Loading...
HomeMy WebLinkAbout20080669 Ver 1_Certification of Completion_20090521 DEPARTMENT OF TRANSPORTATION STATE OF NORTH CAROLINA BEVERLY EAVES PERDUE GOVERNOR WBS Element: Federal Aid No.: Contract No.: DWQ Project No.: County: Description: a May 18, 2009 2 :r /X le UNn Sly Fo. v1,9 ii EUGENE A','KWI, JR. 33826.3.1(B-4671) BRZ-1532(3) C202019 20080669 Wayne Bridge over Nahunta Swamp and Approaches on SR-1532 Mr. Rob Ridings NC-DWQ 1650 Mail Service Center Raleigh, NC 27699-1650 Dear Mr. Ridings: Subject: Certificate of Completion Attached for your further processing is the Division of Water Quality's Certificate of Completion for the above referenced project. If you have any questions or request additional information, please contact us. Respectfully, Corey D. McLamb, PE Resident Engineer Attachment cc w/att: File (II. A.) P.O. Box 3165, Wilson, North Carolina 27895-3165 Phone: (252) 237-6164, Ext. 3607 Fax: (252) 237-0804 OF W A 7 ,,9 o -c C.) r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 122 Coleen Sullins, Director Division of Water Duality DWQ ProjectNo.: 211 0QBatntO9T I . County: A /? Applicant: No,-4 CQYO( Ilr10.-1Jelq0.r'Tr",en4- o-( T?r'r Project Name: r/d e 35 Oil sic lrsb?- / Date of Issuance of 401 Water Quality Certification: Apr/ . 16, 2008 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification - 1, - , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial / Final 1 ?O rE t, 1- KACjam. a ryl , as a duly registered Professional Engineer in the State of North Carolina, havin een authorized to observe (periodically, wee , full time) the construction of the project,for the Pemnttee hereby state that, to the best of my abilities, due cue and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certti/il1fication and Buffer Rule/s, the approved plans and specifications, and other supporting materials. Signature L,yr "? fqCL --k) Registrationt No. <)37-147 Date 5/ 18 / zodii l P Carolina Transportation Permitting Unit "'tura??t? 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crahtree Boulevard, Suite 250, Ralegh, North Carolina 27604 Phone: 919-733-17661 FAX 919-73366931 Internet httoJ/h2o.enr.state.nc.us/nmetlands An Equal OpportunilylAifirmative Acton Employer - 50% Recyded/10% Post Consumer Paper