HomeMy WebLinkAbout20081265 Ver 2_Triage Comments_20090513
Use this form instead of writing inside the folder
oNQz
Triaged By:
Reviewer 1
Reviewer 2
Reviewer 3
Triage Comment Sheet
Date:
Date: U
Date:
Issue with conditions (Reviewer 2)
More Information (Reviewer 1)
? Return Application (Reviewer 1)
? Send to Regions (Reviewer 1)
? Send to Regions (Reviewer 2)
? More Information (Reviewer 2)
? Return Application (Reviewer 2)
SATriage Forms\Triage Issue Sheet.doc
PLEASE PRINT CLEARLY
Issue Project (Reviewer 1) ? Issue Project (Reviewer 2)
08-1265v2 Two Bale Lane
AML comments
May 13, 2009
1. Please provide a stormwater management plan that removes a minimum of 85
percent TSS from the stormwater runoff from Two Bale Lane (roadway). For
each proposed BMP, please provide a completed BMP Supplement Form, with all
the required items. The BMP Supplement Forms are available at the following
web site: http://h2o.enr.state.nc.us/su!bmp forms.htm.