STATE OF NORTH CAROLINA
v?
e0
DEPARTMENT OF TRANSPORTATION ?So ?ry
BEVERLY EAVES PERDUE EUGENE A. JR.
Govr.RNoR SECRETARY
May 19, 2009
Mr. David Baker, NCDOT Regulatory Project Manager -
U. S. Army Corps of Engineers 090588
151 Patton Avenue. Room 208 Asheville, NC 28801-2714
Subject: NW 3 and NW13 Permit
Bridge No. 178 - on SR 1393. Wilds Cove Road, Burningtown Creek
Macon County
State Project No. 14B.205611 (DWQ Minor Permit Fee $240.00)
Dear Mr. Baker:
The North Carolina Department of Transportation is proposing to remove accumulated sediments from
beneath and immediately up and downstream of bridge 178 over Burningtown Creek. Additionally, Class B
shot rock will be installed on an eroding streambank on the northeast quadrant of the bridge. A significant
sand and cobble bar approximately 75 feet long x 25 feet wide extends from upstream of the bridge to
downstream of the bridge along the east side of the main channel. The bar is well vegetated below the bridge
and reaches to approximately 5 feet in height above the stream at the highest point. The depositional bar is
between the main channel of the creek and a secondary channel (7-8'wide) that runs along the east side of the
bridge. A smaller depositional bar approximately 60 feet long x 10 feet across at its widest point has formed
along the west side of the creek and a secondary channel (4-5'wide) has formed between the west bank of the
creek and this depositional bar.
NCDOT proposes to excavate the bar materials along both banks and use these materials to create floodplain
benches. The sand, gravel and cobble bench will serve as a streambank during normal flows to maintain the
stream at a width-depth ratio similar to the existing channel up and downstream of the bridge. Large shot
rock will be placed at the toe of the eroded bank to protect the wing wall of the bridge and adjacent private
property.
I am including a USGS topographic map, a marked county map. PCN, a drawing showing the proposed work
and photographs of the site.
The North Carolina Natural Heritage Database was checked for records of federally threatened and
endangered species. There are no records of listed species in the immediate vicinity of the project. There are
records for the small whorled pogonia (Isotria medeoioider) within one mile of the project. The small
whorled pogonia typically inhabits open, dry deciduous woods with acid soil. Conifers. such as hemlock and
white pine, are key components of small whorled pogonia habitat. The areas to be affected are highly
disturbed in-channel sand, gravel and cobble bars and highly disturbed riparian areas in the immediate
vicinity of the bridge and the road intersection. Habitat for the small whorled pogonia is lacking. For these
reasons, we believe there will be "no effect" on the small whorled pogonia. Burningtown Creek provides
Bridge 178 on SR 1393''. 2 May 19, 2009
habitat fbr the spotfimchub (Erimonax monachus), a federally threatened species. There are records shown
in;the'database that are approximately 6.5 miles downstream of the project. The material to be removed is
unconsolidated sand, gravel and cobble and is natural substrate material that originated in upstream areas.
Potential for adverse. sedimentation effect from these materials is significantly less than from soils having a
significant clay,co'mponent. The use of sandbags to divert the water away from the work area and the
sequencing of the project to minimize impacts will reduce the potential for adverse effects on downstream
habitat. For these reasons, we believe the project "may affect but is not likely to adversely affect" the
spotfin chub.
The proposed work is limited to stabilization of an eroding streambank, removal and/or reshaping of a depositional
channel bar, All these areas are highly disturbed by the road, bridge and natural scouring of the creek. Therefore, we
believe there will be no adverse effects on historic or cultural resources.
The best management practices will be used to minimize and control sedimentation and erosion on this
project. The construction'foreman will review all sedimentation control measures during installation to % ensure sedimentation is being effectively controlled. If the planned devices are not functioning as intended,
they will be replaced immediately with better devices.
Impacts to Waters of the United States
Bumingtown Creek (DWQ Class B Tr) is shown on the USGS topographic map as a perennial stream. The
main channel at the bridge is approximately 30 feet in width. The stream has a well-defined channel
composed primarily of cobble, gravel and sand. The stream is of sufficient size at the project location to
provide habitat for fish, including trout. Burningtown Creek flows approximately 7.8 miles to the Little
Tennessee River. The Little Tennessee River meets the definition of a Traditional Navigable Water. For
these reasons, we believe that Burningtown Creek is a Relatively Permanent Water and is under the
jurisdiction of the U.S. Army Corps of Engineers. In order to construct the project, it will be necessary to
impact waters of the United States in the Little Tennessee River,Basin. Specifically, NCDOT is requesting to
remove and/or redistribute depositional materials and stabilize an eroding streambank on Burningtown Creek.
Listed below is a summary of the proposed impacts.
Site No. Existing Condition Proposed Condition Net
Station Impacts
install 25 feet x 4 feet of temporary sandbags and
Site IA Unobstructed free concrete barrier to divert side channel flow away ]00 It -
Side flowing side channel from secondary channel and east bank into the main
channel
channel
Site 1B East 25-feet of eroding Placement of Class fl shot rock to stabilize
Side streambank bank 251f
25'w x 75' long Redistribute depositional materials (cobble, gravel
Site 1C East depositional bar under and sand) to create a floodplain bench along east
Side bridge extending up bank to restore proper width main channel and close 1875 f 2
and downstream off 100 foot of secondary channel and remove any
excess depositional materials.
Site 1 D Unobstructed free Install 15 feet x 4 feet of temporary sandbags and
West Side flowing side channel concrete barrier to divert side channel away from 60 ft'
west side of creek into main channel
Site IE 10'w x 60' long Linear Reshape depositional bar to restore proper channel
West Side depositional bar along width and close off 60' of secondary channel 600 ft2
west end of bridge
tT otal:P:eiinanent ImpactBaiik Stabilization < ` 25 if
Total Temporary Impact for concrete and sandbag dike and diversion 160 ft2
Total Temporary Impact from reshaping of depositional bars 2475 ft'
Bridge 178 on SR 1393
Permits Requested
May 19, 2009
NCDOT is hereby requesting authorization under Section 404 of the Clean Water Act to proceed with the
construction project outlined above. By copy of this letter. I am asking Mr. David McHenry, Mountain
Region Coordinator of the North Carolina Wildlife Resources Commission (NCWRC) to comment directly to
you concerning the 404 Nationwide Permit request.
Also, by copy of this letter, I am requesting authorization under Section 401 of the Clean Water Act from the
North Carolina Department of Environment and Natural Resources (DENR), Division of Water Quality
(DWQ). In addition, I am asking Mr. McHenry and Mr. Ed Ingle, Roadside Environmental Field Operations
Engineer (NCDOT), to comment directly to me concerning this permit request.
If you have any questions or need additional information, please contact Mr. Chris Lee at (828) 497-7953 or
me at 828-586-2141.- Your early review and consideration will be greatly appreciated.
Sincerely,
,V ,a. ' -
Mark Davis
Division 14 Environmental Officer
cc: Mr. Brian Wrenn, DWQ, Raleigh (4 Copies)
Mr. Mike Parker, DWQ, Asheville Regional Office
Mr. Troy Wilson, Biologist USFWS Asheville
Mr. David McHenry, Mountain Region Coordinator, NCWRC, Waynesville
Mr. Joel Selzer, P.E., Division Engineer, NCDOT, Sylva
Mr. Chris D. Lee, El, Division Bridge Engineer, NCDOT
Mr. E. L. Ingle, Roadside Environmental Field Operations Engineer, NCDOT
O20cF WWjAF7
> 1 L.J_WS?
oliii? I
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps:
®Section 404 Permit L] Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: NW 3 & NW 13 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ? Yes ®No
1d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required? Forth e record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
? Yes ®No
11. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 In
below. ? Yes ® No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ®No
2. Project Information
2a. Name of project: Bridge 178 over Burningtown Creek on SR 1393, Wilds Cove Road
2b. County: Macon
2c. Nearest municipality / town: Franklin
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state
project no: State Project No. 148.205611
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. N/A
3c. Responsible Party (for LLC if
applicable): N/A
3d. Street address: N/A
3e. City, state, zip: N/A
3f. Telephone no.: N/A
3g. Fax no.: N/A
3h. Email address: N/A
Page 1 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ® Other, specify: Mark Davis, Division Environmental Officer
4b. Name: Mark Davis
4c. Business name
(if applicable):
North Carolina Department of Transportation
4d. Street address: 253 Webster Road
4e. City, state, zip: Sylva NC 28779
4f. Telephone no.: 828-586-2141
4g. Fax no.: 828-586-4043
41h. Email address: markdavis@ncdot.gov
5. Agent/Consultant Information (if applicable)
5a. Name: N/A
5b. Business name
(if applicable): N/A
5c. Street address: N/A
5d. City, state, zip: N/A
5e. Telephone no.: N/A
5f. Fax no.: - N/A
5g. Email address: N/A
Page 2 of 11
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
la. Property identification no. (tax PIN or parcel ID): N/A
1 b. Site coordinates (in decimal degrees): Latitude: 35.2148 Longitude: - -83.4982
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: N/A acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Burningtown Creek
proposed project:
21b. Water Quality Classification of nearest receiving water: Class B Tr
2c. River basin: Little Tennessee River
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The area of the project is within Burningtown Creek. The land use is rural residential with a mixture of woodlots and open
areas.
31b. List the total estimated acreage of all existing wetlands on the property:
N/A
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
N/A
3d. Explain the purpose of the proposed project:
The purpose of the project is to repair an eroding bank, reshape two depositional bars under the bridge and up and
downstream of the bridge to create a floodplain bench to bring the normal flow channel width back to a width similar to
sections up and downstream of the bridge....
3e. Describe the overall project in detail, including the type of equipment to be used:
The work will require installing concrete barriers and sandbags to divert water out of two side channels. One channel
(east side) will be filled with the depositional materials and the depositional bar reshaped to form a floodplain bench on
the east side of the stream. Class II shot rock will be used to stabilize the eroding streambank. A narrow linear
depositional bar on the west side of the bridge will be reshaped and the stream width restored to a similar width as up and
downstream of the bridge. A small excavator such as a bobcat will be used to remove materials from under the bridge
and reshape the bars. Dump trucks, track hoe, sandbags and various hand tools also will be used for the repair.
4. Jurisdictional Determinations
4a. Have.jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
? Yes ® No ? Unknown
project (including all prior phases) in the past?
Comments: N/A
41b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: N/A
Name (if known): N/A Other: N/A
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
N/A
5. Project History
5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown
this project (including all prior phases). in the past?
51b. If yes, explain in detail according to "help file" instructions.
N/A
Page 3 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
N/A
Page 4 of 11
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T N/A N/A ? Yes
? No ? Corps
? DWQ N/A
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P F T ? Yes ? Corps
? No ? DWQ
WS ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts N/A
2h. Comments: N/A
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ? P ®T Concrete Barriers
and Sandbag gurningtown ®PER ®Corps
30
N/A
Dikes Creek ? INT El DWQ
S2 ® P ? T Bank Stabilization Burningtown
Creek ® PER
? INT ® Corps
® DWQ 30 25
S3 ? P ® T Reshaping of Burningtown ® PER ® Corps 30 N/A
Depositional Bar Creek ? INT ? DWQ
S4 ? P ® T Concrete and Burningtown ® PER ® Corps 30 N/A
Sandbag Dikes Creek ? INT ? DWQ
S5 ? P ®T Reshaping of Burningtown ® PER ® Corps
30
Depositional Bar CreekB ? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 25
3i. Comments: Temporary Concrete Barrier and Sand Bag Impacts equal 160 square feet . Temporary impacts from the
dempositional bar reshaping consists of approximately 2475 square feet. This work will restore the streams natural
characteristics and prevent bank erosion; therefore, there should be no new impacts.
Page 5 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
Ot ? P ? T N/A N/A N/A N/A
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts N/A
4g. Comments: N/A
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1 N/A N/A N/A N/A N/A N/A N/A N/A
P2
51% Total N/A N/A N/A NA N/A NA N/A
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ®No if yes, permit ID no:
5i. Expected pond surface area (acres): N/A
5j. Size of pond watershed (acres): N/A
5k. Method of construction: N/A
6. Buffer Impacts (for DWO)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ?Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact required?
s
B1 ? P ? T N/A N/A O No N/A N/A
?Yes
B2 ?P?T ? No
?Yes
B3 ?P?T ? No
6h. Total buffer impacts N/A N/A
6i. Comments: N/A
Page 6 of 11.
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measurestaken to avoid or minimize the proposed impacts in designing project.
This is not a designed project but a result of natural processes around a man-made structure.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Water will be diverted away from the work areas using sandbags and concrete barriers to minimize sedimentation to
downstream habitat. The project will be sequenced to minimize impacts. As much as possible, the stream will be returned to
a width similar to up and downstream sections.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: N/A
3b. Credits Purchased (attach receipt and letter) Type N/A Quantity N/A
3c. Comments: N/A
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ®cold
4d. Buffer mitigation requested (DWQ only): N/A square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: N/A acres
4h. Comments: N/A
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
N/A
Page 7 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) -required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ® No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 N/A N/A 3 (2 for Catawba) N/A
Zone 2 1.5
6f. Total buffer mitigation required: N/A
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
N/A
6h. Comments: N/A
Page 8 of 11
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ®No
within one of the NC Riparian Buffer Protection Rules?
1b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments: N/A
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? N/A %
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Project is Covered by Individual NPDES
Permit NCS000250
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan:
N/A
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
E3 NSW
3b. Which of the following locally-implemented stormwater management programs ? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
? HOW
4a. Which of the following state-implemented stormwater management programs apply ORW
(check all that apply): ? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
? Yes ? No
attached?
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met. ? Yes ? No
Page 9 of 11
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWO Requirement)
la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federal/state) land?
1b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
tc. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes
? No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ®No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future Impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?`
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
The only work being proposed is work around an existing bridge structure. No infrastruture is being upgraded; therefore,
this project will not contribute to a change in development patterns.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 10 of 11
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ® Yes ? No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No
impacts?
? Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
The North Carolina Natural Heritage Database. The project area is upstream of habitat suitable for the spoffin chub
(Erimonax monachus)
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
There are no marine or estuarine communities within the Blue Ridge Province
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes N No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology),?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
The project will not change the landscape or existing bridge and road infrastructure. The project will be in a highly
distured area within the scour zone of a perennial stream.
8. Flood Zone Designation (Corps Requirement)
Ba. Will this project occur in a FEMA-designated 100-year floodplain? N Yes ? No
8b. If yes, explain how project meets FEMA requirements This project will reshape existing depositional sediments, and thus,
will have a positive effect on hydraulic capacity at the bridge structure.
8c. What source(s) did you use to make the floodplain determination? INC Floodplain Mapping
Mark. Davis ?? /? ley May 19, 2009
Applicant/Agent's Printed Name Applicant/Agent's Signature
(Agent's signature is valid only if an authorization letter from the applicant Date
is provided.)
Page 11 of 11
PCN Form - Version 1.3 December 10, 2008 Version
q !
j Y 1j.1 FM'+3.
m
j ?; s
9 g r
+I
N
VII
01
?? t cy
.
N ],
f
F
• I!
v ,
N t
ry \
J
Gry
5 I _ S ti?'.?F„ f
'.
C `
t n Y.. it
a . `
c t-'- ?--- i Frl
13
Op 1 p sJ `?1
M
ti
d
to
r
MI
r
N
r
A
Q63' 31' 60.00" W , 983-30-00,00"W, I I 983° 29' D0.00" W
lam'\?l
a\\` ?'
\a.t <l 'l +t t`,I,tK
4,
71 t: :.f lftf 7 f
?\t?ty Jt'?^?-'r > `\? C
5
,.sIf?',/ ' i q?TA
1??('-JkP? fa7 q r ? °' 4'
MZia
- / t
" ;l n?6 ? (' j l?
\ 1
° Yr '? ?-?`.'> \ ?\L 'rsl ??+41»/
?
\ . ''?
--•;
?
? t I(`?(' ?
G ar ?, I T:ao \ "' Ifs 1 f Y
t" ? < c \0 '-: 6??'Ca r r \ti'? f i .,, 's ?': J?.UeanB'2r1
" ^' I s"\}M LHT;?
e k6t w
1l? rM1S ?
J
r \ ?
?
?
? .? ?
a
Rurl
N
ll
. Z
iifi
e
`"l<
ii b
,
°
° i Y r
A o 3Nbl
? \Z `
Q '"`' /r i2 ck K o? ')Jp s,.r / (/ "r\' 1
' ---
?
?
f •! ???
/.!? fry/
i l? l r ^0 4r.\ /!
?/; 1 -?? M\.-.-?
?
? ?Y{`i ! ?/ / \.
?1?, ???. 4? / Y
1
•% /
s 1 ?/
a 1 i?
? ? /%\ ? (/?F
_ + Kt
? N ? l) \ ??
am ? ?1/
e` 3 1?/?y??'.k. ?, ?Y b
k ? ?
\4 { 1 ?L r Iw4?T4 j `j.'! f ?Iffl?rM1
-+
? ?
,
? <
?
?f O
I r
?? ?r? a
' -. J? S ,., zBW
r e > ?.
.
?
y ? ?
-< L . ?
,
? _rr /
? s ? f rt
P
.
7a' ? r>)"Tr
r t ,,,, ,?
,
.
?
x
>
, .? /
?,
r ? a :? 2061
//? t ?A iy ) ?? { ja \. 'I I ? aBuJ
s I
- A SAi r:. SV £4 s l
? ??? '?r ?i )
/
Cv?
a V" Yr"?i t? ? ,P r ? ? ??? / P?
rg
\
r'' t a,l, n
/r `
L
t t
)
)
?
^
? I
v ..;
r.
; r-- x ? r
/
l+t
l'
>
'6
+ .! J v
; Y
} ?'1b} ,
j,/j/ j
1 ?t? f );<?
k?./? tirr? +
M1 . y,y
,,
\vt+-/i !4`
i r a /
?
./.,....
....!!.?.1
_
1 )?, ?l ! 1
ti Ft,, l ?L ?\. P,l\? r C?
4 r ? ??/ I d yl 1.A `-•'?t';v? ,> ,y?l} y
J'1{t1W y Ii,JR; '4 4/.
ti7? y C' r ? R,( C ,? ?/fr ° ???' ?1sY ? r 2P00'w ( -d?k'\ 4
/..t?}I ,,1
r re ° Vt r ?j4?
vs
c ?f k \ \ , IfJ ,yt .! l :;C'
vv i""< y ? i
? t
F
L
{
`
: \ lay ^16
• ?
x rt.F' Z I'i, ? \''M
aM I
HT 10G
Z
1 I ,
\ f
l: i A
Y..,r,/ p .v
`? r
Yr
v
!!
!e M1
:
r,
to A ^".? ? ?
l
'
P
? ?
. , ?
a
I k
' '>?
;
f
` .
v
?,.+? ( rsc 1 II ?
??.
i
° ha 1
- ! \\I>' ?
Z
O
I lIT
Y/
y ?`
?
7 rt \
?-.V f
Yt )i -
?' ' w
l_! SL'. 4\
S
\ ?`
"(''4t) ?. F\ J iJS /. /
Y yW
a J
G
4
Plrl ` 4
+T? {
C
< ?' „ /M ` \? O
o ip l`, ?
r
I m
N
(h
O .ru t \
\-?
?
S 11`
"' ? \ ':'\- ? { ?
al7ti? ? \t V?1a
fil A??iM \ '?. I:L I
? '?{{ / Y
1 S J
{
\
'?Y-\S
' If 7r F siFy
t?t r \
/,`2y\' `.'Hal Y '. d ?
I \ "i J ft)
r, \P'3 !
I.? ?/?,?k8
I'.. ? .l iF s fk
Y? 'w/Mrs'
51
?" ?.W{>r`X'
\ ??a4)+yF,
= .i S?
1?, .. ? yY J
fi )£ Y \ /s' ? 4. ?
?f ? k'?t. ?. .x ?3 ?v?&. SI`1?y1"..
( y h?.y? L ,? OP \`V b I t '"
J" S? '„ P S kU'j?
.*kJ'L
r? k
"
l' ?
rv
? (
4 ? .?-
N
?
O
L Cp
y
.y
\
?9N
w! ? ?? ye I
?s'1
r nr?
3 ?'S\%? j ? ? \
3,
\ }
/ i r..n- ^v M1 M1
2 h o x{\?h' ?l ?' / ?
t
`C J Y y „ l1kw
F ?i YTOO ?. ?3-..
.
F
\
U-
;
-.. ,•sr ?i 01
a/'
'?'4? ??\
v =
n aR 21 r ?S A
? F \
?' ?
,,
y $,
t 7
'\ 6?'4
1x i e
?? LH?Ckajt ? pIt fi,na, Chl
2? t7 ? ?
tw yV ,? /.c ? X =f Vy dCc ate Grh
h f r^-\l?; tt /
?(m L Y 'H,
1? ?
?.l \ ' ??d?f }'1-J,i
,a t/f .7? +h+
r t ? h %Y ?.: f`w?
ti k?
l ?
a ' >°
\ \'!'V'"'?„'. ?'3 ?r
?^. `cF". „++r;;
,
r'
'
? \? ? ??tP J
' L"?ka.? r ` ? p .
k? `Z i
M1 ?
^
I r?
?"
?
F
e
K'
r 1f 11. \ 1.r
v vi^"` 1 4
/' ? f (
s
? ?
/? V
.j , \ aW
,rlFf ?t
y
,r u / q M 1 --e
</y"'?+?M1
I
1e</ M
j 1S
K? t
nlr.u
ti? Jpp/ L v
?
? \I
C
-J' is Y
?
w \ g_ `1. ?` r x W
?? ?
?
I Fd
?.r'Y, c,
,. ?t
j' ??
.n ; I ? (i a.;, v ? r`?kp Jv'-?
:w !/ 1 ^ v c r
?a
>
i /.:r 1$ 'ice" w '}?t,(I•`?\ 71
.
.?
w'i !c Cv v <I" All
v?°4?
Xi- rkm M1 > -, F< M ti
}-" / r
/N.S` ? -`???--...,? +' 1/
? / A? ? w fi./ V t
v v % `1?1 W ? l? R1nQ ' ?
v? . <` alts > dr ?' 1 LE yt+ar ? v 3VA r
vi y 1 ???, ? t'1l. ? dam/ M1??.''A\r' .^. ''` ?"an
,,?.'- tkl .. ?
I t:i? 1((?
f( t
?Vt'?l %' ./ \
l ??`
-/ l} 1 ?i=4) ?T. .. 'S,?''
4 J w `t \ ?` ?'?\. ?,y
5\ +r?+ O `24 ?5^ '(.'? ?74 .'it ?/ ?i?i+l F^
f Y K". Tai „P ]A Y
? 'v
? ? vA ? a.. ? 1
y J ?? ?? r -V r 4
? ? ? h+ 1 I r: i x_
1 ?? V.1 {x ? t ? ' { / 1 v?
J?4 r br' a .fie, 'r b t / +
N'"r.?nt 4r i V( 5 r^ { 5['??: y" r``?'?fl
Z ' Cr
V<1
r
' k k ?Yto
+. ? + .7 ? .3
i
'1
r
?
?
? ? r z
° V
vAA
"'??
? f
/ ?.l
l /
J l ? '?)? / ,%t``/..?
?
i I
_ J
??
W / ? o i
? ?3 \?S ? ?°
s G
t
'
? e.33?"?t'"?c:.F' ° ?
? /?
'
? ??
? .
/
. ? S
A
?
.?
?1 1?'" ''!`! /j" r fist ?
f
I?FI f fy
f
' ? M1 o
O
q ? ? l
?+l ?
N , '^
$:.. i
?
?h -.
?
?\ T
?
\\ a\` I
?TJ
i/!:r Y ! tf 1? 4\V \ \ 1 ??l / ??/ s• ? diSr 4 ?
A
/ ?'?. ? .a 2'S*n, ?,i? y? .?
$
C t ,?t' V is ? ? ,.'L c °? ? «??'R i
'a
°
N
, M
° l"\ I
\
\'
``?
l?.\ r
?
? u. ?v .n [ ) 7 1rt? I
`i eC 1 l? i I
i " ? !/ )} q
,a Ir'-• \ \ i II C' f Ir
r\\?\??` 4f\+.
I
`?
>
I
\
\ r M1? r <v?..
t ? y \,
/% \ l \ f y .. \
1?1 ? \
,r?l \\\\
,
` r? \
1
1 \ ,r,,, / ?; '
vn.
??v 1p, f \ cl riti,
sir 1 a t h
,, ?'d., /\ ? ?. ?C
y4 ,?,? ?fY'Z.n Nt
{rtie
r r
t ? ?dPa s' ?
e `??, .' a>,°'?
4# ?:
t`{ta +. P nr
,? t'$ qM a
.3A ' -`A' `}r .e
?.3"? i[T3? /FR?N$,4
!
t s M1 ? k b \ ..$
r= i t a r -t,•, .y, ..,'
?.. a?.k A Y c+?rx'" f / S W I ES^.
u S izt ,r t .z
?"ti.?. Cx' '• ?0 )? 1.
/
" ??
?
\
? i
n
ch
o
,
I i•1
?
rd Z
r? 1 71
Ili ?k'
t n/R ?
/ ) )?,,
.
3 +
I
1
t >('? Wr
!(/iUl \ taa
S I ?j7 tl cl?} \
1
?.. '„ /
) 'l 1 I
/ 1L.? I \
rtf , 940 \
,
M , t 1,
kk M1t`x'td`,'?'. /
? ?C x_ c
' ? + t xt 8
r??,,x i.
a
? ?
r
rte `t?5. - ?' /T
,ooa
itCy 4 5/ ?
z
fi
? .Yyy;
F
v.,. (;Rry yr
. . s ? - s
'`t?/ •? F ^\t UT
/ ?
fl
? r
? ?
`
v'3
1'
'r f
F ,
»"
?
k ?; ? \Y
JJJ of I L
?/u f
? ( 1, ,? f
r 1
? 1
\
1
t
) n I ?
?? J ?
?;
? w
A
S
r, ?
?
? s,
?dn
t
C 1 \! i, 1 a L ?
Yh h "ygry
v+
.+. tl
, ??yy!?' 0 Y { ?! -F "v ?,?t
J 6l<
'
Y
?
? ?
?' ?Yk < ,J
+ A??
? ? W ??
T
{ ) CY
? < 4V ,, L
4
+d ?,^,
:^Q
r. liN
?
'A' 1 VI l ASS Tj°/? /r FA ? F ?r ( 2 d .fy ,
693-31- D0.00" W 1 1 1 683° 30' .00" W 1 1 1 683-29- b0:00" VII . I I I
Name: FRANKLIN Location: 035° 12'54.13" N 083° 29'42.26" W NAD 27
Date: 5/7/2009 Caption: Bridge 178 on SR 1393, Wilds Cove Road, over Burningtown
Scale: 1 inch equals 2000 feet Creek
e
Y
O
O ? O
e
p or I
? 4 ? n 3
r u I
t W e
m
O I
,l
II
J
4
a
0
io
v
M
rn
0
0
N
M
C
O:
l0
O
c
N
N
G
l0
N_
m
C
O
U
(0
C
Bridge 178 on SR 1393 in Macon County over Burningtown Creek
Photo 1. Looking Upstream along Eroding Bank and Secondary Channel with
Depositional Bar on Right Side of Photo
Photo ?. Eroding Bank Looking from Bridge
Photo 3. Looking Upstream with Secondary Channel and Eroding Bank Out of Picture
to Left of Large Depositional Bar with Small Depositional Bar on West Bank Partially
Visible on Right Side of Photo
Photo 4. Looking Upstream from Bridge with Secondary Channel Visible to Left of
Photo and Edge of Depositional Bar at Bottom of Photo
Photo 6. LookinL, Downstream of Bridge along
Bar to Right and Small Depositional Bar to Left
t
Photo 5. Looking East along Upstream Side of Bridge with Depositional Bar and
Secondary Channel in Center of Picture
Main Channel with Large Depositional
Proposed Work
Proposed Work
`'Vest Side of Creek
Secondary Channef
to Be Filled - ??