Loading...
HomeMy WebLinkAboutNC0049662_ATC application_20180419r y di er- Resourr. es isti�J A. The Division of Water Resources will accept this application package for review only if all of the items are provided and the application is complete. Failure to submit all of the required items will result in the application package being returned as incomplete per 15A NCAC 02T .0105(b). B. Plans and specifications must be prepared in accordance with 15 NCAC 02H. 0100, 15A NCAC 02T. North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities. C. The plans and specifications submitted must represent a completed final design that is ready to advert ise for bid. D. Any content changes made to this Form ATC -12-14 shall result in the application package being returned. E. The Applicant shall submit ONE ORIGINAL and ONE DIGITAL COPY (CD) of the application, all supporting documentation and attachments. All information must be submitted bound or in a 3 -ring binder, with a Section tab for each Section, except the Engineering Plans. F. Check the boxes below to indicate that the information is provided and the requirements are met. G. If attachments are necessary for clarity or due to space limitations, such attachments are considered part of the application package and must be numbered to correspond to the item referenced. H. For any project that requires review under the State Environmental Policy Act (SEPA), an Authorization to Construct cannot be issued prior to the completion of a State Clearinghouse advertisement period for a FONSI, EIS, etc. unless the project qualifies for a Determination of Minor Construction Activity. I. For more information, visit the Division of Water Resources web site at: http://portal.ncdenr.org/web/wq/swp/ps/`npdes, 1. In addition to this Authorization to Construct, the Applicant should. be aware that other permits may be required from other Sections of the Division of Water Resources (for example: reclaimed water facilities permits; Class A or B biosolids residuals permit). 1 111 '111 iiil'�IIIIIIII Applicant's name Aqua North Carolina, Inc. Signature authority's name per 15A NCAC 02T .0106(b) Shannon Becker Signature authority's title President Complete mailing address 202 MacKenan Drive, Cary, NC 27244 Telephone number 919-467-8712 Email address SVBecker@AquaAmerica.com PROFESSIONAL ENGINEER Professional Engineer's name Benjamin D. Clawson Professional Engineer's title Project Engineer North Carolina Professional Engineer's License No. 033710 Firm name Municipal Engineering Services Co. P.A. Firm License number C-0281 Complete mailing address 68 Shipwash Drive Garner, NC 27529 Application for Authorization to Construct Permit (FORM ATC -12-14) Page 1 LN C. C ?VFQ1Vr XeSourcc�s Telephone number 919-772-5393 Email address bclawson@mesco.com NPDES Permit number NC0049662 Current Permitted flow (MGD) — include permit 0.25 MGD flow phases if applicable Provide a brief description of the project: The proposed prosect will consist of replacing the manual bar screen with an updated auger type mechanical bar screen and bypass manual bar screen for redundancy. Scope of work will also include modifying some piping to allow flows to properly enter and exit new screen tank. ® The letter must include a request for the Authorization to Construct; the facility NPDES Number; a brief project description that indicates whether the project is a new facility, facility modification, treatment process modification, or facility expansion; the construction timeline; and a list of all items and attachments included in the application package. ❑ If any of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities are not met by the proposed design, the letter must include an itemized list of the requirements that are not met. B. NPDES Permit ® Submit Part I of the Final NPDES permit for this facility that includes Part A (Effluent Limitations and Monitoring Requirements) for the monthly average flow limit that corresponds to the work that is requested for this project. ❑ If the facility is subject to any Special Orders by Consent (SOC), submit the applicable SOC. ® Not Applicable. 1111 IF 1111111111111111171112115 ❑ Submit a copy of the Finding of No Significant Impact or Record of Decision for this project. ❑ Provide a brief description of any of the mitigating factors or activities included in the approved Environmental Document that impact any aspect of design of this project, if not specified in the Finding of No Significant Impact or Record of Decision ® Not Applicable. E. Engineering Plans ® Per 15A NCAC 02T .0504(c)(1), submit one set of detailed plans that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. Application for Authorization to Construct Permit (FORM ATC -12-14) Page 2 ENd IRONt✓ENTfAL zOUALUTY State of North Carolina Division of • ® Per 21 NCAC 56 I the name, address and License number of the Licensee's firm shall be included on each sheet of the engineering drawings. ® Plans must be labeled as follows: FINAL DRAWING —FOR REVIEW PURPOSES ONLY —NOT RELEASED FOR CONSTRUCTION. ® 15A NCAC 02H .0124 requires multiple (dual at a minimum) components such as pumps, chemical feed systems, aeration equipment and disinfection equipment. Is this requirement met by the design? ® Yes or ❑ No. If no, provide an explanation: Plans shall include: ❑ Plans for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): ® Civil ❑ Not Applicable ® Process Mechanical ® Structural ® Electrical ❑ Instrumentation/Controls ❑ Architectural ❑ Building Mechanical ❑ Building Plumbing ❑ Not Applicable ❑ Not Applicable ❑ Not Applicable ® Not Applicable ® Not Applicable ® Not Applicable ® Not Applicable ® Plan and profile views and associated details of all modified treatment units including piping, valves, and equipment (pumps, blowers, mixers, diffusers, etc.) ❑ Are any modifications proposed that impact the hydraulic profile of the treatment facility? ® Yes or ❑ No. If yes, provide a hydraulic profile drawing on one sheet that includes all impacted upstream and downstream units. The profile shall include the top of wall elevations of each impacted treatment unit and the water surface elevations within each impacted treatment unit for two flow conditions: (1) the NPDES permitted flow with all trains in service and (2) the peak hourly flow with one treatment train removed from service. ❑ Are any modifications proposed that impact the process flow diagram or process flow schematic of the treatment facility? ❑ Yes or ❑ No. If yes, provide the process flow diagram or process flow schematic showing all modified flow paths including aeration, recycle/return, wasting, and chemical feed, with the location of all monitoring and control instruments noted. F. ® Engineering Specifications ® Per 15A NCAC 02T .0504(c)(2), submit one set of specifications that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. ® Specifications must be labeled as follows: FINAL SPECIFICATIONS —FOR REVIEW PURPOSES ONLY —NOT RELEASED FOR CONSTRUCTION. Specifications shall include: ® Specifications for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): ® Civil El Not Applicable ® Process Mechanical ❑Not Applicable ® Structural ❑Not Applicable Application for Authorization to Construct Permit (FORM ATC -12-14) Page 3 Y y f. to #" Ke,,.sources EN`dIRONMENTAL. QUALITY M �-MMEME= ® Electrical ❑ Instrumentation/Controls ❑ Architectural ❑ Building Mechanical ❑ Building Plumbing ❑Not Applicable ® Not Applicable ® Not Applicable ® Not Applicable ® Not Applicable ® Detailed specifications for all treatment units and processes including piping, valves, equipment (pumps, blowers, mixers, diffusers, etc.), and instrumentation. ® Means of ensuring quality and integrity of the finished product including leakage testing requirements for structures and pipelines, and performance testing requirements for equipment. ❑ Bid Form for publically bid projects. G. Construction Sequence Plan ® Construction Sequence Plan such that construction activities will not result in overflows or bypasses to waters of the State. The Plan must not imply that the Contractor is responsible for operation of treatment facilities. List the location of the Construction Sequence Plan as in the Engineering Plans or in the Engineering Specifications or in both: Sequence Plan is laid out as part of the Engineering Plans. H. Engineering Calculations ® Per 15A NCAC 02T .0504(c)(3), submit one set of engineering calculations that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer; the seal, signature and date shall be placed on the cover sheet of the calculations. For new or expanding facilities and for treatment process modifications that are included in Section 4.C, the calculations shall include at a minimum: ❑ Demonstration of how peak hour design flow was determined with a justification of the selected peaking factor. ❑ Influent pollutant loading demonstrating how ea influent characteristics in Section 4.B.2 of this form were determined. ❑ Pollutant loading for each treatment unit demonstrating how the design effluent concentrations in Section 4. B.2 of this form were determined. ❑ Hydraulic loading for each treatment unit. ❑ Sizing criteria for each treatment unit and associated equipment (blowers, mixers, pumps, etc.) ❑ Total dynamic head (TDH) calculations and system curve analysis for each pump specified that is included in Section 4.C.6. ❑ Buoyancy calculations for all below grade structures. ❑ Supporting documentation that the specified auxiliary power source is capable of powering all essential treatment units. I. Permits ® Provide the following information for each permit and/or certification required for this project: Application for Authorization to Construct Permit (FORM ATC -12-14) Page 4 Permit/ If Not Issued Provide Not Date Date Certification Status and Expected Permit/Certification Applicable Submitted Approved Number Issuance Date Dam Safety X Application for Authorization to Construct Permit (FORM ATC -12-14) Page 4 'y'uttl NaSoc;rres ENViRONMENTA.L 4:aLEAI_ TY L J. r • .; .MEM• Soil Erosion and Sediment Control X USCOE / Section 404 Permit X Water Quality Certification (401) X USCOE /Section 10 X Stormwater Management Plan X CAMA X NCDOT Encroachment Agreement X Railroad Encroachment Agreement X Other: Residuals Management Plan ❑ For all new facilities, expanding facilities, or modifications that result in a change to sludge production and/or sludge processes, provide a Residuals Management Plan meeting the requirements of 15A NCAC 02T .0504(1) and .0508; the Plan must include: ❑ A detailed explanation as to how the generated residuals (including trash, sediment and grit) will be collected, handled, processed, stored, treated, and disposed. ❑ An evaluation of the treatment facility's residuals storage requirements based upon the maximum anticipated residuals production rate and ability to remove residuals. ❑ A permit for residuals utilization or a written commitment to the Applicant from a Permittee of a Department approved residuals disposal/utilization program that has adequate permitted capacity to accept the residuals or has submitted a residuals/utilization program application. ❑ If oil, grease, grit or screenings removal and collection is a designated unit process, a detailed explanation as to how the oil/grease will be collected, handled, processed, stored and disposed. ® Not Applicable. Application for Authorization to Construct Permit (FORM ATC -12-14) Page 5 yyasci Resturces ENVIRONMENTAL. QUAL TY LN - .; . •SUMIMM wal' • ' 111 1,111 1 • 11• • • • • • ��t�1/�� r���%� i� l<T�_� til �i• � i'� I_i► � i � �i1t��/ I i• I�iI:T�i�� i C•7i•Q�iT►�i7��i �i<riT:7i,f��itL•7T�:/7e� 17T►Te7 y_[�TI1 � � I �� 1. Provide the following flow information: Application for Authorization to Construct Permit (FORM ATC -12-14) Page 6 Plant Flows Existing Plant Design 0.25 MGD Current NPDES Permit Limit 0.25 MGD Current Annual Average (past 12 months) 0.123 MGD For Past 12 Months: Start Date: Oct 2017 End Date: Nov 2016 For Past 24 Months: Start Date: Oct 2017 End Date: Jan 2016 Maximum Month 0.13 MGD 0.14 MGD Jan 2016 Maximum Day 0.32 MGD 0.32 MGD Apr 2017 Peak Hour [Data not Available] MGD [Data not Available] MGD Application for Authorization to Construct Permit (FORM ATC -12-14) Page 6 La i `r4;Ief Rei WCCc s G NVIRONMENT. L GUAUTY State of North Carolina partment of Environmental Quality ResourcesDivision of Water FOR TREATMENT PROCESS MODIFICATIONS 1. Have all of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities been met by the proposed design and specifications? ® Yes or ❑ No. If no, provide justification as to why the requirements are not met, consistent with 15A NCAC 02T .0105(n): 2. Provide the design influent and effluent characteristics that are used as the basis for the project design, and the NPDES permit limits for the following parameters: Estimated, based on industry standards Project Basis of Design and sampling at other similar plants Design Influent Design Influent Design Effluent owned by Aqua NC Concentration Load Concentration Influent (Must be (Must be and/or Load Concentration - supported by supported by Engineering Engineering (Per Historic Current Annual g g g g records from 1047 Average (past 12 Calculations Calculations to 1-15 Parameter months) if Available (Section 3.H11 [Section 3.H1) NPDES Permit Limits (monthly average) Ammonia Nitrogen 0.266 mg/L Summer 2.0 mg/L Summer (NH3-N) 15 mg/L mg/L Ib/day 0.596 mg/L Winter 4.0 mg/L Winter Total Kjeldahl N itro�en mg/L Total Nitrogen /year 16.0 mg/L Summer 30.0 mg/L Winter 200 per 100 mL 8.0 mg/L I b/year mg/L 1.0 mg/L Total Phosphorus 2.0 mg/L mg/L Ib/day Ib/year Ib/year Total Suspended 150 mg/L mg/L Ib/day 3.49 mg/L 30.0 mg/L Solids (TSS) 3. Based on the "Project Basis of Design" parameters listed above, will the proposed design allow the treatment facility to meet the NPDES Permit Limits listed above? ®Yes or ❑ No. If no, describe how and why the Permit Limits will not be met: Application for Authorization to Construct Permit (FORM ATC -12-14) Page 7 1? v cn`e rResources ENVIRONMENTAL QUAL7Y 4. Per 15A NCAC 02T .0505(1), by-pass and overflow lines are prohibited. Is this condition met by the design? ®Yes or ❑ No If no, describe the treatment units bypassed, why this is necessary, and where the bypass discharges: 5 Per 15A NCAC 02T .0505(k), multiple pumps shall be provided wherever pumps are used design? ® Yes or ❑ No. If no, provide an explanation: Is this condition met by the 6. Per 15A NCAC 02T .0505(1), power reliability shall be provided consisting of automatically activated standby power supply onsite capable of powering all essential treatment units under design conditions, or dual power supply shall be provided per 15A NCAC 02H. 0124(2)(a). Is this condition met by the design? ® Yes or ❑ No. If no, provide (as an attachment to this Application) written approval from the Director that the facility: ➢ Has a private water supply that automatically shuts off during power failures and does not contain elevated water storage tanks, and ➢ Has sufficient storage capacity that no potential for overflow exists, and ➢ Can tolerate septic wastewater due to prolonged detention. 7. Per 15A NCAC 02T .0505(0), a minimum of 30 days of residual storage shall be provided. Is this condition met by the design? ® Yes or ❑ No. If no, explain the alternative design criteria proposed for this project in accordance 15A NCAC 02T .105(n): 8. Per 15A NCAC 02T .0505(g), the public shall be prohibited from access to the wastewater treatment facilities. Explain how the design complies with this requirement: Existing fence around the perimeter of the facility with locked gate for entry 9. Is the treatment facility located within the 100 -year flood plain? ❑Yes or ®No. If yes, describe how the facility is protected from the 100 -year flood: 1. PRELIMINARY AND PRIMARY TREATMENT (i.e., physical removal operations and flow equalization): Treatmen+" ;t Application for Authorization to Construct Permit (FORM ATC -12-141 Page 8 Calculations No. of Plan Sheet Specific ation Tye V Size per Unit Provided? Units Reference Reference (Yes or No) Huber—Manual N Manual Bar Screen 1 bypass screen built _ MGD at peak hourly flow C-2 into base tank of mechanical screen Huber—Auger Special Y Mechanical Bar 1.59 MGD at peak hourly 1 type Mechanical C-2 Equipment Screen flow Bar Screen 1.0 MGD at peak hourly Grit Removal N/A flow Flow Equalization N/A ft diameter; ft Primary Clarifier N/A Circular side water depth Primary Clarifier N/A Rectangular square feet; ft side water depth Other Application for Authorization to Construct Permit (FORM ATC -12-141 Page 8 tc�r .eSOUI Cu,) Ll •..rxmlm. Kim. Application for Authorization to Construct Permit (FORM ATC -12-14) Page 9 CNVIRONMENTAL OUALITY 14) State of North Carolina Division of - •. 2. SECONDARY TREATMENT (BIOLOGICAL REACTORS AND CLARIFIERS) (i.e., biological and chemical processes to remove organics and nutrients) 3. TERTIARY TREATMENT Calculations No. of Plan Sheet Specification Treatment Unit Units Type Size per Unit Reference Reference Provided? (Yes or No) Aerobic Zones/ N/A gallons Tanks N/A Circular hourly flow; number of Anoxic Zones/ N/A (Parallel; in water depth Tertiary Clarifier Rectangular gallons Tanks series) water depth Anaerobic square feet Tertiary Membrane (Gas; gallons Zones/Tanks tablet; liquid) square Sequencing Batch -- gallons Flow Equalization -- gallons Reactor (SBR) gallons Membrane -- gallons Bioreactor (MBR) ft diameter; ft side Secondary Clarifier Circular water depth Secondary Clarifier Rectangular square feet; ft side water depth Other 3. TERTIARY TREATMENT 4. DISINFECTION Calculations No. of Plan Sheet Specification Treatment Unit Units Type Size per Unit Reference Reference Provided? (Yes or No) ft diameter; ft side Tertiary Clarifier N/A Circular hourly flow; number of Ultraviolet Light N/A (Parallel; in water depth Tertiary Clarifier Rectangular square feet; ft side series) water depth Tertiary Filter square feet Tertiary Membrane (Gas; feet Filtration tablet; liquid) square Post -Treatment -- gallons Flow Equalization Post -Aeration gallons Other 4. DISINFECTION Application for Authorization to Construct Permit (FORM ATC -12-14) Page 10 Calculations No. of Plan Sheet Specification Treatment Unit Units Type Size per Unit Reference Reference Provided? (Yes or No) gal/day per bank at peak hourly flow; number of Ultraviolet Light N/A (Parallel; in banks; number of series) lamps/bank (Gas; gallons of contact Chlorination tablet; liquid) tank/unit Application for Authorization to Construct Permit (FORM ATC -12-14) Page 10 i4l w of R.e sura G N ViAOF1MENTAL DUALiTY -•.•. • •.' c• • •' • • •', '' •. Dechlorination No. of Pumps (Gas; gallons of contact Capacity of each pump Plan Sheet Reference Calculations GPM No. of tablet; liquid) tank/unit Plan Sheet Specification 5. RESIDUALS TREATMENT L" PUMP SYSTEMS (include influent, intermediate, effluent, major recycles, waste sludge, thickened waste sludge and plant drain pumps) Location No. of Pumps purpose Type Capacity of each pump Plan Sheet Reference Calculations GPM No. of EQ Basin Plan Sheet Specification Treatment Unit Units Type Size per Unit Reference Reference Provided? (Yes or No) Gravity Thickening N/A square feet; ft side Tank water depth Mechanical Thickening/ dry Ib/hour Dewatering Aerobic Digestion N/A Anaerobic gallons Digestion Composting dry Ib/hour Drying dry Ib/hour Other PUMP SYSTEMS (include influent, intermediate, effluent, major recycles, waste sludge, thickened waste sludge and plant drain pumps) Location No. of Pumps purpose Type Capacity of each pump Plan Sheet Reference Specification Reference GPM TDH EQ Basin 7. MIXERS Location No. of Mixers Purpose Type Power of P fixer (HP) plan Sheet Reference Specification Reference N/A Application for Authorization to Construct Permit (FORM ATC -12-14) Page 11 w ei Resources ENVIRONMENTAL QUAUTY . sTrOMMIMe Application for Authorization to Construct Permit (FORM ATC -12-14) Page 12 K%diet Rear,}Luce ENVIRONMENTAL r4UAL:TY L5 E] �''' • •' i' • • • '' ' ' LaMduffilliksaxis Location No. of Blowers purpose Type Capacity of each Blower (CFM) plan Sheet Reference Specification Reference N/A Requirement met by the Required from Nearest Setback Parameter TreatmentStorage Design? If "No", identify Setback Waivers in Item D.2 Unit Below Any habitable residence or place of assembly under separate 100 ft ® Yes ❑ No ownership or not to be maintained as part of the project site Any private or public water supply source 100 ft ® Yes ❑ No Surface waters (streams — intermittent and perennial, perennial 50 ft ® Yes ❑ No ODOR CONTROL Location No. of Units purpose Type Plan Sheet Reference Specification Reference N/A Requirement met by the Required from Nearest Setback Parameter TreatmentStorage Design? If "No", identify Setback Waivers in Item D.2 Unit Below SETBACKS —COMPLETE FOR NEW WASTEWATER TREATMENT STRU 1. The minimum distance for each setback parameter to the wastewater treatment/storage units per 15A NCAC 02T .0506(b) are as follows: 2. Have any setback waivers been obtained per 15A NCAC 02T .0506(d)? El Yes or ®No. If yes, have these waivers been written, notarized and signed by all parties involved and recorded with the County Register of Deeds? F1 Yes Is Minimum Distance Minimum Distance Requirement met by the Required from Nearest Setback Parameter TreatmentStorage Design? If "No", identify Setback Waivers in Item D.2 Unit Below Any habitable residence or place of assembly under separate 100 ft ® Yes ❑ No ownership or not to be maintained as part of the project site Any private or public water supply source 100 ft ® Yes ❑ No Surface waters (streams — intermittent and perennial, perennial 50 ft ® Yes ❑ No waterbodies, and wetlands) Any well with exception of monitoring wells 100 ft ® Yes ❑ No Any property line 50 ft ® Yes ❑ No or ❑ No. If no, provide an explanation: Application for Authorization to Construct Permit (FORM ATC -12-14) Page 13 EF4VIRO IE%TAL ry'i3AUTY �-•. • •Sam • Professional Engineer's Certification per 15A NCAC 02T .0105: I, Benjamin D. Clawson ,attest that this application package for an Authorization to Construct (Typed Name of Professional Engineer) for the Hawthorne WWTP Bar Screen Rehabilitation (NC0049662) (Facility and Project Name) was prepared under my direct supervisory control and to the best of my knowledge is accurate, complete and consistent with the information supplied in the engineering plans, specifications, calculations, and all other supporting documentation for this project. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with all applicable regulations and statutes, 15 NCAC 02H. 01001 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities, and this Authorization to Construct Permit Application, except as provided for and explained in Section 4.6.1 of this Application. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon this Certification and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this application package. I further understand that the application package may be subject to a future audit by the Division. Although certain portions of this submittal package may have been prepared, signed and sealed by other professionals licensed in North Carolina, inclusion of these materials under my signature and seal signifies that I have reviewed the materials and have determined that the materials are consistent with the project design. I understand that in accordance with General Statutes 143-215.6A and 143-215.66, any person who knowingly makes anY false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal with written signature placed over or adjacent to the seal and dated: Application for Authorization to Construct Permit (FORM ATC -12-14) Page 14 State of North Carolina Department of Environmental Quality sion of•Water Resources V`>rater Resources CNVMONMEN AL. GUALMr APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC -12- 14) SECTION 6: APPLICATION CERTIFICATION BY AFPLlCANT Applicant's Certification per 15A NCAC 02T .d106(h}: f, Shannon seeker, President ,attest that this application package for an Authorization to Construct (Typed Name of Signature Authority and Title) - for the Hawthorne WWTP Bar Screen Rehabilitation (NCD049562) (Facility and Project Name) has been reviewed by me and is accurate and complete to the best of my knowledge. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that in accordance with 15A NCAC 02T ,0120(b), the Applicant or any affiliate has not been convicted of environmental crimes, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been abandoned or exhausted, are compliant with any active compliance schedule, and does not have any overdue annual fees. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit maybe based solely upon acceptance of the Licensed Professional Engineer's Certitication contained in Section 5, and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this application package. I further understand that the application package maybe subject to a future audit. I understand that in accordance with General Statutes 143-215.6A and 143-215.68 any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 perviolation. Signature: Date: `- e l THE COMPLETED APPLICATION AND SUPPORTING INFORMATION SHALL BE SUBMITTED TQ: NDRTH CAROLINA DEPARTMENT OF ENVIRQNMENT AND NATURAL RESOURCES DIVISION DF WATER RESOURCES/NPDES By U.S. Postal Service By Courier/Special Delivery : 1611 MAIL SERVICE CENTER 512 N. SALISBURY STREEC, 9TH FLDOR RALEIGH, NORTH CAROLINA 27699-1617 RALEIGH, NORTH CAROLINA 27604 TELEPHONE NUMBER: {919} 807-6396 Application for Authorization to Construct Permit (FORM ATC -12-141 Page 16