HomeMy WebLinkAboutMarshall Plan for Identification of New Discharges Sept 30 2014 Marshall Steam Station Ash Basin Plan for Identification of New Discharges NPDES Permit NC0004987 September 30, 2014 Duke Energy Carolinas, LLC | Plan for Identification of New Discharges Marshall Steam Station Ash Basin REPORT VERIFICATION i Report Verification PROJECT: GROUNDWATER MONITORING PROGRAM MARSHALL STEAM STATION ASH BASIN NPDES PERMIT NC0004987 TITLE: PLAN FOR IDENTIFICATION OF NEW DISCHARGES This document has been reviewed for accuracy and quality commensurate with the intended application. Prepared by:______ _______________ Date:____ ______________ Checked by:______ ________________ Date:____ ______________ Approved by:_____ ________________ Date:___________________ Project Manager: Brooke Ahrens, PE Professional Engineer Seal: HDR Engineering, Inc. of the Carolinas 440 South Church St., Suite 1000 Charlotte, NC 28202 North Carolina Engineering Firm Number F-0116 Duke Energy Carolinas, LLC | Plan for Identification of New Discharges Marshall Steam Station Ash Basin TABLE OF CONTENTS ii Table of Contents Page Report Verification ......................................................................................................................... i Table of Contents .......................................................................................................................... ii List of Figures .............................................................................................................................. iii Section 1 - Introduction ................................................................................................................. 1 Section 2 - Site Description ........................................................................................................... 3 2.1 Plant Description ................................................................................................... 3 2.2 Ash Basin Description ........................................................................................... 3 Section 3 - Site Geology and Hydrogeology ................................................................................. 4 3.1 Site Geologic/Soil Framework ............................................................................... 4 3.2 Site Hydrogeologic Framework ............................................................................. 4 Section 4 - Identification of New Discharges ................................................................................ 6 4.1 Purpose of Inspection ............................................................................................ 6 4.2 Seepage ................................................................................................................ 6 4.3 Areas To Be Inspected for New Discharges.......................................................... 6 4.4 Inspection Procedure ............................................................................................ 6 Section 5 - References ................................................................................................................. 7 Appendices A – Marshall Station Ash Basin – Inspection for Identification of New Discharges Duke Energy Carolinas, LLC | Plan for Identification of New Discharges Marshall Steam Station Ash Basin LIST OF FIGURES iii List of Figures Figure 1 – Site Location Map Figure 2 – Areas To Be Inspected For Seeps Duke Energy Carolinas, LLC | Plan for Identification of New Discharges Marshall Steam Station Ash Basin SECTION 1 - INTRODUCTION 1 Section 1 - Introduction The purpose of this document is to address the requirements of North Carolina General Statute (GS)130A-309.210 (d) Identification and assessment of discharges; correction of unpermitted discharges, as modified by North Carolina Senate Bill 729, for the Marshall Steam Station (MSS) ash basin operated under National Pollutant Discharge Elimination System (NPDES) Permit NC0004987. The following requirements are contained in General statue 130A-309.210: d) Identification of New Discharges. – No later than October 1, 2014, the owner of a coal combustion residuals surface impoundment shall submit a proposed Plan for the Identification of New Discharges to the Department for its review and approval as provided in this subsection. (1) The proposed Plan for the Identification of New Discharges shall include, at a minimum, all of the following: a. A procedure for routine inspection of the coal combustion residuals surface impoundment to identify indicators of potential new discharges, including toe drain outfalls, seeps, and weeps. b. A procedure for determining whether a new discharge is actually present. c. A procedure for notifying the Department when a new discharge is confirmed. d. Any other information related to the identification of new discharges required by the Department. (2) The Department shall approve the Plan for the Identification of New Discharges if it determines that the Plan complies with the requirements of this subsection and will be sufficient to protect public health, safety, and welfare; the environment; and natural resources. (3) No later than 30 days from the approval of the Plan for the Identification of New Discharges, the owner shall begin implementation of the Plan in accordance with the Plan. The North Carolina Senate Bill 729 establishes the submittal date of this Plan for Identification of New Discharges no later than October 1, 2014. This bill also modified GS 130A to establish the following submittals that are related to this Plan. GS130A-309.210(a) was modified to require: (2) No later than December 31, 2014, the owner of a coal combustion residuals surface impoundment shall submit a topographic map that identifies the location of all (i) outfalls from engineered channels designed or improved for the purpose of collecting water from the toe of Duke Energy Carolinas, LLC | Plan for Identification of New Discharges Marshall Steam Station Ash Basin SECTION 1 - INTRODUCTION 2 the impoundment and (ii) seeps and weeps discharging from the impoundment that are not captured by engineered channels designed or improved for the purpose of collecting water from the toe of the impoundment to the Department. The topographic map shall comply with all of the following: a. Be at a scale as required by the Department. b. Specify the latitude and longitude of each toe drain outfall, seep, and weep. c. Specify whether the discharge from each toe drain outfall, seep, and weep is continuous or intermittent. d. Provide an average flow measurement of the discharge from each toe drain outfall, seep, and weep including a description of the method used to measure average flow. e. Specify whether the discharge from each toe drain outfall, seep, and weep identified reaches the surface waters of the State. If the discharge from a toe drain outfall, seep, or weep reaches the surface waters of the State, the map shall specify the latitude and longitude of where the discharge reaches the surface waters of the State. f. Include any other information related to the topographic map required by the Department. The inspection procedures presented in this plan, developed to satisfy the requirements of GS130A-309.210(d), will be used as the basis for developing the topographic map required by GS130A-309.210(a)(2). Duke Energy Carolinas, LLC | Plan for Identification of New Discharges Marshall Steam Station Ash Basin SECTION 2 - SITE DESCRIPTION 3 Section 2 - Site Description 2.1 Plant Description MSS is a four-unit, coal-fired electric generating plant with a capacity of 2,090 megawatts located in Catawba County, North Carolina, near the community of Terrell. The site is located north of NC Hwy 150, east of Sherrills Ford Road and south of Island Point Road, and the surrounding area generally consists of residential properties, undeveloped land, and Lake Norman (Figure 1). The ash basin is situated between the MSS to the south, primarily residences to the west, residences and undeveloped land to the north, and undeveloped land and Lake Norman to the east. A topographical divide is located along Sherrills Ford Road to the west and along Island Ford Road to the north. The topography at the site generally slopes downward from those divides toward Lake Norman. 2.2 Ash Basin Description The ash basin system consists of a single cell impounded by an earthen dike located on the southeast end of the ash basin. The ash basin system was constructed in 1965 and is located approximately 2,000 feet northeast of the power plant. The area contained within the ash basin waste boundary is approximately 382 acres in area. The full pond elevation for the MSS ash basin is approximately 790 feet. The normal pond elevation of Lake Norman is approximately 760 feet. The ash basin is operated as an integral part of the station’s wastewater treatment system and receives inflows from the ash removal system, coal pile runoff, landfill leachate, flue-gas desulfurization (FGD) wastewater, the station yard drain sump, stormwater flows, and station wastewater. Due to variability in station operations and weather, inflows to the ash basin are highly variable. Inflows from the station to the ash basin are discharged into the northwest portion of the ash basin. The discharge from the ash basin is through a concrete discharge tower located in the eastern portion of the ash basin. The concrete discharge tower drains through a 30-inch-diameter slip- lined corrugated metal pipe which discharges into Lake Norman. The ash basin pond elevation is controlled by the use of concrete stop logs in the discharge tower. There are six permitted landfill areas and one structural fill area located adjacent to the ash basin. Two ash landfills (Permit No. 1804) are located adjacent to the east and northeast portions of the ash basin. The demolition landfill (Permit No. 1804), asbestos landfill (Permit No. 1804), and industrial landfill (Permit No. 1812) are located adjacent to the northern portion of the ash basin. The FGD landfill (Permit No. 1809) is located southwest of the ash basin. The structural fill area is located adjacent to and partially on top of the western most portion of the ash basin. The approximate boundary of these landfill/structural fill areas and existing groundwater monitoring wells associated with the ash landfills and the FGD landfill are shown on Figure 2. Duke Energy Carolinas, LLC | Plan for Identification of New Discharges Marshall Steam Station Ash Basin SECTION 3 - SITE GEOLOGY AND HYDROGEOLOGY 4 Section 3 - Site Geology and Hydrogeology 3.1 Site Geologic/Soil Framework MSS and its associated ash basin system are located in the Kings Mountain Belt of the Piedmont physiographic province of North Carolina (Piedmont). The rocks of the Kings Mountain Belt were formed during the late Proterozoic to Early Paleozoic era. The Kings Mountain Belt bedrock consists of metasedimentary and metavolcanic rocks including schist, phyllite, marble, metavolcanic rock, quartzite, and gneiss (North Carolina Geologic Survey 1996). The soils that overlie the bedrock in the area have generally formed from the in-place weathering of the parent bedrock. The fractured bedrock is overlain by a mantle of unconsolidated material known as regolith. The regolith, where present, includes the soil zone; a zone of weathered, decomposed bedrock known as saprolite; and alluvium. Saprolite, the product of chemical and mechanical weathering of the underlying bedrock, is typically composed of clay and coarser granular material up to boulder size and may reflect the texture of the rock from which it was formed (LeGrand 2004). 3.2 Site Hydrogeologic Framework Piedmont topography is characterized by gently rounded sloped hills and valleys. Recharge typically occurs on upland areas and slopes while groundwater discharge is concentrated in surface water bodies and lowland areas. LeGrand’ s (1988, 2004) conceptual model of the groundwater setting in the Piedmont incorporates the above two medium systems into an entity that is useful for the description of groundwater conditions. That entity is the surface drainage basin that contains a perennial stream or river (LeGrand 1988). Each basin is similar to adjacent basins and the conditions are generally repetitive from basin to basin. Within a basin, movement of groundwater is generally restricted to the area extending from the drainage divides to a perennial stream or river (Slope-Aquifer System; LeGrand 1988, 2004). Rarely does groundwater move beneath a perennial stream or river to another more distant stream (LeGrand 2004). Therefore, in most cases in the Piedmont, the groundwater system is a two-medium system (LeGrand 1988) restricted to the local drainage basin. The groundwater occurs in a system composed of two interconnected layers: residuum/saprolite and weathered rock overlying fractured crystalline rock separated by the transition zone. Typically, the residuum/saprolite is partly saturated and the water table fluctuates within it. Water movement is generally through the fractured bedrock. The near-surface fractured crystalline rocks can form extensive aquifers. The character of such aquifers results from the combined effects of the rock type, fracture system, topography, and weathering. Topography exerts an influence on both weathering and the opening of fractures while the weathering of the crystalline rock modifies both transmissive and storage characteristics. The aquifer system in the Piedmont typically exists in an unconfined or semi-confined condition in the bedrock zone. Under natural conditions, the general direction of groundwater flow can be approximated from the surface topography. Groundwater moves both vertically down through Duke Energy Carolinas, LLC | Plan for Identification of New Discharges Marshall Steam Station Ash Basin SECTION 3 - SITE GEOLOGY AND HYDROGEOLOGY 5 the regolith and parallel to the bedrock surface to areas where groundwater discharges as seepage into streams, lakes, or other surface water bodies. A surface water divide is located to the west of the MSS ash basin approximately along Sherrills Ford Road to the west of the ash basin (Figure 2). A surface water divide is also located approximately along Island Ford Road to the north of the ash basin. Lake Norman is located to the southeast of the ash basin. The geology/groundwater conditions at the site are expected to be generally consistent with the characteristics of the conceptual groundwater model developed by LeGrand for the Piedmont region. Duke Energy Carolinas, LLC | Plan for Identification of New Discharges Marshall Steam Station Ash Basin SECTION 4 - IDENTIFICATION OF NEW DISCHARGES 6 Section 4 - Identification of New Discharges 4.1 Purpose of Inspection The purpose of the inspection is to identify indicators of potential new discharges, including toe drain outfalls, seeps, and weeps associated with the coal combustion residuals surface impoundment (ash basin). 4.2 Seepage Seepage is considered to be the movement of wastewater from the ash basin through the ash basin embankment, the embankment foundation, the embankment abutments, or through residual material in areas adjacent to the ash basin. A seep is defined in this document as an expression of seepage at the ground surface. A weep is understood to have the same meaning as a seep. Indicators of seepage include areas where water is observed on the ground surface and/or where vegetation suggests the presence of seepage. Seepage can emerge anywhere on the downstream face, beyond the toe, or on the downstream abutments at elevations below normal pool. Seepage may vary in appearance from a "soft," wet area to a flowing "spring." Seepage may show up first as only an area where the vegetation is lusher and darker green than surrounding vegetation. Cattails, reeds, mosses, and other marsh vegetation often become established in a seepage area.1 However, in many instances, indicators of seeps do not necessarily indicate the presence of seeps. 4.3 Areas To Be Inspected for New Discharges The areas to be inspected for new discharges are the areas of the site where water contained in the ash basin might infiltrate into the underlying residual material and be expressed as seepage. This would include the earthen embankment which impounds the ash basin and certain adjacent areas. The extent of the area to be inspected was determined based on the generalized LeGrand conceptual model, the concept of the slope-aquifer system, and the site topography. In this generalization, flow of water from the ash basin would be expected to be located within the slope-aquifer compartment and to be below the full basin elevation of the ash basin. The area to be inspected for new discharges is shown on Figure 2. 4.4 Inspection Procedure The inspection procedure for identification of new discharges and indicators of potential discharges associated with the MSS ash basin is provided in Appendix A. In addition to the specific requirements for the inspection, Appendix A also provides the general requirements, the frequency of inspections, documentation requirements, and provides a decision flow chart for determining if the discharge is associated with the ash basin. 1 Dam Operation, Maintenance, and Inspection Manual, North Carolina Department of Environment and Natural Resources, Division of Land Resources, Land Quality Division, 1985 (Revised 2007). Duke Energy Carolinas, LLC | Plan for Identification of New Discharges Marshall Steam Station Ash Basin SECTION 5 - REFERENCES 7 Section 5 - References North Carolina Geologic Survey. 1996. Generalized Geologic Map of North Carolina, 1991, Reprinted 1996. LeGrand, H.E. 1988. Region 21, Piedmont and Blue Ridge, p.201-208, in Black, W., Rosenhein, J.S., and Seaber, P.R., eds., Hydrogeology: Geological Society of America, The Geology of North America, v. O-2, Boulder, Colorado, 524p. LeGrand, Harry, Sr. 2004. A Master Conceptual Model for Hydrogeological Site Characterization in the Piedmont and Mountain Region of North Carolina, North Carolina Department of Environment and Natural Resources. Figures SEPTEMBER 30, 2014 Areas to be inspected A MARSHALL STEAM STATION ASH BASIN INSPECTION FOR IDENTIFICATION OF NEW DISCHARGES Marshall Steam Station Ash Basin  INSPECTION FOR IDENTIFICATION OF NEW DISCHARGES     1    1. Purpose of Inspection  The purpose of the inspection is to identify new discharges and indicators of potential new discharges,  including toe drain outfalls, seeps, and weeps that arise after the initial submittal of maps required by  North Carolina General Statute 130A‐309.210(a)(2)(ii).  Seepage is considered to be the movement of  wastewater from the ash basin through the ash basin embankment, the embankment foundation, the  embankment abutments, or through residual material in areas adjacent to the ash basin. Therefore, a  seep is defined in this document as an expression of seepage at the ground surface.  A weep is  understood to have the same meaning as a seep. If new discharges or indicators of potential new  discharges are identified, the decision flow chart (see Figure A‐1) will be used to determine if the  potential new discharge is from the ash basin and if notification to the North Carolina Department of  Environment and Natural Resources (NCDENR) Division of Water Resources (DWR) is required.    2. General Inspection Requirements  2.1. Inspections are to be performed on areas that are below the ash basin full pond elevation and  within the area shown on Figure A‐2.  The purpose of the inspection is to identify new  discharges and indicators of potential new discharges, including toe drain outfalls, seeps, and  weeps associated with the coal combustion residuals surface impoundment (ash basin).    2.2. If required, a larger scale figure showing the locations of outfalls from engineered channels will  be developed.  If a separate figure showing outfalls from engineered channels is not developed,  Figure A‐2 will be revised to show these features.  2.3. Inspections of areas on or adjacent to the ash basin embankments should be performed within  two months after mowing, if possible.  2.4. Inspections should not be performed if the following precipitation amounts have occurred in  the respective time period preceding the planned inspection:   2.4.1. Precipitation of 0.1 inches or greater within 72 hours or   2.4.2. Precipitation of 0.5 inches or greater within 96 hours  2.5. Record the most recent ash basin water surface elevation.  2.6. Review previous Inspection for Identification of New Discharge report(s) prior to performing  inspection.  2.7. Review the most recent previous dam inspections.  2.8. Conduct an interview with the Site Environmental Coordinator prior to performing inspection  to inquire about possible changes to site conditions, such as pond elevations, operations,  additions or removal of wastewater discharges to the ash basin, changes to site surface water  drainage, etc.    Marshall Steam Station Ash Basin  INSPECTION FOR IDENTIFICATION OF NEW DISCHARGES     2    3. Frequency of Inspections   Inspections will be performed on a semi‐annual basis during the following months: April to May and  October to November.  4. Qualifications   The inspections shall be performed under the direction of a qualified Professional Engineer or  Professional Geologist.    5. Documentation of Inspection  The inspection shall be documented by the individual performing the inspection.  The report should  contain observations and descriptions of the seeps observed, changes in observations compared to  previous inspections, estimates of flows quantities, and photographs of seeps and outfalls of engineered  channels designed or improved for collecting water from the impoundment.  Photographs are to be  numbered and captioned.  6. Initial Inspection   An initial inspection should be performed to identify features and document baseline conditions  including location, extent (i.e., dimensions of affected area), and flow.  Seep locations should be  recorded using a Global Positioning System (GPS) device. Photographs should be taken from vantage  points that can be replicated during subsequent semi‐annual inspections.  7. Inspection For New Seeps at Outfalls From Engineered Channels  Inspect the outfalls from engineered channels designed and/or improved (such as through the  placement of rip‐rap) associated with the ash basin dikes to identify new seeps or indicators of new  seeps.    7.1. Inspect all outfalls from engineered channels designed and/or improved (such as through the  placement of rip‐rap)  7.2. Document the condition of the outfall of the engineered channel with photographs.   Photographs are to be taken from similar direction and scale as photographs taken during the  initial inspection.  7.3. Observe outfall for seepage and for indicators of seeps.    7.4. Compare current seepage location, extent, and flow to seepage photographs and descriptions  from previous inspections.   7.5. Record flow rate if measureable.     Marshall Steam Station Ash Basin  INSPECTION FOR IDENTIFICATION OF NEW DISCHARGES     3    9. Inspection For New Seeps Not Captured by Engineered Channels  Inspect areas below the ash basin full pond elevation and within the slope‐aquifer system shown on  Figure A‐2 to identify new seeps or indicators of new seeps.  Inspect topographic drainage features that  potentially could contain new seeps that potentially discharge from the ash basin.    9.1. Previously Identified Seeps  a) Inspect previously identified seep locations.  Document the condition of the seeps with a  photograph.  Photographs are to be taken from similar direction and at a similar scale as the  photograph documenting original photograph of seep.  Describe the approximate  dimensions and flow conditions of the seep.  b) If flow measurement device is installed at the outfall, record flow.  c) Observe seep to determine if changes to location, extent, or flows are present. Document  changes to location, extent, and/or flow amount or pattern.  9.2. New Seep or Indicators of Seep  a) Mark the location of new seep or indicators of seep using a GPS device.  b) Document the condition of the seeps or indicators of seeps with a photograph.    c) Describe the approximate dimensions and flow conditions of the seep.  d) Map the location of new seep or indicator of seep using GPS coordinate points collected  during the site visit.  e) If seep or indicator of seep was not caused by changes in surface water drainage and if the  location is below the ash basin pond elevation, utilize the decision flow chart to determine if  the seep represents a discharge from the ash basin and if notification to DWR is required.  10. Update Maps Identifying Seeps  If new seeps are identified during the inspection, Figure A‐2 shall be updated to show the location of the  new seeps.  All seeps located below the ash basin full pond elevation and within the slope‐aquifer  system shown are to be shown on Figure A‐2.  11. Decision Flow Chart  The decision flow chart developed to determine whether a new seep discharges from the ash basin is  found on Figure A‐1.         Marshall Steam Station Ash Basin  INSPECTION FOR IDENTIFICATION OF NEW DISCHARGES     4    12. Procedure for Notifying NCDENR DWR If New Discharge Is Confirmed  If it is determined that a newly identified seep is present, Duke Energy will notify the DWR Regional  Office by mail within 14 days after the determination.     Marshall Steam Station Ash Basin INSPECTION FOR IDENTIFICATION OF NEW DISCHARGES   5    Notes: 1. If no new seeps are identified, inspection will be documented however no notification to NCDENR DWR is required. 2. If new seeps are identified that do not represent discharge from the ash basin during the same inspection that identifies new seeps that do represent a discharge from the ash basin, a single report will be submitted to NCDENR DWR.   Areas to be inspected