HomeMy WebLinkAbout19850087 Ver 1_COMPLETE FILE_19850710
A/IR16'AI'IOMh
FOW
FE MIT" T0EXCAVhTEAN0JMFIt L W1TMQ 'CEri FI
EASSMEW i114 LANUSCOVERM, W IMi1?TE CifrtMitl t?dR'MfMl t
Depoem tt of'Adeil `
(GS ,146-12t
Stastot NoM CarMM 0gwVnwA of **,Amsy
ppa?rmncof Nswal RMwanaMdCe tlkOwMM Cwpdf Ezra, tllombosookom
(GS 113.2M 1433215.3(ali1)..141.21S.3(c)i,113A•11& (31CFW20 .3101320
Ntase type or print and fill in all blanks. If infonttation is not applicabir, so, indicattby piaci%N/A in blank.
IIB. ???t .
-
A, 1. Maintenanarof exiMinBproiect X 2. New worit
Purpast of excavation or fill N/A
1. Accesscchanrrci: lend ?,.,,? tdthfi._,.,,...?..deptls -
Z, a", basin Ienott vradth depth
1 Fill area lenilthe,widtit®depth
4. Other length width® depth
Ce 1. Bulkheadlengtfr Average distance waterw d f MHW (shoreline)
2. Type of bulkhead construction (material) H -
D. Excavated material (total for proiect)
1. Cubic yards 0 2. Type of material N/A
E. Fill material to be placed below MHW (see also V1. A)
1. Cubic yards 0 2. Type of material N/A
IV. Land Type-, Disposal, Areas and Construction EQuipwtent:
A. Does the. area to be- excavated include any marshland, swamps or other wetland? Yes•®No ® N/A
B, Does the disposal area include any marshland, swamps or other wetland? Yes No
C. Disposal Area
1. Location --
Z, Do you claim title to disposal area?
D. Fill material SuUILe if fill is to be trucked in
E. How will excavated material be entrapped and erosion controlled' -
F. Type of equipment to be used
G. Will marshland he crossed in transporting equipment to protect site? If yes, explain
Applicant Information
A. Mame.Commanding General, Marine Corps Base
First Middle
B. Address Office of AOt', Facilities
Street, P. O. Box or Route
Camp Lejeune NC 28542 FTS 676-3034/5
City or Town State Zip Code Phone
11. Location of PropOSnedSRroolft:
A. County V Camp Le j eune
B. 1. City, town, community or landmark X
2. Is proposed work within city limits? Yes-No New River
C Creek, river, sound or bay upon, which project is, located or neatest named body of water, to project
( A
Et v. pi
` oiF?1
A. ,. Fill
4:Odtea Recreation Pier
NJ A. T
IE, t.. Lnp.siae(s) mass*
I Elsvatkwof lot(s) above mean No water
3. SoN type and texwrr
4. Type of building facilities or structures
5. Sewap disposal andlor waste. water treatment A. Existing Planned
Describe
6. Land Clasufieation (circle tine) OEVELOPEO TRANSi TIUN.Ai. COMMUNITY RURAL
CONSERVATION ATHER (See CAMA Local Land Use Plan Syrtopait)
VI. Fwtaktift to Fill and Water Quality:
A. Does the proposed project :rvolve the placement of fill materiaig below mean !sigh water? Yes_No X
B. 1. Will any runoff or discharge enter adjacent waters as a result of project activity or planned use of the
area following project comp lettion) Yes-No X
2. Type of discharp N A
3. Location of discharlI unknown
VIR. heo te?rsteefshorefineremsiom(if known):
VNE LI*pntdktt miIWMaad istnedatarof pre+rwwCoDetmsmnentd Arutw, GwW of.EagimmarSseop hn
None
tNrMltits paojeetaeat ib'appfie- b-12 months,
U Lwob i Mnta upettemcempleterpRei
)?. lava/mdkietttadtecampMt?appficatiott`ferm-? t??BMmttettbrp
A, Auadrs &Ca m of the dmsrA (with 5tatsapplitatien' on*) = of athee mmuma t> under which applicant,
claim* tide tatheaffeetedpapoW.OAifappli mListtosdaitr6r*to4hmrttte:avrneWotsaiAprqpeIV.
char forwar4 a copy of the deed or otMsinstrommtw*wtdeer whim# theowrw clawas.tithr pksg we uen,
permission from the owner to cant' out the project: on-his, land.
L. Attach an accurate work plat drawn: to scale on 8'h X 11" white paper (seeinstruttimrbooklet for
details). Note: Original drawings preferred • only high quality, copies accepted.
C. A copy of the application and-plat must be served upon adjacent riparian landowners Jeosteredol.
certified mail or by publication (G.S. 113°229 (d))Enter date served D. List names and complete addresses of the=riparian landowners with property adjoining. applicant's.
Such owners have 30 days in which to submit comments to agencies listed below.
XL Cadfication requirement: I certify that to. the best of my knowledgit, the proposed activity complies
with the State of North Carolinats approved coastal managanwrit program and will be conducted in a
manner consistent with such program.
XIL Any permit issued pursuant to this application will allow only the development described in this appli
Cation and plat. Applicants should therefore describe in the application and plat all anticipated devei-
opi w t activities, including construction, excavation, filling, and land clearing.
05 Aug 1985 C' ?&Jd?a?
DATE.
B. W. ELSTON Aop(jgattt's Signature
Deputyy Assistant Chief of Staff, Facilities
Owf'it SEE REVERSE SIDE FOR-MAILING INSTRUCTIONS
Mail gm copy to.
District Engineer
Wilmington District Corps of Engineers
P. O. Box 1890
Wilmington, N. C. 28402
(Note: attach Corps transmittal letter)
Phone: 919/343-4631
AND
Mail 2ne copy to your regional field office as indicated on the map below:
cw?ve"
t
?.ow e
From south side of PamlicwRiver, tatirsdu?Osniasrf.?swlr iiMtr:
Division of Marine Fisheries
Room Department of-Natural Resources and Corrnsit*dty WvNallinU tt
P: O. Box 769
Morehead City, N. C. 28557
Phone 919/726.7021
t#?rR
For Perrier, New Hanover and Brunswick Counties:
Wilmington Regional Office
Department of Natural Resources and Community Development
7225 Wrightsville Avenue
Wilmington, N. C.28403
Phone 9191762.3394
f
_a
c?
--- 5? °
7.0
•
0 14-7.7-0
?If?v/
?I???
Ar
I `-711
L \XAT
M
Z-Z?to STr? ,????
-- }`'TOW- - --
? _,
r _ co.
INC)
Daybeacon
11t O ank
s Ruins
L/
?(?: _ (al)
Creek
3M
Pier
Light MA
Mumford
(9 Pt
Solomons/
? q
- ? _ gnt
Tuiagl POINT FIELD \
4
PETS
?.? GLIDER BASE
I ? o3r?coa--. ? A
Pile
1.23
/ \\ plight
' ?'
o' Ragged
??.
X00 Jarman
D (C) ?.
?? ? ?\•,\ G, ice, =?_-__? ,5? j ?, L%-
i
Foul Q) 22
?/,' / /'?? ?=`??
j? ?, ? 1? \ ? - ?"+, ? ??---%%? / '?J??" ' it
?11ti ?I? III . 5? ; Foul
r ri
??
__ - ,
. - _ _ ,
__
?• t
DIVISION OF ENVIRONMENTAL MANAGEMENT
Water Quality Section
July 25, 1985
M E M O R A N D U M
TO: John Parker
FROM: Dennis Ramsey
SUBJECT:- Application for CAMA Consistency Determination
U. S. Marine Corps - New River Marina
Onslow County
The subject application has been reviewed to determine water
quality concerns and the following comments are offered:
1) _ The project as proposed will not require a 401 water quality
certification.
2) Marine pumpout facilities and a "locked-head" policy should be
established for the marina. Violations of fecal coliform
standards can be expected unless these facilities are provided
and their use strictly enforced.
DRR/BM:dkb
cc: Preston Howard
Bill Mills
W&-
DIVISION OF ENVIRONMENTAL MANAGEMENT
Water Quality Section
July 25, 1985
M E M O R A N D U M
TO: John Parker
FROM: Dennis Ramsey
SUBJECT:- Application for CAMA Consistency Determination
U. S. Marine Corps - New River Marina
Onslow County
The subject application has been reviewed to determine water
quality concerns and the following comments are offered:
1) _ The project as proposed will not require a 401 water quality
certification.
2) Marine pumpout facilities and a "locked-head" policy should be
established for the marina. Violations of fecal coliform
standards can be expected unless these facilities are provided
and their use strictly enforced.
DRR/BM:dkb
cc: Preston Howard
Bill Mills
1
M E M O R A N D U M
DIVISION OF ENVIRONMENTAL MANAGEMENT
Water Quality Section
July 25, 1985
TO: John Parker
FROM: Dennis Ramsey
SUBJECT:- Application for CAMA Consistency Determination
U. S. Marine Corps - New River Marina
Onslow County
The subject application has been reviewed to determine water
quality concerns and the following comments are offered:
1) _ The project as proposed will not require a 401 water quality
certification.
2) Marine pumpout facilities and a "locked-head" policy should be
established for the marina. Violations of fecal coliform
standards can be expected unless these facilities are provided
and their use strictly enforced.
DRR/BM:.dkb
cc: Preston Howard
Bill Mills
a.i
DIVISION OF ENVIRONMENTAL MANAGEMENT
Water Quality Section
July 25, 1985
M E M O R A N D U M
TO: John Parker
FROM: Dennis Ramsey
SUBJECT:- Application for CAMA Consistency Determination
U. S. Marine Corps - New River Marina
Onslow County
The subject application has been reviewed to determine water
quality concerns and the following comments are offered:
1) _ The project as proposed will not require a 401 water quality
certification.
2) Marine pumpout facilities and a 'locked head" policy should be
established for the marina. Violations of fecal coliform
standards can be expected unless these facilities are provided
and their use strictly enforced.
DRR/BM:dkb
cc: Preston Howard
Bill Mills
a$?,
DIVISION OF ENVIRONMENTAL MANAGEMENT
July 12, 1985
M E M o R A N D U M
TO: Bill Mills
Operations Branch
FROM: Michael F. Williams, Chemical Analyst I i4lf--
Wilmington Regional Office
THROUGH: A. Preston Howard, Jr., Regional EngineerA*
Wilmington Regional Office
SUBJECT: Regional Office Review & Recommendations
Application for Permit for Excavation and/or Fill
U.S. Marine Corps - New River Marina
Onslow County
RECEIVED
.1111 2 31985
WATER QUALITY SECTION
OPERATIONS BRANCH
The applicant proposes to replace a 220 foot pier with a 370 linear foot pier
with 30.slips at the marina located adjacent to New River, classified SC.
The project has been reviewed to determine impacts to water quality. The
following comments are provided:
1) The project will not require 401 certification.
2) Marine pumpout facilities and a "locked head" policy should be established
for the marina. Violations of fecal coliform standards can be expected
unless such facilities are provided, and their use strictly enforced.
3) Since the applicant is a Federal Agency, long term maintenance of the
facilities should not be a problem.
MFW/APH/sbm
cc: Wilmington Regional Office
}
Ms. Robin Smith
N.C. Division of
Management
P.O. Box 27867
UNITED STATES MARINE CORPS
Marine Corps Base
Camp Lejeune, North Carolina 28542-5001 IN REPLY REFER TO
t47
' tr?t1. 6280/4
yl?'., ale'='.?:: l, t it . i F A C
s{ f ; 13 JUN 1585
JUN 17 1985
Coastal
r??CT ;, ,. .?•crc? M4t?,
Raleigh, North Carolina 27611
Re.
Dear Ms. Smith:
Coastal Zone Consistency
Determination
Replace Pier-at MCAS(H), New River
In accordance with the North Carolina Coastal Management Guide-
lines and the Federal Consistency Policy, we are forwarding this
consistency determination and project drawings for your review.
The proposal consists of replacement of a 220' wooden recreational
pier at the Marine Corps Air Station (Helicopter), New River Marina
with a similar structure 370' in length. This replacement is
required due to the age and condition of the existing pier. The
site location and project drawings are enclosed for your review
and concurrence.
Based upon our review of Section 7H, the proposed project is
consistent with the Guidelines as shown below:
a. Coastal wetlands, estuarine waters, and public trust areas
will not be adversely affected; the Marina is an acceptable land
use for these areas of environmental concern.
b. Preservation of the estuarine shoreline will be accom-
plished during the project.
C. Land disturbance will be involved 1-ear the shoreline
only Lo the extent to allow operation of construction equipment.
d. Existing ground cover within the project area will be
maintained to the maximum extent to provide a buffer zone along
the margin of the estuarine waters.
e. The limited area disturbed by construction will be re-
vegetated within 30 days of project completion.
f. This project will not interfere with existing public use
of the navigable waters of the New River.
We believe the proposed project will be conducted in a manner
which is consistent to the maximum extent practicable with the
6280/4
FAC
North Carolina Coastal Management Program. For further infor-
mation, please contact Mr. Bob Alexander, MCB Environmental
Engineer at 919-451-3034•
Sincerely,
DYE
STON
Deputy Assistant Chief of Staff, Facilities
By direction of the Commanding General
Encl:
(1) Dwgs of Proposed Pier, MCAS(H), NR
Copy to:
U.S.A.C.O.E., Wilmington
N.C. Div of Coastal Mgmt.,
Morehead City, N.C.
CO, MCAS(H), NR
I
i
Q
M
/moo
'So
GoN'>'o UKS ?'?? M ? of
N IG ? k/?,T?? ??N
-72,0
-7.0
??v??? ?I 1E??2
y
C
M
I VAT-1ot-4
17> e,: Z
-1-? 4( vv- -
Brier
? s
'0 Day.beacon
an /( / . v (c) o
c"-~. Ruins
All
?? °, \ Pr`s m , ?? ie
Creek , dal) ?I -
BM
19
? Z Pier`.
j0?%...,,, ' Light (c)0 u ?i\?? IO V
O N„ V I tom.. Mumford 's O4
IV w pt
l Solomons.'
10 ,Light
4-
.00
?c
° OT
-' ) - ' r
?P E??S POINT FIELD
x - - Tulagi
?W GLIDER BASE _ -. (M) 9Pe // \\ 9Pd
W GLIDER Bracoa
Pile
&Light
-?`\\\/`\\?? ` 'V Ragged
¢ ^? ; Jarman
! (c)
ell
41
H ( n\??r \ Foul
Foul
??? ??2 •? 'fit _ - w?. ? ,. -, \ .
V J, 30--
-? _ - 0.11` '-?1-?-L ? ^--._ ? • / ? _- /
i
Ms. Robin Smith
N.C. Division of
Management
P.C. Box 27867
UNITED STATES MARINE CORPS
Marine Corps Base
Camp Lejeune, North Carolina 28542-5001 IN REPLY REFER TO.
Lit, A% 6280/4
FAC
AN 17 1985
Coastal
Raleigh, North Carolina 27611
Re.
Dear Ms. Smith:
Coastal Zone Consistency -
Determination
Replace Pier at MCAS(H), New River
In accordance with the North Carolina Coastal Management Guide-
lines and the Federal Consistency Policy, we are forwarding this
consistency determination and project drawings for your review..
The proposal consists of replacement of a 220' wooden recreational
pier at the Marine Corps Air Station (Helicopter), New River Marina
with a similar structure 370' in length. This replacement is
required due to the age and condition of the existing pier. The
site location and project drawings are enclosed for your review
and concurrence.
Based upon our review of Section 7H, the proposed project is
consistent with the Guidelines as shown below:
a. Coastal wetlands, estuarine waters, and public trust areas
will not be adversely affected; the Marina is an acceptable land
use for these areas of environmental concern.
b. Preservation of the estuarine shoreline will be accom-
plished during the project.
c. Land disturbance will be involved i-,ear the shoreline
only to the extent to allow operation of construction equipment.
d. Existing ground cover within the project area will be
maintained to the maximum extent to provide a buffer zone along
the margin of the estuarine waters.
e. The limited area disturbed by construction will be re-
vegetated within 30 days of project completion.
f. This project will not interfere with existing public use
of the navigable waters of the New River.
We believe the proposed project will be conducted in a manner
which is consistent to the maximum extent practicable with the
6280/4
FAC
North Carolina Coastal Management Program. For further infor-
mation, please contact Mr. Bob Alexander, MCB Environmental
Engineer at 919-451-3034•
Sincerely,
7t4d DYE
STON
Deputy Assistant Chief of Staff, Facilities
By direction of the Commanding General
Encl:
(1) Dwgs of Proposed Pier, MCAS(H), NR
Copy to:
U.S.A.C.O.E., Wilmington
N.C. Div of Coastal Mgmt.,
Morehead City, N.C.
CO, MCAS(H), NR
I.-
4
M
J ?,O
Go?`roU?S b,?? M??
72. a -----
????UZ? 1:-::15 lf::?7I i T<?
- $,J--re
P
M
4 -vv
^ -
1 N
IIxG.i fie` !:: ??a
T Jacks Pt
GCl
3-1
10 Day?eacon
(M
?-
i ' /,. ?? _ ?,?,`? ?,F'?l ? •. Ruins
\y
Creek
(M -/l -
) JJ
? ire 19 ?^\\ ="?%-I !'?•-? ? mss! ?'\ '..-??y ? ??= ? /
r ` " \ Pier o \
„ v
Light(C)p o'
0 1V V 1 4/?',., Mumford
Pt 0
3. Solomons l
' o: y m
w
plight
so olx
p T POINT FIELD s
?j'GLIDER BASE - Tulagi qP L \? 9P
_ oBeacoa (M) d? a
y
Pile
20-
r,?7! i?y\ plight
Ragged
Pt
21
/( Jarman /
(c)
01
\ Off' ??' \?
„I ( \ Foul O - J
Foul
?2? 30=? /-,, \,