three (3) vessels in reported water depths ranging from approximately 2.1 ft. to 3
ft. @ NLW.
Submitted by: Tara MacPherson Date: May 18, 2018 Office: Wilmington
719 Shoreline Drive West CAMA Major Permitj� G�
Project Narrative
A. Introduction
Southern Environmental Group, Inc. has been retained by the property owner (see Attachment 1), Fred &
Nancy Baldino (herein referred to as the "Applicant"), to secure a NC Division of Coastal Management
CAMA Major Permit, for a dock that is prosed to extend more than 400 linear feet past the normal high water
line.
B. Property Characteristics
1. Project Address: 719 Shoreline Drive West, Sunset Beach, NC (see Attachment 2)
2. Parcel IDs: 255LA012 (see Attachment 3)
3. Existing Conditions: There is an existing dwelling (approximately 3600 SF of built upon area) on the
property.
4. Wetlands and waters of the US (WOTUS): The site exhibits both US Army Corps Engineers' (USACE)
Section 404 and Section 10 wetlands and abuts the Atlantic Intercoastal Waterway (ICWW).
5. Receiving stream name and classification: This portion of the ICWW is classified as SA; HQW by the
NC Division of Water Resources.
6. Primary Nursery Area (PNA): This section of the ICWW is classified as PNA (see Attachment 4).
7. Essential Fish Habitat: The proposed work is not anticipated to impact essential fish habitat.
8. Water depths at normal low water (NLW): Water depths were taken on 12/5/17 at 3:30pm. On that day,
low tide was predicted to be at 3:46pm, with an estimated tidal coefficient of 94, producing a -0.6' NLLW
tidal height, at the Sunset Beach Bridge ICWW tidal gauge. Measurement were taken at approximately
10' intervals, extending from the NLW line waterward, and for a distance of 30 feet, where the depth was
measured at -2.4' or -3.0' taking into account the tidal coefficient (see Attachment 5).
9. Length of Shoreline: 80 linear feet (see Attachment 6)
10. Width of Waterbody: +/- 575' (see Attachment 6)
11. Substrate: The substrate, under the proposed gazebo, floating platform and boat lift, is sandy, with a thin
layer of silt.
12. Submerged Aquatic Vegetation (SAI/): No SAVs exist within the project area.
C. Proposed Work
The Applicant intends to construct a 4' wide by 650' long fixed, slatted pier, which will be elevated at least 3'
above the substrate in all areas where crossing wetlands. At the terminus of the pier will be a 10' x 10' (100 SF),
fixed, covered gazebo, wit, 1' x 12' (72 SF) floating platform that will extend off the east side of the gazebo and
will provide for loading and unloading. Lastly, a 12' x 12' boat lift will be installed to the west of the proposed
gazebo. Please refer to Attachment 6 for details). The Applicant intends to utilize the docking facility for pleasure
and private use.
The proposed structures have been positioned not to extend waterward of the designated pier head line, as
determined by Sean Farrell, or USACE Navigational Channel Setback, which is located approximately 30'
waterward of the proposed structures (see Attachment 6 for details). No part of the proposed structures will
encroach into the associated riparian corridors. Both adjacent riparian property owners have been notified of the
proposed development and each has signed the applicable waivers (see Attachment 7).
RECEIVED
Page 1 (4/19/18)
APR 2 42018
DCM WILMINGTON, NC
719 Shoreline Drive West CAMA Major Permit
SE.G1
Machinery, such as a pile driver and barge will be utilized to install the necessary pilings. The barge will either be
tied to a piling or relocated when not in use. At no time will the barge be allowed to rest on the bottom or extend
waterward of the USACE navigational setback. Typical marine dock and pier material will be used to construct
the structure.
Very little land disturbing will take place with this project and no impervious surface area is being proposed.
RECEIVED
Page 2 (4/19/18) APR 2 4 2018
DCM WILMINGTON, NO
NCE ■F-1
APPLICATION for
Major Dovolopmont Pormlt
past revised 12/27106)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant(Landowner Information
Business Name
Na
Project Name (if applicable)
719 Shoreline Drive W
Applicant 1: First Name
Mr. Fred
MI
Last Name
Badino
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
719 Shoreline Drive West
PO Box
City
Sunset Beach
State
NC
ZIP
28
Country
USA
Phone No.
347 - 300 - 9419 ext.
FAX No.
Street Address (if different from above)
City
State
ZIP
Email
fredbaldino@optonline.net
2. Agent(Contractor Information
Business Name
Southern Environmental Group, Inc. (Segi)
Agent/ Contractor 1: First Name
MI
Last Name
Dana
A
Lutheran
Agent/ Contractor 2: First Name
MI
Last Name
David
A
Syster
Mailing Address
PO Box
City
State
5315 South College Road Suite E
Wilmington
NC
ZIP
Phone No. 1
Phone No. 2
28412
910 - 452 -
2711 ext.
910 - 225 - 1841 ext. preferred
FAX No.
Contractor #
910 452 2899
NA
Street Address (if different from above)
City
State
ZIP
Same
Email
Dlutheran@segi.us
RECEIVED
<Form continues on back>
APR 2 4 2018
0G5.4 0-111-5.4141GT- 0 N, NG
252-808-2808 .. 1-888-4ROOAST .. www.necoastaimanagement.net
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
. Project Location
County (can be multiple)
Street Address
State Rd. #
Brunswick
719 Shoreline Drive West
1186
Subdivision Name
City
State
Zip
NA
Sunset Beach
NC
-
Phone No.
Lot No.(s) (rf many, attach additional page with list)
NA - - ext.
255LA012 I I I ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Lumber
ICVWV
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ®Manmade ❑Unknown
ICWW
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within.
Sunset Beach Extraterritorial Area
4 . Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
80
22,560 SF
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
NA, I I
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
10, ®NHW or ❑NWL
e. Vegetation on tract
Vegetation in the area of the project consist of Spartina alternaflora and Juncus
f. Man-made features and uses now on tract
There is an existing 3600 SF house on the property.
g. Identify and describe the existing land uses adjacent to the proposed project site.
There are residential homes on each side of the project site.
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
MR2
(Attach zoning compliance certificate, if applicable)
®Yes []No ®NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No [INA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No [INA
National Register listed or eligible property?
<Form continues on next page> APR 2 42018
DCM WILMINGTON, NC
252-808-2808 .. 1-888-4RCOAST .. www.nccoastalmanagement.net
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. ProJect Location
County (can be multiple)
Street Address
State Rd. #
Brunswick
510 Shoreline Drive E
d. Approximate elevation of tract above NMN (normal high water) or
Subdivision Name
City
State
Zip
Waterway Oaks
Sunset Beach
NC
28468 -
Phone No.
Lot No.(s) (if many, attach additional page with list)
- - ext.
7, 7A,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Lumber River
Atlantic Intracoastal Waterway
c. Is the water body identified in (b) above. natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Atlantic Intracoastal Waterway
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limlt the proposed
Was []No
work falls within.
Town of Sunset Beach
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
90
82,210 SF
c. Size of individual lot(s)
d. Approximate elevation of tract above NMN (normal high water) or
26,135 SF, 56,075 SF,
NWL (normal water level)
(if many lot sizes, please attach additional page with a list)
9 ®NHW or ❑NWL
e. Vegetation on tract
Upland grass and Coastal Marsh Grass
f. Man-made features and uses now on tract
undeveloped, vacant
g. Identify and describe the existing land uses adiacent to the proposed project site.
Residential
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
Maintland Residential MR -2
(Attach zoning compliance certificate, if applicable)
®Yes ❑No ❑NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No ®NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
RECEIVED
MAY 0 7 2011
252.808.2808 . 1.888.4RCOAST .. www.nccoastalml,+dM'2'ti��net '
Form DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ®Yes ❑No
(ii) Are there coastal wetlands on the site? ®Yes []No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Waste water is treated by municipal services.
o. Describe existing drinking water supply source.
Drinking water is provided by municipal services.
p. Describe existing storm water management or treatment systems.
There is no existing stormwater management or treatment systems on the property.
5. Activaities and Impacts
a. Will the project be for commercial, public, or private use? ❑Commercial ❑PublictGovemment
®Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The home owner intends to use the docking facility for pleasure.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Pilings will be installed with a barge and pile driver, in areas that are not accessible via uplands. Treated lumber will be used
to construct the dock and gazebo. Machinery will be stored in uplands or on the barge, in an where the water depth is greater
than 18" at NLW.
d. List all development activities you propose.
The Applicant intends to construct a 4' wide x 650' long fixed pier that will lead to a 10' x 10',fixed gazebo, with 12�,1t to
floating platform, and 12' x 12' boat lift.
e. Are the proposed activities maintenance of an existing project, new work, or both? New
f. What is the approximate total disturbed land area resulting from the proposed project? NA ❑Sq.Ft or []Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No [INA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
NA
L Will wastewater or stormwater be discharged into a wetland? ❑Yes ❑No ®NA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA
j. Is there any mitigation proposed? ❑Yes ❑No ®NA
If yes, attach a mitigation proposal.
<Form continues on back> APR 2 42018
DrM WILMINGTON, Ne
252-808-2808 :: 1-888-4RCOAST .: www.nccoastalmanagement.net
Form DCM MP -1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
in addition to this completed application form, (MP -4) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name See project narrative Phone No.
Address
Name Phone No.
Address
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
NA
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Cerfitic ition and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date April 23 2018 Print Name D7:A.m —h ra
Signature
Please indicate application attachments pertaining to your proposed project.
❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development RECEIVED
®DCM MP -4 Structures Information
,SPR 2 72111
DCM WILMINGTON, NC
2S2-808-2808 ;- 1-888-4RCOAST ;. www.nccoastaimanagement.net
Form DCM MP -4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FAC/LIM MMAR/NA, CHAR'ACTEMST/CS OThis section not applicable
a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public?
❑Commercial ❑Public/Govemment NPrivate/Community []Yes ®No
c. (i) Dock(s) and/or pier(s)
d. (i) Are Finger Piers included? []Yes ®No
(ii) Number 1
If yes:
(iii) Length 650'
(ii) Number
(iv) Width 4'
(iii) Length
(v) Floating []Yes ®No
(iv) Width
(v) Floating ❑Yes ❑No
e. (i) Are Platforms included? ❑Yes ❑No
f. (i) Are Boatlifts included? ®Yes ❑No
If yes:
If yes:
(ii) Number 1
(ii) Number 1
(iii) Length 12'
(iii) Length 12'
(iv) Width Je�
(iv) Width 12'
(v) Floating ®Yes ❑No
Note: Roofed areas are calculated from drfpline dimensions.
g. (i) Number of slips proposed
h. Check all the types of services to be provided.
1
❑ Full service, including travel lift and/or rail, repair or
(ii) Number of slips existing
maintenance service
❑ Dockage, fuel, and marine supplies
0
❑ Dockage ("wet slips") only, number of slips:
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
❑ Other, please describe:
Day dock and boat slip
i. Check the proposed type of siting:
❑ Land cut and access channel
[]Open water; dredging for basin and/or channel
®Open water; no dredging required
[]other; please describe:
k. Typical boat length: 25'
m. (i) Will the facility have be pilings?
[--]Yes ®No
(ii) If yes number of tie pilings?
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
open runabouts
I. (i) Will the facility be open to the general public?
❑Yes ®No
RECEIVED
APR 2 4 2018
DCM WILMINGTON. NC
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06
Form DCM MP -4 (Structures, Page 2 of 4)
2. P' CfUMG FAClUTYLMARINA OPERATIONS ®This section pot ap�tlica�ble
a. Check each of the following sanitary facilities that will be included in the proposed project.
❑ Office Toilets
❑ Toilets for patrons; Number: ; Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of "Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h• Give the number of channel markers and "No Wake" signs proposed.
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing?
I. If this project is an expansion of an existing marina, what types of services are currently provided?
M. Is the marina/docking facility proposed within a primary or secondary nursery area? ,4 P R 2 42018
❑Yes ❑No
7CM WILMINGTON, NC
252-808-2808:- 1-888-4RCOAST :: www.nccoastaimananement.net revised: 12/27/06
Form DCM MP -4 (Structures, Page 3 of 4)
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes []No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shrill bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
❑WL []None
p. is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. B6ATFI0USE (iwuding covered lilts) ®This seciion not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Govemment ❑Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applkable
a. (1) Number
(ii) Length
(iii) Width
5. BREAKWATER(e.g., wood sheetp le, etc) ®This secdon not applicable
a• Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
16. MOORING PILINGS and BUOYS ®This section not applicable
a. Is the structure(s): b. Number
❑Commercial ❑Public/Govemment ❑Private/Community
c• Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present
d. Description of buoy (color, inscription, size, anchor, etc.)
e. Arc of the swing RECEIVED
7. GENERAL APR 2 4 2018
DCM WILMINGTON, NC
252-808-2808 :: 1-888-4RCOAST :: wwwmccoastalmanagement.net revised: 12/27/06
Form DCM MP -4 (Structures, Page 4 of 4)
a. Proximity of structure(s) to adjacent riparian property lines
16' to the western adjacent riparian line and 22' to the
eastern riparian line
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body
+/- 575'
e. (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
b. Proximity of structure(s) to adjacent docking facilities.
within 200' of the existing dock to the east
d. Water depth at waterward end of structure at NLW or NWL
3.0'
8. OTHER ®This section not applicable
a. Give complete description:
4/23/19
Date
719 Shoreline Drive West
Project Name
Fred Baldino
Applicant Name
Dana utheran for d Baldino
Applicant S'
RECEIVED
A"R 2 72018
OCM WILMINGTON, NC
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmananement.net revised: 12/27/06
719 Shoreline Drive West CAMA Major Permit
Attachment 2
Vicinity Map
SE -61
Page 4 (4/19/18) OCM WILMINGTON, NC
federal, state, county, and private organi;zations. This map is a general
guide to assist the public and Is for Illustrative purposes only. While every
effort Is made to keep this map accurate and up-to-date, it Is not Intended
program. Informational data used to create this map were collected from
This map was produced by the Geographic Information Systems (GIS)
to replace any of source. Under no circumstances shall the State of
North Carolina be liable for any actions taken or omissions made from / �y
reliance on any Information contained herein from whatever source nor
shall the State be liable for any other consequences from any such reliance.
--
h"
17
ow
Shallotte River
.0103218
cod
Cadw Bar
SaUeepan Creek
.0103 21 d
Cala—, Gause Landing Area ranl
.0103 22 0 1.01031, 2, 1!
z
w. 4
Shallotte Creek
(UtUe Shallotte
River)
1.0103 21 c EM
010321 bj
Shallotte Rive
(Ocean Rats)
.0103 22 c i Big Teague Creek
.0103 22 c ii Utfie Teague geek T-1 6
.0103 22 d
Mad Inlet Area L
��, f .0103 22 c III I Big Norge Creek
RECEIVED
1 19 1
APR 2 42019
DOM WILMINGTON, NIC
Background imagery are U.S. Geological Fishery Nursery Areas
Survey 1:100,000 -scale planimetric maps. Nrnary Fishery Nursery Areas
Pernument Secondary
Spectal Secondary
Military Danger
Zones and
Restricted Areas
locallor map Inland wasrs (WRC juftdlcbw) Map 28
+Map Datum: NAD83
Map Projection: NC State Plane
Map Date: March 2011
1000 0 1000 2000 Yards
0.7 0 0.7 1.4 Miles
LF OF SHORELINE 80 LF
AVAILABLE PLATFORM AREA 640 SF
PROPOSED FIXED PLATFORM AREA:
GAZEBO: 200 SF
PROPOSED FLOATING PLATFORM AREA:
DAY DOCK: 72 SF
TOTAL: 272 SF
PROPOSED FIXED PIER 650 LF
719 SHORELINE DRIVE SW
DOCK PLAN 1 OF 2
PREPARED 4/23/18 BY SEGI
SCALE 1" = 20'
WIDTH OF WATERBODY = +/-575'
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - k _ _ _ _ USAGE ICAC CHANNEL SETBACK
PROPOSED PKl
12'X 6' 10
FLOATING PLATFORM FIXED
-------------------------------------------- ' ------------
I 3
I
I
I
I
...................... L---------------
I
15'
RIPARIAN CORRIDOR
GANDY DAVID M ET & GANDY CAROLY
255LA011
94'
I
I
i
I
I
I
1
I
I
I
BOAT LIFT V OFF RIPARIAN CORRIDOR
4-3, 'AT NLW L PLER.NfAD UNE 1_16,S -LF FROM EDGE OF MARSH)
I
2
I
i -2.1' AT NLW
I
AT NLW I
.-.-.-.-.Lgsacf icW�HRQVjI.
I
IRIPARIAN CORRIDOR F
I
• -4.1'. AT NLhVI
MCCORMACK MICHAEL ET LOUISE
255LA013
\ I
I PROPOSED 4' X 650' FIXED PIER I
II
•-D.& AT NLW
I
I
I
•O.O'AT NLW
nftenmD
`/-71' MAY 4
+/-566' TO COASTAL WETLAND
TO ORIGIN
_ • 0 'A T NLW -
- DCM WILMINGTON, NC
1_
3n
25'
20'
719 SHORELINE DRIVE WEST
DOCK PLAN 2 OF 2
PREPARED BY SEGI
4/23/18
_ _ _ _----- - --- -- --- - ,__ ------- --- - --- ---s+
_ �w
- - - T - -I- - -- - - - - - - - - - _ Ij@,STRATr
t
PRID
.......... _ ..._..-_ _ UQAT.. LIFT
y
30' 35' 40' 45' 50' 55' 60' 65' 70' 75' 80 85' 90'
RECEIVED
MAY 14 " 71
DCM WILMINGTON
04 TW _
POST(TYP.)
'. 2x8 PILE CAP
2z6 DECKING
(EACH* 51DE)
- 1/2" H.D.G. CARRIAGE '
BOLT WAWA5HER5 (AT NUT
AND BOLTHEAD END)
GX6 MARINE -GRADE
PILING (TYP.)
So b$- I.OUAIP
yK #
- 1/2".H.D.G. CARRIAGE
)LT W1WASHER5 (AT NUT
AND BOLTHEAD END)
2X8 STRINGER
2'-0" O.C. MAX.
�x 6
2X6 CROSS "BRACING
I /2" X 6". H..D.G 'rlixu
BOLTS EACH END)
GENERAL- NOTES:
I . All WORK-5HALL BE DONE IN ACCORDANCE
WITH STATE AND LOCAL BUILDING CODES AND
OWNANCES. .
2. ALL WOOD PILINGS SHALL BE INSTALLED IN
STRICT CONFORMITY WITH COUNTY AND STATE
ORDINANCES AND POLICIES.
3. USE SALTWATER MARINE: GRADE LUMBER,
TIMBER, AND PILINGS.
4: BOLTS, NUTS, AND WASHERS SHALL CONFORM
TO APPLICABLE A5TM-BPECIFIGATIQNS-, BOLTS -
ASTM A-325, NUTS -ASTM A-563,
WA5t1ER5-A'5TM A436.
5. ALL STEEL PLATES, ANGLES, NUTS, BOLTS, AND
WASHERS ARE TO BE HOT -DIP GALVANIZED
UNLESS OTHERWISE NOTED.
G. CONSTRUCTION FOR RESIDENTIAL PEDESTRIAN
PIER USE ONLY. LOAD BEARINGS BASED ON 20
PSF DEAD LOAD AND 50 PSF LIVE LOAD ON
WALKWAY AREA.
7. SPECIFY, ORDER, AND INSTALL PtLE5 FORTRUE
LENGTH.. PILES SHALL BE DRIVEN TO GRADE.
.JETTING OF FIRST TWO FEET TO OBTAIN
ALIGNMENT MAY BE PERFORMED. PILES SHALL
BE DRIVEN VERTICAL (PLUMB):
8. THIS STRUCTURE HA5-NOT-BEEN DESIGNED TO
WITHSTAND CATASTROPHIC WEATHER
CONDITIONS. '1''l Ed l Zq- ASS D CS .s NG
DOES NOT GUARANTEE STKUC-I'UKAL
. STABiLITY-DURING SUCH EVENTS, WHICH MAY
INCLUDE EXCESSIVE STORM SURGES, HIGH
WINDS OR WAVES, OR ANY COMBINATION OF
THESE.
- i
-�H GARP
�0 44 rEss/6--
SEAL -
2�2U8
-_D_-W�� ._� _ 3�EC E IV E D
Brunner Associatij 1%4.2015
301 SPcreline Drive West
Suns t Bea 8�lmILm"fm8TON, N
3111119