HomeMy WebLinkAbout20180576 Ver 1_401 Application_20180423_ � '�_►_C�
3500 Parkway I ane. S�vte 5!q T 678 338 �1401 F R7B 338 �14a
Per:n[recGxmx G&vgn:UtH9 a�.wµtrtYx�.mn
April 20, 2018
Paul Wojoski
NC DWR, 401 & Buffer Permitting Branch
1617 Mail Service Center
Raleigh, NC 27699-1617
Re: Piedmont Natural Gas
Line 326 DOT Relocation Project
Forsyth County, North Carolina
401 Water Quality Certification Application
Dear Mr. Paul Wojoski
On behalf of Piedmont Natural Gas (PNG), Pond is pleased to request for 401 Water Quality
Certification for PNG's Line 326 DOT Relocation project. This proposed project would impact
jurisdictional waters of the US, including wetlands and streams associated with the installation
of approximately 0.78 miles of 6-inch steel, natural gas pipeline in Forsyth County, North
Carolina. PNG has an existing pipeline within North Carolina Department of Transportation
(NCDOT) right-of-way (ROW) that is being relocated to accommodate NCDOT reconfiguring the
roadway.
The project starts (36.217, -80.309) at an existing tie-in approximately 0.5 miles north of the
John M Gold Freeway and Highway 65 intersection near Stanleyville, North Carolina. The
proposed route then travels approximately 4,100 linear feet (LF) south along the west side of
John M Gold Freeway and crosses Highway 65 to tie into the existing 6-inch pipeline (36.208, -
80.304) on Bethania Rural Hall Road/Highway 65. The ROW will be cleared for a 100-foot
corridor and maintained as a 50-foot wide easement except where the pipe and ROW cross
waters of the US, in which case the ROW will be narrowed to no more than 40 feet. The pipeline
construction activities will include initial ROW clearing and grubbing, installation of erosion and
sediment control (E&SC) best management practices (BMPs), trench excavation, pipe
installation, backfilling to preconstruction conditions, and implementing final stabilization. The
proposed natural gas pipeline project traverses mostly mixed pine-hardwood forestland.
Waters of the US including two perennial streams, one intermittent stream, and one wetland will
be crossed by the project. All stream crossings will involve open-cut construction methods and
have been oriented as close to perpendicular as possible to minimize impacts.
All Pond & Company morketing moteriols ore p�inted on popers mntoining posPmnsumer recydedJibers and are FSCCertiJied
Based on the proposed activity and impacts, this project qualifies under the terms and conditions
of the 401 Certification. We trust the information provided within this document package will be
sufficient for your office to grant the 401 Certification approval. If you have any questions or
requests for information please contact Flynt Barksdale (678-459-2470,
barksdalefCcDpondco.coml or Glenn Martin (706-255-0852, martinaiCcilpondco.com).
Respectfully,
I��/ / i%i��� �
W. Flynt Barksdale, PWS Glenn I. Martin, PWS, CE
Senior Scientist Project Manager
cc: Alicia DePalma, Environmental Siting and Licensing Support
USACE, Section 404 Permitting
Enclosures:
Attachment A: PCN Package
Attachment B: Plans
Attachment A: PCN Package
_0
3500 Pnkvny lare, Suite 500 T� B�R 338 na01 F: g�B 33R »<a
FNr.MmnCnma GBn9n3NfPJ w�..ryrho.rm�
April 20, 2018
Mr. Bryan Roden-Reynolds
United States Army Corps of Engineers
Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, North Carolina 28801
704-510-1440
bryan. roden-reynolds@usace.army. mil
Re: Piedmont Natural Gas
Line 326 DOT Relocation Project
Forsyth County, North Carolina
Nationwide Permit 12 — Pre-construction Notification
Dear Mr. Roden-Reynolds
On behalf of Piedmont Natural Gas (PNG), Pond is pleased to submit this Pre-Construction Notification
(PCN) and supporting documentation for the use of a Nationwide Permit (NWP) 12, pursuant to Section
404 of the Clean Water Act (CWA). This proposed project would impact jurisdictional waters of the US,
including wetlands and streams associated with the installation of approximately 0.78 miles of 6-inch
steel, natural gas pipeline in Forsyth County, North Carolina. PNG has an existing pipeline within North
Carolina Department of Transportation (NCDOT) right-of-way (ROV� that is being relocated to
accommodate NCDOT reconfiguring the roadway.
The project starts (36.217, -80.309) at an existing tie-in approximately 0.5 miles north of the John M Gold
Freeway and Highway 65 intersection near Stanleyville, North Carolina. The proposed route then travels
approximately 4,100 linear feet (LF) south along the west side of John M Gold Freeway and crosses
Highway 65 to tie into the existing 6-inch pipeline (36.208, -80.304) on Bethania Rural Hall Road/Highway
65. The ROW will be cleared for a 100-foot corridor and maintained as a 50-foot wide easement except
where the pipe and ROW cross waters of the US, in which case the ROW will be narrowed to no more
than 40 feet. The pipeline construction activities will include initial ROW clearing and grubbing, installation
of erosion and sediment control (E&SC) best management practices (BMPs), trench excavation, pipe
installation, bac�lling to preconstruction conditions, and implementing final stabilization. The proposed
natural gas pipeline project traverses mostly mixed pine-hardwood forestland.
Waters of the US including two perennial streams, one intermittent stream, and one wetland will be
crossed by the project. All stream crossings will involve open-cut construction methods and have been
oriented as close to perpendicular as possible to minimize impacts.
Based on the proposed activity and impacts, this project qualifies under the terms and conditions of the
NWP 12. We trust the information provided within this document package will be sufficient for your office
to grant the Section 404 approval. If you have any questions or requests for information please contact
All PonA& Compony marketing mnteriols nre printed on popers rontoining post-mnsumer rerydedJibers and are FSCCerti/ied.
Flynt Barksdale (678-459-2470,
martinaiLa�.nondco.com).
Respectfully,
W. Flynt Barksdale, PWS
barksdalef(�D�ondco.coml or Glenn Martin (706-255-0852,
A����
Glenn I. Martin, PWS, CE
Senior Scientist Project Manager
cc: Alicia DePalma, Environmental Siting and Licensing Support
NC DWR, 401 & Buffer Permitting Branch
Enclosures:
Attachment A: USACE Documents
Agent Authorization Form
Jurisdictional Determination Request Form
Attachment A: Preliminary Jurisdiction Determination Form
(Supplemental I nformation)
Pre-Construction Notification Form
(Su pplemental I nformation)
ORM Aquatic Resources Table
USACE Wetland Determination Data Forms
Attachment B. Figures
Figure 1. Location Map
Figure 2. Project Overview Map
Figure 3. USGS Topographic Maps
Figure 4. USFWS NWI Maps
Figure 5. NRCS Soils Maps
Figure 6. Jurisdictional Impact Maps
Figure 7. FEMA Maps
Attachment C. Project Photographic Log
Attachment D. IPaC Trust Resources Report
Attachment A: USACE Documents
Agent Authorization Form
Jurisdictional Determination Request Form
Attachment A: Preliminary Jurisdiction Determination Form
(Supplemental Information)
Pre-Construction Notification Form
(Supplemental Information)
ORM Aquatic Resources Table
USACE Wetland Determination Data Forms
AGEfdT AUTHORIZATION �ORM
Line 326 DOY 12elocaqon (Begin (36.217, -80.309), End (36,208, -80.304)J
Project Location:
Please print:
Properly Owner: Pledmant Natural Gas
The undersigned, registered property owners oP the above noted project easemenfi, do hereby authorize
Glenn I. Martin
. of
(Contractor / Agent)
Pond & Co
(Name of consulting firm)
to act on my behalf and t�ke all actions necessary for the processing, issuance and acceptance of
thfs permit or cerrtification and any and afl standard and specfal condidons attached.
Properiy Owner's Address (ff different than above):
4720 Piedmont Row Drive, Charlotte, NC 2821d
Telephone: (704) 731-4681
I hereby certify the above Information submitted in this applicatlon ts true and accurate to the
best of my knowledge.
Aaron L. Weldon, Engineering Project Manager
Authorized Property Owner (Printed)
�ate• `� l�l1$
� . ���
Authorized Signature
Jurisdictional Determination Request
;.�
os �r com�
m Enyn.«..
N7n:rqmn oiana
This form is intended for use by anyone requesting a jurisdictional determination (JD) from the
U.S. Army Corps of Engineers, Wilmington District (Corps). Please include all suppor[ing
information, as described within each category, with your request. You may submit your request
to the appropriate Corps Field Office (or project manager, if known) via mail, electronic mail, or
facsimile. A current list of county assignments by Field Office and project manager can be
found on-line at: http://www.saw.usace.annv.mil/Missions/Re u� IatoryPermitPro�ram.aspx , by
telephoning: 910-251-4633, or by contacting any of the field offices listed below:
ASHEVILLE REGULATORY FIELD OFFICE
US Anny Corps of Engineers
151 Patton Avenue, Room 208
Asheville, North Carolina 2880I-5006
General Number. (828) 271-0980
Fa�c Number: (828) 281-8120
RALEIGH REGULATORY FIELD OFFTCE
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
General Number. (919) 554-4884
Fax Number. (919) 562-0421
WASHINGTON REGULATORY FIELD OFF[CE
US Army Corps of Engineers
2407 West Fifth Street
Washing[on, North Carolina 27889
General Number. (910) 251-4610
Fax Number: (252) 975-1399
WILMINGTON REGULATORY FIELD OFFICE
US Artny Corps of Engineers
69 Darling[on Avenue
Wilming[on, North Carolina 28403
General Number: 910-251-4633
Fax Number. (910) 251-4025
Version: December 2013 Page 1
Jurisdictional Determination Request
INSTRUCTIONS:
All requestors must complete Parts A, B, C, D, E and F.
NOTE TO CONSULTANTS AND AGENCIES: If you are requesting a JD on behalf of a
paying client or your agency, please note the specific submittal requirements in Part G.
NOTE ON PART D— PROPERTY OWNER AUTHORIZATION: Please be aware that all JD
requests must include the current property owner authorization for the Corps to proceed with the
determination, which may include inspection of the property when necessary. This form must be
signed by the current property owner to be considered a complete request.
NOTE ON PART D- NCDOT REQUESTS: Property owner authorization/notification for JD
requests associated with North Carolina Department of Transportation (NCDOT) projects will be
conducted according to the current NCDOT/LTSACE protocols.
NOTE TO USDA PROGRAM PARTICIPANTS: A Corps approved or preliminary JD may not
be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or
your tenant are USDA Program participants, or anticipate participation in USDA programs, you
should also request a certified wetland determination from the local office of the Natural
Resources Conservation Service, prior to starting work. .
Version: December 2013 Page 2
►�
B.
C.
Jurisdictional Determination Request
PARCEL INFORMATION
StTOet 1�dCITeSS: South of US-52/State Route 65 Interchange
Cl�, Si1ie: Stanleyville, North Carolina
CO�{�r: Forsyth County
D1TeCtloriS: From Stanelyville, NC: Head west on SR 1840 to US-52/SR-65 Interchange.
Continue south of interchange for —0.22 miles.
Parcel Index Number(s) (PIN):
REQUESTOR INFORMATION
See PCN Supplemental Infortnation for landowner and parcel information
NaTne: Glenn I. Martin
M8111rig AC1C�TeSS: 3500 Parkway Lane, Peachtree Corners, GA 30092
Telephone Number: (s�a� sssa�aa
Electronic Mail Address I: man�n9�@Pond�o.�m
Select one:
� I am the current property owner.
❑✓ I am an Authorized Agent or Environmental Consultantz
I�
I�
Interested Buyer or Under Contract to Purchase
Other, please explain.
PROPERTY OWNER INFORMATION
Name:
Mailing Address:
Telephone Number:
Electronic Mail Address3
Aaron Weldon
4720 Piedmont Row Drive
Charlotte, NC 28233
(704)364-3210
aaron.weldon@piedmontng.com
❑✓ Proof of Ownership Attached (e.g. a copy of Deed, County GIS/Parcel/Tax Record data)
1 If available
Z Must attach completed Agent Authorization Form
3 If available
Version: December 2013 Page 3
jurisdictionaI Determination Request
D. PROPERTY OWNER CERTIFICATION4
I, the undersigned, a duly authorized owner of record of the property/properties identified herein,
do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps)
to enter upon the property herein described for the purpose of conducting on-site investigations
and issuing a determinadon associated with Waters of the U.S. subject to Federal jurisdiction
under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of
1899.
Aaron Weldon (PNG)
Ovmer (please print)
Property Owner Signature
E. 3URISDICTIONAL DETERMINATION TYPE
Select One:
a
IC
Date
I am requesting that the Corps provide a areliminarY JD for the property identified herein.
This request does include a delineation.
I am requesting that the Corps provide a preliminary JD for the property identified herein.
This request does NOT include a delineation. ,
� I am requesting that the Corps investigate the property/project azea for the presence or
absence of WoUSS and provide an apnroved JD for the property identified herein. This
request does NOT include a request for a verified delineation.
� I am rec2uesting that the Carps delineate the boundaries of all WoUS on a property/project
area and provide an approved JD {this may or may not include a survey plat).
� I am requesting that the Corps evaluate and approve a delineation of WoUS (conducted
by others) on a property/project area and provide an apnroved JD (may or may not
include a survey plat).
° Far NCDOT requests following the current NCDOT/USACE protocols, skip to Part E. '
5 Waters of the United States
Versiori: December 2013 Page 4
Jurisdictional Determination Request
F. ALL REQLTESTS
� Map of Property or Project Area (attached). This Map must clearly depict the boundaries
of the area of evaluation.
❑✓ Size of Property or Project Area 9�5 acres
ni verify that the property (or project) boundaries have recently been surveyed and marked
by a licensed land surveyor OR are otherwise clearly marked or distinguishable.
G. JD REQUESTS FROM CONSULTANTS OR AGENCIES
(1) Preliminary JD Requests:
� Completed and signed Preliminarv Jurisdictional Determination Form6.
� Project Coordinates: 36.217 Latitude -$0.309 Longitude
Maps (no larger than l 1x17) with Project Boundary Overlay:
� Large and sma11 scale maps that depict, at minimum: streets, intersections, towns
❑✓ Aerial Photography of the project area
� USGS Topographic Map
❑✓ Soil Survey Map
� Other Maps, as appropriate (e.g. National Wetland Inventory Map, Proposed Site
Plan, previous delineation maps, LIDAR maps, FEMA floodplain maps)
6 See Appendix A of this Form. From Regulatory Guidance Letter No. 08-02, dated June 26, 2008
Version: December 2013 Page 5
Jurisdictional Determination Request
Delineation Information (when applicable)�:
Wedands:
� Wetland Data Sheets8
❑✓
❑✓
❑✓
Upland Data Sheets
Landscape Photos, if taken
Tributazies:
� USACE Assessment Forms
� Other Assessment Forms
(when appropriate)
Field Sketch overlain on legible Map that includes:
■ All aquatic resources (for sites with multiple resources, label and identify)
• Locations of wetland data points and/or tributary assessment reaches
■ Locations of photo stations
■ Approximate acreage/lineaz footage of aquatic resources
(2) Approved JDs including Verification of a Delineation:
� Project Coordinates:
Latitude Longitude
Maps (no targer than 11 x 17) with Project Boundary Overlay:
_I
u
�
�
Lazge and small scale maps that depict, at minimum: streets, intersections, towns
Aerial Photography of the project area
USGS Topographic Map
Soil Survey Map
� Other Maps, as appropriate (e.g. National Wedand Inventory Map, Proposed Site Plan,
previous delineation maps)
� 1987 Manual Regional Supplemen[5 and Data forms can be found at:
htto://www.usace.armv.mil/Missions/CivilWorks/Re¢ulatorvProaramandPermits/rea suoo.asox
We[land and Stream Assessment Methodologies can be found at:
htto://oortal.ncdenr.ora/c/document librarv/¢et file?uuid=76f3c58b-dab8-4960-ba43-45b7faf06f4c&¢rouold=38364 and,
htto://www.saw.usace.armv.mil/Portals/59/docs/reeulatorv/oublicnotices/2013/NCSAM Draft User Manual 130318.odf
a Delineation information must include, at minimum, one wetland data sheet for each wetland/community type.
Version: December 2013 Page 6
Jurisdictional Determination Request
Delineation Information (when applicable):
Wetlands:
� Wetland Data Sheets9
❑�
�
n
Upland Data Sheets
Landscape Photos, if taken
Tributaries:
� USACE Assessment Forms
� Other Assessment Forms
(when appropriate)
Field Skatch overlain on legible Map that includes:
• All aquatic resources (for sites with multiple resources, label and identify)
• Locations of wetland data points and/or tributary assessment reaches
• Locations of photo stations
• Approximate acreage/linear footage of aquatic resources
Supporting Jurisdictional Information (for Approved JDs only)
�❑
I�
Approved Jurisdictional Deternunation Form(s) (also known as "Rapanos
Form(s)")
Map(s) depicting the potential (or lack of potential) hydrologic connection(s),
adjacency, etc. to navigable waters.
9 Delineation information must include, at minimum, one wetland data sheet for each wetland/community type.
Version: December 2013 Page 7
Jurisdictional Determination Request
I. REQUESTS FOR CORPS APPROVAL OF SURVEY PLAT
Prior to final production of a Plat, the Wilmington District recommends that the Land
Surveyor electronically submit a draft of a Survey Plat to the Corps project manager for
review.
Due to storage limitations of our administrative records, the Corps requires that all hard-
copy submittals include at least one ori inal Plat to scale) that is no larger than 11"x17"
(the use of match lines for larger tracts acceptable). Additional copies of a plat, including
those larger than 11"xl7", may also be submitted for Corps signature as needed. The
Corps also accepts electronic submittals of plats, such as those transmitted as a Portable
Document Format (PDF) file. Upon verification, the Corps can electronically sign these
plats and return them via e-mail to the requestor.
(1) PLATS SUBMITTED FOR APPROVAL
I�I
CI�
Must be sealed and signed by a licensed professionalland surveyor
Must be to scale (all maps must include both a graphic scale and a verbal scale)
� Must be legible
�
I-
�
I-
❑
Must include a North Arrow, Scale(s), Title, Property Information
Must include a legible WoUS Delineation Table of distances and bearings/metes
and bounds/GPS coordinates of all surveyed delineation points
Must clearly depict surveyed property or project boundaries
Must clearly identify the known surveyed point(s) used as reference (e.g. property
corner, USGS monument)
When wetlands are depicted:
• Must include acreage (or square footage) of wetland polygons
• Must identify each wetland polygon using an alphanumeric system
Version: December 2013 Page 8
Jurisdictional Determination Request
� When tributaries are depicted:
• Must include either a surveyed, approximate centerline of tributary with
approximate width of tributary OR surveyed Ordinary High Water Marks
(OHWM) of tributary
• Must identify each tributary using an alphanumeric system
• Must include linear footage of tributaries and calculated area (using approximate
widths or surveyed OIIVVM)
• Must include name of tributary (based on the most recent USGS topographic
map) or, when no USGS name exists, identify as "unnamed tributary"
� all depicted WoUS (wetland polygons and tributary lines) must intersect or tie-to
surveyed projectJproperty boundaries
� Must include the location of wetland data points and/or tributary assessment
reaches
� Must include, label accordingly, and depict acreage of all waters not currently
subject to the requirements of the CWA (e.g. "isolated wetlands", "non-
jurisdictional waters"). NOTE: An approved JD must be conducted in order to
make an official Corps determination that a particular waterbody or wetland is not
jurisdictional.
� Must include and survey all existing conveyances (pipes, culverts, etc.) that
transport WoUS
Version: December 2013 Page 9
Jurisdictional Determination Request
(2) CERTIFICATION LANGUAGE
� When the entire actual Jurisdictional Boundarv is depicted:
include the following Corps Certification language:
"This certifies that this copy of this plat accurately depicts the boundary of the jurisdiction
of Section 404 of the Clean Water Act as determined by the undersigned on this date.
Unless there is a change in the law or our published regulations, the determination of
Section 404 jurisdiction may be relied upon for a period not to exceed five (5J years from
this date. The undersigned completed this determination utilizing the appropriate Regional
Supplement to the 1987 U.S. Army Corps of Engineers Wetlands Delineation Manual."
Regulatory Official:
Title:
Date:
USACE Action ID No.:
� When uplands may be present within a depicted Jurisdictional Boundarv:
include the following Corps Certification language:
"This certifies thot this copy of this plat identifies all areas of waters of the United States
regulated pursuant to Section 404 of the Clean Water Act as determined by the
undersigned on this date. Unless there is change in the law or our published regulations,
this determination of Section 404 jurisdiction may be relied upon for a period not to exceed
five years from this date. The undersigned completed this determination utilizing the
appropriate Regional5upplement to the 1987 U.S. Army Corps of Engineers Wetlands
Delineation Manual."
Regulatory Official:
Title:
Date:
USACEAction ID No.:
Version: December 2013 Page 10
Jurisdictional Determination Request
(3) GPS SURVEYS
For Suzveys prepared using a Global Positioning System (GPS), the Survey must include
all of the above, as well as:
� be at sub-meter accuracy at each survey point.
� include an accuracy verification:
One or inore known points (property corner, monument) shall be located with the
GPS and cross-referenced with the existing traditional property survey (metes and
bounds).
� include a brief description of the GPS equipinent utilized.
Trimble Geoexplorer 6000 series GeoXT hand-held unit was used to
delineate jurisdictional waters for the Line 326 DOT Relocation project.
Version: December 2013 Page 11
ATTACHMENT A
PRELIMINARY JURISDICTIONAL; DETERMINATION FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL
DETERMINATION (JD):
B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD:
Aaron Weldon 4720 Piedmont Row Drive, Charlotte, NC 28233
C. DISTRICT OFFICE, FILE NAME, AND NUMBER:
Asheville Regulatory Field OfFice
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:
_See PJD Supplemental Information
(USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT
SITES)
State: NC County/parish/borough: _Forsyth City: _Stanleyville _
Center coordinates of site (lat/long in degree decimal format):
Lat. _36.213 °N; Long. 80.306 °W.
Universal Transverse Mercator:
n
Name of nearest waterbody: _Beaver Dam Creek
Identify (estimate) amount of waters in the review area:
Non-wetland waters:
_ 1,363 _linear feet: _4 width (ft) and/or 0.14 acres.
Cowardin Class: _R2UB21, R4SB21
Stream Flow: Perennial & Intermittent
Wetlands: 0•72 acres.
. Cowardin Class: PF01A,
Name of any water bodies on the site that have been identified as Section 10
waters:
Tidal:
Non-Tidal:
1
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT
APPLY):
❑ Office (Desk) Determination. Date:
� Field Determination. Date(s):
SUPPORTING DATA. Data reviewed for preliminary JD
(check all that apply - checked items should be included in case file and,
where checked and requested, appropriately reference sources below):
nMaps, plans, plots or plat submitted by or on behalf of the
applicant/consultant:
� Data sheets prepared/submitted by or on behalf of the
appl�i❑cant/consultant.
Office concurs with data sheets/delineation report.
� Office does not concur with data sheets/delineation report.
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑ U.S. Geological Survey Hydrologic Atlas:
X❑ USGS NHD data
� USGS 8 and 12 digit HUC maps
Stanleyville, NC
QU.S. Geological Survey map(s). Cite scale & quad name: �•5 Minute Quad
0 USDA Natural Resources Conservation Service Soil Survey.
Citation: USDA NRCS SSURGO
❑X USFWS NWI Mapper
National wetlands inventory map(s). Cite name:
❑ State/Local wetland inventory map(s):
X❑ FEMA/FIRM maps: FEMA Floodplain Mapper .
� 100-year Floodplain Elevation is:
(National Geodectic Vertical Datum of 1929)
0 Photographs: 0 Aerial (Name & Date): B�n9 or
XQ Other (Name & Date): Field Photos 2-6-2018
� Previous determination(s). File no. and date of response letter:
� Other information (please specify):
�
1. The Corps of Engineers believes that there may be jurisdictional waters of the
United States on the subject site, and the permit applicant or other affected party
who requested this preliminary JD is hereby advised of his or her option to
request and obtain an approved jurisdictional determination (JD) for that site.
Nevertheless, the permit applicant or other person who requested this
preliminary JD has declined to exercise the option to obtain an approved JD in
this instance and at this time.
2. In any circumstance where a permit applicant obtains an individual permit, or
a Nationwide General Permit (NWP) or other general permit verification requiring
"pre-construction notification" (PCN), or requests verification for a non-reporting
NWP or other general permit, and the permit applicant has not requested an
approved JD for the activity, the permit applicant is hereby made aware of the
following: (1) the permit applicant has elected to seek a permit authorization
based on a preliminary JD, which does not make an official determination of
jurisdictional waters; (2) that the applicant has the option to request an approved
JD before accepting the terms and conditions of the permit authorization, and
that basing a permit authorization on an approved JD could possibly result in less
compensatory mitigation being required or different special conditions; (3) that
the applicant has the right to request an individual permit rather than accepting
the terms and conditions of the NWP or other general permit authorization; (4)
that the applicant can accept a permit authorization and thereby agree to comply
with all the terms and conditions of that permit, including whatever mitigation
requirements the Corps has determined to be necessary; (5) that undertaking
any activity in reliance upon the subject permit authorization without requesting
an approved JD constitutes the applicant's acceptance of the use of the
preliminary JD, but that either form of JD will be processed as soon as is
practicable; (6) accepting a permit authorization (e.g., signing a proffered
individual permit) or undertaking any activity in reliance on any form of Corps
permit authorization based on a preliminary JD constitutes agreement that all
wetlands and other water bodies on the site affected in any way by that activity
are jurisdictional waters of the United States, and precludes any challenge to
such jurisdiction in any administrative or judicial compliance or enforcement
action, or in any administrative appeal or in any Federal court; and (7) whether
the applicant elects to use either an approved JD or a preliminary JD, that JD
will be processed as soon as is practicable. Further, an approved JD, a proffered
individual permit (and all terms and conditions contained therein), or individual
permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331,
and that in any administrative appeal, jurisdictional issues can be raised (see 33
C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary
to make an official determination whether CWA jurisdiction exists over a site, or
to provide an official delineation of jurisdictional waters on the site, the Corps will
provide an approved JD to accomplish that result, as soon as is practicable.
This preliminary JD finds that there "may be" waters of the United States on the
subject project site, and identifies all aquatic features on the site that could be
affected by the proposed activity, based on the following information:
IMPORTANT NOTE: The information recorded on this form has not
necessarilv been verified bv the Corps and should not be relied upon for
later iurisdictional determinations.
Signature and date of
Regulatory Project Manager
(REQUIRED)
4
Signature and date of
person requesting preliminary JD
(REQUIRED, unless obtaining
the signature is impracticable)
US Army Corps of Engineers, Wilmington District
Attachment A Preliminary Jurisdictional Determination Form
Su pplemental Informaiion
D. Project Location(s) and Background Information:
The Piedmont Natural Gas Line 326 DOT Relocation Project, located in Forsyth County near the City of Stanleyville,
North Carolina, involves the relocation of a 6-inch steel transmission line to accommodate the North Carolina
Department of Transportation (NCDOT) highway expansion. The project starts (36.217, -80.309) at an existing tie-in
approximately 0,5 miles north of the John M Gold Freeway and Highway 65 intersection near Stanleyville, North
Carolina. The proposed route then travels approximately 4,100 linear feet (LF) south along the west sitle of John M
Gold Freeway and crosses Highway 65 to tie into the existing 6-inch pipeline (36.208, -80,304) on Bethania Rural Hall
Road/Highway 65. The ROW will be clearetl for a 100-foot corridor and maintained as a 50-foot wide easement except
where the pipe antl ROW cross waters of the US, in which case the ROW will be narrowed to no more than 40 feet.
The pipeline construction activities will include initial ROW clearing and grubbing, installation of erosion and sediment
control (E&SC) best management practices (BMPs), trench excavation, pipe installation, backfilling to preconstruction
contlitions, and implementing final stabilization. The proposed natural gas pipeline project traverses mostly mixed pine-
hardwood forestland.
Linear
, Acreage . Class of. -
- Cowardin .. . � �Fooiage in : Photo
Feature ID Latitude. ; Longitude m.Pro�ect . � Aquatic
Classification• Pro�ecf � Num6er*
� - ' - - Area Area� Resource
Stream 1 36.213 -80.307 R2UB21 0.084 743 Non-Section 10 �
Non-wetland
Wetland 2 36.213 -80.307 PF01B 0.72 N/A Non-Section 10 Z
Wetland
Stream 3 36.215 -80.308 R2UB21 0.035 252 Non-Section 10 3
Non-wetland
Stream 4 36.216 -80.309 R4U621 0.023 330 Non-Section 10 4
Non-wetland
*See Attachment C for photos of aquatic resources in the project area.
Office Use Only:
Corps adion ID no.
DWQ projed no.
Form Version 1.4 January 2009
Pre-Construction Notification (PCN) Form
A. Applicant InfortnaUon
1. Pracessing
1a. Type(s) of appraval sought from the Corps: � Sedion 404 Permit ❑ Section 10 Permit
1b. Specify Natlonwide Permit (NWP) number: 1z or General Permit (GP) number:
tc. Has the NWP or GP number been verified by the Corps? ❑ Yes � No
1 d. Type(s) of approval sought fram the DWQ (check all that apply):
0 401 Water Quality Cert�cation — Regular ❑ Non-404 Jurisdidional General Pertnit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this natificatian solely for the record For the record only for DWQ For the record only for Corps Pertnit:
because written approval is not required? 401 Certification:
❑ Yes ❑x No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for
mitigation of impads7 If so, attach the acceptance letter from mitigation bank ❑ Yes ❑X No
or in-lieu fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h � yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concem (AEC)? ❑ Yes � No
2. Project InformaUon
2a. Name of projed: Line 326 DOT Relocation
2b. County: Forsyth
2c. Nearest municipality / tawn: Stanleyville
2d. Subdivision name: NA
2e. NCDOT only, T.I.P. or state projed no: NA
3. Ownerinfortnatian
3a. Name(s) on Recorded Deed: See PCN supplemental information
3b. Deed Book and Page No. See PCN supplemental information
3c. Responsible Party (for LLC if qaron Weldon
appliqble):
3d. Street address: 4720 Piedmont Row Drive
3e. City, state, zip: Charlotte, NC 28233
3f. Telephone no.: 704364-3120
3g. Fax no.:
3h. Email address: Aaron.weldon@piedmontng.com
Page 1 of 10
PCN Form — Version 1.4 January 2009
4. Applicant Information (if different from owner)
4a. Applicant is: OX Agent ❑ Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: Glenn I. Martin
5b. Business name Pond & Co
(if applicable):
5c. Street address: 3500 Parkway Lane Suite 500
5d. City, state, zip: Peachtree Corners, GA 30092
5e. Telephone no.: 678-336-7720
5f. Fax no.:
5g. Email address: martingi@pondco.com
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): See PCN supplemental information
1b. Site coordinates (in decimal degrees): Latitude: 36.217 Longitude: -80.309
1c. Property size: 9.500000� acres
2. Surface Waters
2a. Name of nearest body of water to proposed project: Beaver Dam Creek
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Upper Yadkin - 03040101
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
This proposed natural gas pipeline project is located adjacent to proposed NCDOT rights-of-ways (ROWs) within a predominately mixed pine-
hardwood forest.
3b. List the total estimated acreage of all existing wetlands on the property: 0.72
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,325
3d. Explain the purpose of the proposed project:
See PCN supplemental information
3e. Describe the overall project in detail, including the type of equipment to be used:
See PCN supplemental information
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the � Yes ❑X No ❑ Unknown
Corps or State been requested or obtained for this property /
ro'ect includin all rior hases in the ast? Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for �Yes ❑X No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes �X No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
�X Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of impact Type of wetland Forested Type ofjurisdiction Area of
number Corps (404,10) or impact
Permanent (P) or DWQ (401, other) (acres)
Tem ora
W2 P Land Clearing Non-Riverine Swamp,Forest Yes Corps 0.08
- Choose one Choose one Yes/No -
- Choose one Choose one Yes/No -
- Choose one Choose one Yes/No -
- Choose one Choose one Yes/No -
- Choose one Choose one Yes/No -
2g. Total Wetland Impacts: 0.08
2h. Comments:
The pipeline ROW will be cleared and maintained at 50-feet wide in perpetuity for structural integrity and safety except where it crosses water
resources in which cases it will not exceed 40 feet. Mechanical clearing will be utilized in the forested wetiand crossing.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact
number intermittent (INT)? jurisdiction stream length
Permanent (P) or width (linear
Temporary (T) (feet) feet)
S1 T Excavation Unnamed Trib PER Corps 2 52
S3 T Excavation Unnamed Trib PER Corps 5 41
S4 T Excavation Unnamed Trib INT Corps 5 64
- Choose one - -
- Choose one - -
- Choose one - -
3h. Total stream and tributary impacts �57.00000�
3i. Comments:
Open cut methods will be utilized to construct this proposed pipeline. Average trench width will be 4 feet wide. Construction corridor will be no more
than 40 feet wide at waters.
Page 4 of 10
PCN Form — Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number (if applicable) Type of impact Waterbody Area of impact (acres)
Permanent (P) or type
Tem ora
- Choose one Choose
- Choose one Choose
- Choose one Choose
- Choose one Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. 5d. 5e.
Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland
purpose of pond (acres)
Flooded Filled Excavated Flooded Filled Excavated
Choose one
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required? ❑ Yes OX No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a. Project is in which protected basin? ❑ Neuse ❑ Tar-Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b. 6c. 6d. 6e. 6f. 6g.
Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2
number — mitigation impact impact
Permanent (P) or required? (square (square
Tem ora feet feet
- Yes/No
- Yes/No
- Yes/No
- Yes/No
- Yes/No
- Yes/No
6h. Total Buffer Impacts:
6i. Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
See PCN supplemental information
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
See PCN supplemental information
2. Com ensato Miti ation for Im acts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for � Yes ❑X No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? ❑ Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Com lete if Usin a Miti ation Bank
3a. Name of Mitigation Bank:
Type: Choose one Quantity:
3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity:
Type: Choose one Quantity:
3c. Comments:
4. Com lete if Makin a Pa ment to In-lieu Fee Pro ram
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: Choose one
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires � Yes ❑X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes �X No
within one of the NC Ri arian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes OX No
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? p o�o
2b. Does this ro'ect re uire a Stormwater Mana ement Plan? ❑ Yes 0 No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
No impervious surfaces or stromwater infrastructure will be constructed as part of this project. Other than permanent clearing of the ROW, all
disturbances are temporary and will be restored to pre-construction conditions. No non-404 Jurisdictional General Permits are required for this project
as this project will not result in greater than 24% impervious surtace, and does not contain drainage areas with greater than 24% impervious surFace.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a. In which local overnmenYs 'urisdiction is this ro'ect? Forsyth County
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): � USMP
� Water Supply Watershed
0 Other: None
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No
attached?
4. DWQ Stormwater Pro ram Review
�Coastal counties
❑HQW
4a. Which of the following state-implemented stormwater management programs apply �ORW
(check all that apply):
❑Session Law 2006-246
X�Other: NCG 010000
4b. Has the approved Stormwater Management Plan with proof of approval been � Yes ❑X No
attached?
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met? �X Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes �X No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes OX No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑Yes OX No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in �Yes OX No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
The pipeline is classified as a transmission line which will not result in additional development following its completion. The installation of this proposed
line is to relocate an existing pipeline as a result of NCDOT expanding a highway interchange. Therefore, a cumulative impact analysis has not been
implemented for this project as this project is not anticipated to contribute to future impacts.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
During construction, portable sanitary units will be provided. Waste will be coliected a minimum of one time per week by a licensed portable facility
provided in complete compliance with local and state regulations. All sanitary waste units will be located in upland areas and be easily accessible. this
project does not require sanitary sewer or septic tank service. No sanitary waste maintenance will be necessary post construction.
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated CriUcal Habitat (Corps Requirement)
5a. VYII this projed occur in or near an area with federally proteded species or 0 Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Ad � Yes 0 No
impads?
5c. If yes, indicate the USFWS Field Oifice you have contaded. -
5d. What data sources did you use to detertnine whether your site would impad Endangered Species or Designated Critical
Habitat?
USFWS, Infortnadon for Planning and Consultadon (IPaC): USFlNS Forsyth Counry Endanpered Spedes, Threatened Spedes, Federal Spedes of
Concem, and Candidate Speaes; NC Natural Herifsge Program. See PCN supplementel infortnation.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to detertnine whether your ske would impad Essential Fish Habitat?
NOAA Habkat Conservation Nationai Marine Fisheries Service, Essential Fish Habitat Mapper Jd.O
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project axur in or near an area that the state, federal or tribal
govemments have designated as having historic or cuRural preservation � Yes � No
status (e.g., National Historic Trust designation or properties signfipnt in
North Carolina history and archaeology)?
7b. What data sources did you use to detertnine whether your site would impad historic or archeological resources?
Norih Carolina State Historic Preservalion Otfice (SHPO) Historic Property flles, and National Register of Historic Place (NRHP). See PCN
supplemental infortnation.
6. Flood Zone Designation (Corps Requirement)
8a. Will this projed occur in a FEMA-designated 100.year floodplain? ❑ Yes � No
8b. If yes, explain how projed meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
FEMA Nation Flood Hazard Layer (GIS geodatabase)
Glenn I. Martin �°'�'r^ � 4-20-2018
ApplicanUAgenYs Printed Name ApplicanUAgenYs Signature Date
(Agent's signature is valid only if an authorization
letter irom the a IicaM is rovided.
Page 10 of 10
US Army Corps of Engineers, Wilmington District
Pre-Construction Notification (PCN) Form
PCN Supplemental Information
A.3a. Name(s) on Recorded Deed:
Table 1 below presents property owner information including name(s) on recortled deed. Piedmont Natural Gas will
serve as the owner of the Property Easement crossing the properties listed in Table 1 below. Pietlmont Natural Gas is
grantetl the authority to acquire by purchase or condemnation ownership of property for public use or benefit through
the North Carolina General Statute, Chapter 40A (Eminent Domain). Attachment 1 of this document presents the
Property Survey Notification Letter issued by Piedmont Natural Gas to property owners within antl surrounding the
proposed easement.
A.3b. Deed Book and Page No.
Table 1 below presents property owner information including deetl book and page number.
Table 1. Proiect Parcel Report
OWNER
DB/P6 PIN Owner Name OwnerAddress
Shamrock Capital Partners/Pierce 17 Rosebay Lane
N/A 6910-20-5311 Chandler LLC Greensboro, NC 27455
Winston Salem/Forsyth County PO Box 2513
002927/03404 6819-39-4903 Board of Education Winston Salem, NC 27102
8001 Arrowridge BLVD
003279/03128 6819-49-2108 D R Horton INC Charlotte, NC 28273
Shropshire Family Trust 4225 Stonehenge Lane
003270/01675 6819-48-8167 John Douglas Shropshire Winston Salem, NC 27106
8001 Arrowridge BLVD
003279/03128 6819-483060 D R Horton INC Charlotte, NC 28273
1175 Bethania Rural Hall Road
N/A 6819-56-4486 Woodland Baptist Church Winston Salem, NC 27106
B.3d. Explain the purpose of the proposed project:
This project involves the relocation of 0.78 miles of 6-inch steel, natural gas pipeline. Piedmont Natural Gas (PNG) has
an existing pipeline within North Carolina Department of Transportation (NCDOT) ROW that is being relocated to
accommotlate NCDOT reconfiguring the roadway.
B.3e. Describe the overall project in detail, including the type of equipment to be used:
The Piedmont Natural Gas Line 326 DOT Relocation Project, located in Forsyth County near the City of Stanleyville,
North Carolina, involves the relocation of a 6-inch steel transmission line to accommodate the North Carolina
Department of Transportation (NCDOT) highway expansion. The project starts (36.217, -80.309) at an existing tie-in
approximately 0.5 miles north of the John M Gold Freeway antl Highway 65 intersection near Stanleyville, North
Carolina. The proposed route then travels approximately 4,100 linear feet (LF) south along the west sitle of John M
Goltl Freeway and crosses Highway 65 to tie into the existing 6-inch pipeline (36,208, -80.304) on Bethania Rural Hall
Piedmont Natural Gas — Line 326 DOT Relocation Project Pontl & Company
PCN Supplemental Information April 2018
Road/Highway 65. The ROW will be cleared for a 100-foot corridor and maintained as a 50-foot wide easement except
where the pipe antl ROW cross waters of the US, in which case the ROW will be narrowed to no more than 40 feet,
The 100-foot corridor will be clearetl for temporary use for the construction of this project. Upon the completion of the
pipeline construction, the 100-foot corritlor will be allowed to return to natural contlitions. The clearing of the 50-foot
wide permanent easement will be maintained. The pipeline construction activities will include initial ROW clearing antl
grubbing, installation of erosion and sediment control (E&SC) best management practices (BMPs), trench excavation,
pipe installation, backfilling to preconstruction conditions, and implementing final stabilization. The proposed natural
gas pipeline project traverses mostly mixed pine-hartlwood forestland,
Construction activities will include initial clearing, BMP installation, pipeline installation (trenching/open-cutting),
backfilling, antl final stabilization, The two perennial streams, one intermittent stream, and one wetlantl tlelineated
along the proposed route will be crossed using open-cut methods. All stream crossings involving open-cut construction
methods have been oriented as close to perpendicular as possible to the stream banks to further minimize impacts.
Standard mechanized construction equipment will be used, including but not limited to feller bunchers, backhoes,
excavators, and other tracked equipment. Structural and vegetative BMPs will be implemented according to an E&SC
Plan designed for this project and existing site conditions.
D.1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.
Preliminary environmental surveys were conducted during the conceptual phase of this project antl included field
delineations along the proposetl route to identify all sensitive resources in the area. Using the environmental data
collected, the least impactful route was chosen, and adtlitional route modifications were matle to reduce impacts at
stream antl wetland crossings. All stream crossings involving open-cut construction methods have been oriented as
close to perpendicular as possible to the stream banks to further minimize impacts. Within the initial project area
surveyed, two perennial streams, one intermittent stream, and one wetlantl were delineated. The extent of impacts has
been minimized by narrowing the right-of-way (ROW) clearing ranging from 100 feet to no more than 40 feet in width
at resource crossings.
D.1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction
techniques.
Open-cutting has been proposed for all stream and wetland crossings as horizontal directional drilling (HDD) typically
requires a larger work space for associated machinery and equipment. Similarly, open-cut methods were selected to
remove the potential impact of drilling fluids entering Waters of the US through possible inadvertent returns. Erosion
antl Sediment control measures will be implemented at all stream crossings to minimize impacts during construction
(temporary stream crossings, bank stabilization). Additionally, construction has been sequenced to minimize the length
of time for which excavations of streams remain in disturbed condition and will be stabilized as soon as possible.
F.5d. What data sources did you use to determine whether your site would impact Endangered Species or
Designated Critical Habitat?
A list of threatenetl and endangered species was obtained from the United States Fish and Wildlife Service Information
for Planning and Consultation (USFWS IPaC) online database. Two (2) fetlerally listed species, northern long-eared
bat (Myofis sepfentrionalis) and small-antheretl bittercress (Cardamine micranfhera), were fountl to potentially occur
within Forsyth county, according to the IPaC tlatabase. Pond ecologists contlucted a detailed fieltl survey on February
6, 2018 to itlentify antl locate potential presence of suitable habitat for listed species within the project corridor, Suitable
foraging habitat for northern long-eared bat (Myofis septenfrionalis) was present within or adjacent to the project site.
However, USFWS 4(tl) Rule states incidental take through tree removal activities is not prohibited unless it results in
removing a known, occupietl maternity roost tree; removal activities within 150 feet of a known maternity roost tree
from June 1 to July 31, or removing trees within 0.25 miles of a hibernaculum at any time of year. Online review of
USFWS resources from the Raleigh Ecological Field Office for northern long-eared bat (Myotis sepfentrionalis) does
Pietlmont Natural Gas — Line 326 DOT Relocation Project Pontl & Company
PCN Supplemental Information April 2018
not indicate presence of roost trees or hibernacula in the project area. Habitat for small-anthered bittercress (Cardamine
micranthera) was not present in the project area.
F.7b. What data sources did you use to determine whether your site would impact historic or archeological
resources?
A desktop survey was conductetl to evaluate the presence of cultural resources near the proposed project. One
documented cultural resource, the Constantine C. Stoltz House, is located adjacent to the proposed route. This
resource is listed as "Determined Eligible" for listing on the National Register of Historic Places (NRHP) and is located
approximately 400 feet south-southwest of the proposed pipeline route. However, the Environmental Impact Statement
for the Winston-Salem Northern Beltway indicates that the resource was demolished in 1995 and is no longer NRHP-
eligible.
Piedmont Natural Gas — Line 326 DOT Relocation Project Pontl & Company
PCN Supplemental Information April 2018
Attachment 1. Piedmont Natural Gas Property Survey Notification Letter
Piedmont Natural Gas — Line 326 DOT Relocation Project Pontl & Company
PCN Supplemental Information April 2018
Re: Pipeline Survey Activity Notice
DOT relocation, Piedmont's Line 326
Dear Landowner:
As you may be aware, NCDOT will be constructing a new interchange near Hwy 52/ Bethania-
Rural Hall Rd. and Piedmont Natural Gas Company ("PNG") will need to relocate one of their
existing lines.
Our firm specializes in the acquisition of real property rights and we have been hired by PNG to
contact you to explain the survey data collection process to establish a preliminary route, and
determine the extent of the additional rights to be acquired. You have been identified, through
public records, as an owner whose property that MAY be affected by the project.
Preliminary survey activities will begin soon and PNG's contract survey company, Encompass
and POND engineering may need to access your property for the purpose of determining route
suitability and performing a preliminary survey. Once the survey data is collected, if your
property is affected by the project, an individual plat will be prepared showing your property and
the location of the proposed right-of-way and easement. With this information, we will then
contact you to begin the negotiations for the purchase of the needed right-of-way and easement.
It is PNG's intent to minimize any inconvenience to you through the survey process and any
other phase of the project. In consideration of a tight schedule, we will also attempt to contact
you by telephone in the coming days. If you have any questions or concerns about the survey or
land acquisition process, you can contact me at 919-247-6621 (cell) or my email:
j ohn.dietz@contractlandstaff.com.
Thank you in advance for your cooperation.
Sincerely yours,
John Dietz
Right of Way supervisor
Contract Land Staff
PNGLand035.rev2014
Stream 1
Weiland 2
Stream 3
Stream 4
StaEe - , HGM_Code
NORTH
CAROLINA R2U62
NORTH
CAROLINA PFOt
NORTH
CAROLINA R2UB2
NORTH
CAROLINA R4582
i
Linear 735 FOOT
Area 1 ACRE
Linear 300 FOOT
Linear 330 FOOT
WaCers_Type LatiSude
RPW 30213
RPWWD 36.213
RPW 36.215
RPW 36.212
L9ngifuate —
-80.305
-80.307
-80.308
-80.309
WETLAND DETERMINATION DATA FORM - Eastern Mountains and Piedmont Region
Project/Site: Line 326 DOT Relocation City/County: Forsyth Sam lin Date:
P 9 06-Feb-18
Applicant/Owner: POND State: NC Sampling Point: UP DP 1
Investigator(s): Kaili Stevens; Cory Haynes Section, Township, Range: S T R
Landfortn (hillslope, terrace, etc.): Hillside Local relief (concave, convex, none): ConCave Slope: g,p% / 4.6 °
Subregion (LRR or MLRA): MLRA 136 in LRR P l.at.: 36.20704 Long.: -8030261 Datum: NAD83
Soil Map Unit Name: PBColet clay loam NWI classification: None
Are climatic/hydrologic conditions on the site typical for this time of year? Yes O No O (If no, explain in Remarks.)
Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ signi£cantly disturhed? Are "Normal Circumstances" present? YCS � NO �
Are Vegetation ❑ , Soil ❑ , or Hydrology ❑ naturally problematic? (If needed, explain any answers in Remarks.)
Summary of Findings - Attach site map showing sampling point locations, transects, important features, etc.
Hydrophytic Vegetation Present? Yes � NO �
Hydric Soil Present? Yes � NO 0 Is the Sampled Area �
Wetland Hydrology Present? Yes � NO �
within a Wetland? Y� O No O
Remarks:
Hydrology
WeUand Hydrology Indicators: Secandarv Indicators (minimum of tw�reauired].
Primarv Indicators (minimum of one reauired: check all that annlv ❑ surf'ace soil Cracks (s6)
❑ SurFace Water (Ai) ❑ True Aquatic Plants (B14) ❑ Sparsely Vegetated Concave Surface (B8)
❑ High Water Table (A2) ❑ Hydrogen Sulfide Odor (CS) ' ❑ Drainage Patterns (B10)
❑ Saturation (A3) ❑ Oxidized Rhizospheres along Living Roots (C3) ❑ Moss Trim Lines (B16)
❑ Water Marks (Bl) ❑ Presence of Reduced Iron (C4) ❑ Dry Season Water Table (C2)
❑ Sediment Deposits (B2) ❑ Recent Iron Reduction in Tilled Soils (C6) ❑ Cra�sh Burrows (C8)
❑ Drift deposits (83) ❑ Thin Muck Surface (C7) ❑ Saturation Visible on Aerial Imagery (C9)
❑ Algal Mat or Crust (B4) ❑ Other (Explain in Remarks) ❑ Stunted or Stressed Plants (DS)
❑ Iron Deposits (BS) ❑ Geomorphic Pasition (D2)
❑ Inundation VisiBle on Aerial Imagery (87) ❑ Shallow Aquilard (D3)
❑ Water-Stained Leaves (89) ❑ Microtopographic Relief (D4)
❑ Aquatic Fauna (B13) ❑ FAC-neutrel Test (DS)
Field 06servations:
Surface Water Present? Yes � Na � Depth (inches):
WaterTable Present? YeS � NO � Depth (inches):
Saturation Present? Wetland Hydrology Present? Yes � No �
includes ca illa frin e Yes � No � Depth (inches):
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available:
Remarks:
�
US Army Corps of Engineers Eastern Mountains and Piedmont - Version 2.0
VEGETATION (Five/Four Strata)- Use scientific names of plants.
Dominant Sampling Point: UP DP 1
Coarinco
Tree Stratum (Plot size: 30 ) .
� , Pinus taeda
2. querc� niqra
3, ]uninenls vlrqiniana
4.
5.
6.
7.
8.
Sapling-Saplinq/Shrub Stratum (Plot size: 15 )
1. Quercus nigra
2, Junloerus vir iniana
3.
4.
5.
6.
7.
$.
9.
� �.
Shrub Stratum (Plot size: 15 )
1. Liqustrum sinense
2.
3.
4.
5.
6.
7.
Herb Stratum �Plot size: 5 )
� . Rubus laciniatus
2.
3.
4.
5.
6.
%.
8.
9.
10.
11.
12.
Woady Vine Stratum (Plot size: 30 )
� . Smflax rotundifolia
2.
3.
4.
5.
6.
A6solute Rel.Strat. Indicator I Dominance Test worksheet:
% Cover c.,vPr Status
Remarks: (Include photo numbers here or on a separate sheet.)
30
20
5
0
0
0
0
0
ss
� 54.5°/a FAC
❑� 36.4°/a FAC
❑ 9.1% FACU
❑ 0.0%
❑ o.o�io
❑ 0.0%
❑ a.o�io
❑ 0.0%
= Total Cover
10 ❑d 50.0°/a FAC
10 �❑ 50.0% FACU
0 ❑ 0.0%
o ❑ o.o�io
o ❑ a.o�io
o ❑ o.o�io
0 ❑ 0.0%
0 ❑ 0.0%
0 ❑ 0.0%
0 ❑ 0.0°/a
zo = TotalCover
30 0 100.0°/a FACU
0 ❑ 0.0%
0 ❑ 0.0%
o ❑ o.o�ro
o ❑ o.o�io
o ❑ o.o�io
0 ❑ 0.0%
30 = Total Cover
15 ❑� 100.0% UPL
0 ❑ 0.0%
0 ❑ 0.0°/a
o ❑ o.o�io
0 ❑ 0.0%
o ❑ o.o�io �
0 ❑ 0.0% �
0 ❑ 0.0°/a
o ❑ o.o�io
0 ❑ 0.0%
0 ❑ 0.0% '
o ❑ o.o�io ^
15 = TotalCover
5
0
0
0
0
0
5
❑� 100.0%
❑ 0.0%
❑ o.o�io
❑ 0.0%
❑ o.o�io
❑ 0.0%
= Total Cover
FAC
Number of Dominant Species
That are OBL, FACW, or FAC: 4 (A)
Total Number of Dominant
Species Across All Strata: 7 (B)
Percent of dominant Species
That Are OBL, FACW, or FAC: 57•1°�o (A/B)
Prevalence Index worksheet:
Total % Cover of: Multipiv by:
OBL species Q x 1= Q
FACW species 0 X 2= 0
FAC species 65 x 3= 195
FACU species 45 X 4= 180
UPL species 15 x 5= 75
column Totals: 125 Ca) 450 �B�
Prevalence Index = B/A = 3.600
Hydrophytic Vegetation Indicators:
❑ Rapid Test for Hydrophytic Vegetation
❑d Dominance Test is > 50%
❑ Prevalence Index is 53.0 1
❑ Morphological Adaptations � (Provide supporting
data in Remarks or on a separate sheet)
❑ Problematic Hydrophytic Vegetation 1 (Explain)
1 Indicators of hydric soil and wetland hydrology must
be oresent. unless disturbed or uroblematic.
Definition of Vegetation Strata:
Four Vegetation Strata:
Tree stratum - Consists of woody plants, excluding vines, 3 in.
(7.6 cm) or more in diameter at breast height (DBHJ, regardless
of height.
Saplinglshru6 stratum - Consists of woody plants, excluding
vines, less than 3 in. DBH and greater than 3.28 ft(1 m) tall.
Her6 stratum - Consists of all herbaceous (non-woody) plants,
regardless of size, and all other plants less than 3.28 ft tall.
Woody vines - Consists of all woody vines greater than 3.28 ft
in height
Five Vegetation Strata:
Tree - Woody plants, excluding woody vines, approximately 20
ft (6 m) or more in height and 3 in. (7.6 cm) or larger in
diameter at breast height (DBH).
Sapling stratum - Consists of woody plants, excluding woody
vines, approximately 20 ft(6 m) or more in height and less than
3 in. (7.6 cm) DBH.
Shrub stratum - Consists of woody plants, excluding woody
vines, approximately 3 to 20 ft(1 ta 6 m) in height
Herb stratum - Consists of all her6aceous (non-woody) plants,
including her6aceous vines, regardless of size, and woody
species, except woody vines, less than approximately 3 ft(1 m)
in height.
Woody vines - Consists of all woody vines, regardless of
height
Hydrophytic
Vegetarion Yes � fVo 0
Present. �
*Indiotor suffix = National status or professional decision assigned because Regional status not defined by FWS.
US Army Corps of Engineers Eastern Mountains and Piedmont - Version 2.0
SO1� Sampling Point: UP DP 1
Profile Description: (Descrihe to the depth needed to document the indicator or confirm the absence of indicators.)
Depth Matrix Recl��Featkres
�i�c esl Color o'stL, _ o%_, Color fmoist� % T�ue 1 Loc? Te�,tpre Remarks
0-18 lOYR 4/4 S00 Sandy Loam
1Type: C=Concentration. D=Depletion. RM=Reduced Matrix, CS=Covered or Coated Sand Grains �Location: PL=Pore Lining. M=Matrix
Hydric Soil Indicators: Indicators for Problematic Hydric Soils 3:
❑ Histosol (Ai) ❑ Dark Surface (S7) ❑ Z cm Muck (A10) (MLRA 147)
❑ Histic Epipedon (A2) ❑ Polyvalue Below Surface (S8) (MLRA 147,148)
❑ Black Histic (A3) ❑ Thin Dark Surface (59) (MLRA 147, 148) ❑ Coast Prairie Redox (A16)
(MLRA 147,148)
❑ Hydrogen Sulfide (A4) ❑ Loamy Gleyed Matrix (F2) ❑ piedmont Floodplain Soils (F19)
❑ Stratified Layers (AS) ❑ Depleted Matrix (F3) (MLRA 136, 147)
❑ 2 cm Muck (ASO) (LRR N) ❑ Redox Dark Surface (Ffi) ❑ Very Shallow Dark Surface (fF12)
❑ Depleted Below Dark Surface (All) ❑ Depleted Dark Surface (F7) ❑ Other (Explain in Remarks)
❑ Thick Dark Surface (Al2) ❑ Redox Depressions (FS)
❑ Sandy Muck Mineral (Sl) (LRR N, ❑ Iron-Manganese Masses (F12) (LRR N,
MLRA 147, 148) MLRA 136)
❑ Sandy Gleyed Matrix (S4) ❑ Umbric Surtace (F13) (MLRA 136, 122)
❑ Sandy Redox (SS) ❑ Piedmont Floodplain Soils (F19) (MLRA 148) 3 Indicators of hydrophytic vegetation and
wetland hydrology must be present,
❑ Stripped Matrix (S6) ❑ Red Parent Material (F21) (MLRA 127, 147) unless disturbed or proBlematic.
Restrictive Layer (if abserved):
Type:
Depth (inches): Hydric Soil Present? YeS � NO �
Remarks:
US Army Corps of Engineers Eastern Mountains and Piedmont - Version 2.0
WETLAND DETERMINATION DATA FORM - Eastern Mou�Mains and PledmoM Region
P%�ect/Sroe: L'me 326 DOT Rdocatlon Gty/County: frorsyth Samplinq Date: 06-Fetr18
Applka�K/Owner: POND Smte: NC SamPlirq Pal� WL DP 1
InvestlpaMr(s): Kaili Stevere; Cory Haynes Sectlon, Township, Ranpe: S T R
landlom� (hillslope, ternce, atc.): Toeslope �I �� (�^n�. �^�. ^�^e)� corrc'ave sbro� 5.0% / 2.9 '
Subreplon (LRR w MLRA): MLRA 136 in LRR P l+t: 36.21291 �� -8030659 Dehm: P1AD83
Shc Map Unit Nama: Pecolet dey loam NNR cWoMlotlon: None
Are dimatic/hydrolopic conditlana on the aife typiral for thls tlme of yeaY1 Yes OO No O (If no, aryWin in Remarks.)
Are Vepiatlon ❑ . Soil ❑ . ar Hydrobpy ❑ alpnMka�Aly disWrbed7 Aro'Namal Circumamncn' P�� YPS � NO �
Are Vegelatlon ❑ . Soll ❑ . w Hydralapy ❑ nahralty P��c7 (If needed, c�laln any amxras In Remarlla.)
Summary of Findings - Attach site map showing sampling point locations, transects, important features, etc.
Hydrophytic vepetatlon vresaM7
Hydrk Soll Present?
weu.ne Hymo�oDy Presenn
Ranarkr.
Hydrology
Yes V No V
Yrs OO No O
Yes OO No O
Is the Samqed Aroa Yg � NO �
wkhin a WatlandT
WeLend Hyd�olopy IndlmOors: 5¢�p�y Indkators (minimum M Mro reaWredl
Primarv Indicators (minimum of one reauired: check all ihat aoolvl ❑ 5urrace soil cracks (e6)
❑ Surface Water (AS) ❑ True Aquatic Plan� (614) ❑ Sparsely Vegetated Conove SurFace (BB)
� High Water Table (A2) ❑ Hydragen SiYflde Odor (L3J � Dralnage Pathrris (B30)
� SaWratlon (A3) ❑ Osldized Rhizospheres along Living Roo[s (C3) ❑ Moss Tnm lires (B16)
❑ WaFer Marks (81) ❑ Presence of Reduced Iron (C4) ❑ Dry SeaSon Water Table (Q)
❑ SedimerR Depostr (B2) ❑ ReceM Iron ReAu[tlon In lllled Soils (Cb) ❑ Creyfish Bvmws (C8)
❑ Drift deposits (63) ❑ Thin Muck Surfxc (0) ❑ SaWratlon Ysible on Aenal Imagery (C9)
❑ Algal Mat or Crust (B4) ❑ p�her (Eaplain in Remarks) ❑ SMteO or Stressed Planhs (DS)
❑ tron �eposi� (es) Q Geomorphic PoStlon (�2)
❑ Inundatlon VWble on Aerial Imagery (Bn ❑ Shalbw Aquimrd (D3)
� Wafer9airied Leaves (89) ❑ MkroNpogaphk Relkf (D4)
❑ AQuatl[ Faure (B13) ❑ FAC-reWal Tes[ (DS)
Fldd Obswetlons:
Surface Wa�r Present? Yrs � No � Depth Qnches):
WaterTahle Present? YES � NO � Dep[h (inches): 8
SaMatlon PresenV Wetland HydrolaYY Pmaent'r Yea � No �
��� � �� � Yet � No 0 Depth (irches): 0
Describe Recorded Data (sheam gauge, rtani[oring well, aerial photos, previous inspections), if available:
Remarks:
US Artny Corps of En9ineers Eastem Mountains and Piedmont - Version 2.0
VEGETATION (Five/Four Strata)- Use scientific names of plants.
Dominant Sampling Point: y�(�. DP 1
c., �o��
Tree Stratum (Plot size: 30 )
Absolute Rel.Strat. Indicator I Dominance Test worksheet:
°/a COVei' Cnvrr StatuS
�, Pinus taeda 30 ❑� 54.5°/a FAC
2, Liquidambar styraciflua 25 ❑� 45.5% FAC
3. 0 ❑ 0.0%
,4. 0 ❑ 0.0%
rj. 0 ❑ 0.0%
6. 0 ❑ 0.0%
7 0 ❑ 0.0%
8 0 ❑ 0.0%
Saalinq-Saplinc�Shrub Stratum (P�ot size: 15 )
55 = Total Cover
� , Liauidambar stvraciflua
2.
3.
4.
5.
6.
7.
8.
9.
10.
Shrub Stratum (Plot size: 15
1.
2.
3.
4.
5.
6.
%.
Herb Stratum �Plot size: 5 ,
1.
2.
3.
4.
5.
6.
7.
8.
9.
� �.
��.
12.
Woody Vine Stratum (Plot size: 30 )
1.
2.
3.
4.
5.
6.
Remarks: (Include photo num6ers here or on a separate sheet.)
10 � 100.0% FAC
0 ❑ 0.0°/a
o ❑ a.o�io
o ❑ o.o�io
o ❑ o.o�io
o ❑ a.o�ro
0 ❑ 0.0%
0 ❑ 0.0%
0 ❑ 0.0%
0 ❑ 0.0°/a
10 = TotalCover
0 ❑ 0.0%
o ❑ o.o�io
o ❑ o.o�io
o ❑ o.o�io
o ❑ o.o�io
o ❑ a.o�io
o ❑ o.o�io
0 = Total Cover
75 �❑ 100.0%
0 ❑ 0.0%
0 ❑ 0.0°/a
o ❑ o.o�ro
0 ❑ 0.0°/a
o ❑ o.o�io
0 ❑ 0.0°/a
0 ❑ 0.0%
0 ❑ 0.0%
0 ❑ 0.0%
0 ❑ 0.0%
0 ❑ 0.0%
75 = Total Cover
❑ 0.0%
0 ❑ 0.0%
o ❑ o.o�io
o ❑ o.o�io
o ❑ o.o�io
0 ❑ 0.0%
0 = Total Cover
Number of Dominant Species
That are OBL, FACW, or FAC: 3 (A)
Total Number of Dominant
Species Across All Strata: 4 (B)
Percent of dominant Species
That Are OBL, FACW, or FAC: 75•0% (A/B)
Prevalence Index worksheet:
Total % Cover of: Multinlv by:
OBL species Q x 1= Q
FAcw species 0 x 2= 0
FAC species 65 x 3= 195
FACU species � x 4= �
UPL species � x 5 = �
column Totals: 65 (n) 195 �B�
Prevalence Index = B/A = 3.000
Hydrophytic Vegetation Indicators:
❑ Rapid Test for Hydrophytic Vegetation
� Dominance Test is > 50%
❑d Prevalence Index is <_3.0 1
❑ Morphological Adaptations i (Provide supparting
data in Remarks or on a separate sheet)
❑ Problematic Hydrophytic Vegetation 1 (Explain)
1 Indicators of hydric soil and wetland hydrology must
be present, unless disturbed or oroblematic.
Definition of Vegetation Strata:
Four Vegetation Strata:
Tree stratum - Consists of woody plants, excluding vines, 3 in.
(7.6 cm) or more in diameter at breast height (DBH), regardless
of height.
Saplinglshrub stretum - Consists of woody plants, excluding
vines, less than 3 in. DBH and greater than 3.28 ft(1 m) tall.
Her6 stratum - Consists of all her6aceous (non-woody) plants,
regardless of size, and all other plants less than 3.28 ft tall.
Woody vines - Consists of all woody vines greater than 3.28 ft
in height.
Five Vegetation Strata:
Tree - Woody plants, excluding woody vines, approximately 20
ft(fi m) or more in height and 3 in. (7.6 cmJ or larger in
diameter at hreast height (DBH).
Sapling stratum - Consists of woody plants, excluding woody
vines, approximately 20 ft(6 m) or more in height and less than
3 in. (7.6 cm) DBH.
Shrub stratum - Consists of woody plants, excluding woody
vines, approximately 3 to 20 ft(1 to 6 m) in height
Her6 stratum - Consists of all her6aceous (non•woody) plants,
including her6aceous vines, regardless of size, and woody
species, except woody vines, less than approximately 3 ft (1 m)
in height.
Woody vines - Consists of all woody vines, regardless of
height.
Hydraphytic
Vegetation
Present? Yes O No �
*Indiotor suffnc = Nadonal status or professional decision assigned bepuse Regional status not defined by FWS.
US Army Corps of Engineers Eastern Mountains and Piedmont - Version 2.0
SOI� Sampling Point: WL DP 1
Profile Description: (Describe to the depth needed to document the indicator or canfirm the a6sence of indicators.)
Depth Ma�rix Red,pxFeaty�es
fi�ct�.e;� Co o(.�o�s_t� % Color (r�r oist] ° o Tvoe 1 Lycz , Textpre Re�n�Xks
0-3 lOYR 3/2 100 Clay Loam
3-18 lOYR 4/1 85 7.SYR 5/8 15 C M Clay Loam
1Type: C=Concentration. D=Depletion. RM=Reduced Matrix, CS=Covered or Coated Sand Grains zLocation: PL=Pore Lining. M=Matrix
Hydric Soil Indicators: Indicators for Problematic Hydric Soils3:
❑ Histosol (Ai) ❑ Dark Surface (S7) ❑ Z �m Muck (A10) (MLRA 147)
❑ Histic Epipedon (A2) ❑ Polyvalue Below Surface (S8) (MLRA 147,148)
❑ Black Histic (A3) ❑ Thin Dark Surface (59) (MLRA 147, 148) ❑ Coast Prairie Redox (A16)
(MLRA 147,148)
❑ Hydrogen Sulfide (A4) ❑ Loamy Gleyed Matrix (F2) ❑ piedmont Floodplain Soils (F19)
❑ Stradfied Layers (AS) d❑ Depleted Matrix (F3) (MLRA 136, 147)
❑ 2 cm Muck (A10) (LRR N) ❑ Redox Dark Surface (F6) ❑ Very Shallow Dark Surface (TF12)
❑ Depleted Below Dark Surface (Ali) ❑ Depleted Dark Surface (F7) ❑ Other (Explain in Remarks)
❑ Thick Dark SurFace (Al2) ❑ Redox Depressions (F8)
❑ Sandy Muck Mineral (Sl) (LRR N, ❑ Iron-Manganese Masses (F12) (LRR N,
MLRA 147, 148) MLRA 136)
❑ Sandy Gleyed Matrix (S4) ❑ Umbric Surface (F13) (MLRA 136, 122)
❑ Sandy Redox (SS) ❑ Piedmont Floodplain Soils (F19) (MLRA 148) 3 Indicators of hydrophytic vegetation and
wetland hydrology must be present,
❑ Stripped Matrix (S6) ❑ Red Parent Material (F21) (MLRA 127, 147) unless disturbed or problematic.
Restrictive Layer (if observed): •
Type:
Depth (inches): Hydric Soil Present? Yes � NO �
Remarks:
US Army Corps of Engineers Eastern Mountains and Piedmont - Version 2.0
Attachment �. Figures
Figure 1. Location Map
Figure 2. Project Overview Map
Figure 3. USGS Topographic Maps
Figure 4. USFWS NWI Maps
Figure 5. NRCS Soils Maps
Figure 6. Jurisdictional Impact Maps
Figure 7. FEMA Maps
e
omim,.o
�
P�
Lry�r �t�
�
un ,
b�1aYa
v, v �. .
� Proposed Project Location
�
4
j ~'�"�n �Mn....
r' .,. � vM'�� Q i
4 j
.�......... � �'\'�i y S
�I
m, : ✓ If -
,. � :........�,�i - .
- . �� �Y .....e.F . ..
4�
`r" � � .
� •��''u..r' .� ra. .
,'t �q e :
i ' . . �.s '� yn ..
�xwe..r " �L�.�.. . �� nmoa.
.u....n � � �.m• - ' •+ •"�
� � � .
�� ' N�nCM � ��.�.
p�, S ,^�fil1�01 � t�yl
�r y"'" E ... <sa
,�'1�o crl�` � j rw���,�
�l�� I,,• �� - �.�._ . ��nt� �' p!
!� $ ��t S,
�� ��M� � �� jlC . �_ .. y�_
C �� p+° , �
.. _ -^`" WinstonSalem� �� -
� ���
y�. ..a. �� � - _. -.. .. __.' . _
Service Layer Credits: Sources: Esri, HERE, DeLorme, USGS, Intermap. INCREMENT P. NRCaa Esri
Japan. METI, Esri China (Hong Kong). Esri Korea. Esri (Thailantl), Mapmylntlia, NGCC. OO OpenSireetMap
�:� Piedmont
ro'I Natural Gas
0 1.5 3 Miles
I I I
0 1,500 3,000 Meters
e'�
P�••
Figure 1
Project Location Map
Llne 326 DOT Reloaction Project
Pietlmont Nawral Gas
Forsyth County
April 2018
e
b
� � � � - ` _ }f , h.lr � �D . ?'� � `,;. r - .
. .���y � �
{11�°'�. � " �a.r y.- � F n
� '� ^* E��Au .,., y,"r"iA�..�'� `���� :.#:
. . ..,. C. i l� f h Y, t� . * .
�y.- ± , s , . . .£ � ( 'N :. ` �.X�. i _. � .
� } N 1} �yy\� �1-� � ��
F
„� � �a"v�� �T �� ��° �' `- �` we:���.�
n.
• ,.. ��,�, pi�� �-�1#
:#�, d..' .Y -F w, �n J�� � . rb g+�n c�'it.-':
' 4 ct � i., r � `'y�'u�`�.�N'� �.; `�t.'r, �'�w.�; :'
.� 'F �p,� .;� rX -�R}Y i � t4�����.�Y !�
� , .t ..• C �a.,.t. � � . . �
� � � _e� .� ,
_ - �. ,� ,
,,_
�. _ .
4� . � � � y ' `� - �
! Y _ � � I .. �� � .
� a . �-
/. - �", , ... � ` `J
/ - .� .;_+ i � d�, � �- �� T'Q
� i i,
�,�. "' . 4 � - - r �
�'�� � � � _ . � ,
� �
� � ��;., � , � .
� ��.� � ', _ . . '=a
� � �' _ � � g� yy _ ., .. / - , ' � .l
,} �J y��\ � T N� S�• �V �� � � .
i � t� 47.� .._ G''-'� A � a f t , � �,
_ �� r= � � �.
Legend .� :� > > �
,,� p �
_� Proposed Pipeline Roui� "� � ':� � y� '� �
"� f �,� -� ti, .
Map Inlays '� ��,�, .. �,� CL}F r��n . ._
Service Layer Credits�. �i; 2018 Micros�h. � � ' � . . �� - � .. .. , � � .
�s ;.zni� HERE
�� ��� .i��cfmoni: �
� NalUrll � �s.
�
r
0
750 1,500 Feet
�
175 350 Meters
,r ", � '"�
�,-,� '
��~ �_ 1
- � �_, r:_ 2
Project Overview Map
1_irie 326 UOT Relucation Pro�oci
Pietlmon! N�lural Gas
Porsyih County
April 2018
Legend
�� Proposed Pipeline Route
Q Disturbance Area
� Stream
�-�� _-��' �Netland
��
�
, � v
� +
�
�. z
� ^
�
1
/ti� � y �
� ��
f � �
'� .��.�� T��_��
j __ t' �
4�
�
Service Layer Cretlits: CopyrighCOO 2D13 National Geogranhic Sxiety. i-aibetl
�� Piedmont � o
(O'� Natural Gas �
_ o
200
�
50
P�r��n�a� Str
eam 3
.�
`~ �
__��' .��
i
� i. - �
Figure 3-1
USGS Topographic Map
400 Feet Line 326 DOT Rebcalian Projecf
� Piedmont NaWral Gas
Forsyth Counry
100 MBtefS Apri12018
Legend
=rs proposed Pipeline Route
Q Disturbance Area
�
� �
� Stream �
`"�? Wetland
� � '
� �
r ��
, �
- � ��-`' ":
�v.
. . : �/
v• � �-�- , ,
� _. _ f�` I
: �r �.i '
�
N
r , �,, � ,_ �
, �,
�
.
. � � ��
„�_
,� �
�� P
r
.�� �
d-� / �` � � '�`.�
� .�. �
� _ .�
Service Layer Cretlits: Copyright:�0 2013 National Geographic Sociely, i-cubetl
�� /O�t Piedmont o zoo
� Natural Gas i� �
_ . _ ,. . .... 0 50
400 Feet
100 Meters
Figure 3-2
USGS Topographic Map
Line 326 DOT Relocation Project
Piedmont Natural Gas
Forsyth County
Apri12D18
Legend
a Proposed Pipeline Route
Q Disturbance Area
_ Stream
�I �Netland
L
a
Service Layer Cretlits�. �opyright �_` 2013 National Geographic SocieN. i�cubed
�i /O� Piedmont �
� I Natural Gas
:
�
�
�
9
�
�
�` �
'� � 'S
� �� �`
� �
� �
'� r
,
'r► �r ; A
x �� �� `
'� � � �
i �S
o zoo
I-T
0 50
�
�
�
400 Feet
100 Meters
Figure 3-3
USGS Topographic Map
Line 326 DOT Relocation Projecl
Pietlmont Natural Gas
Forsyth County
Apnl 2018
_
� � � USFWS NWI Map
� �Ic'Ci'�l;).,�,
���� NcTUI"�� '
o zoo
f� �
0 50
400 Feet
100 Meters
Line 32� �OT �el�catioi7 �rqed
Pietlmon� Nalural Gas
Forsylh Caunry
April 201 B
_ „a;,., ..: � — -
3u _ '� � .� � ' ,
� � F:S.� .� !.. '
� ��
��_
h � � � �,i� -[.
��� J M�i� �.
G' � . ~� ' �
° �' �
�' ' "_ +�
�, - �- .
�': �� �,:
, 'u��� . i
♦�
C M� . ' '
y �ir..+M 1 -� � r� r � . '�,
� S �
: � '�: ,� 4' %'
y
.�61 � f� ,. . i '1��, T f . .
�•
,F €t:< :
u��
fF•
ey b
�
F� ��.,.�.,-- r- —�
:#" , a . ., '.
B� . :r.-,. . . _ '
0
�YC��.'�•Q ' ._ �',' .t �, � �.,..�. t
as
" T "rtl,k'. . . .
�'��:Ir,� . _ . . :•ij
� �.w�� . .r � _
_ ' r�:i
r�
r
� i'"
'ti:i
: ��:
� � • � �� �� � � � � � � �� 1�
r � -.v+ . - � �. ,
� ,
�r � ' ,
y • e
� I .i' �.
� � -: l�� . � " � .
' G
f �r+ :�. " �t `.
0. : �> � � i •� V+
'], v : ;+ ,, S �.Y-i. s :, !
Legend �
� Proposed Pipeline Route
�
Q Disturbance Area
� Stream e
� Wetland �'
�� ..�. nl•f!I .
w
S .. \•6� ..:.8 5
. �Jl� n+�� :�i W� � ' .
�k„�� "� _� �, ; /';
.�r, �,,,:�'. .
�
_...., ...�.� -
�,f
... r•.,y: - -
- a'
r
. -, •
� �r,_ , _
r :� .�� -. ,�,_ �
��rt' - - '!hM `.YV:Ir�.• Jf. ���SR �
� : � I � _ . . . . .... .
�� /O�� Piedmont
� Na�ural Gas
�
� - � a`, '
o � �? . - �� '�
;. c%' �
'.� -t :iy 4 �•. f`� ..
r i �
. �,� `�� .f a'.
� � '
i.' ���.� i_�� . .
_ . � r�',- �. {.�.� �
yz=�
� ,. �
.,= a
� �
f `
::
G�9p� �- � / ! h.
T ,� J
�. ; ,� _ ���� � - �
»`�-� `(., � � .. ,.
a"i�' gp�k���.',,��,,��� � � � It'f�� - .- ' �
1.f•Se:,38:��tf.n � � .1'1� t.i.
��
• �.a'
� '�
�'-- ?4.
� y. *.
� �..
��� `
���� S:,�r�> . �
!
0
r
D
200
�
50
400 Feet
�
100 Meters
a
FIUIJ� d-J
USFWS NWI Map
Gne 32G �GT Relocatlon Pmject
Pietlmont Natural Gas
Forsy�h County
APril 2018
� 'r'"i • r.. ' 3oils Series:
Legend ' � �' �` ,,�A- Codorus loam; 0-10% slopes; Hydric
�� Proposed Pipeline Rour , ' _ r �= i�°cF2 - Pacolet clay loam; 15-45% slopes
��� ,; �), - , r�J ���oF - Poplar Forest fine sandy loam; 15-45% slopes
� Disturbance Area �°�; � �- ,
},, r, - ,.� TmH - Tomlin loam; 2-6% slopes
NRCS Soils ,� <. °. '
',',r� � TmC - Tomlin loam; 6-10% slopes
� Stream ,� TmD - Tomlin loam; 10-15% slopes
^�'F �� �'� i ToB2 - Tomlin clay loam; 2-6% slopes
- � ToC2 - Tomlin ciay loam: 6-10'4: slopes
ToD`L -Tomlln clav Icam� ?�-15`�;- slo;�es
•
� . ar� - �� ., . . . . _ . . . . . � .
. . _ . ��, A . � .'.Rli� . . �. . ..�
r �� r�rk -��' ,.a��=
.`` ;�,�Tm�
:� �
: �.--,:� , -�,r ��, : � �-�� �,
,. � r ,����� y�l��"y�'��� � i.i -i�i� ��ii�'��� �� '�Yi'Y���� r*i-i �� ���i� ��� � � �
.�rlt '., .)� .-� �. . _+ -a.'.f , �� _ +_ .�"_ n . �.
- � . � —c�: .2i - :..r l+�
ToC2 , -;�.; - �.
�
,. . �� � i; �� �h '!t -
/ � ' • _ ; — .,- , .�, � . � .,
�-�i'� :�w -• � � � rs�
� CoA. �'�'" -4�+� ,��' �'��;-
� s; �
. . 7< . - � � : �� .; �PcF2 ��
, � .: , -,. .i-. : .
� . � � y i. - r . � a.^. ,
� " �i,if �� �,`� �' • - ,. ' . . � , ., ro . 1
. _. �>�t .� _
� L'- 3 'k�
���� � * . � ` �/ti� ,.., �_2 �„".. . , .�� d , t� 3ti'i�.
� �e,, y3�� �. r a.. � . �� �.
�.y}f+„_= f>: 'c' 1' • 1.� _ :.it' .. . .- ' �• 'S � �y: � . �� .
� !„• ' '. � � ', ^�` ' -
, �(. � �Jt s • � � . S . �e
' FaF
�
- _ _ __,.
. • .; �..::.
_ .
�
' �4 TmC:
;._
�
, r:
,N .. � Y
. ��
_. ��-, - ��"
l � �:..
�
.. , '�`y� _ ,_ , �_r. �£-. '
�,�, ' Y Q� � "� v"_ v , ^
d r-3.�' r':
d�i ' � �' ����
PcF2 �,-. - ��
.r .�tf . !� � .�.
� n Y � �. ... �.F . aV Y"u. ' �1.
w 'a� . _ - , 38.�'
.� r. 3 _. i' �..._ � ,3 � -� .
J . ' a1F . �� r'� � �r � .� � � _'f � .I Ag��.�i e �. _.
? '.f' ..ss � �� irF:-.• i -��i's?I � �'� � �e �" y
-_ �/ r� . �.� ! , ��.
� �n, � � ,r' ��r��l
. l ���' '' . • F. J. � - q � . L — � �
+�� � ':� �y/s '.� �i - �� . �
� • a.. � _ ' � . :. . _ � xdE� . .? .wif � I.'tF
TmD � _�Fr_ �R. r • S � ,�L-� r - } ' -
. ,� .'. �' . �,• _,
'7� . .,.' ' , �! ] a. -
� � ' � . - ♦a � r+ e ' .
� .�f � . � :.� J � W ' . ... M
� � w,�� � � 'Y � ToD2 .:;` �` �' � �-' �- '`
•�� � . .:a�" .a.l�. -���
* � �r � .. . � .. . ,l. ;� � 1
• � - F �3 ; s . � � = ToD2 .-.
r ., � •�w.- �•r e..�'
T �. f j
l
�.!-.J��-.�'. �-.. . s. _. -�� _ .. _..�Ir�•_ - . .� --. _
� ,-
3: , -� � \
� �
i�F
ToB2
a'
.�1- ' �
1 •,+i.
t a"el.a� i . ' . ,,..�.... , ,i'-i :;.i- .. ,. �
_S _, 2U 1f r�� '.... . .. _�'�� Fly LI f@ O-J
NRCS Soils Map
�i �O�I Piedment
Natural G���,
� o zoo
�-�
0 50
400 Feet
100 Meters
Line 326 DOT Relocation Project
Piedmont Natural Gas
Forsyth Counry
April 2018
� �
_ '�: ���_
�
-.� � �.
` .�.
,. � , ,�+ � „
N ' n�¢—� �::� Y
. > _.. _. _ � ..� �.�
l S't `\ .pw a.
�� � . . .�'.� �.�.' 'n, ..i1-T� ..'x _'�' .�!"_��. t.�a�... a` .._
.,i�. _i��yy t� stv, R ��T�. �'� _�... . ' _
s,.. s � i
'.••��k�.t 4i1��' �
S"-;' t ' r.�=.C�+�.,'
1 y�� y
'�; ti ' � � i� �{`I�-�r�� i��� i� �. iY Y��"`�f �� � � � � � � - Yi
i. �. ��. � ��..-Y � _
Al'�i'.C4-'i ' �_ �'- 't`�+�; ..' 'ly-. r -
Wn{ yi"��� ! � '�
C . �1+9 .� ���t.r 4�[ • �� .
���1E � � � % -[� �� .. 1 [�1 . J�I . � � � � �
sF.� w�[n,� � . Ki.r� �t '.. 3Jy� � '• Y � . _ ,YKf.
. "f�
�:. .��.y l+a.Y. � -'� �M�* ���' .i. R l � �;� � . . .
_ .. � �w y� . , ' .
r _ �,y� . �� .•3. � �j,yr, s�r -.� . ': y . 'TKa
�� ` i.�4 n� � s � � ' yd. �' i .
�P: • aB' , i � � r-� 3a �'.+ •� (.�:',
. . � �� s . ? � � � �
'� �;�: �j' .. � �i)��1 !.a -�4
• i i M,�Y
.��.� r, .- �. � .a'��l.���"��.:�^�'"'i
�
6
��-'�i i� :-..�
��ysen�" il
- "6�, .,�:-
�;.Kr;.
�.. �'
.�.�... <.y
'_.A
�€
4.
� "�'y� �
�
..r.�;,:� .,�
�
� ��
,' • .� �;
t �-J 1 -)i
� �`.'.
�� ,�.'M� .
•
r�� �
a' �' _
.y„ _�f��y�
� ' t �7 ���
'� :A!'�
; �" -.�7
, �. ` � - .e . � � a�.; '��
�c ' .
i' -
r w� : �„��'"_ �'
,; .Y�_ .
r � '
,�
._ .:�` _... .
t �
...�,�r„jr,,,r`��+' � � {
� � 3
� �� S y
i
�� i d}
�a
,,� . '
r�InA� �a�'':�,d
....- �..��
0
.�� � � � � � �` �.
- .���.�
.� ..` � -�S� '
t �_ f v .=
.: r��-�i'- "� !+T?,,�- �
! �? �;. s � 1�''
x. � � .
+'�1 �� � S� ��f��} Yi �4 <-
' SIK' � � -�'�' �,3 � �
,. �j'
�.`s�' �"°s3..' . ,.
u�.. i
�� �:'y` �M w�� � Y 1� ► �
.�.4 tr S :
� � n
i ,'��n ➢ ,/
.
� �X�� : r
��^r�r. .♦:�r .#`��
L
_ . �.
y,k � � • r ^� 'a ;
. � � ' �
-• `•� •��.� � r ��� � >�
�:: �' ...-._:. • •a�r•'�'..
� ... � �ohn M-Go�
� `� ^, -���-_
�:�,�-'-"- �-�- ,�_
� �
���� c �
nl�.
. `C '
ss, � r
.. -
�' i—,R� f ,' `~i �
.._ _. �
� r• 1i
� :�yyr ,.. �.,:
' :Ii � � S 4 ..� � Y
� {i' 4
� . . ' p u��L - �ri �4 .
� � N � .. `,
t�n�
t�r���i} :'Y 's" uarr<-T ♦.
� ' - �_' � �'� � . � ��.� ' _
. , _ -_.. ' :' -,�� . .' � �'j::
♦ ,
_.. �� � �,_ �
.. •r.+��� ,��. �.�.
' � � w + . � .. ♦:-• � i
�`��'��'� _ . �_�.'
n "
. . . c - - . -' .� . . , ' 'lG
- r� � _ � _. . _ �-c ,2`J'�
. " �J _ . _ . ,_,i -a a . ,p��
� ... ♦ Y�'�' �: � . � _.I'.'N'� � .- . �
- .�- ::i
. �` ���1�t4� � -T
��,. r . r � ..'.� Y = �"`� :.-�
�r
' _'_ _ �3"� : - - '`s2"�
�:a
� �r -r �
. �. =;,a
�'
. �5 7
C
�' •.
L "
��' d � `�. � TR�..!
'1� 1� ti
w^ — t
� Yr`!T 7� �.. ' �V •: �.,�Y1��'�jt�1'�
.�.!, i` �� ,a ;��
ti til �F �'�b��r �-
K-t ^,
" �
� ..._. �' � �.Y.iIYVr��'�
�,�'� • , ,K ��
, �=
�.-- �. �: _ .y `-- _-'
'['q�(M,' � ni :. .
) �A
_r - �
`:
� ' �z�'' '�y
�.�._ � �—� w
� "� y'� «�I �'_w+i - yM� 4�� ��, � ' .�
a ,� � . l% _ u �� ,} �
r,� �" „ • � " -ti
. . � ��, • r I . _ ��r s �
,.�L - 6. � � ..'s`++ . �, '?
��` _ - _ ' . ;. ,'. T. ,
� �� � . + � I
�� _ � --• ' r -, rp - "t ," �!'' ;I
�"'¢-ap�'` .��^' , , 'S1 ,a�-si•�F. wY/�f`-- . s� ' .1 iz ' . �- �
� , � ; � ' r� � � � �� F ��n�
.. , i . ?L L - .. ��
- _..4 ' ♦ - . . . . � 6 _
� • ! • ' _ r r i + _ . . � � ;f.
�. � _
�c� ..r i-Y•r � ..r�y, '. 9 r`�" i �_1-ettL �..
,;:.�- ,. : ,�-�. � _ �, ��-. � `r -ae` � '. � . '3�. �,.r��` - .�fJ
�Y"^'
-- — +�r,P , - - r .,-_ ::
.-, �=�:..e:..,�ttent-,StreamC4�* � �,•
�� �
'� '�=�:-T -
.. . ,,,,.•_ , . . ' .r
y; -.+ ��J .. ,
rr-IY�.ti'�lll M.��r���"�i,�r.� ���Y� �w� � Y�� ..,�� W��� ���� ��'��.
r
. ' r � ' . � 1. � ' _ '+a
_ _ . .. :�� y'-. ..
_ }..
, . . . 9 , 5 y . . . '
� 4_ �# y _ . .s �: `� �� i Y� �.�
s r . .,m'�jj� r i E < r
� � . � Q ..�.� . . � � . . 7�Y`3ae r � � . � .,- * 7 c� -:
,�.f- ., s"t .� �a e
S J ��. ��. . 'i� A ! �7
.> �.� .9 f �i
. p ' � r H ��
.. + ` — . µ .., ���s . . ,�y�. �� M_.,
rr �.�7 T. si
�. la� .�.�,�„ � �. . -•. '� . . . . . �.�'�' i .
�' iu. , � ,�s,�
�1;��-:•L.. - �. ik-,. 4:. ._ . � .� � . . � c e:_ �.':��'_' __-
•..
`
3� �
�k . ��
�r ,y�. . . �,� . " �. '�`
��'� � � . r"�
4 1-. � � . � :ti
rr E''
w
`'Y• f
srA' �y'_ ..... :�
,U
�''�'��' ` ° � �
� , ,. �
��
Sr i t�, D
� _ � .fi':
�� ' � -
.,_., .,
r
! -.
4�'.
,� -;': :: ' r ._
�r.i _ _ .
C
� J �
�'I
_ 1 .
� ��� i ^��+r,,'�f, ,,_ � ��, ,,.;`.,P-
1 �s` � � � ,,�'•1 �.�� r s���'�" ' ,
�
� '.`a � ,w ��. ,s,�.� � � �
� ,
T': �r _.. _ __ .____._. .__(
- . � fr . ..:o � y� - �.. � 4 � �__I'f - . � . � k[b�r
v. -�� ;' . ' _ ' _
'Aa � Jir.. �\ . . '��,
.� .. ,. N . ��' ���' ^- ' 7`.s �, � � �zwifr--' � . . .. .� rt i
�: �_ . ��� �ri ' . . ,
'3., . . . ' . . _ . . -
T�� ~i��r.� -� . . . .
- � � � �� � � ���- .._. - .
_ '"f • _ _;�� ��.�. . .: .
_ � � ' - :
. _ ' �`� . . ..
- -++�' r . . _ -:.. � -'� � r � � � �.
' . ' if: _r.- ��"� �r�
" .-�. ai�.� :� . "s: . � , .
�
^ � J. �. S.� . � - .. ...I. . •. � � . _
.,. �1'"_ J . f� y ' . -_ � . •�. _- j . . � .
� .. .�'1y . ' . _ . .
_._ � �� . . . . . _ . _ . '
�
�...- � "�-.. :. . ' � , � t_ ��
_ � . � . . - - ��� N . t'.' �
: r� jN �
. ... -. - -. sohn M - -- - il � Y � .
� �� � ��
� . .. � ��� �-���
_ �-� _ ��-- �/° _ . �x ��-} .,.
�Y,� . 1�� U- �O `. iN` �� l�' q 7'.
. r a � `�.� "�
' l=` �� !�: yy li
� . . . _ C . , � �y,�. ��''� ., r'. _ +I� F y�' � tl .tfa* c Y'�I�,~ T -� J ��
'�' t y� � . �:!�'�; �1. �,�.{ti -,Sy-
_. " .� - . . � . . ' .i, F^a.. �R.'„�, �
. ' , _ f _ " F 'f - .'i: .
�M .• y,,�' ; �
r �
,,� � a
, � w �i
M'
��_k.,.. � qti. ��: t-.
•, -...
y:- R� ,y.'i�=
f''� - '
i .. _
� '
� r J � `
�' i
.���``' N �� n 4 �
F
� �e ��'j � ~ _ ' �s,�ht.��r/ T .. '_, .� �`•..�1�'. .�i �
" _ —_ �� � . -' _ . l 'r T
, • ��.,��-� � � f , a l r
r c ^+c-
sc,�. _ .. - - . -'��� •� �
. _ �*� � ,,♦ �� 4 %� �
. ..� ,/ . �'I i
♦
. . � , .. ' . ,I�,, - . ..�.r �� � � �
. aI ♦.
�
. • � � I .y_: -c' IL � �� S 7�
/ � � . 1 •a�. ..�. : -�•�l� -
} r-y � i - .. i . . ♦ ;1:
'...�..� .,,�._ x ��
' . - "' ' * -..r . ♦
' - ' �., _ : -� Jk- :.:
. - .. � — _ . ^ -J _
. ` �� }_�� ��' y�
� . � �. Y :
�- � � _ � - , f... + ' , �-i ti}�r�..
.:� p.. a' ��' - 'li � ,� —�
_ �:
��.� � , ■ �
`, � �1 .�1
Attachment C. Project Photographic Log
Line 326 DOT Relocation - Photographic Log
Photograph 1. Perennial stream 1.
Photograph 2. Wetland 2.
I.ine 3?(i DO"f Relocatian- Photoaraphic Log
., ��
� �'
..
��� �il�e7-1��� � "ii� �� :I
� � �F � S ��-I
{ . .. ��
� r � � � l� � �'. i.
, � i ! � . .�i�
��c, 1 �.• ^ � 7� : 1 �
i.. ,: �� J��,� •P .,��
i
`4'tl�� .�' Ay ��: :J� � ..
T-
::�'^ _ _ _!a
� i ,
-h* :;�•;S �}. � ♦ 'Ly � '�
R ; �'.'.
',��•� 4
� �y� vV
� .Yz�J �i�`.5.����)�y� .
. � S 1�:! ��'e� ..',
� d � ..
� p'` �r.._ " , -,���1��
V� �
� C �.� �lf�"i, �., ..
_. o` � �'- � . ` ."'�'S�`�`-ry,1'
> � 4 f..M (� (h..
<
's'.;�^ x -' P ��se. : i, _. � � .
'1LS'$.-S �� � .. � a
R�. "�+� ���t�� . i�.. ._ �q�.
�., � • � ., � � � �-y.
• ' _ 1r" , _ ' � ;!+,1�
. . - .. , n s, � ., .
Photoaraph 3. Perennial streai7i 3.
; i �'� .€ �.F� v � ,Ei�
'�:: �� �� y_
- �� - 1� �'`� � �
� - � �. . r . � �
' � �.
x�, , i � '
, ;� � � � ��
� �',, ; � , ,.
� s�,�,t�, _
� , ,, �"' � �: .�l{'� ,.
` �` �` :a
t , � `',�����
�. .
t�- �.,
�/f"` � '"k' .,s.�_.: ,
��/� . .'. , ,<�'�
y 3`
� �
� ; -s�� a . ..y� � 'q: � � �3' �.'.
�" � ny.f�r� . 4 � -� { _ .
� 'I� ' * .� �: i�YTM'- �.
:eR��
�a ,�
1 , �. .
u �.,
�" ` � �' l�� -. : ! „
� ��f I��. .y� . . . .{'1
��'.,�, 1,� r �.: {W,a�YI ;, a �� � 1 ��M
7:�.�''. q, �. . .�i'i,y .�:
f,�`. � �tyf�b/"'�"�'�/j�� '�
� ,�t. i _ �''t r� . Uh
'.�i.I . .. �
Photograph 4. Intermittent stream 4.
l.ine 326 DOT Rclocation - Photographic Log
Photograph 5. �epresEntative view o( forested corridor in the project area.
Photograph 6. Cleared right-of-way adjacent to the proposed pipeline route.
Line 326 DOT Reloca[ion P
Photograph 7. Cleariny and subdivision dcvelopment west ot proposed pipeline route.
Attachrrrent D. IPaC Trust Resources Report
3/14/2018
IPaC
IPaC resource list
IPaG E:plore Location
U.S. Fish & Wildlife Service
�I�hls rep�rt Is an autoinntically genera[ed Iis[ of speoes and other resuurees such as ��i[ical ha61[a[ �collerrively referred m as [rus[re�ources)
under [he U.S. Fish and WildliFe Seivice's (LJSfVJS) jurisdiction that are known or expec[ed m he on or near [he projec[ area referenced below.
The list may also indude trust resources that occur ou[side of the projett area, but that could potentially be direaly or indirectly affected by
activities in the project area. However, determining the likelihood and extent of effects a project may have on [rust resources rypically requires
ga[hering additional site-specifc (e.g., vege[a[ioNspecies surveys) and projecPspecific (e.g., magnitude and timing of proposed ac[ivities)
informa[ion.
Below is a summary of the project information you provided and contact InFormation for the USFWS office(s) with jurisdiction in [he defined
projec[ area. Please read the in[roduRion [o each sectfon Ihat follows (Endangered Species, Migra[ory 9irds, USFWS PaciliCies, and NWI
Wetlands) for addi[ional information applica6le [o [he trust resources addressed in that sec[ion.
Location
Forsyth County, North Carolina
�.�•
: �r.
.�,�_^...�.�r.� y.� ..,
Local office
Asheville Emlogical5ervices Field Office
l. (828) 258-3939
� (826) 258-5330
160 Zillima Street
Asheville, NC 28807-1082
ht[o�//www.fws gov/nc-es/esltountyfr html
�..
�
.�
\ ��
- ~` `
6 �� �
�� Y
� (\ �J�
V
�
https:/lecos.fws.govfipadlocation/H60ASCSDPZCJ7HFDNUNJESVUXM/resources 1/7
3/74/2018
Endangered species
IPaC: Explore Location
7his resource list is for informaUonal purposes only and does no[ cons[i[u[e an analysis of projec[ level impacls.
The primary infonnation used [o generate this list is [he known or expecred range of ea�h species. Additional areas of influence (AOq for
species are also considered. nn AOI indudes areas ou[side �F the species range if the species could 6e indirecdy affected by attivities in that
area (e.g., placing a dam ups[ream of a fish population, even if that fsh does not occur at Ihe dam site, may indirectly impact the species by
reducing or eliminating water (low downstream). Because species can move, and site mnditions can change, the species on this lis[ are not
guaran[eed to be found on or near the project area. Tu fully determine any po[ential effects [o species, addi[ional site-specifc and project-
specifc informa[ion is often required.
Section 7 of Ihe Endangered Spedes Ac[ requires Federal agencies m"reyuest of [he Secretary informa[ion whe[her any species which is listed
or proposed m 6e listed may be present in [he area of such proposed action" for any project that is conduaed, permitted, funded, or licensed
by any Federal agenry. A letter from [he local offce and a species list which fuifilis this requirement can only be obtained by requesting an
official species list from ei[her [he Regulatory Review sec[ion in IPaC (see dfrecCions helow) or from Ihe local field office direc[ly.
For project evaluations that require USFWS mncurrence/review, please retum to the IPaC website and request an official species list by doing
the following:
1. Draw [he projeR location and dick CONTINUE.
2. Click DEFINE PROJER.
3. Log in (if direaed ro do so).
4. Provide a name and description for your project.
5. Click REQUEST SPECIES LIST.
LisCed species' are managed by the Emiqgcal Serv�ces Proaram of the LLS. Fish and Wildlife Service.
1. Species Gsted under the FpdapE¢:^�5^ecies Art are Ihreatened or endangered: IPaC also shows species [hat are candidates, or proposed.
for listing. See [he lis[ing s[a[us uaee for more information. -
The following species are potentially affected by activities in this location:
t
Mammals
NAME
Northem Long-eared Bat Myotis septenmonaLs
No cricical habi[at has been designated ta Ihis species.
hfi �s%[acns �w= �r,>/e<:/snenes'9n4S
Flowering Plants
NAME
Small-an(heredBfttercress Cardaminemicranthera
No aitiCal habitat has been designated for this spedes.
I�.:msli.,cu:_la: �n:,��,c'>/;pec,e;r3_�i'
Critical habitats
STATUS
Threatened
SfATUS
Endangered
Poten[ial effects to nitical habitat(s) in this location must 6e analyzed along wf[h Che endangered species Ihemselves.
1 HERE AFE N� Cfllllt`AL FABI'7AT<AT 71�IIS I OCAi IOGi
Migratory birds
Certain birds are pro[ec[ed under [he Migramry Bird Trea[y Ac[� and [he Bald and Golden Eagle Pro[ec[ion Ac[Z.
Any person or organization who plans ar condu¢s activities [hat may result in impacts m migratory hirds, eagles. and cheir ha6itats should
follow appropriate regulations and consider implementing appropriate conservafion measures, as described he)gyy.
1. The Mieratory Birds Treatv Ac[ of 1918.
2. The Bald and Golden Eagle Pro[ec[ion Ac[ of 1940.
Additional information can 6e found using the following links:
hftps:liecos.fws.govfipaGloca�ionlH60ASCSDPZCJ7HFDNUNJE5W XMlresources
zn
3nanaia
IPaG Explore Locatlon
. k3irds of Conservation Concem ht[o�//www fws gov/birds/managemenUmanagefl,4�ecies/
birds-of-mnserva[iommnce m. o ho
• Measures for avoiding and minimizing Impacts [0 6irds htto�//ewwa fws gov/birds/managemenUprpjec[-assessmen[-tools-and-guidance/
conserva[ion-measures uho
• Na[ionwide conservation measures for 6irds
httnv/www �ws gov/mjgram bird�/odf/managemenVna[ionwidestandardmnserva[ionmeasureaodf
The birds lis[ed below are hirds of par[icular concern either because [hey occur on Ihe USFWS Birds of Conserva[ion Concem BCQ list or
warrant special at[en[ion in your project loca[ion. To leam more abou[ [he levels of concem for birds on your lis[ and how [his list is
generated, see the FAQ t�l�w. This is not a list of every bird ynu may fmd in this location, nor a guarantee [hat every bird on [his Ilst will be
found in your project area. To see maps of where birders and che general puhlic have sighted birds in and around your proJect area, visit E-
bird rools such as the E-6ird da[a ma�ginp tool (search for the name of a 6ird on your list to see specific locations where that 6ird has been
reported to ocwr within your project area over a cer[ain timeframe) and the E-bird Eznlore Data Tool (perform a qUery m see a list of all birds
sigh[ed in your counry or region and wi[hin a cer[ain timeframe). For projec[s [hat occur off the Atlanti< Coas[. addi[ional maps and models
de[ailing [he relative occurrence and abundance o( bird species on your list are availa6le. Links to addi[ional information a6out Atlantic Coas[
birds, and other impor[an[ informa[ion abouf your migra[ory bird lis[ can 6e found below.
For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impaas to migratory birds on your
Iist, dick on [he PROBABILfTY OF PRESENCE SUMMARV at the top of your lis[ to see when these birds are most likely to be present and
breeding in your project area.
NAME
BREEDING SEASOIv (IF A BaEEDMG SEASQN IS
INDICATE� FOR A BIRD ON 1'GUR LIST. TH�BIR�J
b1AY BREED IN VOUR PRGJECi AkE/+SOMETIN�E
WITHIN THE TIMEFRHME SVECIFlED, WHICH IS A
VERV LI6ERAL ESiIMATE OF THE �ATES INSIDE
W HIfH TH[ BIRD BREEDS ACROSS IT<_ F.NTIRE
RAN6E "$REEDSElSEWHERP'INDICATESTHAT
THE BIP.D DUES NOT LIKELV BREeD Ik VOUR
PROJER FREA ) � �
Bald Eagle Haliaeetus leumcephalus Breeds Sep 1 coJul37
This is not a Bi�d o! Conzervation Cancem (BCQ in (his area, but warrants actention because of Ihe
Eagle Act orlor potential susceptibilltiez in oHshore areas from certain rypes oidevelopment or
attivities.
h�msUems_- s.e�ecclsp__�.iesn62fi
Blue-winged Warbler Vermiwra pinus 8reeds May i toJun 30
This is a Bird o( Canservation Conrem (BCq atly in panicular Btld Conservation Regions (BCRs) In [he
con[inen[al USA
Cerulean Warhler Dendroi[a cerulea
This is a Bird of ConservatiodConcem (BCq [hroughou[ i[s range in the mntinental USA and Naska.
p: �.os:pr.,_,s.`w-z..eoJV.P�/gpenn_�,1]4
Eas[ern Whip-poor-will Anvos[omus voaferus
This is a Bird o(Lonservacion Concem (BCQ throughou[ Its range In the continental USA and Alaska.
Breeds Apr 28 toJul 20
8reeds May 1 m Aug 20
Golden Eagle Aqwla chrysaeros Breeds elsewhere
This is no[ a Bird of Conservafion Concem (BCq in [his area, but warrants attencion because of [he
Eag�e Att or for po[entlal susceptlbllities in offshvre areas trom certain rypes ot development or
actWlues.
h�tos�//ems fws eov/em/zoe� es/1689
Kentucky Warbler Oporornis formosus
This iz a Bird of Conservation Concem (BGq Nroughout icz range in the mn[inen[al USA and Alaska.
Prairie Warbler Dendroica discolor
This is a Bird o! ConServa[ion COncem (8Cq [hroughou[ I[s range in [he continental USA and Alaska.
Prothonotary War6ler Pro[ono[aria civea
This is a Bbd of Conservatlan Cancem (BCq [hroughout i[s range in tM1e mn[inenCal USA and Alaska.
Red-headed Woodpecker Melaneroes ery[hrocephalus
This is a eird of Conservation Concem (BCq throughou[ i[s range in the rontinental USA and Alaska.
8reeds Apr 20 ro Aug 20
Breeds May 1 [oJul31
BreedsApr 1 [oJul31
Breeds May 10 to Sep 10
https://ecos.fws.govlpacJlocation/FI60ASGS�PZCJ7HF�NUNJE5VUXM/resources 3/7
3/ib/2018
IPaC Explore Location
Rusry Blackhlyd [up��a�us carolinus
This is a 8ird oF Conserva[ion Concem (BCq chroughouL rts range in [he mn[inental USA and Alaska.
WoodThrush f��lylaJchle�m�s��ina
This rs a B�rd of Conservauon Con�em (BCQ [hroughou[ its range m the mntirien[al USA and nlaska.
Probability of Presence Summary
Breeds elsewhere
Breeds May 10 to Aug 31
The graphs below provide our best understanding of when birds of concern are most likely m he presen[ in your project area. This informa[ion
can 6e used [o [ailor and schedWe your project ac[ivities to avoid or minimize impac[s [o blyds.
Probahility of Presence ( �)
Each green har represents the bird's relative prohabiliry of presence in your project's coun[ies during a par[icular week oF the year. (A year is
represented as 12 4-week monchs.) A taller bar indicates a higher probabiliry of species presence. The survey effort (see helow) can 6e used to
es[ablish a level of confidence in the presence score. One can have higher conFdence in the presence score iF [he mrresponding survey effort
is also high.
How is the probability of presence score calculared? The calculation is done in three steps:
i. The probability of presence for each week is calculated as the number of survey events in the week where the species was de[ected diWded
by the mtal number of survey events Por that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee was
found in 5 of them, [he probability of presence of Che Spotted Towhee in week 12 is 015.
2. To properly present the pattem of presence across [he year, [he relative probability of presence Is calculated. This is the probabilfry of
presence divided by the maximum probabiliry of presence across all weeks. For example, imagine the probabiliry of presence in week 20
for the Spot[ed Towhee is 0.05, and that the proha611ity of presence at week 12 (OZS) is the maximum of any week of the yeac The relative
probabiliry of presence on week 12 is 025/0.25 = 1; at week 20 it is 0.05/015 = 0.2.
3. The relative probabiliry of presenw calculated in the previous srep undergoes a statistical conversion so that all possible values fall
between 0 and 10, indUsive. Thls is the probahility of presence smre.
7o see a bar's probability of presence score, simply hover your mouse cursor over the har.
Breeding5eason( )
Yellow bars denote a very li6eral estimate of [he time-frame inside which che bird hreeds auoss i[s entlre range. If there are no yellow 6ars
shown Por a bird, it does not breed in your project area.
Survey Effort (I)
Vertical black lines superimposed on probabiliry o( presence bars Indicate the number of surveys performed for that species in [he munties of
your project area. The number o( surveys is expressed as a range, for example, 33 to 64 surveys.
To see a bar's survey effott range, simply hover your mouse wrsor over the bar.
No Data (—)
A week is marked as having no datd if there were no survey events for that week.
SUrvey Timefreme
Surveys from only the last 10 years are used in order to ensure delivery of curren[ty re�evant information.
: probablliryofpresence breedingseason Isurveyeffort —nodata
.VEqES ��iv FEP MAF APP MAv JIpJ JUL
BaIdEd61e. YI�'IWI �il_II AI7_III
NomBCCVWnenWe(IM1ISISnM A UN � 111 q 11 II
+ ave or co�:brv�k�an �6�o-em
IBCq m tM1e a.ea. Eu[ wamn[s
._ eal[Fc[ngl.
., roi b- f.al
ep�o.lm:�:�nofi:Lnre
, - �m __., ri hFe; �
tlac<�b�"mo; ur ammnesl
Win—w.n� iWarbler
N( [-P:� I Rr; rs a 9etl al
--- --- ---
Ca�se!w5an Can[am �BCq
-_._ .___ . _.. ._...
anly m panmlai b.rtl
consv�s�an aeg�o�s iecasi ��
me m�n�.oni usni
�e,��ea�.wa.b�e�
a«wa��ew��,�o�,�,,,„ --- ---
a„a o, �o�;.�.��o� �o�«m
fyr.q�!nrcu4Fowi.s-rangeln
" ..�i,iusea�e -
elazN�n: . .. -
Eastem Whip-poor-wlll ____
9cc aangewme imN� p'na is a
-_. . . ._._. _....
a�m oi eo��.eN.,uo� co��„�
_..__.__._._ ... _ _._
(peq mmugnnu� es range �n
m�camm<�mi�;n.�a
nlaska;
�i-Y��!� lu�l�l- --�I�I ---�
-QJ I�---
-�—d� �:IP-
--- � � � � '�'���- ��-
A�C SEo UR IJUV GEC
--- Ipj p- IV!�'l:�p -IP�'- q';--
--J��, ����
--;[ —�i-- --
Mtps�.//ews.Fws.govlpaUlocatioNH60ASCSDPZCJ7HFONUNJE5VUXM/resources 4/7
3/74/2018
. nitlPn kdgir
. i...HC[':uln�.r.�[I��IM1�s.Sr.�.1
a Fli�(I �I [��)�Servnl'nM1 Con4xm
INCf11��:M1�F +reu,Gu[wa�i'�ii�
rip��yuvc olflie Fd�l�
rinr 4rp.,renool ..
,.,.: ^runa.i�.: �� ort:no��
..:oo„i.�rr.,m�yp.:or
aa�l.�p„ n.o,aarvp:eq
FenwrkyWarbkr __
�CC Rx'idevnCe �CON� �iry6 ix d
B�.�.14!Cnn.vfrvdlwr'.Can<fT
._._ .. _._. .
(dCq t!nnugnom Itt ran§e m
tne conlinenlallJN antl
AldsYa l
Praide Warbler
BCCPangemEelC6Nlfl�rsrsa �
evEol[an eva<IonCmum
laccl�n�cughoui�inn�n
. .. . . _.. __ -_
[M1[co.�nnenlaluSP 2nE
Ab.A.i.l
FlfLihcnafJiy Wdfblf( ___
a«3�nb�:.m���o�u,�,ri.i,. —
ertE oKomem�ion cenfem -
lacq inrcu�no 1 us �ange �v
�he mnmmul USL anE
Na.Ya.�
Hed.headetl woodpecker �il'Inl_
accnangemee�mru)(mi:i:a A'�
eim oi co�u�.a�ian c«�a.n
IBCQ�nnauguou�hznngei
Ne an IUY.�and
NasMa) n
Nuzry Blackblra
8CC Pangewitic ICAN� QM1�s iz �
Bim or c��xr..uo� cu��..�
(e<O m�augnwno nnge r
��e mnnnenolUYantl
e1a�WJ
Wmd Ibush
Bc[0.�nsewree([ONIOhis e
e�m arco�mcneo� cmcmo �
�ecq mruughom iu range in
mv mnur�.<nul uv. antl
uux,.i
IPaC: Explore Loca�ion
__—� '--+I
_`_ _7'__ q�4'!� 14Yi�- -�-_ N—__ _T—� IT�� �*__
�a��� 1���6 MIpIIE 1—IN— �I--�I ��� �I' --
��II�I �MOdI !MN�� O�p-- �-1— —�—
u:�m� r��e BNe� ����
—y�� �'1� � �
�� �
0�
--- ,,�'"—�1 IIIM 11��I
''e
---- �ilud�l ���1 �Itl�� ����i�IM ���— -- --
Tell me more about conservation measures I can Implement to avold or minimue Impac[s ro migratory blyds.
ua�ion•.�:�fe Con;.�rvaoon inanwes desuibes measures [hat canhelp avold and mmimiie impacts m all hirds at any loca[ion year round. Implementation of these
measures is pareimlarly important when 6irtls are most likely to occur in the projen area. When 61rds may be breeding In the area. identi(ying the locations of any
active nes¢ and avofdiog [heir des[ruction is a very heip�ul impact minimiza[ion measure. To see when birds are mon likely m ocmr and be breeding in your
project area, New Ihe Probahiliry of Presen<e Summary.lL�iS�'�al rne isurr-: and/or �cvrnns may 6e advisa6le depending on the rype of aaiNry you are conduciing
and [he rype of inh�astruc[ure or hird species presen[ on your projecc site.
Wha[ does IPaC use [o generate [he migra[ory birds po[entially occurring in my speciFled low[ion?
The Migra[ory Blyd Resource Lisc is mmprised o( USFVJS Nii d_of Con�gry�tion Cenrcrn LSI and o[her species [hat may warrant special atten[ion In your projett
location.
The migra[ory 6ird lis[ genera[ed for your prqect Is derived trom data proNtled by [he Av nn Nnowledee Neiwork �AKM. The AKN data Is based on a growing
collecGon of sr.n%_v h�nding and otizen saence tlaiasets and Is queried and filtered to rewrn a list of those hirds reporred as ocmrring in [he munties which your
proje4lnterseces, and that have 6een iden[ifed as warranHng special attenNon hecause [hey are a BCC species in that area, an eagle (�1��1 requirements may
apply�. or a species Ihat has a particular wlnerability m offshore ac[ivitles or development.
Again, ehe Migrarory eird Resou�re lin IntluAes only a su[�set of hirds thac may occur in your projea area. I[ is not representative of all blrAs [hat may ocmr fn your
proje[t area. Tc get a I'at of all birds poten6ally presen[ in yaur pro7ect area. please wsit [he Fbird E�lore �ata Tooi.
Wha[ does IPaC use m genera[e [he pra6a611iry of presence graphs for [he migra[ory 61rds po[entlally occurring In my speclfed bcallon?
The prohahi6ry of presence graphs assoclated with you� migratory brcd Ils[ are bazed on data prwlded by the Avian Knowledpe Network IAKN1. This data Is derived
From a growing rollection of 5urvey band�ng antl Ctiren sCenre dataseis .
Prohahiliry of prezence data is mntinuously 6eing upda[ed as new and 6e[[er information 6emmes available. 70 learn more abou[ how [he probabiliry of presenre
graphs are produced znd how [o inlerpret [hem, };o Ihe Pro6a6iliry of Presen<e Summary and Ihen dick on the'Tell me a6out these graphs" link.
How do I know if a bird is breeding, wintenng migrating or present year-round in my project area?
Tr, see what part of a par[icular bird's range your project area falls wi[hin (i.e. breeding, wintering, migra[ing or yearround), you may refer W[he /ollowing
resources: 7he Th o�n II ah o( Om [hology All Abou[ B'rtls B'rd Gu'de, or (if you are unsuccessful in to<ating [he bird of inceres[ there�, [he Cornell Lah of
Omi[holoev Neo[roo cal B'rds euide. If a hird entry on your migra[ory bird spe<ies lizt indicaces a breeding season, i[ is pro6able [hat the bird 6reeds in your
pmjett's coun[ie5 a[ some poin[ within Ihe omeframe specified. If "Breeds el5ewhere" i5'�ndrcared, lhen [he bird likely does not breed in your projett area.
What are [he levels of concem for migramry hirds?
Migra[ory 6irds delivered thmugh IPaC fall ln[o [he �ollowing disnna ca[egories of concern:
https:/lecos.Tws.govlpacfiowtioNH60A5CSDPZGJ7HFDNUNJESVUXMIresources 5!7
3/14/2018
IPaC Explore Localion
1. "BCC Rangewide" hlyds are Bvds af Conzervation Concern (eCq that are of mncem throughout their range anywhere within [he USA (induding Hawaii, [he
Pacifc Islands, Puerto Rim, and [he Virgin Islands);
2"9CG BCR" hirds are BCCs that are o( conrem anly in particular Bird Conservation Regions (HCRS) in [he mn[inental USA; and
3. "Non-BQ - Vulnerable" birds are no[ 9CC species in your proJec[ area, but appear on your list elther because of [he Eaeie qct requlremen6 (For eagles� or (for
non-eagles7 po[en[ial susceptihlli[ies in offshore areas (rom certain rypes o( deve�opmen[ or activiUes (e.g. off:hore energy development or longllne fshing).
Alchough it is important to [ry to avoid and minlmize Impacts to all birtls, efforts shoultl be made, in paNwlar, m avold antl minimize impacts [o the birds on [hls
lisq especially eagles and 6CC spe<ies of rangewide concern. Por more Information on conserva[ion measures you can implement co help avoid and minimize
migramry bird impacts and requirements For eagles, please see �he FAQs for these [opics.
Details a6ou[ 6irds [ha[ are po[en[ially affec[ed by offshore proJects
Por addi[ional details abaut the relative ocmrrence and ahundance of both individual birtl species and groups of bird species wi[hin yaur projec[ area off [he
Atlantic Coast, please visii [he Nor[hean Ocean Data Por[al.7he Por[al also offers data and information ahout other Wxa 6ezides 6irds cha[ may be helpfW to you in
yaur praject review. Alternately, you may download [he brtd model resWts files underlying [he portal maps Ihrough the NOAA N CO Int era�iv tatiai al
Madeling and Prediaive Maooing of Marine 6ird Distri6utions anA Ahundanre on the Atlantic Outer Con[inental Shelf project we6page.
eird nacking da[a can also provide additional de[ails abou[ ocmrrenre and hahitat use [hroughout che year, induding migration. Models relying an survey da[a may
not indude chis informa[ion. For addi[ional informa[ion on marine hird vacking da[a. see the D'vine 6'rd Swdv and the nanotae swd'es or contan Caleb Soieeel or
Pam lorine.
What if I have eagles on my Iist?
If your proJect has [he potential to diswrb or kill eagles, you may need to c�Ma�r, � oern;k to avoid viola[ing the BGEPA should such impaRs ocmr.
Facilities
Wildlife refuges and fish ha[cheries
REFUGE AND FISH HATCHERY M W RMA110N IS NOT AVAILABLE AT THIS TIME
Wetlands in the National Wetlands Inventory
Impacts to NWI wctlandz and other aquatic habitats maybe subject to regula[ion under Section 404 of the Clean Water Act, or other
Sta[e/Federalstatutes.
For more information please contac[ che Regula[ory Program of Ihe local U 5 Army Coros of Erbineers Dis[ric[.
This bcation overlaps the following wetlands:
The area of this project is mo large for IPaC to load all NWI wetlands in the area. The list below may be incomplete. Please contact the local
U.S. Fish and Wildlife Service office or visit the NWI man for a full lis[.
FRESY.wATEFEMr�GENi wE7LAND
PEM1A
P 1
FEM1C
PEMt Fli
PEMiAh
PEM1Cd
PEMI Fb
PEM1A
PEM7 F
FRESIINiA'I'ER FORES'FCl/SIIRUS WF.1L4N0
PF01A
P551A
PF01C
PS51C
PF01Ah
P551Ah
P551F6
P 1 h
PFO1g
PSS1Fh
PFOiCh
https://ecos.fws.govlpac/IocationlH60ASCSDPZCJ7HFDNUNJE5VUXM/resources 6!7
3/14/2018
P tA
PFO1F
P551Ad
PSSiFx
FRESHW'ATEP oONJ
PUBHh
PUBKx
PUBHx
PUBF
LhKE
L1UBHh
O1FiER
PLJSCh
PUSAh
PIJSCx
PUSAx
f'USC
IPaC Ezplore Location
A full description for each wetland code can be found at [he National Wetlands Invenrorywebsite: htgis//ecos fws �nv/ioar/wetlandsidecoder
Data Iimitatlons
7he Service's obJeaive of mapping wetlands and deepwarer habitats is to produce remnnaissance level inPormation on the bcation, rype and size of these
resources. The maps are prepared fmm fhe analysis o( high altitude imagery. Weilands are iden[ified based on vege[ation, visiNe hydrology and geography. A
matgin o( etror is inheren[ in [he use of imagery; thus, decalled on-the-ground inspettion of any partimlar site may resul[ in rpvision of [he weHand 6oundaries or
dassiFlca[ion established through image analysis.
The acmracy of image inrerpreta[ion depends on Ihe qualiry ofthe imagery, the experience of [he image analysts, the amoun[ and qualiry o! the collaceral da[a and
fhe amoun[ of ground [ru[h verifcatlon work mnducted. Metada[a should be mnsulted to determine the date ofthe source imagery used and any mappfng
problems.
Wetlands or o[her mapped features may have changed slnce the da[e of [he imagery or fleld work. There may be occasional differences in polygon boundaries or
da551flcations be[ween Ihe Informatian deplRed on the map and [he actual mndltlOns on site.
Data exduslons
Certain wetlanA habi[ats are exduded from Ihe National mapping prograin 6ecause of the limita[ions of aerial imagery as [he primary da[a source used to detect
wetlands. These habita[: indude seagrasses or submerged aquatic vegeiation that are found in the incenidal and subtidal zones o� esmaries and nearshore coas[al
waters. Some deepwater reef mmmuniues �mral or tuberflcid worm reefs) have also been exduded from the invenrory. 7hese habitaa, be<ause of their depN, go
undetected by aerial Imagery,
Data precauUons
FederaL s[are, and local regulamry agencies with Jurisdic[ion over wetlands may define and describe wedands In a differenc manner than that used in this imenCory.
There Is no atrempl, in either the des(gn or produas of this inventory, [o defne the limia of proprietaryJuristliction of any Federal stace, or local govemment or ro
establish the geographi�al swpe of Ihe regula[ory programs of govemment agencies. Persons infending m engage in acnvities involving modifcations within ar
adjacen[ m wetland aleas should seek the advice of appropria[e federal, stace, or bcal agencies concerning specifed agency regulamry pmgrams and proprie[ary
�urisdictions Cha[ mayaffect 5uch activitles.
https://ecos.fivs.govlipaGiocatioNH60ASCS�PZCJ7HFDNUNJE5VUXMlresaurces 717
Attachment B. Pians
North
�rolina8��
wrrw.�tt.oro �
90% SUBMITTAL
LINE 326
T AR�.�'�4�
� "� a� F�
�- ._
FORSYTH COUNTY
FORSYTH COUNTY, NORTH CAROLINA
, ��� z--.-Y > _.� . _ �
� rni . � .
< "�, _ �}��i' ��.`�.�
� 71➢r.� q� °
���N6 -� ���..
�� �.
I'.-ai� u � __
.�.. � .-r.__i :_
�. w�� �
�,`� ♦ • �
�:��,r�±������� • •
��Piedmont
Natural Gas
IR#: 0351527
OWNER: PIEOMONT NATUR4L GAS
4720 PIEDMONT ROW DRIVE
CHARLOTTE,NC 28210
(704)731-0375
FaMdQriPNJY
3iUPNd6YAYlA"� $LffE9D
�FApR�P7T8S.G4JlH.
caau
90% SUBMITTAL
03/30/2018
NOT FOR CONSTRUCTION
�vovaia�r�amrsratir
GENERALNOTES
1. ALLTOPSOILAN�IXCAVATEDMATERWLSHALLBESTOCKPILEDONSREINANqftE4APPROVED9YPNG.
4. EXCESSMATERIP1150EFINEDASPNYMATERIFLBflOUGHTiOTHESREOYTHEfANTRACTORORGENERATE�WRINGDEMOLRiON.
WHICH IS NOT USED FOR CONSTRUCTION OF T1E PROJECT. All EXCE55 MAiERIA1 PRO�UCED BY iHE COMNACiOR'S OPERATIONS SH4LL
BE DISPOSED OF IN ACGOR�ANCE WRH IOCAL, COIIN7V, STATE. AN� FE�ERAL REGUTAT�ONS FlT NO GQST TO THE OWNEF.
3. THECONTMCTORSHALLCOMPIYWITHALLCItt,COUNtt,STATE,ANOFEDFAP1GUl0EUNE5IREGUlATI0N5RPPLICPBLETO
CONSTRUGTION OF iH15 SITE.
a. E%ISiINGCON�IilONSWERETAKENFROM:
A iOPOGRAPHIC SURVEY PERFORME� BY ENCOMPPSS SERYICES; �832) 831A08fi
AN ENVIRONMENTFL SUftVEY PERFOfiMEO BY PONO 8 COMPANY; (fi18� 336A40
5. GEOiECMNICPIENGMEERINGf2E?ORTSPREPPREDBYINTEftTEI(P51;(/61)59&2TJ4.PPPROXIMATEBOREHOLElOG4iNkISH4VEBEEN
SHOWN ON THE PlANS.
fi. LOGTIONSOFeXISTINGUNOERGR�UNOVTILITIESAN�SREIMPROVEMEMSNREAPPRO%IMATE.RCi11ALFXi$TINGLON�IilONSMAY
VARY FROM WH4T IS REPRESENTED IN THESE ORAWINGS. CONTRACTOR SHALL I�ENTIFY E%kGT LOCATIONS IN THE FIEID PRIOP TO
FXCAVaTION 6Y CONTACTING N�RiH GAROLINA811 ANO iN(E ALL PRECAIJ�IONS NECESS4RY TO AV01� OAMAGE TO EXISPNG OT1LI➢ES
AND SITE IMPROVEMENTS. SOME UiiLITIES ANO SRE IMPROVEMENTS M4Y NOT BE SHOWN. fAMfiACTOR SHALL NOTIFY OWNEf30P MlY
�ISGREPANQES PWORTO CONSTRUCTION.
7. ALL&4CI(FILLFNOFILLM,iTERiALSHALLBEFREEOFORGPNICMATTERAN�WA$TE.
B. WORNAROUNOTHEECISTINGUiILRIES.�FNWIGESYSTEMS.AN�51iEIMPROVEMENTSSNALLBEPERFORME�MAMANNERTHATWILL
nV01D OFMNGES TO THE ltiILR1E5. 5i0RM ORAINAGE, SIiE IMPROVEMEIRS, ANO PAVEMENT. PRIOF TO COMMENCING WITH WORK, THE
CONiRACTOR SWLLLACCURATELv LOCATE OR GET iNE PPPkOPPIAiE UTILItt COMPANY TO LOCATE A60VE AND BELOW� GROUN�
UTIIITIES WHICH MAY BE AFPEG7E0 BV THE WORK iHE GONTRACTOR SHALL PROTECT AlL UTILI➢ES. STORM OFAINA6E. SITE
IMPftOVEMEMS, AN� PFVEMEMS NOT �ESIGNAiE�:OR REMOVAL, RELOG4TION, OR REPIACEMEYT IN THE COURSE OF THE
CONSiRUCTION. NNV E%ISTING IJrILRIES, STORM DRAINAGE. OR SITE IMPROVEMENTS DAMAGE� BY TY.E CONTMCTOR SHALL BE
REPAIRE� TO THE SATISFACTION OF THE UTILIIV COMPA�WES IMMEOWTELY AT NO FXPENSE TO THE OWNER Oft ENGMEER.
FUftTHERMORE.If THE PROPOSED WNSTRUCPON NECESSITATES THE OISCONNECTION Oft RELOCATION OF ANY UTILIiY OR STORM
OPW NPGE SYSTEM. THEN THE ftEP WCEMENT UTILITY INFRPSiRUCTURE SHALL BE IN PLACE ANO NLLY FIINCTIONAL. PRIOR TO THE
�ISGONNECTION OF SaID UTILItt. PLfASE NOT THAi LOCA i ING ALL UN�ERGROUNO FACILITIES B THE CONTPACTOR'S RESPONSIBILIiV.
9. PLLDIMENSIONSARETAKENFftOM/TOE�GEOFPAVEM&Gi,CEMERLINEOFtfilllttORE0GE0FEASEMENTpNLESSOiHERWISENOTE�.
10. MATCHALLNEWPAVEMEMFWSNWITHEXISi1NGPAVEMEM.IINLESSOTNERWISENOTEO.NEWPAVEMENTTOBEINSTALLEDACCOPDING
TO THE ftEQUIftEMENTS OF THE NUTHORITV WITH JURIS�ICTION.
fl. SREGONTRAGTORSHFLLVERIFYN.LCOOROINHTESANODIMENSIONALINFORMATIONPRIORTOGONSTROCTION.BRINGANY
DISCREPANGES WRH lAYOUT TO ATTENTION OF OWNER PRIOR TO STARiING CONSiRl1CTi0N.
4. FLLiiUPFIC51GN5AN�PAVEMENTMARKING55HALlBEINACCORDANCEWIiHTHE'M4NUALONIINIFORMTFAFFILCONTROLDEVICES"
�MUTC�).lATESTEDRION.
13. COMMCTORSH4LLPROVIOETESTPIANAN�C00R01t14TEWITHPNGPfl10Ri0A1LTE5TS.
14. UN1E555PECIFIG4LLYSHOWNOTHERWISEONRIE�RAWINGS.CONiRACTORSWLLLMNINTAINAMINIMUMS'-0'OFFSEfFROMPROPERTY
LMES FND FROM EOGE OF PAVEMENT �EXCWOING FOR ROAD PND PROPERTV LWE CROSSINGS�. ALL CONSiRUC710N MEiM0�5AN�
MATERWIS SHALL CONFORM TO THE CURREM SPECIFlCPTIONS PNO STA40AR05 OF FIE�MOM NATURPL GAS.
15. ALLWORKSHALLBEINCOMPLWNCEWffFI05R1TITLEY90FTHEC0�E0FFEDEPALREGUlATI0N5.AN0ALLOTHERFEDERPI,STATEFN�
LOCAL tAWS AN� REGUTATIONS.
16. THEGASMNNSHALLBEMSTALLE�SOASTOPROVI�EAMINIMUMOFTVJENiYF0UR�74�1NCHE50FLlfARANCET0ALL0THER
UNOERGR�ON� OiILRIES PN� STROCTURES. WNERE THI515 NOT POSSIBLE. APPROPRIATE PROTECTION SHALL 6E INSTALLEO.
11. ALLDRAINAGEPIPESMlDSTNUCIDRESSI{4LLBECLEANE�OF�EBRISPN�Eft00E�JMHiERWL5RE5ULTINGFROMCONSTRUCTION.TNESE
PIPES AN� SiRUCNRES $F1NLL BE M4INTAINEO C�FAN �URING THE PERI00 OF CONS i RUCTION.
18. N1�ISTURBEDSLOPESSHPLLBERESTOREDTOEkISTINGGRAOESANOSTABILQEDA5IN�ICJ�TE�ONTHEPIANSHEREI4.
19. IT IS PNG POLICY NOT TO LEAVE SiOPPLE5IN LINE UNATf:NDED. WMRACTOR SHOOLO FUN AN� SCHE�IILE TIEINS AT FACH SITE FOR 1
OAY OURATION.
10. ACCESS DRIVEWAY MFORM0.PON IS FOR INPORMA➢ON ONLV. COMRACTOR TO COORDINATE WRH PNG FOR ACCESS PERMISSIONS HND
REOUIREMENTS.
YI. PftOPOSE�PIPELOCATIONSSHOWNFREASFlEL�I�ENTiFlE�9YPNGFNDMEBASEDONEVALUATIONOFABOVEGROUN�FEATUftES.
THE FINM11 A1IGNMENT ANO LOCHTION OF PIPE SH4Ll8E DEiERMINED BY PNG PNO fI5 DESIGNATEO INSPECTOR(5).
72. CONiRACTORTOVERIFYWERAN�SHAVEBEENPEFMRTEDANDMITIC4TEDPRI0RT0ACGE551NGPNYWERPNDPAEAS.
SITE NOTES
1. CONTRPCTORSHALLREPAIRALL�PMHGETOF.);ISTI4GFEATURES�PAVEMEM.CUftBS.WALKS,ORNEWAYS,YAROS,WN�SCAPIN6,EfC.)
TO A IIKE NEW CON�RION AT NO AD�ITIONAL COST?0 THE OWNER
2. FlLLTRENCHESCUTINEJ(ISTINGROAOSOR�RNESSHALLIITILIZEAC�FANS4WCUTAND5H4LLBE8ACKFILLED�f00%)TOFlNAL
SUBGRAOE PCCOR�ING TO THE AUTHORIiY HAVING JUFISDICiION'S REpWREMENiS.
7. CONCRETEFORCUFBSlWDSI�EWALKSSHNLBE95COPSICONGPETE.
C. ANYWORKUNACCEPTABLETOTHEOWNER3RCPaESENTNTNETOLOG4LREPRESENTNTNE,ORTOUfILI1VREPftESENTpTIVESH4lLBE
REPAIRE� OR REPLACED BY iHE CONTHdCTOR AT NO A�]OITIONAL EXPENSE TO THE OWNER.
5. ALLPPVEMENTMATERIFLSANDCONSTRUGilONSHhLLGONi0RA1T0iHEAUIHORIttSTANDARO�RAWING5AN�5PECIFICATi0N5.
fi. HLLPAVEMCNTSTRIPINGSHALLBETHERMOPUSTICORAPPROVEOAlTEONATNE.
GRADING NOTES
L PROPERTEMPORARYAN�PERMANENTMEASIIRESSHALLBEUSEDTOCONTROlERO510N/WUSEDiMEMATIONINACCOROANCEWITHALL
LOCAL, STATE AND FE�ERAL REGUTATIONS. ALL EROSION FN� POLLU110N COMftOL DEVICES ANO MEASUFES SMALL BE CONSTRUCTEO,
INSTAllE�, MAIMAINE�, ANO REMOVEO BY TNE COMRqCTOR IN ACCORDANCE W11H ALLAPPLIG48LE FEOERAL, STATE, ANO IOCAL IAWS,
REGOIATIONS. OR�INANCES. AN� POLICIES.
P. MUICHFNOSEE�NLL015IDftBE�AREPSAS500NA5PO551BLEM1FTERFINALC+PADINGISCOMPIEIED,UNLESSOTHERWISEIN�ICATE�.
CONiRACTOR SH4LL Tq!(E WHATEVER MEANS NECESS4RV TO ESTPB4SH PERMVIEM SOIL STABILIZATION.
3. PROVI�ETEMPORARYCONSTRUCTIONACCESS�FS)ATTHEPOINT�S)WHEREGONSiRUCTIONVEH�CLESE%IiTHECONSTROCTIONAREA
MAINiAIN PU6LIC ROAOWAYS FREE OP TPACNED MU� AN� �IRT.
9. THECONTR4CTORSHAILCHECNALLE%ISTINGGFPDESANDDIMENSIONSINTHEFlELOPRIORTOBE6INNINGWORRRNDREPoftTANY
OISCREPANGIES TO THE ENGINEER.
5. THECOMRACTORSHALLCOMPLYWITHALLPEHTINEMPROVISIONSOFTHEMANUALOFACCIOEMPREVEMIONANDCONSTRUCTION
ISSIlEO BY hGC OF AMERICA MG ANO THE SAFEfY ANO HEALiH REGIRATIDN50FCON5TRUCTION ISSUED 8Y THE U.S. DEPPATMEM OF
IABOR
....: ....: as.;�e 7:,.:
6. NOYEGETAiIONORiREES0U151DE0FTHE�EftMANEMEASEMENTANDTEMPORARYWORNSPACES5HALL8EDI5TUF8E�ORREMOVE�.
7. STRIPTOPSOILFROMALLCUiANOFILLARiASANOSTOCKPIlEl1PONCOMPlETIONOFGEOEMLGPADINGDISTRIBl11ETOP501LOVERA:L
�ISNRBEO FREPS, TO A MINIMUM OEWH OF fi'. CONTRACTOft SHALL SUPPLY A��I i IOI�NL TOP SOIL IF INSOFFICIENT OUANTITIES EXIST ON
SITE.
B. POSITIVEDRAINACaEShW.LBEESTABLISHEDASiHEPIRSTOR�EROFWORKAN�SHALL6EMAINiAINE�ATPLL➢MES�VPoNGMIDFFTER
CONSTRUCTIOR SOII SOFTENEO BY PERCHE� WAiER M FOUN�ATION ANO PAVEMENT AREAS MUST BE IlNOERCUTAND REPIACE� WITI
SWTABLE FlLL MAiERiALS FlPPROVED BY A GEOTECHNIG4L ENGINEEfl. GROUNDWATER WFlLTRl�TION INTO EYCAVATIONS SHOUID BE
EXPECTEO. AND THE WATER SHALL BE REMOVED Il51NG GWIVITY �RPIN0.GE OR PUMPING.
9. THELOGTIONOFALLDNERSIONSWA�ESANODITCHESSH0.LLBEFIELOADJUSTE�TOAVOI�TREESFSMUCHASPOSSI9LE.THE
CONTRACTOR SHALL WALK iHE qLIGNMENT OF THESE SWALES ANO OITCHES IN iHE FIELD i0 VERIFY AVOIDANCE Of lAEES.
10. STOCKPILEDTOPSOILORFILLM4TERIFLISTOBECONTAINE�50SE��MENTRUK-0WWILLNOTCOMAMINATESl1RR0UN�W�ARFASOR
ENTER NEARBY STREAMS.
1L PNYSITEUSEDFORDISPOSALANWORSTOGNPILEOFPNYM41ERWlSNALLBEPROPERLYPERM1TfEDFORSUCHACTIVITV.RISTHE
RESPoNSIBILITY OF THE WNiRAC i OR TO SEE iHAT ALL REOUIRE� PERMITS FRE SECOREO FOR EACN PROFERTY IRiIJZED. F COM OF
THE APPROV.� PERMIi MUSi 9E PROVIOED TO THE INSPECiOR PRIOR TO COMMENGEMENT 0' WORK ON A4V PROPERTY. FRI WRE TO DO
50 MFY RESULi IN THE COMMCTOR REMOVMG ANY IILEGALLY PIACE� MN7ERWL FT HIS OWN E%PENSE,
12. ARERSiRIPPIPIGTOPS0ILATSiATI0N51TES,PR00FftOLLEXGOSEDSUBGRA�EWITHALOADEDTRUCKT010ENTIFfUNSiABlE501L5.
STA8ILIZE UNSTABLE AREAS BY ON�ERCUTfING AND REPtACING UNSTA9lE MAiERIALS WITH COMPqCTEO SELECT MATERIAL
13. RLLPIILSHALL6EFREEOFALLORGANICMATTER.TPASHAN�OTHEROELETERI0U5MATERIALS,CONiNNINGNOROCKFRAGMENTS
GftFATER THAN fi INCHES W ANV ONE �IRECiION.
14 SiRUCIDRALS01lFIL�SHALLHAVEASTAN�AROPROCTORMNIIMUMDRYDEN51TY0F90P0UNO5PERClIBICFDOT�GCFJORGPEATER
FNO A PWSTIqtt INOE%�PL) OF 30 PEftCcNT OF LE55. FLL M4TERNL BEMG USEO AS SOIL FILL SHOULO BE TESTED PNO APPROVED BY
OWNER BEFORE BEING PIACED.
15. PtACEAN�COMPACTFlLLINACGOROANCEWRHSPECIFICATi0N5.
1fl PROPOSEDWMOVftSANOSPOTELEVATI0N5SHOWNN2EFINISHGRA�E.PROPEftADJUSTMEMSHOULDBElM�EBYCONTRACTORFOR
SUBGRA�E.
1]. SH4PEFLLORCHESFCCORDINGTOIYPICAl5ECT10NOR5PECNL�ITCH�ETAIL
1B. ONLY M4TERl4l MEETING OWNER'S REQUIREMENTS FOR EMBANKMENi MAY BE USPD.
19. ALLE%CAVATIONISUNCVSSIiIFDWfiH011TREGPRpTOMATERNLSENCOUNTERFD.COMRACTOft5H4LLVI5R51iEPNpOPAWHISDWN
CONCWSIONS TO CON�RIONS ENCOUNTERED. LINE AND GR4�E5 SHOWN SHPLL BE ACHIEVE� WRHOt7� AO�RIONAL COMPENSATION.
Y0, ANYqREATHATIS015TURBEDOUiSIDELIMITSOFCONSTRUCT10NOl1RINGTHEUFEOFTHISPRQIECTSMALLBEREPAIREDBV
COMRACTOR AT HIS FJ(PENSE.
it. THE CONTRACTOR SHPLL NOT DISPOSE Of ANY MATERVil EITHER ON OR OFF PROJECT SRE IN A PEGUTATORY ROOD WFY AS DEFlNEO BY
THE FEDERAL EMERGENCY MANAGEMEM FGENCY WITHOIfr APFROVqL BY S4ME. ALL MATER�4L SHALL BE OISPOSEO OF IN UPIAN�
(NON�WETlANO) AREAS AND ABOVE ORDINPRY HIGH WA"fER Of HNV ADI4CEM WATERCAURSE. THIS �OES NOT FIJMINATE THE NEEO TO
OBTNN RNY OTHER LICENSES OR PERMRS TH4i M4Y BE RE�UIfiEO BY ANY OTHER FEDERAL_ STATE. OR LOCAL AGENCV FOR iHE
CONSiAUCTION OF THIS PROJECT.
VARIATIONS IN PLAN OR PROFILE
1. THEGONTRACTORSHPILMNNTNNTHEHORQONTFLALIGNMENT(PtFNV1EW)RSIN�ICATE�ONTHEPROJECTPWi5WI7HAz3F00T
VARIANCE, 11NLES5 ADDITIONAI �EVIATION IS PPPROVEO 9Y PNG.
2 CONTROLPOIMELEVATIDNSSHOWNINDICATETHEMINIMUMCOVERPNDSFWLLNOTBEHEWCED.iHECONTR4CTORMAY�RILLDEEPER
WIiH THE APPROVAI OF THE OWNER.
3. iHECONTR4CTORMAYRE0VE5TCHANGESTOTHEPftOPOSEDVERTICALANOHORIZONTALALIGNMENTOFTHEINSTALLATIONANDTHE
lOG4TI0N OF THE EMRY AN� FXR POINTS FOR HDD 60RE5. PFOPOSED CHANGES SHALL BE SUBMIT'fED TO THE OWNER FNO RECENE
APPROVNL OF THE OWNER PRIOR TO STARTING THE EfFECTED AGi7VliY.
BORE PILOT HOLE REQUIREMENTS
1. THECOMRACTORSWLLLATALLi1ME5PR0VI�EMlDNo11MNNIN5i0.0MENTATIONWHIGHWILLACCUFATELYLOG4TE7HEPILOTHOLE,
MEASURE ORILL STRWG ARIAL AND TORSION LOADS. AN� MFASURE DW W NG PLUI� DISCHAR6E RATE ANO PflESSURE.
2 THEOWNERWILLHAVEACCESSTOTHESEINSTRUMENTSANOTHEIRftEA�INGSATFLLTIMES
3. THECOMRqCTOR.WHENRE0UE5TEDBYTHEOWNER,WILLPftOVI�EINSPECTIONHOLESATNOADDIilONA1COSTTOVISUALLYVERIFY
THE LOG4ilON ANO CON�ITION OF THE DRILIE� PIPELME.
4. THECOMRACTORSHALLPLOTTHEACTUAiHORROMALANOYERTICALRLiGNMENTOFTHEPIlOTHOlESATIMERVAISNOTF]ICEE�ING
40 FEEC lW0 CORRESPONOMG WITH THE PROJEGT STATIONING AN� DATUM.
5. THEGOMRqCTORSHlLLLMAINTqINANDUPDAiEAN'A&BUlli'PIANANDPROFlLEASTHEPILOT90REI5ApVANGED,
6. THECOMFACi0R5HP11GR4MTNE0WNERRCCES5T0ALL�ATAREqDOUTPERTNNINGTOTHEPOSITIONANpWCLINATIONOFTHE
BORE HE4�, WHEN REOUESTED. THE COMRAGTOR SH4LL PFOVIDE E�(PLANATIONS OF HIS POSIiiON MONITOftING AN� STEEWNG
EOUIPMEM.
]. THE FGNFL PIIOT HOLE EXR P01M SNALL BE LOCATEO VYITHIN THftEE (3) FEEf IATERALLY 0F THE E%IT POIM SHOWN ON THE �RAWINGS.
LONGITU�INALLY. iHE RCTIIAL E%IT POINT SHALL BE NO MORE THAN PIVE (5) FEET SHORT OR FIVE (5) FEET PASi THE EXR POINT SNOWN
ON iHE OMWINGS.
8. THEPROTHOlESHALLBEDRILLEDALONGTHEPFTHSMOWNONTMEPIANANDPROPILE�RAWINGMAINTNNWGiHESPECIflE�
TOLERANCES.
9. THEOWNERSHALLAP7ROVETHEAIJGNMEN70fPiLOTBOREBEFOREiHEREAMMGPH45E0RPIPEPIILLINGMAYCOMMENCE.
70. IF TNE PILOT BORE FAILS TO CONFORM TO T1E ABOVE TOLEPANCES, OWNER MAY, AT HIS OPTION REOUIRE A NEri PILOT BORE TO BE
MNOE
fl. IN Pll CASES, FIGFROF WAY RESTRICTIONS SNFLL TAKE PRECEDENCE OVER THE LISTE� TOLEFANGES.
iL NOPILOTHOLEWILLBEACCEPTEDIFRWILLRESULTINANYOFTHEPIPEUNEBEINGINSTFLLEDINVIIXAT70NOFRIGHTOFWRY
0.ESTftICTI0N5.
13. CONCERNFORADJACENTtJ11lRIE5FN010R5TRUCTURESSHAILTAKEPtiEGEDENCEOVERTHELI5TE0TOLE0.4NCESqS➢NGOF
TOLEPANCES DOES NOT RELIEVE COMPACTOFt FROM RESPONSIBILI7Y FOR SAFE OPERATION Oft �AMAGE TO P➢JACEM UTILITIESANO
STRUCNRES.
14. ALL BEND RADII 5lN1L BE EOUhL TO OR GREATER TNAN THOSE LISTED IN h1E PRQIECT PlANS.
80REINSTALLATION
1. NLL HOD �FILLS i0 BE INSTFItE� BV THE WIftE LINE PROCESS.
2 THECONTRACTOF.SUBJEGTiOTHEREOUIREMENTSOFTHESEPlANS.WILLOEfERMMETHEE%ACTMEfHO�ANDTECHNIDUESFOR
COMPLETING THE H0� CROSSINGS. EXCAVqTED MU� PITS CONSTRUCTEO IN THE ENTRY AND EXIT AREAS WILL 9E LIMITED TO THE PIPE
BOREHOLEFREAONLY.
3. AFfFRCAMPLEfIONOFTtlEDIREC710NALDRIWNGWORKTMEENRtYANOE%ITPRLOCAilONSSMhLL6ERESTOREOTOTHEIRORIGINAL
PIfDMOM'S NATUR4L GAS FAdLITY DMWINGS ARE
�SE
CON�IlI0N5.
BORE PRE-REAMING RE�UIREMENTS
1. AFTERTHEPILOTHOLEISACCEPTED.THECOMRAGTOFSWhI.PERFORMAREAMIN6FNOPftODOCTPIPEPULL.
2 THEMA%IMUMPREREAMINGOIAMETERSfW1BE0EfEFMINEOBYCOMPFNvSPECIFICATI0N5/W�CONSTRUCTIONSUPERVISOR'S
APPROVAL UNLESS OTHE3NIISE nPPROVPD BY THE COMPANYS ENGINEER.
3. BIIOYANGYMOOIFICATIONSSHALLBEUSEOATTHE�ISCftETIONOFTHECONTRACTOR.ANYBUOYANCYMO�IFIG4TIONPROCE�IIRE
PROPOSED FOR OSE SHALL BE SUBMIifED TO THE OWNER FOR FPPROVAL THE CONTRACTOR IS RESPONSIBLE FOR (WY MMAGE TO THE
PULL SECTION RESULTING FpON 6VOYBNCY MO�IfICA➢ONS.
80RE PULLBACK RE�UIREMENTS
1. CONTRACTORSHALLPULLE%TRALENGTHOfPR00UCTPIPE500NEJOWTCANBEIXAMINE�.
Z CONTRAGTORSMALLSUPPOf1TTHEPRODUCTPIPEPULLSECTIONhSITPROCEE�SOURINGPOLL8ACK50TH4TITMOVESFREELYhND15
NOT OVER STRESSE�.
BORE DRILLING FLl11DS
1. CONTRACTORSHALLSUBMRTHECOMPOSIiIONOFRLL�RILLMGFWID5T00WNERFORAPPR�VPL
l. CONTFNCTORSNALLNOTOSEPNYORIWNGFLNOTHAT�OESNOTCOMPLVWITHPERMITREOUIREMEMSANDENVIRONMENiAL
REGULATIONS.
7. CONTRICTORSHPiLBERESPON5IBLEFOROBTNNING,TRN:SPORTING,AN�STORINGANYWATERREWIRE�FORDftILLINGFLU105.
4. CONTRACTORSHALLMA%IMREREGIRCUlATIONOFDRILIINGFWI�SORiFCERETUFNS.
5. CONTRACTORS:ALLPROVIOESOLIO<COMROLANOFLW�CLEANINGEQUIPMEMOFACONFIGURATIONANOCAPACIiViHA7GW
PROCESS SIIRFACE RETORNS AN� PFO�UCE pRIW NG FLUID SUITABLE FOR ftEJSE.
6. OISPOSAL OF �GESS �ftILLiNG FL01� IS iHE RESPONSIBILITY OF THE CONTPACiOR AN� SHALL BE GON�UCTED M COMPLIANCE WITH pLL
ENVIRONMENTFL REGULATIONS. RIGNT-0FWAV AND WORKSPI CE HGREEMENTS. AN� PERMR REOUIREMENTS.
]. COMRACTORSHALLSUBMROftILLINGFLUID01SPO5PLPROCE�lIRE5T00WNERfORAPPROVAL
B. COMRACTORSHALLEMPLOYBESiEFFORT5TOM4JNTAINFULLANNULARCIRCUlATIONOFORIWNGFWIO.
9. �RILLINGFWIpRETURNSATLOCATIONSOTHERTHANTHEENTRYANOEYRPR55H4LLBEMINIMIZEO.
10. IN THE EVENT iHAi ANNUfAR qRCULATION IS LOSi, GONTRNCiOR SHALL iAKE qCTION TO RESIDRE CIRCUTAPON.
11. IF INADVERTeNi SU4FACE RETURNS OF DRILLING FLUI�S OCCOR, COMRACTOR 51W.L IMMEDIATELY CLFAN PND COLLECT.
BORE CROSSING WITHOUT CASINGS
1. THELONSTRUCTIONOFALLCROSSIN6S�ESIGNEOBYiHECOMPANY.MCLUDINGALLDETAILSINCIDEMTOTHEINSiAW1➢ONOPSUCH
CROSSINGS, SHALL 0E IN AGCORDpNCE WITH THE �FAWINGS AND SNFLL COMPLY WIiH SUCH SPEGFIG4TION5 AS MAY BE RE�UIRFD BY
iHE OTHER AUTHORftt NAVWG JURISDICTION. ANO SUCH SPEGIFlCATIONS HEREIN AS M4V BE PPPLICABLE.
P. iHEBORE0CRO551NGWiTHOUTCA51NG5H0UL�BEINSiqLLEDBEFOREiHE�RCHIN6ANOBEN0INGOPERqTI0N5PRRNEATiME
GROSSING. WHEN BORING. THE CURING HEAD SNALL NOT EXTENO BEVOND ME LEPDING END OF iHE CAPRIER PIPE MORE THPN SIX
INCHES.
GROUTING OF BOREDAND CASED CROSSINGS
1. WHEREREOUIRE�,BOREDPN�CASE�CROSSINGSHALLBEPRESSURE6ROUff�BYTNECONTRACTORTOCOMPIFTELVFlLLME
ANNULAft SPAGE BEiWEEN THE CAkRIER OR CASING PIPE FNU THE FARTH. THE GROIJr SHALL CONSIST OF F SANOLEMENT SLORftY OF AT
LEAST 7WO SACKS OF CEMEMrY�3. OR AS ftEOUIRED BY JURISDICTIONFL AUMORITY.
NCDOTGENERALNOTES
1. AWNTiENNGREEMEMI5RE0UIRE0FORANVUTILfIVWHICHISTOCR0.550flOTHFRWI5E0CCUPYHIGHWAYRIG1i�-0FWFY.AiTER
PPPROYqL THE DIVISION Ek6MEER OR HIS PPPOINTEO REPRESENTAiNE SHALL BE GNEN PRIOR NOTICE BEFORE BE6INNING WORK ON
HIGHWFY PICaHTAF�WAY. iNERE MUST BE A MURIPI UN�ER5iPNpING BEIWEEN UiILIiV ANO DOT REORESENTPTNES PS TO WHEN WORN
Wlll COMMENCE ANO ON ANY OTHER CONORIONS �EEME� NECESSARY'.
4. T0.4FFlCWILINOTBEDET0URE00FREk0U7E00N5TATEROMSFORTHEINSTALLATI0NI1NLE55PPPROVEOBYTHEONISIONENGINeER.
WHEN DETOURS ARE ALLOWEO, THE DIVISION ENGMEER WILL OEUNFATE THE �EfOUR ROIfrE AND ALL SIGNING ANO MARKING OF THE
�ETOUR WHICH MAV BE NECES54RY.
3. PARNINGOFVEHIGLESONAFEASOFINSTALIATIONORMAINiENANLEWILLN0TBE7ERMITfE�INTHETRAVELE�WAY,EXCEPTWHEftE
THE PRESCRIBED SIGNING OR FIAGMEN, OR BOTH, ARE IN PIACE.
<. THESiORAGEOFMATERW.SONTNER0A0WAYWILLNOTBEPERMRiE�E%CEPTINE%iREMEINSTPNCESANOTHENONIVBY
PERMISSION FROM THE ONISION ENGINEER OR NIS PEPflESENTATIVE FN� WHERE PFOPER SIGNING IS IN PlACE.
5. ALLAREASDISNR9EDDUWNGGONSTRUGTIONORMAIMENPNGESWIILBERESTOREDTOTNESATISFACTIONOFTHEDNISIONENGINEER
OR HIS REPRESENTATNE.
6. IN iHE EVEM THE CONiRACTOR FAILS TO RESTORE ANY ROADWAY OPENING TO ME SA7ISFACTI�N OF iHE OMSION ENGINEER. AFfER
SIIPFIQEM NOTIFIG4TION BY THE ONISION ENGMEER, iHE NON�BEfTERMENi WST OF RESTORING OR kEPNRING SAME 9Y OOT FOFGES
WILL BE BORNE BV THE CONTR4CTOft.
]. TRAFFICCONTROLDEVICES
a. PNY AGENCY PERFORMMG CONSTF2UCTION ANO M1411NTENANCE WORB ON OR AWFCEM TOA STREET OR HIGHWAY ON THE SiFTE
HIGHWAY SYSTEM IS RESPONSIBLE FOR USING THE PFOPER TRAfFlL CONiROI DEVILES THE OF/IGES USFD FRE SUBJECT TO
APPROVN BY THE DNISION OF HIGHWAYS AND SHALL CONFORM TO R1E MUTCO ANO TO hiE NOPTH CPAOIJNA SUPPLEMEM TO THE
MOTC�.
b. Pll TRAFFIC CONTROI �EVICES INSTALLED ON i}IE STATE HIGHWAY SYSTEM SHALL BE IN CONFORMANCE WITH THE MUTCO ANO THE
NORTHCqROLI'MSUPPLEMENTTOTHEMUIG�,
8. THECROSSINGSSHOOLDBELOCATEOASNEARNORM4l.TOTHEHIGNWAYAIIGNMENTASPRACTICAL
• �MWING IS CURRENT ONLY THROUGM THE UTEST REVISED OATE' TO INSURE THERE IS NO RISK OF IN4PPftOPRIATE
�T BE �ESTROYEO IN ACCOR�PNCE WITH RECORDS 8 MFO. MANAGEMENT IRIMI POLICV 1001
'EG'°""` C411 piedmont
_NGINEeP
�Gp'E`� Natural Gas
iEC 6 STO
vqINCIPFL �OVTNGMIDIS%EDMOMNSNRALIN9COPP.
ENGMEEa CONP.OiFICEBID*REdA0.YTftUWqLVE
LINE 326 REPLACEMENT
GENERALNOTES
FORSYTH COUNTY, NC
WINSTON-54LEM RESOURCE CENTER. WWSTON�SN.EM, NC
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF, owc�s�
SHEET(S) 2 OF45 DWGSCALE NONE
]WG�AiEO&012018 SUPERSEDEO _
DNPPoNGNVMBER REVI51(
PNG-G-326-0001001 A
NCDOT GENERAL NOTES (continued)
9. CON�InONSWHICHAREGENEAHLLYUNSUITABLEORUNDESIPABLEFORPIPELMECROSSINGS5H0ULOBEFV010E0.THE5EINCLUDE
LOCATIONS, SI1CH AS IN DEEP CUTSI NEAR FOOTINGS OF STRUCTURES: ACROSS INiERSECTIONS FT GRF�E OR aAMP TERMINALS; AT
CFOSS �RAINS WHEFE FIOW OF WqTER, ORIR, OR SiREAM BEOLOAD MAY BE 005iRUCTEO;, WITHIN BASINS OF AN UNDERPASS ORAINEO
BY A PUMP IP PIPELINE G4RftiES A LIOUIO OR llOUEFlEO G45: AN� M WET OR ROCKY TERFW N WHERE R WILL BE OIFFICULT TO ATTAIN
MINIMUM BURY.
10. ON LONGRU�INAI INSiPLIATi0N5. UiILRIES SHOULO BE LOCATED SO/S TO MINIMIZE INTEflFFAENCE WITH HIGHWAY ORAINAGE, THE
STRUCNRAL IN7EGRItt OF THE 7RAVELE� WAY. hND iHE SAFE OPEMTI0.Y OF THE HIGHN'AY. THEV SHOUL� BE LOCATED ON IINIFORM
FLIGNMEM PREFERABIY NEAR TNE RIGHT-0E-WAY LINE. LOFGITU�IN.4L INSTALLATIONS WILL NOT BE PERMITfED UN�ER THE PAVEMEM,
OR PAVE� SHOULDERS, FXCEPT WHERE AN EXTREIdE HAR�SHIP CASE E%ISiS.
u. VERTIG4LnNDNORIZONiAICtEARANCEBEIWEENAPIPELINEAN�lASTRJCTlIREOROTHERHI6FM1YAYORIRILRYFFCIl1tt5H00LDBE
SOFFICIEM TO PEFMIT MAINTENANCE OF TNE 0➢LITY FAGILITV AND T41E HIGHWFY FACILOY.
f2 WHEREPIPELMESAREMSiALLE01NTHERIGHT-0P-WnYAND4RENOTOFfEFRWSANTERIAL,ALOGITIN6TAPE5HV1BEM5TPLlED
WITH THE PIPELINE.
13. THEPIPESHPLL9EPROPERLYBE��EDASPROVI�E�HEftEIN.THEPIPESHALLBEWDTRIIETOLINEANDGPA0E0NABEDWHICHIS
UNIFORMLY FlRM THROUGHIXIT RS EMIFE LENGTH nN0 CAREFULLY SH4PED TO Fli THE OUISIOE OF TNE VIPE FOR FT LF1sST 10°: OF f75
OIRSi�E OIFMETEq. WHEftE ROCN IS ENCAUNTEftE�, THE iRENCH SH4LL BE UNDERCUT AT LfAST fi' AN� 9ACKFILLED WRH SUITABLE
MAIERIAi_ FREE OF ROCK.
/4, THEBACNFILLAROIIN�ANDUNDERPIPESOROTHERUTILITYINSTPIWTIONSONALLOPENLUTSECTIONSACROSSOPPAR4LLELTO
HIGNWAYS WRHIN CONSTRUCTION LIMRS SHALL BE M40E OF qPPROV'e� MHiERIP1 FREE FROM qOCKSIN 6' LOOSE IAYEFS, OR OTMER
nPPROVE� MEiH00.5. AND SHALL BE COMPACTED TOAT LEAST 95Ye OF STqN0AR00ENSltt AS OETERMMEO BY PASHTO MEfFi�� TA9.
WHEN COM11PACTIN6IN IAVERS, EACH LAYER MUST BE iHOROUGHLY TMiPED 8Y A MECHPNICAL TAMP BEPORE THE NEXT IAYER IS
PLACED. A PNEIIMATIC TAMP, A GhSOL1NE RAM TYPE TPMP, OR A VIBRATING TAMP WILL BE REOUIRE� TO MEET THE SPECIFICFTIONS OF A
'MELHHNICALTAMP'.
15. nLL EXCESS E%CAVATEO M4TERl4l SHALL BE PEMOVE� AN� �ISPOSE� OF OlJr51DE THE LIMRS OF THE RIGHT-0E-WqY IN SUCH F M4NNEft
FS NOT TO INTERFERE WITH THE DR41N4GE OF HIGHWAYS UNIESS OTHERWISE PEHMITTE� OR OIRECTE� BY THE ONISION EN6INEER OR
HIS REPftESENTNiNE.
Ifi. WMEREITISNEGESSARYTOOPEN-CIf�ACROSSLONCRETEPAVEMEMORCONCRETEB4$EPPVEMENT,CUTSSHOUL�BEMADEWITNP
CONCRETE S4W WHERE PAAC7ICAL A SECTION CP PqVEMEM OF MiNiMI1M LENGTH OF 10' SHALL BE REMOVE� AN� REPLACED WIiH NEYV
CONCPETE. WNERE THE EOGE OF iHE PAiCH OR SEC➢ON OF REMOVEO PRVEMENT IS LE55 THAtJ f 0' FROM THE TMNSVERSE EXPANSION
OR GONTRAGTION JOIrfI OR CRACN, THE ENi12E SECiION OF PAVEMENT SHALL BE REMOVFD I1P TO THE JOINT OR CPACK ANO REPUCED
WIiH NEW CONCPFfE. TNE NEW CONCRETE SHALL 9E �OWELE� INTO THE EXISTING CONCREfE 6Y ORILLiNG HOlE51NT0 THE EXISTING
CONCRETE AND MSTALLING DOWeLS. AI.L REPlACE� CONCflEiE 51ULL HAVE A OEPTH OP P GPE4iER ilWJ THE DEPRIOF THE OFIGINPL
SIABJMMEDIHtELv VN�ER THE REP�qCED CONCREfE THERE SHALL BE PIACEO A iHOROl1GMLY CAMPACiE� 3' L4YER OF SDIL iYPE
BASECOURSE.SAN�,SCftEENING,OROTHER GRANOLAft MAiERIAI.ALL REPL4Cm CONCflETE,DOWEL5.J01NT FlLLER.AND SUBGRAOE
REMFORCING MATERLAI SH4LL MEET THE SPEGFICATIONS OF THE �EPARTMENT, BOTH AS TO MATERIAL AN� PERPoRMANCE OF WORK
WHERE TNE E%ISTING PF4EMENT IS BA�LY CRACKEO OR HAS 6EEN PATCHED TO A StaTE WHERE F RESURFAGING WILL BE REOUIREO IN
THE IMME�IAiE FUipRE THE �IVISION ENGINEER MAY AUTHORIZE THE USE Of A BINMINOUS PATCN TO MEET R1E DEP0.RTMENPS
PATCHWGPROCEDURE
11. WHEREITISNECESSIRYTOOPENCUTACROSSROADSWITHSURFACESOTHERi1WNCONCRETE.THEPAVEMENTREPNRS4ALLBEAS
��RECTE� 8Y THE OEPARTMENT WITH NO LESS THAN A MINIMUM OF z OF SURFAGE COURSE AND ASPHALT flASE WORSE, ttP[ H6, TO
THE ORIGIR4L $UBG W�E OR A MINIMUM OF 6' OF M6, WHIGHEVER IS GkeATER. THE REPLACEMEN� SIIRFA�E ANpIOft 845E SHALL EXiENO
A MINIMUM OF 1' ON EACN SIOE Of TNE EXCAVATED OPENING. THE T1ICKNE55 OF THE REPIACEMENT MATERWL SHALL BE SUFFIGIENT TD
PROVIDE A&1SE AN� SURFAGE OF EOUIVALENT STR:NGTH TO THE UNUISTURBED BPSE AN� SUPFPCE ALL REPlACEO SIIRFAGIN6 SMALL
MEET THE SPEGFICATIONS OF THE OEPARTMENT 60TH AS TO MAiEkIAL 0.Np PERFORMANCE OF WORK
18. OPENINGS IN iHE SM�ULOERS, SIDE DITCHES AND CLR OP FILi SLOPES OP THE FOAO SHALL BE REPNRED TO THE 54i15FAC710N OF THE
�MSION ENGINEER.
19. WHEREVEPTHETMYELE�PORTIONOFTH=ROPDWAYISCUiNORMALTOTHEHIGHvVAVALIGNMENT.ONLVONEHALFOFiHER0A0
WIOTH SHALL BE OPENED AT ONE TIME IN ORDER TO MAINTNN TRAFFIC. BEFORE THE OTHER HPiF IS CUT, THE FIRST OPENING SHALL BE
MADE USABLE, SAFE. M'� MAINTNNEO FOR TRpFFl4 NO TRENCN MA➢E IN THE TPAVEL PORTION OF THE ROADWAY, ERNFR NORM4L OR
PAFALLEL SMALL 6'c LER OPEN OVERNIGHt E,CCEPT IN M! EMERGENCY ANO ONLY THEN WHEN ADEpUATE iRAFFIC CONWOL �EYICES.
WARNWG SIGNS. ANU LIGHTS ARE PROMWEMLY DISPIAYED TO PROTECT THE TftAVELING PUBLIC.
[0. WHERETHESHOOLOERISOPEN-0UTPARALLELTOPAVEMENT,A�EOUpTETW�FICCONTROLDEVICESANDWARNING5IGNSAAETOBE
PtACEO Ml�. IF NECESSARV, FIAGMEN ARE TO BE EMFLOYFD TO GONiROL TPAiFIC. IF TRENGHES PRE LEFf OPEN OVERNIGMA
SUFFIGENT NUMBER OF TRAFFIC GONTROL �EVICES, WARNING SIGNS, PN� UGHiS MUST BE PROMMENRY OISPlAYEO SO THAT THE
iFtqVELING PUBLIC WILL BEADEOUATELY PROTECiED.
21. THEFOLLOWINGREOUIREMENTSAREAPPLIGABLEWHEREPPN�LLERRENGHESAftEMADE:
a ECCAVATION MATERkL SHALL NOT BE STORED ON THE PAVEMENi IF R CAN BE REASONABI.Yl+ANDIE� OTHERWISE:IN CASES
NIHERE STOWNG OF E%CAVqTEO MAiEftIAL ON PAVEMEM IS ABSOLOTELY NECES54RY. S4ME SH4LL BE PEMOVED a50UICKLY AS
PRAGiICALANDTHE PAVEMENTSHHlLBE THOROUGHLY CIEANED.
�. E%CAVqTION IN THE IMME�IATE VICINIiY OF pRAIN4GE STPOCTlIRES SWll19E MA�E WITH SPECl4L G4RE 50 FS NOT TO OPMAGE OR
INTERFERE WIiH THE USE OF THE FXISiING DPNWaGE PACILITIES.
c ORNNAGEFACILITIESTHATAREINADVERTENTLY�AMAGE�MUSTBEFEPNREOIMMEDIAIELY.
d. THE BOTfOM OF THE E%CAVATION fORA PHRALLEL INSTFLLATION IN RURPI AREAS.OR ELSEWHEftE WHEN SPACE WILL PERMIT.
SHALL NOT BE NFARER THE E�GE OF THE PAVEMENT (MEASURE� IN A HOflIZONTAI PIANE) TNpN THE DEPTH OF THE EXCAVATIONS
SO THAT THE TH WRETICAL $IOPE FROM THE EWE Of THE PAVEMENi TO 1HE BOTTOM OF ME DRCH WILL BE NO STEEPER TIWN A
ONEdO-0NE SLOFE.ON PAVED SECTIONS UN�ER i<' IN WIOTH, CONSI�EFAiION SW9.L BE GIVEN FOR FUTURE WI�ENING AN� PAVING
OF SHOUILERS. THE TRENCH SHALL NOT BE CLOSER THAN 31 TO THE E�GE OF THE PFVEMENT EXCEPT IN SPEGNL CON�IilONS
APPROVEO BY 1'HE �IVISION ENGINEER.
e, PUW1lF10PEN TftENCH WSTRLLAilONS THAi �0 NOT REOlI1RE SHOPINGSHOUID BE 0.05ED PT THE ENo OF EACH WORKMV.
WHERE SHOPoNG IS REalI1RE0, THE TAENCH SHOULO BE PROPERLV SHIEIDEO WI1H TRAFFIC BABRIERS, SIGNS AN� 11GHi5, PNO
FLLOWEO ID REM41N OPEN VNTIL GOMPLEiE�.
f. BOREPRSA�JpCENTT00RWHICH/MYBEHALIRWUSTOTRAFFICSHOUlDNOTBELEFfOPENORUNSMiELDEDOVERNIGHT.
SHIELPING M CONFORMANCE WITH THE MANUAL ON UNIfORM TfL4FFIC CONTROlOEVICES SHA1L 9E NLLOWED IN THE CASE OF
WYGE PRS OR FJ(iENSIVE BORE AND JACk OPER4TION5. S.WyL BORES UN�ER TNO LANE ROAOWAVS SHOUID BE COMPLEfED IN
ONE CONTINl10U50PEMilON. PITS 51 BEYONO THE TOE OF FILlSLOPES FIJ� O11T510E iHE CLEAft RECOVERY AREP OR BEHINO
GUAR�RAIL NEEO NOT BE SHIE�OED.
ABBREVIATIONS
APPRO%.
CIL
CMP
COMM
CP
DI
DIA
DIP
E
EA
ELIELEV
Ea
FLC
FM
F�
H I HORIZ
HDD
IN/INV
JAB
L
LF
hL1X
MDPE
MIN
MH
N
NT.S.
O.C.
oC
o.o.
PCC
PIV
P I PIL
PSI
WC
R
RD
RNV I ROW
RCP
50
SS
SSD
STA
iWS
T.G.E.
TYP
UGE
UGi
VlVEftT
W
W.T.
X-ING
GENER4L RESTRICTIONS
APPRDXIMATE
CENTERIJNE
CORflUGATEO METAL PIPE
COMMl1NICAT10N5
CATHO�IG PROTECTION
DROPINLET
OINMEfER
DIICTILE IRON PIPE
EASTING
EACH
�evnnorv
EXISTING
FOREIGN LINE CROSSING
FORCE MAIN
FEET
HORIZONTPL
HORIZONTAL DIRECTIONAI �RILL
INVERT
JACK AND AUGER BORE
LENGTH
LINEAfifEEi
bVJUMUM
MEDIUM DENSIN POLYETHYLENE
MINIMOM
MANHOLE
NORTHING
NOT TO SCALE
ONCENTER
OPEN CUT
oursioE owM�n
PORTIAND CEMEM CONCftETE
POSi IN�ICATOR VALVE
PROPEfttt LINE
POUNDSPERSOVAREINCH
POLYVINYI CHLORIDE
Rnows
ROAD
W6HT-0E-WAV
REMFORCED CONGRETE PIPE
STORM �RAIN
SANITARV SEWER
$OLID STFTE OECOUPLER
STATION
TEMPORARV WORRSPACE
TEMPORARYCONSTRUGTIONEASEMENT
naic�,�
IINOERGROIIND ELECTRIC
UN�ERGROl1ND TELEPHONEtCOMMUNIGATIONS
VEftTIGAt
wioni
WqLLTHICKNESS
CROSSING
STAY IN ROWIEASEMENTS OR WIIHIN PREOETERMWE� WORI(SPACE AREJS.
ONLV USE DESIGNATEO POIMS OF ACCE55 AS I�EMIFlED BY PNG INSPECTOR(5J.
NO OIGGING. WORK, OR STORAGE WIiHW 25' OF POWER LINE OR EOUIPMENT
INCLUOING GUY WIRES, EXGEPTAT CROSSINGS Of POWER RIGHt OF WAV
DESIGNATEO ON PlANS.
ANY �Oi CFOSSING NOTIFlCA➢ON$ TO BE M4DE AS OIGiRTEO BY iHE PERMIT OR
STATE p0i GERMR.
CONTRACTOR IS RESPONSIBLE FOR NNOWING LOCAiION OF PLL ENVIftONMENTALLV
SENSITNE AFFA RESTRIGTIONS PERTNNING TO TNIS GROJECT.
LEGEND
PROPOSE� iEMPOR>RV WORKSPhGE
------ PROPoSEDPERMANEMEASEMEM
— CLFARINGLIMITSIPERMANENTEASEMENT)
� � � � � / PIPESTIiINGPAE��TEMPORARYWOftKSPACE�
�—
STREAM
��
�% WETlANO
&7
$ APPROXIMAiE90FEHOLELOG4Ti0N
�m
1 1 PROGOSEDGASLWE
—�—�—� E%ISTINGG0.5LINE
- RIGHT-0E-WAVIPROPERIYLINE
�•— FENCELME
^""""'""'^'^'^ WOODS�NE�GELINE
----90P---- COMOUR
---------------- - SiORMWFTERUNE
—��—�•—� WERHEADELECTRIC
— � — � — — WATER EASEMENT
E�GE OF PAVEMENi
—'--•—'—•— UNDERGROUNOTELEPHONE
—'�—'�—'�--� UN�'cRGR0UN0ElECTftIG
---�—"—"--"- UNDEFGROUNOG49LEN
—�—•—•— WATERLINE
�- SHNIiARVSEWER
I I�I 111 I I I�� ��ROAO
rnurrue innr a wnrmen i uu Au ni�n i s nesrnveo � oo NOT sGLE THIs oruwlNc • usE oIMENSIONs aNLv
PIEOMOM'S NATURAI GAS FACILItt ORqWINGS ARE C0451DERED CONFIOENTIAL (OA41095)' ORAWING IS CUFREM ONLY THROIIGH TME LATEST REVISED DATE' TO INSORE THE0.E IS NO RISK OF INAPPROPFIATE
�ISClOSEFNLLPPEVI0U5PAPERCOPIESOFTHI50RA'MNGMUSTBEDESiR0YE01NACCOROANCEWRHRECORp581NFO.MAN4GEMENT WM POLICV1001
WTE PEN910N�S�Df4CbTION BY CNM AGGO OESCPoFiION qpGqOVALS
�3oao,a 90%SUBMITfAL ,IAM sF e� A�EA�ooE _<� �a µ�� AE��°� Piedmont LINE 326 REPLACEMENT
ACCOUNT NUMBER XXXXX ��x� � EHGI.4EEP ���'
PROJEGTNUMBER 0351527 y�t -�-• M«=E=� Natural Gas ABBREVIATIONS & LEGEND
oanNnN�ev JAM �� � aF=a�*J FORSYTH COUNTY, NC
STP.TIONID 3-T-WSM3995 0^` •"'°" vAiHaPn� �orrwcxrmisAeoManrrxaluwaeqscoav.
CHECM.[RINITLiLS SF �����2018 � ErvewEEa coar.oFFSE�naweoMOMaowowve WINSiON-$ALEMRESOURCECEMER,WINSTONSALEM,NG
cnuaorre, uc zuto
90% SUBMITTAL
NOT FOR CONSTRUCTION
PEP. DWG�S)
]WGDATE OYOv101B SUPERSEDE� _
PNG-G-326-0001002 pEA
qSGPLPIE
¢bNNERSXIP
y2 �CPEFGE
EASEnEMS
flFF.ONG.NO.
MGL�)IP15
z
� � �
0
s H
'a �
:
' T?AYEN� E4cE�d4^�'
�r-
. � ::: �rn� f�
�� If
rrwsrorosueM Foxsrix cowm
BOfA00FEWGNMI
51939<Y1i.W
MAi1iG3E01P951PG4
z
0
2:' TEMP. CON3TRLCiIOW EA�r IE��
�J 'Y . .��
1�._CPr/ 6
o z o
w � w
o � n � o
� N� �
m a"a _
,v _ U� V� :� �AS LINE — �
� i �Fioeeno�uoorveoi
-,- _ � .rFF , ,. .-� rT '? a� - -
..t `L. r�• �� �1&`� 1e y�; �,�, t.19��a� \'l'� < q� � � y .�� � -�--.
� 1 � ,+�- `�— �, �� � \ \ \ —�
..�� . , 1 '�� �� � ' T •1 4, � 1 `� .�, ` !� ' �., S�
�
� � y� , , I 11 �r 1 1.� n,� ��.� . �� ' .,s-
_, N . , a, �. � � '.. ��
�.� _ t 1L I,,a "_ . E 1cYt ryt A OP l I 9 [,r)v .:�i� �� �
�� III.,JrIYN.iGb,tl�V'EI '�•���/�y��
E%I511 _r::iLJE � ��L r + - -
♦.
(IJNE 20l i ... J� ."� I ...
� . � ��
Y � �,�
PARTNER9PIER �r' / . ; �
CHAN�IERLI ti.:�• �'• � •
�,. -.�` ��.�� �
� is �
IA i5
/IL �1� NQS IIIID
�� �
�
3
�
� a
i
� �
_ �
§ '°
� ao
� e
� �
o-
ANiEPW
CIX�Si.M'iHW
CVSSIINOP
TIEIMOEX.6PIPEUNE
(GONTRACTORTOFIELD VERIFY ELEVRTION7
�T�
tl
eonaoo�eoucnnnn
68193�J-090300
�asrw�canoe
O.fl.HOWONMC
fi614�&llqB[q
fIB1�9PG��RBIR..]�
JONNOOUGVSSNPOPSMRE
fi8t¢168tfi1.W
OB 331� PG �H]SCN2915 W i]I
oez�t�wimioemeoxes�,
� p w w w g ��LL� w w� w
�o� o o h H � 6 8��� �� b � o �
�RR C 5 5 � $^� ffi^ � 8^ d
' � "a_ 0"a_ ' > � � p
�:� � : a � �� � a r « -za <a �
N
f x IP C0� 3 f-I..E45F,1�,E\T � FUiL'RENC��irPd Exl' IkG70�PeftMArvENiFASEMENi
lJ FI. . .. I �" N . "n'_TIi�Y`J 2 . .
- L —
� _, �y�ti . C'`S �� G� _�:AS -- G%�— i45 ) — _..:, � _ 1 '
..� . �.t _ sn �,m` � _� i -',.. y"5 . ��'j. �..
R ` _
�.� {` y;,.� i \��f :-,L— .yJ+/x, -�" W ',., - _f.l��- `�'�.-�, �
��1�� \ '� � v `'� � �- i/ / 1� /�� , � �"_� a N x V1 ir f 'wI'"'y �t s. .
.� � ���Ja � ` V '�^' ��J+�� ..__ � 1� IJ� 'i' J�
♦ ", � . - T 4.i . �'-�7}
'��\.�,� � \:��� � � �s �—''r� _ ,� "' y'� � � /� i f> 'a�
� � ,� .,—� � -:.
2
��� > h _. �. - .- �w7 �. -
�� : �
' / `=r�hss �.: o;��ac s,ao= hi .
l '.-1:�.. _ � � i� X �, � �L�_`
ne 9 ] J
� `� � � r'RCPUSEDt CLFM �LI4'�I . . � � ���"s` � � y,�� � �d��� �
PROPOSED6'SiEELPIPELINE CONTW�CTORiOLIMITCONSTRUCiIf: __ ���. � � `� � � 9' �
�5 J � ". \ . Sf.i
�MAOP 100�PSIG! ACTIVITIESWIiHINSTREAMSANDWEfLA1D � � � �
, � . / 1�:�'-'� ,� �
p. • , ' �� ;�,,a[.<M� 1 ) \ . �� ,.\ .. • �Sy�
}f�,� �AI � •� � �. S. f � � � ` I �: `M/r i \ �`i �� ` � �, `^�'
�� // /
�����'��'-� L�� ." ; , . . . � �1rv ' / f. r .iit� , /� �a� � \.
� M.r} �f ry• , �- ~' L � 6Bi&4&2108.W �.../ I �.2 // �` �'y- � � .
b•.� J� � t, . �.••• 83279PG3128TR.2i� � Y��•` .. �.
,� � .� �� �. , ���:,�P���. a �'��: . �
��' � : .. �;a . "°�— *' �
�
15E EWY%-l0! NOPM GWq,,, W�4lM. RIM FIGW YI% OR E0.NNfllf N�1VlO ,Yff15
H6 ��� EGP
� �� �
srz I_`'i' I �..^�i���.�.�i� I I �� I S.S
1N0 1N0 TMO TMO
ROMS XOWS ROWS ROWS
Y-] � Y3 �� ��� I 5`J I� 1 5F3
Ro�Yls ie P�OYF ra I+O�'MS N�ows 0 OR�'MS
i5C
qNll(1I.1
—�
1
�
6'PIPELINE
FIEOMONPS NATlIRA1 WS FAqLIN ORAWINGS ARE CONSI�ERE� CONFl�EMWL (OM-0095)' OMWING IS CURREM ONIY THROOGH THE LATEST REVISED DATE' TO INSURE THERE IS NO WSK OF INAPPRO�RWTE
�ISCLWER HLL PREVIOUS P4PER COPIF.S OF THIS �FAWING MUST BE �ESTRpYED IN AC WROPNCE WRH RECOROS 81NF0. MFWiGEMEM RIM POLICY 1001
er cxn arvo oescwenor+ aroaovrLLs
vN sF ec naencooe xaoo ��� -��= qE�,� ���I LINE 326 REPLACEMENT
ACCOUNTNUMBERXX%XX ���x � ENcirvEEn Piedmont
�Ro,E�,N„MaER 0351527 �� � M�,��„ ALIGNMENT STA: 0+00 TO 24+50
o�,N�N�BY �, RE<,sr� Natural Gas FORSYTH COUNTY, NC
STATIONID 3-T-WSM3995 °"` ^"" pq�rvcipq� coarwcKrmmn[omomrwiuwi�asscoav.
.,HECKeRINITIALS SF 0111&21110 X%X EH��rvEEp coxv.orvicearmmeornoxrrzowowve WMSTON-$ALEMRESWRCECENTER,WINSi0NS4lEM,NG
cww�ar� rx mxio
NOTE'.
i. GEOiECHNIG4l �ATA IS
PEN�ING ANO Wlll BE
PROVI�EOFORGONTPACTOR
REPERENCE.
uc �
>:o
rrc p
�
� a
Bi0
�
eea
B�A
k
a
ff
NOT FOR CONSTRUCTION
REF.�1N6�5) PNGCJi6W�f002,PNGM3260001001
PNGbL3Y60001'J11
SMEET�S) 5 OF45 DWGSCALE ASNOTED
)WGDATE 01114'2018 SUPERSEOE� _
ORANINGN�MBER FEVISI
PNG-C-326-0001000 A
� OWNERS�UP
9
ACPFAGE
FASEMENiS
PEE qYG. uU.
� � L:MFl.
�
L '� �.�
4 �� ' z �
��, �i , � . ,..
HlNN0011GV551li015XIPE
�19d8d16].W
008110 Po i6�5 �B 8q5 Po PS
OBHMFGIt01pB2(80PGffi6
_ ,,_ ��/ % ��
3 r��l�l i r�
_ _ 1 `�-.
. .H N �Si l,�-
fiB19-0830fi0.00 PROP � i ilECLVIPELME
F14)PPf,i1>PRPC IMAOP'1JOOPSI61
x
�
�
� rs Q �
��
u mm� aa �wm
rn� �
�
�o
�
xo
s+o
eoo
eoo
ero
�
wo
w �
� �ei N . ¢
o a � a
�.H.NOPIpiIM."
89141E�1U0.0�
003t)9PG3�]B(IH��
YNESHtIiCl�1S
89195T.1149NDBIP63GG3BP
pB 1�t PG9N OB Yfi1 PG 10.59
C
� ��
�Z N Vr �
0 o W o u e�.wCs w n
mF U > UM1'uC
� �. � (� – «a� � � =
ymw - i3hrt•'--• > ^ �
O O" o m - "
am x�� . � S
' F
8 � b ffi FS� - 8� $
A AA � '� �„��;1.�.� ��. �
¢ :i.+. ` a rar - - <.
N PftOP09E� NC�OT R�uV �� , F � � '
�is � . �W' �•E3 L y , ,,.� t��' �t �
W
6dt 1 � r `� � + 4 7
t � CB fn F � �� I'� R4'q1B'- -
� � ��� E%. f' � I .c , Y�I� : �B t 2 : • �• � � * .� � y
� � (-ME3P5T0.-cC.'. ! � �' l 1. p9LY`�11y � ,���
4
4� h � * i / S �•. d "al � � �' � ]
•. � � V"✓�f�'- . ♦ �� `3LREMObEGI �� . �
EASEMENr � 3.. r'� � �O y � ..i:����.'�d t � '�t "� � IqPlTGIX G5 uNE � �� e� ��1
I�t � � 1�. ,, - [ SHEETAt�MJ:c-'�� �
9 �=c�A \ �\\.� a°' � � � i � �. �� '�� ��� ' .
°� � �i �i.L/ti�i�:�, /J\~
� .y': � �. y �
i�^ – 1� 'i: \`\ y \ /�j�.
,�
� '-^� � ��%�
. +. ' - , r.' �f; fi,�. � � ' , /
J ��j � 1'i�i � _. �[o; �,�c�a�E ,��a�i
.� .� . � f 0 x . �., �, .1'
� _ �s
PFOPOSE� `A FERA4WBI1 Fi: ' AtEh li TEMP.CONSTRlICT10N EAS MF^;" ��
��f.aT��'�
�
PIEDMONPS NPNRAL GFS FACILitt
DISCLC51
er cnx nnai
"�� �.#,i . -''\\�� 1 �" •
��� /! ,,..
?�� � f�\, �`�� � �� �� / \ � siEMBCONSiRUGtI0N6'� . � ��•..
/`' s'1�� � \ �. � � . ' �' �+. �� �i
Y \, ,•L � _ � FcuuToa sT noN � `►»
�FE sn�r aNGu azsmo�oo�
� � �{� . . _ � ► � r
��C_55 HGi.�
i;�' �, � i .. •
l
�T'.:.. �� \ \ �:���
i��' � � � •11-
y�� ` y •
F � { u .r._ePr � +z .
� �� � � f
f, f
wanm m oaz raxsw.c
Q
� EXISTINGGFA�E '—' -
� —
-- � OVER4'MIN
�
PIPELINE— . . . . . . '— —
0 3i.00 u.pp a.00 sa�oo u.00
f m m mm m
CONFl�ENTWi N.L RIGHTS FE:
CONFIOEMW. (OM4G35�' �W
ES OF TNIS DRNWIN6 MLIST BE
lga (ga
tya t�7a
EX. GAS LINE �—�—
. TIE INTO EY fi' PIPFiWE
� � � �CONTRACTORTOFlEI�VERIFYELEVATION)
z
M
THFOIIGH THE UTEST REVISEO DAiE' TO INSUftE THERE IS NO RISK OF INpPPROPRIAiE
WCEWRHNECOROSbINFO.MAN40EMENT WM POLICY1001
R`G�°"" C411 piedmont LINE 326 REPLACEMENT
E�G��� ALIGNMENT STA: 24+50 TO 40+98
°�� `�`� Natural Gas �I(�
REL65i0 ����p, qEpMOM� �� opo. FORSYTH COUNTY� IVl/
PFMCIFPL COPV.OFFlCE9TA%EUMOMRQq'p1iNE
exrdneee ��o����o WINSTONSPIEMRESOURCECENTER,WINSTONSALEM.NC
no�:
t. GEOTECHNICAI �FiA IS
PENOING ANO WILL BE
PROVIDED FOR CONTRACTOR
REFERENCE.
a.raxan
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF.DWG(S) PNGM�3160001006�,PNGG]26�W01001�,
4
x
�
�
s
]WGOATE 01119'2018 SUPERSE�E� _
pRqNiNGNUMBER REV19i
PNG—C-326-0001001 A
"s
e
a
z
¢
: � i .�TC�.9`OVN.B�G' ./J�STaSP
— — -,
. � �.r ,."-.
.. �� S . �`�. �Y� BEGIYSECTI0�0 p . r� �
FLevvio � 5 - ��
.. �� ��SSia .�s���� n ia_w y°'t� � '�.
r �- �o�ESrE��,r�a��.z;
ELE"AiIOPf d6i
� t' • . aa ss�?=�zzoo=>ia
C. P � - - _,. —�.
s LG'� _____ _
\ Y ' � '.
� ' Rt�P �� Pr�''�'�
� � e r -
� � �l.��.�i`.�..L.' � r �*,w� � � , .�/
!"
�
� .
♦. ,
.S+
: ;� :.
�
,.
� �,r �_�-
►`caw�,. -�
�{ . � 44 ST- �C • '� "F. I -� � �0
��' � �
K� { � � >
�� ��� � � ' � �
� .� ��L , �
�:r'' �t � Ra�� � "
�:�;,,� ,� _��s . ���: _�.,
�' N a�+� ��ewr.;,�
4- ��-±{ ~" 1�'� �
d
` � ��
�,'
�
r ^
J .
� A �, *�
� ' ' -
� - �. . r S ? . . .
E/ � . �, . . . . _' —
�� �
r�a'''� 0 �� � �� _
,.
� .�s ��t , :, i.r, � �':
�y'`..` � .- �
, a: �'' . '� ?
�! -" �" . ,
T5 , ' , -�• � .
k# `.�r, + _.r�, if:
5 �y
S ' rS';1�
;= ,
�'� .i. ��..-J L�l�'
', �
i ' ��, .' '���.�� ,
. �� h -H�Si ELE�9 lua �r �� '
Elc��: llJ� v�• L: Z � � M
.•�� r^ft�SSLFF Ifi Fol.;���� {{?' �
: ..�����...�
LINE 326 - HYDROl�EST TABLE
�t �
� h05E ilONA0�9P
PTIJN�.998'
N� �aE'2169P51G
�i
���
TEST SECTION 1 BEGIN SECTION LOWEST EVEVATION HIGHEST ELEVATION DIFFERENCE END SECTION
STATION(FT.) 0+00 9+23 34+q0 25+77 40+98
TOP PIPE 948 867 952 85 938
ELEVATION (FT.)
PSIG 2764 2200 2162 31 2769
HORIZONTAL ap 98
LENGTH (FT.)
ACTUALSECTION 4124
LENGTH (FT.)
VOLUME
(CU.FT./GALLON) 82��6,189
PROPRIEiARY d CONFIOENTNL,
PIEDMONPS NANRA� GAS FACILIiY �RAWINGS ARE CONSIDERED CONFlOEMWL
�
1�
J' DO NOT SCALE THIS DMWING' USE �IMENSIONS ONLV
IS CURRENT ONLY THROUGH THE LATEST flEVISE� DATE' TO INSt1RE iHERE IS NO RISK OF INAPPROPRNTE
tOYE� IN ACCOROANCE WRH ftEGOP�S 61NF0. MAt{AGEMENT (RIM) POLICV 1C01
ovqts
R`G'°"�` �O�I Piedmont LINE 326 REPLACEMENT
E�G��EEp HYDROSTATIC TEST
MGpTECH Natural Gas
°`"6iO FORSYTH COUNTY, NC
PRINCIvpI �OPYPoGNi3015%E�MONTHATUMLfi49COqP.
COPp.OF[ICE 9]A %FUMPY� PJW INtlVE
�awEEa �,.ewn..�.,�o..�n WINSTONS�LEMRESOURCECENTER.WMSTON-SALEM,NC
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF.OWG(5) pNGG3260W1000',PNGCd26-000100f
SHEEi�S� 1 OF45 DWGSCALE NONE
owconTE ovoirzo�e suaEasEOEo _
ORIhYiNGNUMBER REVI511
PNG-C-326-0001002 A
�`5��`' ��L ,'�
1 t�.. ',1� ' � _�. .
. �} y
R . l
I � ^ -
�i'''.,�a.. `�..
V . �'
��. � '.+ �
ir_ ry
y
y� l�y .
Y��' �
T "�.
-, - - - . ` -�.-� � �ii�Fl I
6819-4&8167.00
� d,' ' . '..\\UB 3270 PG 1675 DB 2945 PG
� 1 � _ . � - . � . a,i, DB_�26 pG �O�.p_�20�
�� .�-.. -r .!Pl . �. . �� •,-
�
'. .. r. - ' � , -'� �R�POSFDNODOi R+':1� �.,
' � � \ - j � - � ' '� , - '\,, _
ti�� ,r�'1 � .., i . � � i .
i.� Y� ,�„.•y'� 1 �,�
�5 , � . ,�r - �T �� �i • til
� � `1• 'T^ � . . �
4 + ��� ' ^•. ~�
k T �`
1 . }'
� i i d.`.. . .
�._' L
k • �'
r � . .�
k� y. �� '_� ` �� ." � � � �- ♦ �t' ���
, +.`
ti � �. x�
�. . ��.' "'R i��., �h . � ' �� l 4�`�..
�, �� 4 � n� y �•J {�^ ��yS�' r � ,. �rr. , ,;. . �-J..-yi
-'�' �' J 6�� i���• PROPOSEDNCDOTWW '� 4. ..�s�
D R H�RTON 1NC �.+,. � 1. � V ��
ss�saa-sosnrn� � � sQ �� �._ • �, ,�� � �
�'
q� y B 32)� PG 3125 (TR ��; . . � / � -
� . �. - . : . Q � ...��':
+y.. ,1`,' �- i �1. ..t . _- �` �J� r . "
�. 1. ; { �•. . . , ' �- _ . . _ . '�� .
' �'� � a �e- � �� FRANTCLIN DURIiAM
��.�.�.���� . " - �• •, , ' �' � 6819-573'�3;0
� �� � \
/ �?B 3263 i � ,�13 �e;�
_` � y .. . / � , �f '° y!� }_'_
wS
� SHOkE RD ' � �` ���,y�
r . \ a� 1 �' -•- � • � ` �'�°?
� � � � � � � �I � 25'TEMP. CON�TRU� f ��N � '1ENT � �
, v /
J '�
�? � JANE S. HUTCHENS � �
' '. "-, . � _ � � 6819-57-1148.00 �� � �
�' � � � � � � r�"�r DB 1663 PG &�? �`r
I � 'r � 1•. ,( � �\ � � �` y�: DB 1392 PG Q:i�
���1.:_ . . r' -:R � . ' 1, � � /� • �l� ` -f� � I�8295� PG �058 l� �.
3�—' —.
�� � �
, t � - -
�t . /�/
�
�
v` ���_ i ,
f
.y
i
i' ,.,�
� �`.
� t " ��
�� .
� _r. Y e1�
,� �t � � ' �'`f�T 1 T �� +�T�` 'k �
�� �--►-4� � f . f p��� ��� 1 �i . t.
•4 . .` � ' �' � � _._ ' ' � . �--,� ��� c S�
� �G;,�, .+,�� }t ,. y�s� — �e�� �'
� ��:_,.�.:
----- - — �5�
, — �--------- ------
�-- -- -- -- — E�;. �o FER�:iNti'�vr E,�sEr,^�!vT �,`•. �' :
- �` " � �
ACCESS ROAD 1 25' TE^:1P. G0�'vSTRUCTIOPJ �ASEB4FNT �� �_, .
�
: i �
'' � "� •i� �' i
WOODLAND�BAPTISTCHURCN� s..� � _.���', �r. _,
6819-56-4486AG
.: +. , pB 2307 PG 2432 7
� `-�. _
k ` ..
iT .���'�� i
1I �
_ .'.-1-�_ ���i,.��s' ���� __ _ _
PIE�MONTS NATURAL GAS FACILITY �R4WIYG5 AftE CONSI�ERFD CONFIOENilAL (OM4095�' �RpWING IS
a�
xwxxna� xx,c
�,�� �
01If912018 XXX
� �� ��
� �F '#
� i .' �
. :` `¢` � �� yr.
�T
.
� j w' : F<
..� : _ r. � � , ��
'HIS OPAWING' IISE OIMENSIQYS ONLY
THROUGH THE IAiEST REVISED DAiE' TO INSi1RE THERE IS NO RISK OF INAPPROPRWTE
JICE WITH RECOR�S B INFO. MAN4GEMENT RIM POLICY 1001
R`G'°�` ���I Piedmont LINE 326 REPLACEMENT
ENGINEEft
"�"E" Natural Gas ACCESS ROAD LAYOUT
'E"s'° FORSYTH COUNTY, NC
GftINCIPPI COPYWGNTIDIS%EOMONTNATIIflALWSLORV.
F.NGINEEIV �ORPAFFlCE<RO%EOMOHt1iOW�f11VE WMSTONSqLEMRE$O1IRCECENTER,WIN$TON-S/QEM,NC
cwa�aorre, xc:u�o
`—J
50 0 50 to0
SCALE:P=Sp'
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF. �WG(5)
SHEET�S) 8 OF45 DWGSCALE ASNOTED
�wcoahoao�no�e suaEaseoeo _
IXiPN1NGNlIMBE0. FEVI51�
PNG-C-326-0001003 A
GLPROPOSED PftOPoSED
6'GASPIPEIINE rygppTROW
Ot TYPICAL CONVENTIONAL PIPELINE CONSTRUCTION
50' PERMANENT EASEMENT WITH
25' TCS ON RIGXT $IDE
GLPROPOSEO PROP0.Sm
6'Ca45PIPELWE NCWTROW
O2 TYPICAL GONVENTIONAL PIPELINE CONSTRUGTION
50' PERMANENT EASEMENT WITH
25' TCS UN LEFT AND RIGHT SIDE
GLPftOPOSED PROPOSE�
6GASPIPELINE NCOOTROW
O2 TYPICAL CONVENTIONAL PIPELINE CONSTRUCTION
50' PERMANENT EASEMENT WITH
25' TCS ON LEFT SIDE
SLOPE H
V�
�
VERiICIu wuL
u eeooi
REGUIRED SLOPE OF UNSHORED E%CAVATION WALLS
40TE5
I. ALIFXLAVATI0N5H4LLMEEiiHEHEOUIREMFMSOFO5HF29CFR1938,
P. ONLY AVINOFIZED PEFSONNEIPAE PEFMIiiED IN E](GVAIEORRFA
3. G1VEaNPROiECt10N8Y5LOPMG:
a. IF THE SOIL 6AN4LYZE0, CAiEGORIZE�0.YD OOGUMENTED 9Yp WPIIFIE�AND COMPEIfM PEFSON AS iYPE0. B.OR C SOIL,IHE SLOPE WIIL 6E
0.5FOlLOWS:
iYPE A-Ya �H�T01(V�, ttPE B- f TO t. ttPE C-1K i0 t.
b. IF 7HE SOIL IS NOTAW�.YLp ANO CAIEGORRED BTAOUALIFlEOPfN COMPEfEM PEFSON. THE SOLL StCPE M1LL BE CONSI�EREDiYGE'C 6
SLOPE� ACCOPDING i005Nh SiAN0.4ROS LFR tBi6 SUPPOfiT'P'. iNE SLOPE WIU BE fROM iHE T�E OFTHE IAFNCH W:O WILL 9E CONSISiENT
THROUGHOUf iHE iRENCH WALL
4. VERiI[ALWAII��OESNOiING.VOEBENCHES)ANDVERTICALCIRSPREPiLOWE00NtYASl151E08ELOW-
ttPE A�VERTIGL CUT G4N BE R M1NX-0F J i%f. W HEIGHTW(RIAY<�XI T01 NISLOPE BUi CPN NOi BE MORE iX>N B Ff.OEEP. VE1tIM11 CUrCAN BE A
XNXIMIIM OF 3X R.IN HEIGHf BEIWEEN B i0 R R.IN OEPiH 6UTRIE SLOPE INCPEASES TO 1 TO 1 ABOVE THE VEPiICAI CUT.
iYGE B-VERTIUI WT NOTPIlOWEO. EJ(GEPi FORA BENCH CUT IN LOHESNE B SOII.
iVPE G V[PTIfAL CVI NOi ALlOWEO. $LpPE TO i0E 90% SU BM ITTAL
NOT FOR CONSTRUCTION
PIEOMOM'S NANPAL 6N5 PACILIiY OPAWWGS ARE CONSIOERED CONFI�ENTIAL �OM�1095�' ORAWING IS CORREM ONLVTHROl1GH THE IATEffi REVISED �A1E' TO INSURE THERE IS NO RISK OF INAPPROPRWTE
��
� _�c.�a ...�
oviw�aie I�cx
"G'°""` piedmont
cNGINEEP
���`� '' Natural Gas
iEG 6 SN
PRINCIPRL ��YPoGMYliS%EDMOMMFiUMLGARCORP.
ENGINFER COIlPAFFlCE�RO%EOMOMqOWDPoVE
CM4fiLOTlE NC tBftO
LINE 326 REPLACEMENT
TYP WORKSPACE CM 1
FORSYTH COUNTY, NC
WINSTONSFIEMRE50UftC`GENIEF,WINSTONSALEM,NC
REF.OWG�S)
SHEEf�S� 9 OF 95 �wG SGLE AS NOTED
)WG�ATE0 310114 0 1 8 SUPEFSE�E6 _
WNYNNGNUMBEIt REVI6H
PNG-C-326-0001004 A
p5Gl%&E�WiX510N5^1'.MPESWPC£CEMIFAILMEIID
�
r
a
3
n
`�:(1:�LONOULiOq$PiM1WtM11A15AG. I I I
C�'INinNnl E(JUIPmENi CIFAPM"u? FR01.1
.�,2,qu0UR095AilAMIMVAI@G. ' > �
Yg S� G.`
1`. n"I`ilA1V1A EOIIIfNFN � ClEA1L:NCE FflCl.1
.i.�.(:JryGUCip45Pi�.1}il�'UA154i. � I
1
I I I �tl�NIM�Mc0U1�1ENiCEAIUNt�FFfjV'�
�� ]YIFYCON011CTOF3AtAWlIMLIA�G.
— L} 10'IAINIMUMEOOLMEMLC:EAF1NCcFflO¢
vI� I I IIS[bLINIWC�GASAiANMIA1pM�AG
�_z 30MINIMVMGR0.�ING�]I51/�.NCEFHOMSIHJC1l1F.E5,GUY5PN�A�Cl1(]IiS�HE�a/�HOlES:f]FiOWtN51LE5IYLEVflVVLiP/�E�.
� 40'�]J�kV)pNOW'�SWkV�MINIMUMpISTAtiLEOF2IPELWE�PEGARD�E550Fi0WERSIZEOPSIYLEj.
� MINIMUMC�FNNNCEDISTANCES�GEFRCF0.§t9364aNPOWERLWESAFEfYWHILEiHAVE�INGUNpERORNEPAPOWERLMESWtiHNOLO���
�i MINIMUMCtEAPANCEDISTANCES�GERRBCFR§IBM.�<OBGOWERLINESPFEfYIUPTOJ50kV}EOUIPMEMOGERATIONS�
onre
NOTE:
hLL CANSTRUCi10N STnN�M05 PNO PftACTICES SHSLL MEET OR FJ�CEEO iNE
lAiE9T GUI�E LMES PNp REOUIREMENTS OF NATIOWL FIRE PNOTECTIqJ
hS5CC1ATIONlRTILIE Ib WOPM.INVOLVING ELECTRIfF1 VWAFi05 AN� LIX'.AL
IITILITV REQWf1EMEM5.
1O CONSTRUCTION METHOD 1
TYPICAL PIPE LAY AROUND POWERLINES
MINIMUM GROUND, EQUIPMENT
AND PIPING CLEARANCES
PIEDMONPS N4TURAL GAS FAGLITY
FOR CROSSING EXISTING PIPELINES
SECTION 3-3
� WY REOUIFE MOIPONPL IXiERNP1
SIIPPOIZf. RS NEmEp.
^ FOLLOW iHE MORE 4RMGEr.T
CLEIR,�NCE/COVER REOUIREMEM
d�5E0 ON T1E CQJEF 0( THE
IXISiINC PIPELME.
PRO�OSEO PIPELINE 90% SUBMITTAL
FOREIGN PIPELINE CROSSING DETAIL NOT FOR CONSTRUCTION
NESERVE�' DO NOT SCALE THIS ORAWING' IISE DIMENSIIXv'S ONLY
DRAWING IS CORRENT ONLY TH90lIGH THE IATEST REVISED DATE' TO INSURE THERE IS NO RISK OF INAPPHOPRt4TE
"'"` Piedmont
'E" C411 Natural Gas
c sro
i��pq� COPYNGMAISNEOMOMW1T11flALfi�SLOPV.
._ CORV.OFFlCEIIAqEDMOMpOWOPoVF
LINE 326 REPLACEMENT
TYP WORKSPACE CM 2& 3
FORSYTH COUNTY,NC
WINSTONSALEMRESOURCELENTER,WINSTONSALEM,NC
REF, OWG�S)
�W6 �ATE O3'Oi17018 SVPERSE➢E� _
PNG-C-326u0001005 �A
u
�.em.l p�� c�iao�wi.ue.mi
w�rw � I mqu r� oww ���rt[mi
----'--� � � � r-- •---• .� ,. ���1
� I/� I I•pp• I.1 I I I I u� \` arma aauf�.l
� ��� ��/ � � � am ^°" __ _—' l--•
� � �m"�" : �"'�F°°rom � I•/ i I �r �i, ��r I}{ � I I
� m..m� `___ � , +' � -I
� ' 'se' s�cna�'���'
�i I ��a m°�`m�w r �
e ��m - - - - -
�3 I � "�S��vme �awcmm 9
�� wm �a vu
rr f�J �' x[Y¢xs
� �� � �
�i ' em�tio "s" aomwe amnwr k
'� �"'°" �� mrtu�urt mv�r imI¢ (mJ
� SECPON �8-B' b u�m iw � Im� �m[ D
ir.mw • � w¢
�• �••' PLAN VIEW �"'� wam,
�.o a
1� wm mnw�ort wr
. YiI�Q9W1RMW1fORWL16N64K.TIlOmigS641.RRML3i4M459GM1IM 6 MfIL[MY61E9GONIRtC11Yf�01lRMV51Pf/YMMYNWMWAIDt1211P0.V6W
' IEV! �I LVOI WP PIfA M 41E�f OI I(.W M 01�iMICIYI I�If-0E-�S. f101� NYR IR /D 16qP M NIP1pIW 6 fXOL 0.R�Ff11 I� %)� )
x wa ma nuos Y.s inw x w¢ u wwon ioe�ms m mwxrt +wre mw era ��vueom a�e �. u�x xo �ean mxnw �� awi a�o¢im va, nm � r�wr. e // /
UIRMlIO�I�G6MWIfDX09OAl1Il ��� IIY. 2 , ///�/�
6 l61NLG19TMT0O6EITFN46ML90RpN7]IINMlVOffi� ! !
i m.wm aPumc w*�[ v.mamr wu a umo m ma i[mm m mda msmrnox � miu ms or
me�qi �ev wn� M wrtimm. mim�nw avu rou Mo is . meawer mrxi �c e aoe+s uu m uam.� us sw. im x sm xo msvm vw. im a minm m. �m �rze n rK mw..ue�ra w� w°� mr¢ xv[ �m mu �mara
wcuryslrwamsmrms4A�a����wemr.avn�mwwnrmrawmn ��.
•. �'wc.�a s«� s ,a vm.u,wa num w wm as «rK.a�mo, m nevn vmox or am. �no wxo wmoa v� mu� mi �.na "` PLAN NEW n�w swu v rw�
.RIOI MO N�QP MY I'�pM'JIIN 3VI IMU M V M MIFI@I. I�MM!RGpI ifirOl 9MJ�116 w tl1p M PAMY61�$IR
i rwc o� �nwn imwms wiv: v� rtn � ounn om u[ wsiw« anwc x tt seru xv. awe m xm�r um � x� rm, e wn¢n
♦�mru rwE wqn ��ra a.smry �p�y en aw¢ xr imo�c �. mmuna sru �rw¢ o-�au a ron-a ur rmumi ww�rt m nmmr wn sumo wu s r� rw w w m.
e ie wo 9�c ox wa erc xu RMh smYc tr.t� sWCM n FeMlp� W S4d w Nmec 4x M uxmr e vLm A mn¢ �E mi n M avw�w xG N � w.m���6 �mr y�.�u rt mpN f�9 �Ri x0 qR�6 mf➢i 1�9 rt[t &mo
lµ%WISRIYM111O.OIMiWILM�50[1@•II9610MSAfYmMIWIERqMDNp(�E 121161W�Idl�[f18S1125H1OlYAW4RWMTf01@9WISNCR9AR'Lp�IdfflddlBNG 1 M1MI4p496VIA�IME9\4IXN14W6�AG[RIWLL
�� � /YWA PRPm6 MO Ia11MR 1 iLp. BJ{RF )p6 pMq 10 �£WL
L 11gEAY MW N�E WQ9ID PfhNl bIR 0�1 MO SIIF/l� kpF S IH 31 Idtl N II[ iIPoY IJ Ilfi A[ �! pY�C AfMIMI SMVIm 9S
6 W Itl! PO�M f1YE Af tl1NL TOGWn Nf U116 W bSIINE.WMIR Q MML fMW � IF)IIXVYI 6 IM GWt QKIG F BFIYP M!A (� tllE }i N �4fX NINY 9I VWLI /O� m619A1O1 M. IXB IY�IMA fWU6
�
E R]M411W[104MOM611YfMEIP49WPIVM[OlY1rt9R64d6fWpLWPtlM 2i1rt�liUf3NNPMIDTMp�IYYRfY1B61R
fTEY � NO BVF 6 QIP[IF. . Wi14 QOIp1�I f4�iC VIVA ML B1�F3 MO NRW ➢�I WS M fl� W F1q1140CR Ild dIWG tlX2V1
M.4�26 M RR�Vh
OP^`yUME CROSSING TEMVORARY EROSION CONTROL MEqSURE O TYPIGAL WATERBODY CROSSING (DAM AND VUMP METMOD)
� rz mrvi 4v wrt n
mu�owva � � �air. '�q� an�ma�¢ � �woAm�ranoun
onmr i � iI mYamxr e�
� Itl Yx � � !�— IC YN �
� �.
— a,� „ + a.� �m.,�,Wm.�a� r
--�.� i � i ii i i ' ''J �� �, � ;� _
, — — � -- �,g-;� �,�, �,
�,� _ _.�,
� ioi9 � �
�� -
A � � �
� I 1.,� L.
� � � � "'� � .
& � '�"�'�'"` I I �� PLAN VIEW
6 I ���� �.,��g � �
� �umms srmnnrt rxu.v
v� ms ��
J �_ :
EnMo �nixo � L i,�'.
Wrs
I1�5 �I . . . . OMLL . �1�.�.
. �}ISHI�Vh
fp �NfW � Y' �._ �:'�:'^::..:`�.,.. •.•' � # �I ..
(� IM � lLid _ xmo ♦ xIX �T.ww • •. . •' � / 506.W VOW�T
�.�. ��$'� ` � "°' "'°'aa` "`°"" s �'°" w SECTION A-A
� ��
1 �..�� s ��: �.,..� :� 'aa ,�. ��. �
m...e.�.�a PLAN NEW mw. ma�¢ �oor is �a. uoa eonr�"TMO+i Qma"""w u� "'eA
`�w°�'mr�: abo n �.awo°W� �w w�m.a am °'.� om`
�S M �FIIM6 �IIMII A.MG Y1W P LWMR SS f YJWl061MFM @�bll [Y� R16 MGl��WI eL MMM �C6 A �YII QCS4 YOK OVII
I. @�dfV1�MC4W1lIA-0OWIRIDRmOYVlOLH��lW1OWt0POI1�l1HWpImO1 iel�T u�99u�1�lF1OA YYV�O�IlTOIIDE
1!� WR 6 M R�WO/��N6d� BpPp�.ES�
]. 161ML brtlbbl lE4 2 A1 M d4 R lll A66 MVIi ry M RO.V6
> DiIDI M M1E EM'f➢ tlM WC m11M1LIIX 9WL fM11A[ OLVG N M BPW 4FA.'OWIII A lIINO IMR M M4ANd R llu� EG.VYxf WR [MIW� RI.MY
A.CNI NL 6 flM� NO R0 N IIE RII.VO 6 R'OI 10 DLC[L 9iIP 6 A IWY Y 1ilY �lYI f� MO F1104 4�d� ^��N= �O u�Rw�L N� siul xai E �� F
IFlmI I�A iFEL 4A011E FR O ME AWYF ME� �. xTIW �Rilllt iMec uMU Ml MG6 wE TMM� ��E11 Wif M
• �s,�mniow�.v�wi,.rmcmwsw�nrmKwa�r,�.amm�mmeism �mmmuermw, SECTION B-B
1 WIRV AO N@4RY NC.ILL BIfV ID61� A Gp9f w[�!N! mG'f IAM pIVfIC MYIDrt y�lEBL6 MO ttl
L 16iNL �IRIIf fA% Vml Mt Ilm MO 14WUPI �1dY 4V5 N l9Ei N POCR $b111d dllOL NY9R �� � 1Y Th M�14 �� a'�iEv�11PY 1dliNi 49n
IW WA6 MO RIIMOS 3 9t4t xn�E 4E tlNY/4M 10 0i1.W Olpi MOM M�E@p .Nlmlf
� �pni IWi pR�a.'v tlumn ��NdmQ um RnueS MRRC.V AV RT.uOi
OTYPICAL UNSATURATED WETLANDIWATERBODY TEMVOIiARY TIMBER ECUIPMENT M/1T TYPIGAL RAILCAR GROSSING
CNRGO�S�N6WITMTOPSOILSEORE/1TION OO .c..e,xov OO suu.n.. 90%SUBMITTAL
NOT FOR CONSTRUCTION
PROPRIETMY fl CONFI�EML4L ALL RIGHiS RESERVEO • DO NOT SCALE TNIS DMWING' USE DIMENSIONS ONLY REE DWG�S)
PIEOMONTS NqNPAL GAS FAGLitt DR4WING5 ARE WNSIOEREO CONFIDENML (0lh10B5�' DFAWING IS CUFRElrt ONLY THROUGH THE tATEST REV6ED DATE' TO INSURE THERE IS NO RISR OF INAPPROPRIATE
�ISCLOSERALLPREVIOlISPAPEPCOPIESOFTHIS�RFWINGMUSTBE�E5TR0YE�INAGCORDANCEWITHRECOROS8MF0.MANAGEMEM M POLICY1001
rw. on*e uevGmw+lslo[s<wrnox er cxK avvo oescaPnox aeppovus
A 03/3p12019 90%SUOMITTAI VN SF BG AREACOOE 2400 "" � LINE 326 REPLACEMENT SHEE��S) 11 OF45 DWGSCPIE ASNOTEp
p`G'°"" piedmont
ACCOUNTNUMBER XX%XX ��X� � Ervr,iuees OWG�ATE 0&0112018 SUPEft5E0E�
PRo,E�TN�MaER 0351527 d� -�w, M�A rE=�� ,I Natural Gas TYP WORKSPACE CM 4(SHEET 1) �,�,„���MaEa wE�,s,o�
DR4`MNGBY VN ��X � pEcnsrc
S.AT�oN�o 3-T-WSM-3995 �� -u� ,a,„�„p� _�_����=A,sP�E�m�M�����«_��. FORSYTH COUNTY, NC PNG-C-326-0001006 A
qp�y�ryry,py���y7qyo O1I1WA71B %%% ENGINEER �Oaa.OFfICEnA%EDMorviaoWowve WINSTONSPLEMRe50URCECEMER,WINSTONSALEM,NC
Ha.K'cftINITNLS SF cNnrs�om,rvcuzio wswu�e�wumar�,v�¢Ma:younccm�rtn�urt�x
ro��.
�.
�
Ig j _ __ __ xoot w>-vu g1
L _ —__ _ ���I�aY���j
�yr r��im�a �� mrwsaaz���� �vaera
ff �'� PLAN VIEW Q10°"w,nw�"�'"`�a
ru �r roruxvi
wi. tY
voan�
�x awa �.. � ::;
� a
arut mvff
1°01"' SECTION A-A
1(Y 6 9�I. RE W E Ni WMI
2N A!HEfLL 5f�6
/ . � Sipl Ni6
v 1[P R M�IX . . . ,� t 19]I lm-W
� SECTION B-B °""�""°""'�°
���
� ioiwc s n¢aar a mamuna.wo Amaaia m¢ mi�v a �u meaw nue � e�¢
i. nwwr � wr a aamvcn �� w.:nreax.ur ovmc
� M�s..E�::.��.�x.,;��s-��a�...���.�.B.��m�,�..�.�
M m a ru waer. . wm Ai a r� a�:, r �tflm w vxir suaz ml avR we w.�mr m a v.� w M rwu
1 wRWC�CWYWiaA40.�O��1Em3pi'.MTIO��iF�lN(LW3�ILLWILflM1f�,161�L�-MP6NER.V➢
P' IIR MR"9p� [EII W�16115 6 M%S pTi pli)OW A YYIW (! 1Yl W flE LNflf6 X10.MARi.11B\ @�1d1 �Mi
Al lBA qIMO' WY �i NFJ N F.R l[ iRvq A18AZ
i0 kLK[ [6� GRVW T[ MR�I !MW [}NIOII Rqy M MflP/I'N IpV11FA'M4 W M 0.lMA! O�Y MIIl i M9 NN
�. s.a�a.o a vn+nn �na we .wrwio..srrux� m+.�r¢ wn rw r� unx r ars n� io mvw � wsciwr mo[
�m ue m s ac mm m mous w s.�nr uw¢ e� w vu� armoi ruem xz m a imuim m urt x mimw
rm sm. m ma M ummn �. un ou¢ �s-os. � w Yutt guon mas [q.
S HOOCYVMRM1ENYWAP'%9[II6WURMMWE�EM9N-IfV4'i�CI1Rm6pllL�.�6116
WhR`L Fl IUS Im RR llp M MIFRW u0 A9M M 101 Wd LLMI.
6 Ill'�.0�1E 0R[IO� 611E C�Y LY.�£ 1@ iILL W d MOIO NlE M14 ild M JO�N YI �ft�MO.
1. F610E 5%/Y b1I.� FU �YEPROt pTICY.
6 fWe�ti6T[£�I�MI.�ILlA92UMSTAiaPLLM5�161�[CPrtMRAi11YNMIWi0RY0Fpl
O�`PI CMAL FLUME BRIDGE CROSSING
OPTE
..r:a•�.� a. .:r.r. .
tm um�
r�wvvuw[
m�
, � wis s�m
O19�M
� airs smwni¢ rm miY[ m x
ia wrcisi � ro va�vn io.vui.
� ��
� � •�
� � 0 � �
Q � O
O Q�/
tC H4 'fw[
0
� o�i � �
0
� iCoam-w�wm.m
�� IUE-4C�YWMV$
EXAMPLE OF DEWATER DIFFUSER
(ACNAL SIZE TO BE DETERMINED BY FLOW CONSTRAINTS)
OT1/PICAL WATER DISCNARGE DIFPUSER
scua rwwe
PIE�MONPS NFTURAL C4S FACIIJtt
..
VNtl6
Haxuu
�wnicn
�
pE �0P °F ina iar or
inv e.wH rax a�xK
���� � � 1 � YLV.
eortou or o� S-°• �.)
wx.
vn axo- vc mo
YW.Ntt1POIRVEOII
MEI(illt$ I( flF11111RE➢
b�
I. T� WVII4.Vfl1�Idf N �LL SAV/11 M P'1�14ffi9Ya5 IN 9qM �1�9.MLi O�m W 011lP 061AL11]II GRWl4S
z amuxv muous��w rxims m s cmwun a oumam e. orowrc. o �m wnriu.r mmw a.u�wxi
�
a�u iu msmeno� m a ow¢ n mim�nm
OTYPICAL STREAM UNDERGROSSING
ecuu xoxe
ING' �JSE OIMENSIONS ONLY
THE UTEST REVISED DRiE' TO INSURE THERE IS NO RISR OF INAPPROPftIATE
RECORDS fl INFO. MANAGEMENT IRIMI POLICY 1001
pEG'°"p` �A�I piedmont LINE 326 REPLACEMENT
ENG1NEE4 TYP WORKSPACE CM 4(SHEET 2)
NGFTECM �1` Natural Gas
'E"�'° FORSYTH COUNTY, NC
PRMCIPAL �OVYPoGNiP15%EOMOMWlT111iAL�NCORP.
EH�µEEq coAv.oFFlcePim�co�oMrtowowve WINSiONSALEMRESOURCECENiEft,WINSTONSALEM,NC
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF. DWG(5)
451 OWGSCALE ASNOTED
�WG�FTEOWOVP018 SUPERSE�ED _
ORFN1N6NpM8ER PEN51�
PNG-C-326-0001007 A
fMYmIMEIWIM$Ip�.�.S�tqPE50NiC[CEN1FAILMEll6
5'
�
a
Y
�
_.,. . _.� J
OPMkIl 9[E
vaon
�0�
BORED ROAD/RAILROAD CROSSWG
O1 80RED RAILROAD CROSSING
PQ�p�
'\' `G�
Y_tlV
fi' uwmpv —
CRUSNEO SONf:
(PRWIDE EHOSION
CONRVOL i1LiEF
I.�BWC ONOEF
•ccREui[J
BE
fl15' MIN Of W10 IXI TIE
�
!_•� ����.. �.
O5 CONSTRUCTION ENTRANCE
N.TS.
r� ��
°i�� �
SPot .
.'y�.• ` 1CPSL4 $IN�PED
SEE IqiF ] W'1, i' M/5
SFf XNE ♦ T............ NWYIMD 8!
T�4 CWVM'!.
nocK m¢
c�vwm
xau ma sa'� l�b� wmw)
wcouiuv !a sn xacs eEw�'
PFC WNd 19 PMSENf.
���a�a
na�
1. pEPIX p" CRJQf SXOlI. BE YFASIIFEO /5 IHE 9bftR5f DWENSIOX FROM IHE
iOP Of TIE CU1iE➢ PNE ttl TYE IpIiA4L CROIINO IMl_
z a�.xnu ro ac rsacx rn¢ m � omn� cwu m oa muLrn �wx txc
MICK DEPIN IN MNCEM UN05NFBFll N+FAS.
1 B�CNf1LL IN NL1lJAiEp MF/5 i0 BE ROCI( FltEE I. MIHIMUM Of It� B6mY
ME SUfK/GE 0� T1E SVRROUNOINC SOIL
1. 5G6 Of IPENCH 1D BE SLOPEO M KCORMVCE TO 051N SYlIY
PEpIUMINS FEVRpNG IXGVAilONS.
O TRENCH AND BACKFILL REQUIREMENTS
FOR GAS PIPELINE
WNSTRUCTION ENTFANCE-GENERAI NOTES
1. 5TI8WSFD CCMYIRUCi1PV ENIPA.KC SXOIRD BE USFD Ai .LL1 PdNR W!!AE TW£IC WILL
E64E355/IXG1�4 A CONSIRIILIION SflE OHIO A RIBLIC RUN Ofl M'Y IMPEIMWS 9JP�.�1S. SIICII AS
PHpMt ID15.
2 MHfI� A PERMM'EVT ACQ55 POI.O liftlllNAlR/fNCf10Aq6 ONRI A W911C RO.NWI.T .Wo MLL
PEWIflE A QILYWi ,Wp [p15iRUCTp1 FH1RµCE LO BE INSi�LLFD, 1XE LVL�ENT SH.LLL BE
RpMitli� WICNEIE NOE� YM�YIIY IB' M.WEiP. i0 � NRHl91F➢ M9 IHSi/�LLFD BY TIE
CCN1MCiq1.
]. INSlNL A IpX-MbJFH EF�IIXIeE F.�9LC P'10.N1 i0 PULMG Nry $IIXIE
f. iN5fN1 A CLLVEF! %PE /LRJ55 ME MIW.VCE WNFN HEmE� lO GPS1�E PJ9ifrE OWIHIEE.
1 T£ FHfMVCE vW11 CCN56I CF T-INCM lp J-INCN 0.b Sip�E PIM.F➢ AL /� YINIY(IY pEFIM OF
8-RA'M6
a uu+wu aurHmxs or TME wiw.w:E siwi. ec s�-rtn woc er �oo-rtxr iam. uio w.v ec
uoar�m ws HEccswr ro�cwwowa s� wusmuvis.
i. �[ncEs ov tnc wmwcc swu ec nwwm our mw.wos .n[ xow .o vxehrrt m.v�xixc �*
� [ocE ar iv[ nmur;ce.
B, qYfllf 4L SU6tCE FUxpiF µD ORVNWE fAOY 1ME SfONF VIO N A 5£pYfM 1PM q1 bSX CH
OMER $f➢IMENI lRA^FlMC SINIICNNE.
B. 11ME5lONE 1MY NOi 9E U4➢ fqt 1XE SfOXE PI➢.
CONSTR. ENTRANCE - MSPECTION 8 MAIN�ENANCE
�. ixE HEY 10 NxCIq1lLL CpISfR4:C11W ENI0.WC6 5 MEIXLY INSPECMNS, RIXIIWE MVNIFWl10E .WU
ascuvn sm�uerr acxw.�
Y. qECUU9 IN�ECIYJNS pf CON$ifl11CIKK1 fl11MNC6 SIWL � Cp1WLRf➢ ONCE flTAY W£NWi WEIX
M10. AS NFCOYYEH�F�.'AIMIX ]�-N011(S /31FA fMX WVNfN1 EVEN 1Wi PqCplICFS 1/4-iNLN OR
YOPE O! %iEARTAPON_
�. w.wHc r�wuv irsvccnas, crrtcx vw+ uuo un smiuwr e�i�uv ,wo c�n wi[rmrc. nsaecmx
fPEWf11CR3 IMr N� l0 BE uOqE iREWEHf WMING LOxG PEIeWS OF MEf WFAiMEA
�. R6MAVF 1XE SIOXE PM IS NECESSA91"fOR ORIIM�CE INO PUNOfi CqARM.
s. wAv� at a[ruc[ smnrs As xrmrn Nm ws wuc�[o Br srtE varrtcral. Ti[ SranE w�xE
EVIRAVfE SHOUI➢ BE WASNm qf PEPIICm WIIENE�91 1XE EMIWNU FIJLS iU RmUCE TIE MqUM
OG YII� BlING CIAPoE➢ Cif-SIIE BY VFHKYfS. FlIE➢UEM W/SMNC W1LL IXIfNO 1NE USE£LL �lfE [f
SIONE FAO.
8. IMMEDNIFLY REVOYE MUD M!0 SEqMEM RVLI(m ON WNNED OMO IANCFM 11PWNqS SUfli'AC6 BY
BRUSMNC OR SYFFPINC. Fl.IFv111N0 SNOIILp ONLY BE USm WMEI! TIE WRhA GN BE dStlWUFD ip A
56YMFM 1PM IXf 6KIN.
]. pURIHG WIMEHVICF MIMTeS. NA' @lY3H PAVENEM SHOIRD ff NkYNRED IYYEOI�iELY.
& CCNSf1iULTCN EVI0.W65 SYIW4D 9E MYME� MER iXE SRF WS flFKJIlD {1NK S�I@IOATp1.
PflIWNEM VFLEi�l10N SNWI➢ RFPVLE MF/5 iAOY WXICX COXS�flL'CPCN EMRINCES INYE 9EEN
RFIINEp, IINIIIS IAFA WILL BE COMrFfllm TO N1 iYPE1M0U5 SLRGACE N SFINE PoST-CCNSIflUC11OM.
�IEDMOM'S NATURAL GAS FAGLRY DRAWINGS ARE
oescwanorv
RESERVED'
oanwinc is
e- w�i� mw.[ "� �w m"'�PS
mcamu � - m¢ vx¢
�-oa�wE -�yu
o-�
�-vwrsw
n-�uw�acwccrw x-mrt�iau�nmY
PLAN
WARABiVY
s �
�i-s¢ rort a
�
�
0 0
o �^��
%R WM
RPE flWF16
000
�; PROFlLE
1. ENSURE IHAi ONLY BFMCIIRE 6lSm ONWNC YIIO IS IISE 1HE IISE OF
COM�PAiW6'SO�pECOF�IWHG MU� IS FlMFABIIE� WIIH�Y! PR10R IPPFP/K Ci
3. 116LPLL SIIRIBIF OflIWNG N110 iM'16 OR SIIMPS RI PRMN! CQYI0.MIINiqN Of
W/SERCIXIRSE
]. Oi5GO5E Oi DRIWNC MUD IN ACCOR6wCE WrtH REWIRENENiS Of NL
NI1NOfl1116 1NNNL JUFISpCIlONS.
{. flEOUIPED �EFlM TO BE OETEFNINtD M1FIEP GEOIELNNM.LL IM'EtitIG/�TON.
O3 CONCEPTUAL CROSSING MEfHOD
FOR HORIZONTAL DIRECTIONAL DRILL
M
O6 CABLE CROSSING DETAIL
O CATHODIC PROTECTION SCHEDULE
AND DETAILS
N.TS
T REYISE� 0.ATE' TOINSURE TNERE IS NO RISK OF INAPPROPRIAi E
81NF0. MANAGEMENT IRJMI POLICY 10�1
SECTION DETAIL
O4 NPICAL SITE FINISHING DETAIL
DETAIL BY PIEDMONT NATUR4L GAS
BWietBwS I�
�....e...���r..�y M.—♦
I
�CaMul�
���
90% SUBMITTAL
NOT FOR CONSTRUCTION
REE DWG(5)
� LINE 326 REPLACEMENT s�e�r�s� isoFas owcscue ASNOTED
��� �� "`G'°""` piedmont
eNcweea OWGOATE oy01IP01B SUPERSEDED
„rt "`p'E`" I Natural Gas CONSTRUCTION METHOD DETAILS oRa„„��„�Eq a�„�
�� �"" aE"s'° FORSYTH COUNTY, NC
,a,„�,,,� =oor��Mm,s%��M�=���=o� PNGG326-0001008 A
p1I1912O1B XXX6 ENGINEEr+ LOpp.OFf�ueoT�mEornwutPowDwVE WMSTONSALEMRESO�RCECEKTER,WMSTONS�LEM,NC n,v,a.,,,,,w�.,,ti,�.,��o,r,�,,.�,��2,,.��,„
Oi HYDROSTATIC DEWATERING DETAILS
PLAN VIEW
SCALE: MS
2' r 1" WOODEN STPItE
Cm'J
2UYERSOF2'.2'x1'
SECURELY TIEO BALES OG
FUY OF StMW
INSIALL A UYER OG 'HIGH EFGICIENCY
B65 NR FlLiER MEOW� BEIWEEN flOWS
OF HAY OR STRAW 6�16
SECTION A-A
FROM THIS DwG
SCP1E: MS
"1� \i1 ' �y ".I L�
LHIIXEN WIRE fENCE SECURED TO
Y v 2' WO�DEN POSTS, WIRE TO
EXIEND BENEATH BAI.ES
20' DnERrOR PIPE
t4RGE P�PE�
]0' EIHOW
ancs
SECTION B-8
FROM rHis owc
SCALE: NTS
NOTES:
i. STRUCTURE SH/�LL BE PLACED ON A SUITABLE, WELL
VEGEfATED SITE SUCH THAT WATER WILL FLOW AWAY FROM
STRUCTURE AND ANY WORK AREAS.
2 FLOW RATES THROUGH DISCHARGE AND DNERTOR PIPES
SHALI BE SUCH THAT STftUCTURE WILL NOT OVERFLOW OR AT
A RATE NOT GREATER THAN SPECIFIED BY ANY AGENCY
PERMIT IF APPLICABLE.
3. WHERE CONDITIONS WARRANT, A 30� x 30� RECTANGULAR
STRUCTURE MAY BE SUBSTITUTED FOR THE CIRCUTAR
CONfIGURAT10N SHOWN.
4. �IMENSIONS SHOWN ARE THE MINIMl1M ACCEPTABLE VALUES
ANO MAY VAR`( DEPENDING ON SPECIFIC LOCATION.
TO eE 5- CONTRACTOR SNALL PROPERLV REMOVE AN� �ISPOSE OF
wiRE FENCE DEWATERING STRUCTURE IMME�IATELY UPON COMPLEfION OF
DEWATERING PROCEDURE. UN�ER NO CIRCUMSTANCES SHALL
USED DEWPTERING STRUCNftES BE LER IN PLACE FOR ANY
ruTURnL GFAOE �ERIOD OF TIME GREATEft THAN 48 HOURS AFTER TO
COMPLEf10N OF DEWATERING PROCEDURE.
NOTES:
STAHES SECURING 'HIGH EFFICIENCY AIR
FILTER MEDIA" AND CHICKEN WIRE FENCE
ARE NOT SHOWN FOR CLARIiY PURPOSES.
WELL VEGEfAtEO ME4 (SEE NOiE BJ
LGRP➢IEM
w�
FILTER BAG
PLAN VIEW
SCALE: NTS
�SE
HOSE
WEIL VEGEiRTEU. GRf55Y PREA
O2 FILTER BAG
ELEVATION VIEW
SCALE NTS
�se
5E
NOTES:
1. FlLTER BAGS SMALL BE MADE FROM NON—WOVEN CEO—TEXTILE MATERiAL WITH HIGH STRENCTM, DOUBLE STRCHED "J' ttPE
SEAMS. FILTER BAGS SHALL BE CAPABLE OF TRAPPING PARTICLES IARGER THEN 150 MICRONS.
2. A SUITABLE MEANS OF ACCESSING iHE PILTER BAG WITH MACHINERY REOUIRED FOR DISPOSAL SHALL BE PROVIDEO. FlLTER BAGS
SHALL BE REPLACED WHEN THEY BECOME $ FULL SPARE BAGS SHALL BE HEPT AVAILABLE FOR REPL4CEMENT OF THOSE THAT
HAVE FAILED OR FILLE� BEYOND 14 Fl1LL.
3. BACS SHALL BE LOCATED IN WELL—VEGEfATEO (GRASSY) AREA, AND �ISCHARGE ONTO STA9�E, EROSION RESISTANT ARFAS.
WHERE THIS IS NOT POSSIBLE, A GEO—TEXTILE FLOW PATH SHALL BE PROVIDED. BAGS SIIP11 NOT BE PLACED ON SLOPES GREATER
THAN 59..
4. THE PUMP �ISCHARGE HOSE SHALL BE INSERTED INTO THE &4G5 IN THE MANNER SPECIFlED BY THE MANUFACTURER ANO
SECURELY CLAMPED.
5. iNE Pl1MPING ftATE SHALL BE NO GRFAiER THAN 750 GPM OR 79 THE MAXIMUM SPEQFlED BY THE MANUFACTURER, WHICHEVER
IS LE55, OR IN ACCORDANCE WRH PERMIT REOIJIREMEMS. IF APPUCABLE. PUMP INTAKES SHOULD BE FLOATING AND SCREENEO.
6. FlLTER fiAGS WILL BE INSPECiEO FREOUENTLY. IF ANY PROBLEM IS �ETECTED, PUMPING SHALL CFASE IMMEDIATELY AND NOT
RESUME UNTIL THE PROBIEM IS CORRECTEO.
7. CONTRACTOR SHALL PROPERLY REMOVE AND PROPERLY DISPOSE OF USED FILTER BAGS IMMEDIATELY UPON COMPLEfION OF
DE—WATERING OPERATION IN ACCORDANCE WITH TNE CONTRACTORS APPROVED WASTE MANAGEMENT PLAN.
B. IF VEGETATNE AREA IS NOT AVAIL4BLE, INSTALL EROSION RESISTANT GEO—TEXTILE FABRIC TO A WELL—VEGEfATED AREA DOWN
GRA�IENT Of THE FILTER BAG. NOTE: IF THIS AREq IS OFF OF COMPANY EASEMEM/EiWS LIMITS, LAN�OWNER PERMISSION MAY BE
REQUIREO PRIOR TO OEWATERING ACTMTY.
PROPRIETARY 8 CONFIOENTW. ALL RIGHTS RESERVE�' DO NOT SLALE THIS �PAWING' USE OIMENSIONS ONLY
PIEOMONTS NATURAL GAS FNqLItt ORAWWGS ARE CON51�"eRED CONPI�ENTI0.L (OM4095�' �RAWING IS LORREM ONLY THROIIGH TNE IATEST REYISED DATE' TO INSIIRE THERE IS NO WSK Of INFPGROPRIATE
"G'°""` piedmont
NGINEEF
��TE°� '' Natural Gas
vEc e e*o
PPINLIGAL COVYPo6MID15qE0MOMNATURAL6/ISCOIVP.
COPp.OFFlCE�idl%E�MONiROWDPoVE
ENGINEER cuemn�u�mm
LINE 326 REPLACEMENT
TYPICAL DEWATERING DETAILS
FORSYTH COUNTY,NC
WINSiON�SALEM RESOURCE LENTER.WINSTONSFLEM,NC
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF. owc�s�
SHEEf(5� 1d Of 45 OWG SG4L AS NOTED
]WG�ATE 03101I1018 SUPERSE�ED _
IXtF'MNGNJMBEF REVI511
PNG-C-326-0001009 A
� �
� •-nw': rc �
�C<
� E4YRL'A sINE MMI�➢
REWM YIfJNL Of le' If
_ �n or e�u.as s e�.
sccnoxa,� �)
ORC
. KMfl69WLHM2YlIDp9WBdX6Y9O4P�VSiIE
MV�NL Rl��'Q FN��t MY�L Al WH 112 �Ip�l lplLi /5I.
0.W
1.tl19 Wri R R.N96 m Im V 96.V� 6 Aw�mM6U M
$YE �FMNI U mfld Q VML 9S.MLi tll .�S 1lYARY M VH[
SVf pM�CI �a Wtltll R m�11(IOE SIwRY� 91V19rt1j
a mw� urv �ar wnsnwe row r.ws w miu eavws n
m��
l!LH FW�E 1CWY Wi 4YY A RTMO, 6Y6MSf IiIDM �MkA
NY/W SN 1M1o� BTIW a 1�4V�' N IVa�tW ppW R�IA'U
Mdpf41
S MWIMIk1�YO�.IHMIMRWOIf11OdiE.NPRM
BH 6 966 KM M MI�bI. IDY.R IIC1p 96/M Wi6� Q
M 9tl[ 9f.IRl
//� .��� �/// /i
� � �_ �
SLCiIOf:RB
O SACK (TRENCH) BREAKERS
REQUIREMENTS
IA'
Ntlll3LNi.LL N10 HAM'Y 91RF�QS
9.41 BE �C13D �nT� P< ]Yl IIWID
/.4' IL .1 ,.'. 0 0 Gn CM PER
YLL i IE9JI6A2 ��
IY Ylx
StDPE SG/�CWO
TYPICp1 SLOPE BREN(ER
pb I/NL I
I�49GWCR40£RM919WLH161�Ik0111V[ 46E(i) �KIW(fEEI)
r�w� m�o� �nvmn m svo�s cn mwm anc a- s o
L9YVLtt94E}(M}A9WLH�6WlmflAM S-1! ]IO
swvcmamrsxvazr.�oanwarw�wm >�e-n �m
O PERMANENT SLOPE '� 10°
BREAKER
YLL \ M91Rf.�R ,•
�Y uw
w-.m, E om.c a. �.u^ I
�w. mc _ crn.,r �� .�\
smr.a .
]' iOT/L .�X�Li pWLqE1F Pi.lFYdi
�FPM Di EW/.l RI ME MPM !F fl4tiIINE
AWIIKt P^.NM. E�E MXIpLKP I$ IAFAIEA.
��. � 4.0-BASE C0.M4 IX➢M 91NL 9E I V Oi
J � /� EW.LL :O CVTI fF EUSTNG SLB-R�v
'+1.""../i� .. IIIYOIEFR45OIFlfll.
f� � .�:%MPI
M IT WN.
�
I Y1FL! W1FMK iNE I MT1 4MIYW1 �V �]p
o' 1i' F " �. 6A4 � B/061LL Y�IFAIK IN �Lf¢1UAVG£ MT1 $CIICN }lR
� T. � ! Cf TIE ROM MW �ld£ 9EOfIG1KK15
... "'�C�\:.n�.... N0. 3! p1 P MYSEG�rt %VE $ry.Yx6 M KNN/NQ �elM
YC1101II i05 <YI[ Cf 1ME PMO Itp B'm4£ SPEOf1GTG6
NOR4 I_ *�
• 4X.LLT WMp1ER 91FFA2 W1fWI.IL
91- Y31. POR I.pi < 10.4W
9�- B90 fqi Mi ) 10.0T
TIE q51PoCi .�pYIN151q�1p1'S Odpl� 91y1 LEIpYpN[ M[
P61GP1TM PEWIXbdR fLN 011R1i VAYEYdi M6
^ 112NO1 W�IN NIO NK 9EW WG 91/ll 9f N
I.CNP4M1V6 WM YWi.
�^ 11 WOIES YINIYUY �1TMp iNE F➢Gf Cf TAE 1Ppp d
tLMU1tMAM�L OGFN CIIR 4fl 35 fE£! YMMVY R1W0 MC 1Md01
Q`IlEPl1NE CN 19v➢OIpIQRM CH11 dll5. fR AS CERPYWp BY MC
q51RKi MMiM51P�iqi'S CEAOIEE
OS ASPHALT PAVEMENT RESTORATION FOR
OPEN CUT UnLITY INSTALLATIONS
PIEOMONi 5 NPNRPL GAS FAGIITY DRiWINGS ARE CONSI�EftE� CONFI�EMN1
0111&2018 I%%%
�
�s-„� ,. ������,�
�.�������
— � �,.�,
r" � rvw�m�Wo.nmerc�nWwu
mwm.i mewix d mur wu a�
.c+ siur (rb" �. x wucrs. miw,[ uas w Hr.c wurt �.rzn wr nw
m x i'-o• iwc m�w xo ma[ rmv w c�� rrn rm.w
N1NjINmIL MW4qI.6ISMG6�M2aSOM6fMA6
orta� r.wmwa� n s� �v.mi n mioi s wu
9WR
�. MIB�MRY'♦'�ICIYBFNE69W.SISC81mR
411MIf19¢10.
e• wnuw x u sxm immurs owc �mruan wu a
- n�uc sou e�
$ECiION"A'='P'
e�cx�u ro a
rn�wicrm mou
emmu ur
MPROXIYAi BREU(ER SPACING
$ e �-
$IN 0
��
PKOWO UM1fR RPE
412N SERIm
%PEIIlE
� I�
�. ruum�muimwturxommnamranrhmunwmz�maainps
- wuc m¢ vrw m ms �m ro sn.r.
���� 1�62YL MML F Mi6110F A LWiI WAY O�Il
1 0ryM6\ OEMCH[ &TG VJ4 41l M1IRIFTFf 9fFl A YIYY f TV� 6
8111MIF 01lVaYM.
l 02O Wn! M161 �w.Y IY �p olp M�y flp C RAp plp WLLS
TYPICAL BREAKER
O3 PLACEMENT POLYUREfHANE
FOAM TRENCH
)' DO NOi SGAIE THIS �NAWING' USE �IMENSIONS ONLY
IS CURREM ONLV THROIIGH THE LATEST REVISED OATE' TO INSURE THERE IS NO PISK OF INqPPROPRWTE
�,a ���
iEC 8 bTD
vAincivn�
ErvGINEEN
O TYPICAL SACK DITCH
BREAKER
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF. �WG(S)
Piedmont LINE 326 REPLACEMENT owconreayoirzma suaeaseoeo � v V
Natural Gas TRENCH AND DITCHBREAKERS oRa�,v���MaEa aE„s,
%Eo�M�„��,���o�. FORSYTH COUNTY, NC PNGC-326-0001010 A
;wrm�eornoraaowowve WINSTON�SALEMRESOURCECENTER,WINSTONS4LEM,NC
IOR SAME HEIGNT
AS FXISTING
Z�`' FENCE
2 0'
(MIN)
C DIA (ttP)
- X —
- X �
X
X
z
X
X
X
X
X
X
POSTbWIRE � I I I
SAMEAS I I I I
EXISiINGFENCE I I �`J
(SEENOTE2� L�
1.0' MIN 0.EAIW�CE
�
FIPELINE
I I I I
2.0' I I I I
(MIN.� I I I 1
I I I I I
lJ L�
$
E
3 4.W --�
{ POSTBWIRESPMEASE%ISTINGFENCE
�
I �na.s+�uuisraw
X
X
X
X
MN2KER POSTS
X
X
X
X
Oi FENCE RESTORATION
N.LS.
Y %2' WOOO STAYS
ORWIRE STFYS
X
X
X
X
$AMEA$ E%ISTING FENCE
AS REOIlIREO
X
X
X
z
I I
I I
I I
LJ
FENCE WITH TEMPORARV CONSTRUCTION GATE
N.T.S.
z
z
z
x
X
X
X
X
I I
I I
I I
I I
LJ
X
�
X
X
X
X
4"X4'PPSi
m PI
I I I
I I I I
I I I I
LJ LJ
�--- 2W -
9PACESECURELY BEFORE
EXISTING FENCE IS CIR.
PIEOMOM'S NANML GAS F0.CILITY ORAWINGS ARE CONSI�ERED CONFlDENiIAL (OMdUBS)' �PAWING IS
DISC�OSER ALL PREVIOUS PNPER COPIES OF THI$ OftAWMG MUST BE �ESTRO
ar cxK avvo oescwmox pavnw
VN SF BG AREACOOE 2<00 °" "'"'
ACCOUNT NUMBER X%%%% ���x �5
PROJECTNUMBEft 0351527 °"a' """�`
oanvnNcor vr+ ��� �
STATION ID 3T-WSM-3995 °"" '°"`
__�,..,�,.......,.. ... 0711&21118 %X%
9RACE SECURELY
BEFORE FJ(ISTMG
FENCE IS CUi
No�s:
1. COMMCTORSHALFUNNISHPIL
NECESSARY MATERIAL t0 RESTORE FENCE
TO ORIGiNFL CONDITqN.
2 PoST,WIREAN�OTHERMATERW.SNALL
BE SAME PS OR EQUIVALENT MATERWL TO
MATCH E%ISTING FENCE
3. BRACESPANTOBECONSiRVCTE�ON
EACH SIOE OF PIPE! INE PIGHf-0E-WAY,
PRIOR TO INITIAL �ISMANTLING OF FENGE.
G. ACNALOEPTHREOUIREOTOBESETTO
ACHIEVE A STABL SUPPORT POSi.
5. UNOERNOCIRCl1M5TANCESSHAllFENCE
POST 6E PLqCE� �IREGiIY OVER
COMPh4Y'SPIPELMES.CONSULTCOMPANY
AIRHORIZEp RFPNESENTATNEfOR
IOCATI0N5 OF fENCE PoSTAOJACEM TO
COMPqNY'S PIPELINE.
O3 TEMPORARY FENCE GATE INSTALLATION
N.T 5
MA%IMUM OF SIX POST TO BE PqINTE�
ON PIPELINE CROSSINGS
(AS NECE554RY TO ESTABLISH
ORIGINALPENCE POSTSPACING)
O REBUILT FENCE CROSSING
N.T.S.
OR SAME HEIGHf �
2�5 PS E%ISTING _
FENCE
POST HEIGHT ABOVE GRWND
IS TO M4TGH EXISTING PoST
s oa.
(MINIMUM)
TREATED POST
<' X a' NORQOkTqL
TREATEOTIMBEft
Bit4CE (iYP)
1.00 (SEENOTEO) I I �
I J �� 6�VaTREATE�
GENGEPOSTRI'P)
200 -�
(T�P)
O5 BRACING DETAIL
n.rs.
BMCING WIFE i0 BE 9 GA, M1tIN,
CONNECTE�TO FENCE POST
WITH OpU9LE WRAP METHO�
TOP 6 BOTTOM EHCH �IFGONAL
WIRE i0 ALLOW TYVISTWG OF BRACE SPAN �EiFiL
STPAN�SFORTIGHiENING. (SEENOTE3)
THROUGH THE lATEST REVISED �ATE' TO INSURE iHERE IS NO RISK OF INAPPROPRWiE
�NCE WITH RECOftD581NF0. MANAGEMEM RIM� POLICY 1001
RE`�°�"` �O�I Piedmont LINE 326 REPLACEMENT
E�G��EER FENCE RESTORATION DETAILS
M°�'E°� Natural Gas
"`°�'° FORSYTH COUNTY, NC
GqINGIPAt �OPYqIGHi AIS%EDMOMIUNPALAAS COIiP.
Erv�iNEEq mar.omXep�m�eoWOMraowowve WWSTON�S4LEMRESOURCECENiER,WINSTON-SALEM,NC
90% SUBMITTAL
NOT FOR CONSTRUCTION
aef. owc�s�
SHEEf(5) 16 OF d5 �WG SCALE AS NOTED
OWGOATE031012018 SUPERSE�E� _
UNA'MNGNVMBER REVI61�
PNGC-326-0001011 A
u�a
I �sspvN.e�misratir
SAND BAG - DIMENSIONAI DATA
/
^.LLl iYIID q1H19016 1A IPPNOXIWIE WE
i0 1HE piFTNMC N1NRE5 OF 59R/CMVFL USFD
l5 flLLIAR.
vro aee �vm ovaswrs
Plff SQf P�� .�w.M IEG INSINIED I£MCEN
(�) Sn 6VS MR]MEg NIXM
QN) (l9) QN) (M) (�N)
fib25 IAW N 1I fi9
I. ,Yl FlLLN OINENSYJM1S /.ff MPAO%Ol01ED. XHOi IXSfILID. Wq BIG
xtwins cuuraru �mr m txE vmeuxE ci�nexa. emi �
imsc nart aausr. su�o arc mwrs ew ee a�m ixro mrt
lqJlpl XipM.
2 IDOIIIONII. 4h5 AYO WOG4R /AE MIM,1�E fOR Gb1W MPIIGiqNS
]. QO SiN05 !ON W190E IXV�IEA
cnPncm:
O TYPICAL BUOYANCY CONTROL - SAND BAG
N.T.S.
PIE�MOM'S NANRAL WS FACILITY
CONFIDEMW. �OM-1095�' �RAWIRG IS
:5 OF THIS �PAWING MfIST BE OESTRO
P➢PPp�
�o wR ��,
� �� �
Si5T7 °"rt ^"'"'
X%I%1J%XIO( %%X
h3995 01H&2018 %%%
� � ���
iXE iGLL1nWG ip%F 41pR ME YIA BIG
SPKWG M11 6 10 � UffD M1FH 05TNLNG
Ylm &G fOfl BIIUYAVLY CVHIROI (iqV NEC.1iM
apruwrJ
i. rox ou�r wiu nnaxcss, xccnmrt
aumiwca5, nc. nuse corrtKr swo a�c
uwvc,�cru+m ouscrtv rox N[
raaxrowurz saun� vaaurwn.
z wu sw w�dns xorzn ox n�e �
cwm u¢ ,wvxouwrz w.� ro iaru
vuamn M Wea� ocxm .wo aaRasm
�. isaa/a rr s.vEx+u aw.�sr oosm
�wr�c iovE/cu n xmr �ox wm.
u� coun
'HIS �MWMG USE OIMENSIONS ONIV
THROIIGN THE LATEST REYISED DATE' TO INSIIRE h1ERE IS NO RISK OF I W3PROPRIATE
�NCE WITN REWR0.5 8 MFO. MANAGEMENT IRIMI POLICY 1001
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF.OWG�S)
R"�°"�` piedmont LINE 326 REPLACEMENT �""'" """' �.."'�"" "� �"'"
ervciuFea OW�DATE C9012018 SOPE95EDED _
"GR'E`" O,I Natural Gas TYP BUOYANCY CONTROL DETAILS o��„���MeEA a_��s�
'E`"sT° �oa.Po�Mm,,,,Eo��.�,n��,��o�. FORSYTH COUNTY, NC PNG-C-326-0001012 A
GRINCIPqL �OPP.OFFlCEiTlOPIE�MOMP�WL1tlVE
EHcweep ,.,,,e,,.,.,.,,,�.,..�� WINSTONS4LEMRESOURCECENiER,WINSTONSALEM.NC avyu��wixarz�ur.vo.�wrrr.wRw��w�,n
PWTE NUMBERED PANEL
0.1I2'
CAN BE INSTALLEO
win+aiv�rsoa � �O g
Nurs atao eatTs
FRAM[ —
8
TYPICAL AERIAL MARKER
NOTES:
1. ALL �IMENSIONS ARE IN INCHES.
2. THE "A" PRAME, MOUNTING PUTE18" x 14"
3. THENUMBERSSHOWNONTHE"A"FRAMEPLATESHALLBEEVENLY
CENTER ANO SPACED.
4. AERIAL MARNERS SHALL BE PtACED AT APPROXIMATELY ONE (1) MILE
INTERVALS ALONG THE PIPELINE, AS SHOWN ON THE ALIGNMENT
SHEETS.
5. THE AERIAL MARKERS ARE TO BE LOCATED WITHIN THE RIGHT-OF-WAY
HS CLOSE AS POSSIBLE TO THE CEN7ERLWE OF THE PIPELWE.
VIEWING AREA TO BE PERPENDICUUIR TO THE LINE OF THE DITCH.
6. THE POST SHALL BE BURIED THREE (3) FEET DEEPANO THE BACKFILL
TAMPED IN A WORNMANLIKE MANNER.
7
AERIAL PATROL
MARKER
CASING VENTS
PIE�MONPS NAIDRAI GAS PACILITY ORAWINGS FRE CONSIOEPE� CONFI�ENTWL (OM-0095J' �FAWING IS CURREM ONLY THROUGH TNE IATEST REYISEO DqTE' TO
DISCLOSER ALL PREVIOUS PAPER COPIES R iH15 ORAWING MlIST BE �ESTROvm w errnanaucc wrtu acmanc x iucn �neuer.oucu�
� '� °E"°"" piedmont
ENGINEEF
�� � M�'�°� O,' Natural Gas
REC 6 St�
PPINL�PAL �OPYPoGMA15PE4MOMNPTIIMLOP9COlip.
O1/1S�P018 XXXi ENGMEER ��RFOfFlCE�IA%EOMONTRbNOM'E
PAINTED OR MANUFACTURED
FENCE POSTS
If�NPPROPRL4TE
LINE 326 REPLACEMENT
PIPELINE MARKER DETAILS
FORSYTH COUNTY, NC
WINSTONSAIEM RESOUftCE CEHIER, WINSTON�SALEM, NC
90% SUBMITTAL
NOT FOR CONSTRUCTION
aeF. owcis�
SHEET(5) 180F45 DWGSCALE ASNOTED
�WG�ATE09011PO1B SUPERSEOEO _
DflAW1NGNUMfiEq PEVI51
PNG-C-326-0001013 A
�wre. s� vw� wamxc raasaEcir�c wMEnsiars.
LOCATON,SIffOFMEAN�DCATELOGiIQYS
FX1EMSaNNW i0N
'MCOLUMNPpSi pJ5frTL4FOR
IiYPEFEFENC£1 BABmWI E 1EflMINNFOSi
SAFEGUAF�iOPFOF &NDFWS1AEfCNING
x cowrnx rosr ���
I�Eh4FENCE)� EN�BM9 //Y3FGIMF�EINB
� W1EPoStiW
SIMIGMLLG WIPq�LAii�tHMEM
�}YpE qd FENCE�
0.iPFpi �SiREfCl�FPOAPBFNO
2va"N'CIXUFWONEL60� tt4VGFP8RlG
SLM.10 PIPf qNE PJSI 10 PAY
G4iEF'fl9i G4IEFMME
&UCE6TqU5584NOFOR y7q��qgaq
'N'CClUMN1MEPp5i �J(��
���/ z ne o o. rczMrcui con
� 4J ON31?SDU4FEN&NG
iRU55 &ND
FORK LAiCH I KEEPER GUIDE
TOPPOSTFITfINGDETNLS ""°r��
sca� rns
SPlli BOLi CpAPPfS51011 fANM1fCtOPS
BOImING &I�ED OR IUZOR W IflE—�
ML26Wl
caamo
COUNEC1aR
n+s we�o
FMSNEDGfNtf �
./�
vBG1G W1�t15 WEL�MFfk_
1109RHESLPMA'LG90lIN�LWP—�
TAGZGIGCQVNECIpN
WYiHX115WELOMEiPI —
7YPIG4LFENCEGROUND
SCFIEN3
"1' iY. �Y 'u1 Y:u�
/ sirw�.�couo�¢`oaao mrvon+cennaeoow
6hHE5iM4�i(�6':E N{G3GWI
�,rczc caouno cuwNo
WH4ECi0P fANNEGiOfl
61�5W[lCMceL Bfl5WE1�
ME1Fl
�
`�µ� WIENMPE0.
FENCE a���Y
iqVLEFTCR
WGHf
wwocn w*e
BONOMBOSCiD
nriEvsr iz or
:�rvcir�c �sn
j�� �
.�\.. masxeocw,oE
GiGiBPG.MfISMETPIGBIE
*acnouxoacnco�ueerna: ;�.�/,�
vec.zc.vk�
MtISWEI➢MEiq—
va� x �o� crnoezwei� cawxo aoo
INSIA�E� IN B OFl i q PqPERh
USING �3�POD5 A4A iflIMG11lAF
S�N?ELCNNEC1iDiJG[ItlE'n
alaeauixoar ncwanh
srx� wrs
G4iEPoSi� G4tEFMME
TOP GATE MINGE
WiEPQSi�`��kl 1'�0��
L�
l
BOTfOM G4TE HIN6E
OpNEREi1
LORNEP ELLMMYY-�� jjjj WIRUNGER
ii0P680Ti0 U NODGYNE
OP68�iiCF¶
'�1�+ fOPNUTCX
nIr� 0.LWGF.R RCO
4JlJ aGYMFECFR
lOCltl(EEPERGUI�E
FlTiINGS FOR CENTERS
GVTE FITTING OEfNLS
9GtE Mi6
wsruiausx
wiTMrwtiw� cnsrrs
���,
�LORWIFE ��
�T
+r ow ca+cne�
MG]GGRWND P�EW1�lIPF �n
carvuecraa cno�eia+c
n16 WELO MEfpL
uwx unic
FENCE
LDPWGBPAE
C�FFIf Wl9E
{ ttPICqLGROJNDRO�TESTWELL
A uwe�.s
xOIE fENCE 6MA41 BFGFOUNOF�Ai EALH
wa�n allo oxrwH me mene �s eaEnTtn
1 WV11 Wd fE£i BEfWEEN GV W MCNG �5
TYPICAL G4TE GROUN�
SL4E'.Xi6
ura
�o.o s*¢t
CJ�tEPJ6f
��
e�a�xxraan
ELEVATION ����
sa oeneu
�mw.vi
TOP cw..vr�enr
BPNO fOR WIRE STFtETCHING OETAIL
�� \/
�,'.i��t�
`i.�
�. �. .
r.ea �
-GIVWNOPO�
WIqEL1AMP�pSE
ONECIMNFON ^'�'��
uwwinEi wo,�wrww�n
q9mF rµ�Er.�G
3I��WG�FE WPVEFWIFE
aa�xio'-0'iowc
LOPPFAWEt➢GROIINO ROD
- srk-rarm
9a¢
tj OD B0.0CE
mu55 A00
MTIIVNBLCIttF
PERSONNEL GATE
i�vuu
�c
WIRE TIES PoST DEfAR
sro�. xis
smErc�wunxw�oee
��m�zanw rnu
e�:roce¢ „x
61VFPEV6w�0
END OR G4TE PoS7 DETNL
w.i c N15
\ �� ��
�w�.znnwe� uwu¢
5�� �O�YV.V.9EM4Ex
: 9I¢vwPT�.�n�wri
E%TENSION ARM BFRBE� WIRE �ETAIL
nares:
� i, nonwcsmwoEorwe�mmerovanra�wauimnoo.ixcqoo�o
W1 BE FIiNEfl o W N 09 MRFME�.
:. fANBEUSE�IN%ACEOFFttaFGq�DEPAEN�1eY�NG111E[ANWCfqi OEfNxFA
� I e�enoenourwvur�aooroFxn*�+ENo�avm�.s�oe. noacenrm
]. FqiGONOUGtOR550�KCA9lOMVAGEP.liIS�C�CaMIMFNCE011NTPiA
iYVEGiG1B2G �NECiIpNPEMPDEi0T1E590NLMIlCO.�'�UCTOPWILHASNIXIiSlUBCF
t�'SWEWMEiP1 ��WEIDTIE40*OTHEGqWNOP00.
iYPE Gi GONNECPON EXTENSION ARM RAZOR WIRE OETNL
UlE M13 SULE NI5
PROPRIEfARY 8 CONFIDENTIAL A1L RIGHTS RESERVE� • DO NOT SGALE iH15 DMWING' USE �IMENSIONS ONLY
PIE�MONPS NANRAL 6AS FACILIiY OR4WING5 ARE COVSIDERE� CONFl�ENTWL �OM-10957' �RAWING IS WRpEM ONLY iNft011GH THE tATEST REVISED 0.4TE' TO INSORE
oescwviror�
�� � R"'°""` piedmont
EwGINEEfl
� '� MGR'�°� ,I Natural Gas
FEC 65N
VPINCIi�L �OPTPoGXiN15%EDMOMNAiOPALG0.4CORV.
O1I191$O18 XYJ( cnm.iucco COf1PAfFlCE�IARFOMONiROWOPfVE
OOU9LELOILNONP.EINFaFCEO
mweaza�o�amnsn�neo
i01NE iEN510N WINEMIO iD
*UP OF iNE CHNN IINk FAOFIC
1� MSTnLATIONOFFENCEhlDRI0N5HALLBEP!UAIBANOTROETOLINE,CFWNLINKFABRICSHALI
BE iFllT ANU PROPEFLY SECURE�. CORNER BRACES ANO DWGONFL BRACES S W+LL BE PROPEPLY
PLACE� TO PftEVENT SAGGING. iHE COMPLEfE MSTALLATION SHPLL BE INSTALLE� BY SRILLE�
PN� EXPERIENCEO FENCE ERECTORS, IN A WORKNNNLIXE M4NNER. IN ACCOROANCE WIiH G000
CANSTRUGTION PMCTICE ANO IN ACCOROPNCE WIiH ALL LOGN. APFL�G46LE LODES.
z� MATEftNLSHALLBE HOL�IPGPLVANQE�FENCECHAINLINKPHBRIC-THECWIM LINKFABRIC
SH4LL BE IN ACCOR�ANCE WITH HSiM A-392 $PECIFICAilONS AN� SHFLL BE NOT OIPPEO
GALVANIZED AFTER WEAVING. H4VING A COAIING WEIGlR OF 20UNCES OF LNC PER S�OaRE
FOOT,MINIMUM,OFUNCOATE�WIRESURFPCE�CLASStI). FPBRICSHALIBE N0.9GAUGEWIFE
WOVEN IN n 2-INCM CNnM ONK �IHMON� MESN. THE Fh6RIC SHALL BE F0.5TENE0 TO iHE LINE
POST BY MFANS OF N0.6 GAl1GE AW MINIIM WIRE CLIPS SPACEO 121NCHE5 ON GENTER. IT SHALL
BE ATTACHED i0 TOF RAIL WITH N0. 9 WUGE ALUMINUM TIE WIRES SPACE� 24 MCMES ON
CEMER. FABFIC SH4LL BE ATiACHE� TO TERMINNL P0.5i 8Y h1E4N5 OF A ti4' X Y4' TENSION BAR
WITH HEAW GAUGE PRESSEp SiEEI BANO OR CIIPS SPACEO APPROXIMATELY 141NCHE5 ON
CENiER.
3) BAR9E�WIRESHAllBE0F4P01NiPATTERN,COMPOSEDOFiWOSTRpND50FN0,11-0IYGApGE
GALVANRED WIFE WIRi IARGE BPR85 SPACED APPRO%IMATELY 4 TO 5 MCMES ON CENTER. PAZOR
WIRE SHALL BE OSEO WHEN LOCPL OR�INANCE REOIIIRES OR AT PROJEGT MANAGERS REOUEST.
0) BOITOMIENSIONWIFE-NO.IGFUGEG4LVANIZEOCAILSPRINGTENSIONWIREWIiHCL0.SSl
GDATING. WIRE i00E FhSTENE� TO CWJN LINK FNBRIC WRH N0. f 1 GqUGE HOG RINGS ON IB
IhCN CENTERS.
Sj POSTAN�OiHERAPPURTEN4NCE5-ALLPOSTPNOOTHEPAPPIIPTENANCESSHALL9E HOT-0IP
GALVFNIZE� WITH N MINIMUM ZWC CQ411NG OF 2.0 OUNGES PEft SOOHRE FOOT OF SIIRFACE
(CIASSIICOAiiNGASTMH-392).
fi� LINEPOSiSHALIBEYdId"H'COLUMNWEIGHINGA.ILBS.PERFOOT, MINIMOMCARBONCANiENT
35%, MINIMIIM TENSILE STqENGTH ]5,000 PSI OR 7�18' 0.0. SCHEDULE a0 %GE OF SIIFFICIENT
LENGTH TO ALLOW POR INSTALLATqN TO A DEGiH OP 3'-0' BELOW GRWND LEVEL. THE POSTS
SMFLL BE SPFCE� IN TME LINE OF FENCE. NO FURtHEft.
i) TERMiNALP0.5TAN0ALLENO,GORNERAN�PULLPO5T55HALLBE4-117X2-17X.1815'W.T.
SOl1ARE iUBING OR 2-110' 0 0. SCHE�ULE 40 PIPE.
81 GATE PoST SH4LL BE OF THE PoLLOWING SIZE fOR SINCLE SYVING GATES OR ONE LEAF OF
DOUBLE GATE
POST SIZE NOM.'M.
UPTO6'WI�E 141P'SO.OR SAMEASTERMIWIIPOST
2-]IB' 0 0,
OVER6T01P 4'O.D. 9.11L&Ff
9� EACH Po5T SHALL BE OF SUFFlCIEUT LENGTN TO ALLOW FOR INSTALLATION TOA �EPRI OF 3'-0'
BELOW^uROUNDLEVEL.
10) LINEPOSTFNDiEPMINPLPOSTANGNOfWG"cSNALLBEALLPOSTSHALLBESEfINCYLINDRICPI
GONGREiE FOUNDATIONS WITH TOP Of FIMSH GONCReTE SURFAGE 3 MGHES ABOVE FINISH
GRA�E E%CHVATION SHALL BE 3'b" DEEP AN� NOT LESS THAN TEN INCHES (10'� IN OIFMETER FOR
ALL LINE POSTS. AND NOi LESS iHAN 3.5 TIMES THE �NMETEft FOR TERMIWL AN� GATc POST.
CONCRETESHALLMEE(AC4378 SPECIFlCATIONFOft3WOP51-PBDAYSTRENGTHCONCRETE.
11) FENCESH4LLH4VEAGONTINUOUSTOPRAILFORRSFOLLLENGiHOFSTAN�ARD6ALVANIffD
PIPE,1�96' 0.�.. THE TOP Pqll SHPLL PA55 THROl1GH OPENINGS PROVIOED FOR TH4T PURPoSE IN
THE POST TOP$ AN� FAGH LENGTH $HALL BE COUPLFD WITM A SIFEVE COUPIJNG, WITH
E%PANSION COUPLING EVERV FIfTH JOLUT.
tP) TIiU558RACE55H41�BE5TANDAItOGALVPNRE�IS�B'O.O.PIPEY.]1lBlFT.,WfRIFYO'O.D.
TRIlSS ROD AND iURNBUCKLE ATfACHMEM SH4LL BE INSTALLF➢ BEfY/EEN EACH END OR GAiE
POST PN� TME F�JHCENT LINE POST. TWO TRUSS 9RACE5 SMAIL BE FIIIiNISHED ON CORNER OR
PULL GOSTS.
13) FfiTINGSU5E01NTHECOMPLEfEFENCEh55EM8LY5HALLBEOFMPLLEABLE,GSTiRONOR
PRESSE� STEEI AND SHALL BE HOT-OIP GPLVANIZEO At fER FABRICATION.
1C) IXTENSIONARMLINEPOSTSHHLLBEWUIPPE�WIiNE%TENSIONARMSTOWRMSTANDAMINIMUM
PULL-0OWN WEIGHT OF d50 LBS FROM END OF ARM. AfiMS i0 BE DESIGNED i0 EXTENO ATA45
�EGREE ANGLE WITH LOCI(ING OEVIC"e TO SECURELY FASTEN THREE SiRAND50F BARBED WIRE
EOUALIY SPACE� WITH THE TOP STPqNO LOCATE� 121NCHE5 �12'� ABOVE FABRIG AN� 121NCHES
Q2') W i FFOM THE FENCE LME.
15) P0.5TTOVSAN�ALLEND,CARNER,PULLM'DGATEPOSTSHALLBEEQUIPPEDWRHTOPS.
IDBOLhR POSi TOPS TO BE SOOESIGNEO AS TO EXCLUOE MOISTURE F0.0M THE POST. ALL LWE
POST TOPS �ESIGNEO TO HOLO THE TOP NJL AND THE EXTENSION ARM FOR TMREE SiPA4�5 OF
BARBEDWIRE.
16) GATEFRAWESSNALLBEM4DEOF2'%4'%.i10'WT.S011ARESTEE�TU6INGOR1.91NCH00.
SCHE�ULE G0, P.1Y LBJFT. STANOARD WEIGHT PIPE. HOT-OIP G4lVq4RE4 FR4MES TO BE JOMEO
AT GORNEftS TO FORM A RIGIO PANEL qN� SH4LL BE FlLLED WITH GHAIN LINK PA9RIC OF SAME
GAUGEASUSEOONTHEFENCE FnBRICSFwL! BEFASiENEDINTHEFPAMEONFliF0UR51�ES
6Y MEANS OF TENSION B4H5 AN� CLIPS. THREE STRAN�S Of BARBE� WIRE SNALL BE FASiENcO
TO THE E%TENDED PRAMES OF G4TE. EqCH FPAME TO BE EOUIPGE� WITH 3'B' DIAMEfER
A�JUSTRBLE TRUSS RO�, HINGES. POSRNE TYPE IATCNING DEVICE WRH PRW ISIONS POP
PA�LOCRING, A1L DRNE G4TE5 TO BE PROVI�E� WRH CENTER P WNGER RW. CATCH AN�
SEMMUiOMATIC OUTER CATCHES TO SECURE GN�fS IN OPEN POSRION.
17) FENCESECTION
COMPANY ttPE � AA
FPBRIC HEIGHT-96"
TOTAL FENCE HEIGHT-10'-0'
NOiE: COMPANY TO SPECIF1' THE PoLLOWING
GOMPANY ttPE
PIAN OF NftEA TO BE FENCm
LOCATION Oi INSTALIATION OR ANY SPECLiL
COMBINATION IN CONTRACTK7TH FENCING CON7RACTOR
90°/a SUBMITTAL
NOT FOR CONSTRUCTION
REF. DWG(5)
LINE 326 REPLACEMENT
ICAL FENCE SECTION AND DETAI
FORSYTH COUNTY,NC
WINSTON-S4LEM RESOURGE CENIEft. WINSTONSALEM. NC
SHEEf(5) 19 OF 45 DWG SCAIE N.T.S
orvcon�ovovzoie suaeaseoeo _
OMNINGNVM6FR REN51�
PNG-G-000-0001031 A
U{$GGIIxE�WIH$fIXFy1EMqE5WPLELENIFAILMEl16
EROSION, SEDIMENTATION CONTROI, AND POLLUTION PREVENTION PUW NOTES:
EROSION CONTROL MEASURES:
THE PIIRPOSE OF THE PROPOSEO SEDIMENT CONTROL PROGRPM IS TO PREVENT SEDIMEM F0.0M
LEAVING hiE SRE. TiE NFTURE OF THE PROGRAM WILL 6E T0 CAPTURE SEOa1ENT DISTIIRBE� BY
CONSiRUCTiON ACTNRIES. THE USE Of SILT FENCES. CHECK �AM1IS. RIP0.qP OU1LEf
PROTECiION, CONSiHUCTION ROAD STFBILIZ4ii0N, TIMBER M4TiING.SURFACE ROIIGHENING,
AN� CONSTqUCTION FJ(ITS ARE INTEN�E� TO TEMPOPMILY TRaP SE�IMENTS DUFING
CONSiRUCTION. FINN. STABILIZATION USING PEIiAfANENi VEGETATION ANO DIVERSION BEPMS
WITHIN iHE EASEMENTS IS INTENDE� i0 PREVENT EROSION AFTER CONSTRUCTION IS
COMPLETED. CUTS AN� FILLS WfTHIN STREAM BUFFERS OF WERAN�S SHALL BE SiA9ILViD WRH
APPROPRl4TE EROSION CONiROI MATTM� OR BLANKETS NJ� ACCOROWG TO NC DEO
REOUIREMENTS. THESE AREAS PRE CONSI�EREO CRITIGI: AREAS FOft EROSION CONTROL
CONTRACTOR SNALL INSTALL AN� MAINTAM EROSION CONiROL MEFSURES AS DESCWBE� ON THE
PROJECT PVJiS FN� DETFILS DUWNG CONSiiUCTION M!0 SUftFACE RESTOMTION UNTIL SUCH
MEASURES ARE NOT NECESSARY. WHERE PDDITIONpL MEASURES ARE NECESSAAY. THE
CONTFACTOR SHALL WSTPIL PND MAIMAM THE APPROPRIAtE MEASURE$ ACCOROMG TO THE
REGIDNAL OFflCE Oi THE MVISION OF WqTER OUAIITV HAVMG 111RI5�ICTION fURTHERMORE.
FNY EXISTING EROSION CONiROL MFASURES PL4CE0 BY OTHERS ANEA� OF CONSTRUCTION
SNALL BE MAINTAINED DURIN6 TME MSTAILATION OF THE PIPEIJNE.
iEMPOMRY SEEOING
BROWNiOP MILLEf (OR E�UIVALENT SPECIES)RGPIJED AT 90 LBSIAC ON GENRE SLOPES
UTILIZE 500 LBS+AG OF 10.10.1G FERTILIffft OR EOUNALEM
❑TILIZE 3,000 lB9AC OF LIME IF SOIL iEST IhDIGTES SOIL PH eEIOW S.0
PERMANENTSEEDING
ui
s..m.e � +wes..1v� +irr�.r..n..mmp
�M�Sn 6�YFa0�, NWir�s�s[aN
inr+e.
rrm.�.e,:.�.rm
• .�wr.�swrae..m�meera.euw
.�+..rm �, � r em.ti.. pe�
1��J� Ialolo�alpYYllv
ImqinYq
�.,�i w+�.�b wimcs��.sioie
� �mpmmeiwme�(�alMYmb�4v
� +w.w.��.mm.i.i..mwmµ..
• RIIn6�sYmwlM�un.Mum+�q�p�L
vaW YY4aJ� a'lamM Nsy�ptlY Wrvi
Apm�L1f0
611d
9
"e
�
�
�
�
^` s.ds.ao� a
we.�.e.m i
w..owe
� ..r`a..m.eeaa...w�..m.e++.e�n�owo.
�m�!
o.�e.+n.. swo. •
M4d yd��
xoe��.em �..
xn.e�.+'
F+ w� rm � e.n a.�a.a n m wr�
Gn�Y 9�1e� n
n.e.e.o-�is�..�°'eYa....cs.....a�.o..�l.wd
•�on���.�....der
..��.d �.`r.+.�� n....e.�.....n.r•w�....r�.�
uu
w
iw.u�. xy.a.ed..Yes.�—wr.r
xo� w rwe ra..
w�.wn..4> w'.o.
ew�imi.. m�oenrA.p w
�vur x.ne�u.v�.
a.ev�.naaw�.ui.1 »
w W�oY.e`wn weo.u.d
ro.k+��x.e... n...>�.
....,w. ..�n.—e.r
nitwfil ��
� er...d.�... r.a�.�rxc wr..�rr�o.di.....
=.e� rnw+.a..n.....�,.
ura�n'--" �m.�—a�uru.
�+ex>• r vwn va.
iw wn.awara.nw wa.e. w
��an�e�r.u. nra.eyb� m
NVYCEo' b
ia.�r�
VmM e.evi Yr.� mn ..iw.�e uo... ww m x umal
ea MmwAa.a.� wml�e+4�
eM��.wa i
r�d,e...m... io
O�ns mY N
B�^� WrM'brpld�lTSLWnw.bM1p�1
rcr a..r c��
�...a�.�...evw....cw...�..o».�...� �
e�wwm�vv.sr.�w.�
� er.rw...�rr�.a��nr
.�w�.a�e.�.��T �w.�e.o.�.....�ew.s+.v�i...�a.�..
uv
PIEDMONPS NATUFAL GAS FACILItt �FtAWINGS ARE CONSIDERED CONFIDEMIAL
�
��
oviwsoie ��cx
ALL 1AN00WNERS SHAl1 BE NOTIFlEO PRIOR TO CQNMENCING CqYSTRUCTION ACiNITIES.
NO IAND OISTURBING ACiNRIES SHALL COMMENCE IINTIL Pll RE�UIRED PERAiIT
AUTHORILITIONS HnVE BEEN 6aFNTEO.
iEMPORARY PtACEAIEM OF ECCqVATED OR FILL MATERIAL INTO WERAN0.5AND WRTEflS OF THE
UNIiED STATES WILL BE FOR THE FBSOWTE MINIMUM PERIO� OF iIME NECESSFRY i0
ACCOMPLISH iHE W�RK. TEMPOFARY OISCHAR6E5 WILL BE FULLY CONTAMEU WIiH
NPPROPRIHiE EROSION CONRIOL OR COMFINMENT METHO�S Oft OiHERW15E SUCH FlLLS WILL
CONSIST OF NON-ERODIBLE MAiERIN15.
TEMPoRAftILY EXCAVATEO WEftAND TOPSOILS SNALL 9E FESERVED ON SITE AN� REPLACED AS
SOON A515 PFqCTIG4BlE. THE MI%ING OF TOPSOIL AND SUBSOILS WI i HIN iHE WETLANDS AI.ONG
U111fi1' CORRIDORS SHALL 6E MINIMIZED TO THE GREATEST EXTEM PRAGTIGqL. Ol1RING
EXCAVATION. THE SOILS SHqLL BE PLACED ON FFBRIC TO MINIMIZE IMGHLTS WHENEVER POSSIBLE
TOPSOIL ECCAVATED FftOM UTILItt TRENCHES WILL BE PILE� SEPARATELY PROM SI18501L5 AND
WILL BE BACI(PILLED IMO THE TRENCH ONLY AFTER THE SU8501LS FWVE BEEN PIACm PND
CAMPHCTED. P1L EXGVATFD SOILS SW1LL REMAIN IN UPLAND A(1EAS WITH APPROPRWTE BMP'S
50 PS NOT TO CAOSE H SE�IMENT �ISCH4RGE IN WETlPNDS AND STREAMS.
CLEPRE� WETLAIJUS REOUIRE SPEC W.IZEO REVEGETATION WITH NA7IVE SPECIES. TEMPOMRY
STABILIZATION fAN BE ACHIEVEO WIiH STPAW MULCH ONLY AND PERM4NEM STP.BILVATION
ftE�UIRES SEE�ING WITH A NFTNE WERAND SEED MIX. NON�NATNE PEIiENN1AL55lICH AS
FESCUE PRE pROHIBRE�.
ALONG UTILIiY CORRIOORS WITHIN WETUINDS, GRUB STUMPS ONLY AS NEEDED TO INSTPIL THE
UTILI'rv AND QJ� PEMFINING SNMPS OPF qT GRNOE LEVEL. THE GENEFAL STRIPPING OP TOPSOII
WRHIN WERANOS ALONG THE lliRfiY CORRIDOR IS NOT PERMfREO.
A ONE-TIME APPLIG.TION OF FERTILIZER TO PEESTABLISH VEGEfATiON IS ALLOWE� IN DISTURBFD
AREAS.INC W�ING RIPFRWN BUFFERS, BUT IS RESTRICTED TO NO CLOSER TWW 10 FEET fROM
THE TOP OF d4NK OF STREAMS. ANY APPIICATION MUS i COMPLY WITM ALL OTHER FE�ERP1,
STATE ANO LOCAL REGIIlATI0N5.
iHE USE OF RIP-fLOP OR ANY OIHER ENGINEERE� STRUCNRES TO STABILIZF A STREAM BED
SHOUL� BE FVOI�E� TO TNE MP%IMUM FXTENT PRACTICA6LE. IF RIP RAP STABILIZATION IS
NEE�EO, IT $HOOlO BE PLACE� ONLY ON THE SiREAMBrWNS, OR, IF IT IS NECESS4RY TO BE
PLALEO IN THE STFEAM BED, THE PINISHE� TOP ELEVAiION OF THE RIPRAP SHOIIL� NOT E%CEEO
THE ELEVA➢ON OF THE ORIGINAL STREAMBED. A1L RIP�RSP SWJ.L BE BURIE� PNOIOR'NEYED IN'
SUCH TH4T THE ORIGINAL STRFAM ELEVA➢ON FNO STRFAMBANK GONTOURSARE RESTqiE� AN�
M4INTFME�. PLACF1dENT OF Rlo_qpp OR OTHEAAPGROVE� MATEPW.S SHALL NOT RESOLT IN
OESTqBIL17ATI0N OF RiE STR'cAM BE� OR BANKS UPSiREAM OR DOWNSTREAM OF THE ARFA
WNEN DIRECTIONPI BORING OR NORI20NTAL �IRECTIONAL ORILLING UNDER SiAElJAS AND
WETLAN0.5, INSPECTORS SHALL CLOSELY MONITOR FOR HYDRAl1LIC FRACNWNG. ANY OISCH4RGE
FROM HVOPAOLIC FqACIDRING �NTD STREAMS OR WETLAN�S SNlLLL 9E REPORTED TO THE U.S.
ARMY CORPS OF ENGWEERS REGUTATORY FlELD OFFlCE WITHIN a8 MOURS.
THE CONSTRUCTION CORRI W R �INGLMING ACCESS ROA�S. SEOIMENi AN� EROSION CONTROI
MEASURES PN� STOCKPILING OF MATERIALS) IS IIMRE� TO AO FEET IN WIOTH IN WETIANDS FND
ACRO55 SiIiEAM CHPNNELS ANO MUST BE MINIMIZEO TD THE hWUMUM EXiENi PFACTICABLE.
PERMI•NENT, M4IMAINED ACCE55 CORRIDORS 5lNLL BE RESTRICTED TO THE MINIMUM WI�]iH
PRACTIGABLE MlD SHALL NOT E%CEE� 15 FEEi IN WIDTH EkCEPi FT MpNMOLE LOCATIONS. P
1&FOOi BV 1SFOOT PERPEN�ICULAR VEHIGLE NftNFftOUN� MUST 9E SPACED AT LEAST 500 FEET
ry524 MEfERS)FPARi.
AN AMI-SEEP COLLNR SHALL BE PIACE� AT THE WWNSTREAlA �UTILITY LME GFAOIENT) WERAN�
BOUNDARV ANO EVERY 150 FEET (E5.] MEfERS� UP THE GftA�IENT UNTIL THE UTILITY EYfIS THE
;ALE THIS �PAWING' USE OIMENSIIXJS ONLY
ONLY THROUGH THE iATEST REVISEO DAiE' TO INSUflE THERE IS NO RISK OF INAPPROPRWTE
PEGIONK
Eueweca
MGR iECM
PEC 6 Si�
vRinnrni
ENGMEER
Piedmont
Natural Gas
WETlhNO FOR BURIEO UTILRY LINES. ANTISEEP COLLAftS MAY 6E GONSiRUCiED WRH ClASS B
CONCRETE. COMPpCTED C WY, PVC PIPE, OR METq. WLLARS. WETLWD CROSSINGS THAT ARE
OIRECTIONPILY �RILLED, RND PERPEN�ICt11AR WETIAN� CROSSINGS TFNTARE OPEN CL1T MID
LESS THAN t W FEE( �0.5.7 METERSj LONG DO NOT REOUIRE AMISEEP COLWiS. THE COMPACTEO
CUY SHA1L HAVE A SPECIFIC WFlLTRqT�ON OF t X 10.5 CMISEC OR LE55.
ALL PEWMEfER �IKES, SWALES. �ITCNES, 7ERIMETER SLOPES ANO ALL SLOPES STEEPER THAN 3:1
SH4LL BE PR�VI�E� TEMPORARV OR PFAMANEM STABILIZAiION WITH GftOUND COVERAS SOON
AS PRqCTICABLE BUT IN ANY EVENT WRHIN 7 GLLEk�AR pAYS FROM THE WST LAND-0ISTUFBING
ACTIVIiY. qLL SIOPES 50 FEET IN LENGTH OR GREATER SNALL APPLV GROUN� WYER WIiHIN ]
OAYS EXGEPT WHEN SLOPE IS FLATTER THFN 4'.1. SLOFE510 FEEi OR LE55 W LENGTH SH4LL 9E
EXEMPi fROM THE 7-0AY GROUND COVER ftEWIREMENi FJ(CEPi WHEN i HE SLPPE IS STEEPER
THAN I]. ALL OTMER OISTURBEO AfiEqS SHALL BE PROVIOE� TEMPOPPRY OR PERMM'EM
STABILIZATION WRH GROUND CAVER AS SOON AS PRNCIICN6LE BUi IN pNY EVENT WfiHIN 14
fNEN�PR DAYS:ftOM THE VST UND �ISNRBMG ACTIVITY.
DURING TRENCHING qCTNITIES ANO PIPELME INSTALIATION. SIOECFST SOILS WILL 9E
TEMPOFARILY STORED TO THE SI�E OF THE TRENCH UNiIL THE SOIL IS BACKFILLE�. ALL
STOCKFLEO AND SIDECPST SOIlS WILL BE PROPERLY STNBILIZED WITH TEMPORARY MEASURES
AS REOUIRED BY GENERAL PERMR NCG01 WOO. SOIL GIACEMENT WIIL BE REfURNEO TO
PRELONSTRUCTION CONDIiIONS AS SOON A515 PRACTICPHIE.
LINE 326 REPLACEMENT
ENVIRONMENTAL NOTES 1
FORSYTH COUNTY, NC
WINSTON-SALEM RESOURCE CENTEft. WINSTONSAIEM, NC
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF. DW6�5)
�ATE 03'Otf2018 ISUPERSEDE�
ow.vnH� H�met�u
PNG-C-326-0001015 I A
s
s
„�..�.a.�....�..�
:.� —
��
oen�mo� � ..:�.:.;'�,�s w;,�.�..,.,d�.�...,�.�.
py�Pplp �� .wi �uwui.m. M mss.s[ a,eL..y o(
6�naJb.Nu�fPnr
CaMlYone NTe�e n�.•.�.�w.�e.�l.m.uu.. W irve.'....w iwmwtre
PrdctlfeMWlec ww....w.:sw.mw+r�.�x�.onn�...isu�r+vtiu.
u.ou �iMawawne�..iroem�.
w.w w.�u.n...i M........�..wr.. �e..n+..
4wse.n...o.�rw.�e.
m�nrma�awm..q�n.m.rtwn�n6yv+ltlnM Mynn
�u� WnnhrJ�Wk Cmma�u�J��nbr
�uYr w
Plannifg ��me�•• •W������M��•.ww.m in.
Gonskemtlona �'••"w..w.,,,.r���n� am.wr�+w�e
vVW m.F+..�nm.m�.i.,.��
.e.�m.mie�ni. �ua..w��,.tr.eimdw.iae�
w* w�n� w �n..ux u�ntn �...� w w
m��nvu�nqitle� f�o
W FM �ai 4��1� Iwr� mm n M
mv eY�
¢m tr1.. m aW �.f�.
fmvuM4ma-T�+mwrM
��n.ru.im�nM�lm I.m ns�m�
IM+muW.w..�mm� mr.�Amm�.nnJu�rnM. n�MM�ui
WmM sm3d.kP�mv�nm+�6�uw���wiyd
ns'la.rMw�.vnn MnJep��in
q.�wm Y
nnNM wn���Wv
cf+��� �N.iammiv`x� �i
�.� �
u.Mnuu.�n•w m.m.Yp..ln`.�eu.'S+..w�miwmrv.u�aa
mnvmw�mm •�a��...dwa.m�w�.s.wr+�W
Y �W�.owJ���.Rivtln�em
.ivNWu wu�miw.nni.
�wWmwFm�ane�ardFnruaaYxni� q�Ytlu
e.ra..ser..n..e.y..'a..x�•
�_ � t •
� • .. . � ... �.... r. o
�i � �x.v� iviie
. �Ie iimw�rsrw�
Yknurm.en
✓�e �m 9�
. w.. o. �.,..,.,, � d . �. �.. e
••I•.\• : .y1 u
�
aEx&axlsl o[scqvnou
0
M.�.�.�,.,,..�..g.:
�,:�.,..�„� .�.,�r...�..
':.a :°`.�,.�.e.�.�....,.,..__...�.
,�.��.�,m..
�.�. �..�.. �,.. �,,, ,�.�.�,. �..a h.a,m..
....u...�. W tr ..�ew w.w�.a..�.... ���.�d
Oee4^Crkarb c.w.wy�w.....�..re.,,u.,�...r.iw�,,...i,�< iw
�ph �w M�hm ��4n n W iMn ] riuni. u
�rt ImM.��.a� ��u�p �ww• •m 4"�.
Nua�tlemJum.u' 1u.�M m Iv.�m�l^=.� iu M l Wn noY�u�s
w mpear:. cn re � imlu.� �nnnul�nnn svr
iYbniymtine4.10\ imn-:WM�-oomrn
na.em�.wwmi w. +w.�Mu Yow...M1�M
YuplrqaotlGkYM� ]bA4 ��5 ,).fro
�t�k�LMF�nihnnbl 6b�P1 W 6IX0-
��� IObIDM H ipy
as e iieo
,.. a.c�,..��.«�wsw+..,�,...rt
�YM��T�a�M��mAnm���nJ i �Mmmyp�m
��N�M
i�nem�n.mw�. aetW�M�^nhv+ma�n.a
SMnmmlMmmomMW b6�+�aIMN
evp� rwmn� a�Ynprsi �W L� �u.��tr�"eMl M1
Itl�OLL^IV��� of �""��NAVYav6inn�ulM•W
� q�Hldnmlm�npvumlaurMMmm
�IanAxM�� �k�NnaihcuMewv�IJoov
ernd] �iW�Ma ��Y�+�lmeWmal
� 94�I^�RMfeenM�
h 6�N 44 i{� ��µy�� y�i (� �pNf y p mpY
COnBW(YIN WRI1lLL\a Y Mn b�� e� � W m q.
$pOC�fCe�IClV MulMdl�m��
mb.m... �..mm.aM4mMawos.mN.vu.ms.�wam
e.^+'T+^nmMrv ouei..ms.Y�...r�. �.1.mY
�m v�mN.1W �wn W a�Alum
�'
The Slicing Method
ry/\ \ ,G�;\o� �
i
i�.� �.y y i�
! U4
\ i�i / ���i%
`
i \'\\� � \�\
p��/.i;'�; Y\\G
\\\� \\
nnMna�mnpunu.
ns oi n wce
�� ��
"..-__. - ,,'-,;1 >- I '
0.
.m�.. oa. �-e� �«owe e�� d ro.,� .e..a,..,
a....m.�..sb�e.+�..�e....,�,.�,w ..w�,z.�....»..
PROPRIETARY fl GONFI
PIEDMOM'S NAillRAL GAS FACILfiY OR4WING5 ARE GONSI�ERE� GONf
OISCLQSEft FLL PREVIOUS PAPER COPIES OF
,..d..,�,.,e�,�,.
�:��.,a,��
� w.��..: °w:«�..�."�.._��.....
...�.�.
..�.���P.w.�.,� �.a:d.
COxfAYtbx
' mmn mm� bmv �x mIW ++T� v��m nnT�
L 1'win34itrM�Molurryumfn¢.ecm�v¢tl±�Ivin
WTv�bu��bewa� ��4Mfm�n�lwW�da�✓we
A Cm�u�+JeeL�M1w�Iw��vmumwrvv�uwWeY^M.xme
BM
eMW���N1^W+�FI. bmmnnnmv4�x �vurw
A *�A�^ameiu^n^WdbJFkF�Md6�W�vwA�u
� InyJ�.'vkrlm� F+��mMena�nWib 4n w itr44t 4M
muy� W�rcoryw:rpieJwlJM�mm�mun�uprvYyw4
n^XA
q�+.4{pn du�.4n�mm�.i�mnAepa��l�emMmel
.�ate MM�^IJa.m�vTFevm
m4NV���IS¢v�'A,�MaWr�E N�emYnmqA� wse�
n..rY. SUIJr6 ud r�w-ry�ml.m
Melnlenance �d�� ^. �^•�wme:n.wa�wwmr
xio mnrr. m. �.+�n� v i.ane
�a..,,`�m...�e.�rv,.
w.,�.�e��tt � � ��nK �w � w..��.a
�-����.�.e.�..
.�. �m:vo+.�`as
mb W Ysiw.w.. v.N M.msxiry J.+w �. r� rm.
Refenncse .sn `�i-w.v�m��rvsnw,..w.w:.uTM
.«7.
�^ . �
r...�.
�. M„
u,. s«aw a - .
nyP�
nmNYaN� NY�u�4�du�WMvp�MmuOeutlWY
LF.rnn�.Ln�wry pyr m �F� n5n1 •�Yis
f I�M ryrtvp. R. 5 i!�m Minre I.aMe N IrY
Mqw ^A fvM<�N 1P�R CmYInV �W� W,LRI
�Mef.mrle�nY �N ���em0�lmmn�
�b 6Nm M.vwe N blo L�a FeW .Ya.t mv
RW* �n.n�..
..`"�..�: �..
1' DO N0T SCALE THIS DRAWMG USE OIMENSIOt:S ONLY
IS W RRENT ONLY iHR00GH THE IATESi REVISED DAr' TO MSIIRE THERE IS NO RISK OF IN�PPROGRWTE
REGIONAI
ENGMEER
N(iR iECH
REC 8 BTO
PRINLIPAL
ENG�NEER
Piedmont
Natural Gas
RFDMOM NATUMLry15 COqG.
: �]A PIE�MDNT ROW OPIVE
0
M., �,.....w W ..�..�.�.
'�� :.":��'.�.��w.�a�.�,�:.,
..� �. ��. a,, w,..�� w.�.. r...,.,. ,�,
,. n..m��.�...an�.�.«M....K,.,.W.�-.
�.�...�-�.<.,,�..rM�.��..� �.��...
�a mmv.nmi.m.. W..mqe..
rmrk �y �Irc W Mn M�Iliry ua4
�nY04kl�m n'JkNe�P+W�MlryryJa4au^M
�116iB��0GM 1, lb4.YtrNNIwrMYY�b�eMibua�nle
SpeGllcelbnt mwm.we.k+.. ms..�0ex.nHAs.n
rw p.i. � rm wn. mm.e..i o r�,y.i.,�e.0
m��
A YnWiwe�l�m� �itibnne��vetllMMnu6u.�
W�11 nuLaN 4^^ u�mn� tlf bdX� Mm
yrw„�w'I�^ee�
� •NWvqYnYlryrT�'HUY�MY.
S�,niwf lAvma��parM6vilnJlp�bMLlxJrvpX
oie.os...�.a'n..s.w�i �o�...we�nrw:..
hen un.��zm.uw
m+�n��uyn.w+nsm'*.�n�IWwnn'a vrv�.
=W'�'T ammlm�ns e ua'Y� M Lbv �euJ ¢� N m� ml �.'�R
n un xa uct. d� x va er,rr n ub.a eu.e ymue
1M1 wl W m Yw W M1�YLtl a1 m�uNlv nY 6'� um Mm
MF �mM1mm 4� �Mme�ln ♦
jwlri�enimw.rufm�v6bk.�w4 eua.va��seee.n_
V+�ncuYbu �tun� me uknv b�m.a�yp�Cml�h
{ FOR WNTINUATION SEE SHEET PNGC326-0001017
FOR ADDITIONAL DETAILS REGARDING SF-i AND SF-2.
UTILIZE SEDIMENT fENCE MAINTENANCE STANDAROS AND
SPECIFICATIONS FOR SF-1 AND SF-2
LINE 326 REPLACEMENT
ENVIRONMENTAL NOTES 2
FORSYTH COUNTY, NC
WINSTONSALEMRESOURCECENIER,WINSTONSALEM,NG
90% SUBMITTAL
NOT FOR CONSTRUCTION
REf. DWG(S)
SHEET(S) 21 OF 95 OWG SCPlE AS NOTED
)WG�ATE OY0112018 SUPERSEDE�
CFN'MNGNVMBER PEVI51�
PNGC-326-0001016 A
CE
3�
9 S
O
D �'
D
� O
mg
N
r o
H g
.� 4
2 �
n T
m9
SF-1
NOTES
� B' M4X. WITH WIflE -----��y
I (8' MN%. WITXWT WIPE) �
I I
YIDOLE AN� VEPTICAI WIflES
� SHALL BE 12Lp d1U3E MtN.
WIRE � '
FILTffATION GEOTE%TIIE
USE WIflE A MINIYUA OF 32"
IN WIOTN RND WITN A YINIMUY
OF 6 LINE WIPES N3TH 12" ST�Y
SPFCING.
❑9E FILTMTION GEOTE%TILE
A YININUM OF 36" IN WIDTH RNp
FqSTEN ADEWATELY TO TNE MIRE
AS OIPECTED.
VPOVIDE 5'-0"' SiEEL P0.4T OF
THE SELF�FASTENEN ANGLE STEEL
TVPE.
FOR YECHANICRL $LICING YETHW
INSTALL4IION, GEOTE%TILE SHRLL
BE R W%IYUM Of 19" ABOVE GROONO
SURFaCE.
p..ni,. m..enm� .ne sMrUirn�m �
TEMVORARY GRAVEL CONSTRUCTION ENiNANCE'E%IT
�:
py�pya T��a,m.b.R>wMoe.m:�m�mywumm�w�n�,ew
me�y..men...�rvei�Nw. w a�nw �.� in.. W.r �. N.�n:
oeava�wnm�
ConOitionsWhare xnn.„,inm..�eiMb.ew...+�o��.mw.�W.w.��wd�rtmyom.�.
PrecticeAPPiias "'m'�'",'m..aw .NMw� �.�..�.,. ca...�Nmo,�r+.,�..n�Wiee���ie.m.-
DesignCritarla ^�•`��'�`!^�n•��.
MmmeWmN�nnlpW —
iniy�.. ��u.,m
w�n �:�R� rmi.wn..ur��� �rt�m.a.vi.,
vfWii v�l[Le�nl�Run
lmP� 30.fmm�um�mi•'
I.r�llun—laa�' amuu'�i.x mum+uJ �.iY N Ilmi� rJua'ni Inn�
e..wm �i�.oemm�,d.� w w.m�.w;urvq m<w.wnWa.a���m,
If1Y��n41Ma�.No n¢ppW��.em�mnnnon�urvuii�pu4li:maJ�.
�
nw..d, o..a...s...�w..d..,....`.-a,.m..�.+mr�.m..e.e.�..swcc�
DATE
FIITMT
2s" Wix.
�18" 41N.)
E%TENSION OF pEOTEXTIIE AN�
WIflE INiO TflENCN
CE
�
PIEOMONf'S NATl1PAL G0.5
C
N
n..wee-�r.�me� a is�.;�....�.�u iw o.d.r� ��r.w �u��
.� .a q�.ni.b n..e� w w� k r+, i.
+".wl � Ie.y+MUlJhib�'na�wwMl¢E �4 JN�uirc
rMd . Ovimirty�AqM�w�Wkd�iwL .A.asrxi
•� h wN ro wl e va#I nfi p^� �^K^� ���a�l� e
COfI3INCi0(I 1. Clnr W mimmi'� aN nL mm aI pll .'epeu�Am rerq. mvl wM
SVecifiw�ians ,°"` "'"xo-.�r�.,mi.wma.nv�.m�n.
L I'I�cYu�pa��Irviileq�Aia'p�'dmJGimrnnm�Avmm�hP�^w
v�n ��.,.n �i.
). P.mde hainuFe n an� �va W� uJurcn� Vyi a mM mvalk
nnM
. lv V�+�'���1<!op¢� Mau¢ 4n' nyneve �W�iliry nfJKlouWmim in
u.n�a..ei,+� n.'m�.. e�cn.,��.ni.
Maintenance w.n,�..� �k m�*� rd �� .��.ei:v, m a�m� mw u.,x� r�,
bunY�kv ilu�n .rtpan�v'xryW�aunYv�ihi.
wF vw¢ nM md� nwtill. im�� an��w�wiue wuY �e uy� Nunnu
� mi���ry ImmeJlu�.lyrtmu�e�IlulrynvMm�Memum�Y
ry�1lvW.xaM1e� or�w9nl�nn�puClv'nWr.a��
Relerences x„��nca...,er.ai.��e..
. in.��a..a�e�.��.+.
4dim n i�vi mnBurrv
e)p �ILrynwy SvJ�w'm In�
CONFlOENTLLL
09
<�
9N0�
m2T�—yl
9ID
2�D ~
Z�O�T
� ��
< � Fy? C
N
9
M
D
m
0
m
H
�
y
r
m
n
m
�
SF—
NOT 5
USE N0. 6 �R N0. 5] STONE FOP 9EOIYENT
LONiPOL STONE.
USE NPRPYME CLOTN 2t WppE MIPE YESN
WITN 49 INCX YE9N OPEXINp6.
IX9TRLL fi Ff. SELF F/SiENER /JWLE STEEI
POST 1 R. OEEP MSNIYIIM.
S��CE POSi F WNIWIM OF 3 R.
FOfl IMST�LUTiON BkfWEEX SECRQVS OF
SIIT FEXLE, E%TEN� SE�IMEM CINiTpOL
STONE R YINIWY OF 12" IN WIDTM ON E/6H
SI�E OF SPECl�L SE�IMENT EONTPOL FEHLF
HECiION.
AtVMEWu\Cc
IM9iEC� SF➢INEYI FFNCES Ri IEASi 0110E h W EIX NTEH EApI
wu rut. w+r� nw aeawr�n u�auas iw�oureir.
SH W LO iNE FPBNC OF A$EDIMENi fFNCE CIX W SE.1FM.
OECOMPOSEq1BEC01nEWEFFEtiIVE.RETqCEItPROMPM1v.
FE M]JE SELYFIEM �EPoSIiS AS NECE55411Y i0 PRQY pE
RDEOUFiE SiMUGE vCIUME iqi ME NEJRP/JxailpiOHF➢LCE
PRESSIIHE ON iHE FENLE. iPNE G9E iC NVO� IINCE PMININL iME FENCE
OVflMGLLFANIXR.
owsrsaxo
BEENPNOGE18YSipBhIZED.
� 3 f! �
VARIABIE * 1� WIRE YESN
OIYEHSION'
SEOIIEXL EONIROL SidlE
Y it
I f[ min
la WIPE YE9x-
SEDIYExT COxTpOI S10NE
t 1t nln
WPiEP FLpY—� ti� �
�q WiRE NE9N
t ft
Renln SunJ�ndv end Sperhntlon+
Constmetlon nu�au�e
� 8C1fC3�1D(I$ lkl � 1 iln M 4-1 . 1 V ) f �I FI A 11 (�a+
P t[In���.Wnll } C�uul�� �pu Ru�M1�l�ll ninq�Aarvclv�x���:
lmm� hvni.uN.l�nn,eoJ�iLlwnvvMcurcfpc6)I�nm.alrcalo.
loe .Ae)I�u ,�Mlrv vinJCRlurr IMm�ura'Irto�ytlevaMorpu�i�
wil� w[L u rn� or m��Y ua w�il
o�wm wn.. �e.w�-„�m�� rtm.a w.,-i�.� mvu+'i.n..we
4prnicr0vn ISY:b� v2ipAt
AMlpydl sMwW be prt�m tivn ](rhlrve Ilmivg.nM Iim�nY ii iepuircC
�r�n. i.+. ino� nu.
�ole4kub�haJJ M MuCue:lU Inm
smm. .a��.e.�m�� m�or,�m e. i.-.: uw� u.
i4e MM� ntniu¢NI mminB�M1e �Mve 9�^liluuunrdnul! beei Inv :
��. wu rK�� ��d�,. �.:� rnn���n+,w�. erne m,.�.. �.m�, y�a
Iryen�idnM e0'nvLa eYs ufe.unnmm mJ qnallns olurywnl.
(irnmllY. �� Wlc� p�^ nf �M1[ wJ, xM1ic.� n n�Mi In mpv�rt nuRr. N
�wA �v+R.em: m.�..a. m.m,.i �.�,.-a.W rNma.m* ioy..� m.y n�.one
mm�y I(ii nhentlrmM m�mu IinN nMe.
Rpnie wibw�M1 m mm6 uJ M'+�.�a• nd nwlepwtl iq*nil 1Try enn IK
iJmnflN bY unr ��vm¢k I�tlhi uvyt� wArn Jn.
RRIYPPG
Anplupwil�nlrfn�miFv.e �Iktv'iIlG�ieluMd�.e n.(:Ilin
tueJbuilJlntl, a vn�Pa[uonu�)' MwCTa�. A Jb Int'L ev�i�in�g �aTN is
n.„ulJc^i,�w�etls�tl��gmw� � e.Ih'�mn [[d[n�l ' �I�p Y
FI W nV Ilm . v�fl.¢a�i� : IlLmeacA Inl � ppol irq.ntl
�mn v«�mi� �y�.. oi� o�, v+'�.ri wm mn��v ��� a.� �nM::mrc. n�i
.�d���km no.��... d��....,�m.. o�W ax,.,.�wi� i i�ru�.c mmre.rc�rnms.
sruc��:vn.nc
s�:i..+ w�vn. iu�.,��, w wo�e �wp�,. wwAi �w��x..an..,�w ��m��
�n IMluye.i�qrnCrtWinyismiee�mlm�neeumwnh�vlxlenioP�^I
���k�ilN in �nNl Piln Fw�n�N nmr uer nl�ee:lry will Fe uuM1
SNION WMm .Uw vyoom� (m'a� W u�M puriM wM1ert mrmn�
mmam V�men�.
r mw�n .�.m•rr�im rmnou urvh��n by �mI�A1y uaJly m
, k�u. r�..;w. �w ���� m� �i �.,imm� e.y.,n.. � r�w� er �
mm inyrK. rt in, n.ym.o..� s.m„e�
r.�.ce.�.nm�w.-u.�ta�� .ai �� w � .w. ao �xy, n,.�
ual Iic�inFI11�N wIIM1 pamYn reMtlo luio�i�ul emiun W u'evY
�Fn.w.i�IMn�ivefi.Il.Pcrninnen15avJinrlli�
HESERVE�' DO NOT SCALE THIS �RFWIhG' USE �IMENSIONS ONLY
�AAWING IS CIIRRENT ONLY THROU6M THE ATES i REVISED DAiE' TO INSURE THERE IS NO RISK OF INAPPROPRIATE
BE �ESTROYE� IN ACCOPOANCE WITi RECOR�S 61NF0. MFtUGEMEM IRIMI POIICY 1001
ftE"°"" �O�' piedmont
ENGINEEF
M°a"`� Natural Gas
Rec n sro
PRINCIPAL �OGYWGMAISPIE�MOMNLLIIMLfiq$COPP.
ENGME[R ��A��OFFlCE<TA%EOMOM0.0WOPoVE
b.W.l
z
a
a
W
Z
O LL
LL J
io
6
� O
� U
0
�i
W
�
N p
W
rNr y
� J
W N
f.l
W
6
N
TpSI Q
ti1lL Y0.FPa0.aT1U\
xrrv� �rv.°'�"N �m+�,l m.nli.n o,.l�n arM udinu�ouino cwnm� pn��'r.s
su� u Jnm�wn Au�nu Yi1a o.m�uay�. uxl uW6mni Lnnn
a.m.s w���.��� e�m.+ w m.� a.�.n � a wr�ucu v„�,a��c u� m,
�ITmvul0lnn uu1Mr ellcrNemO> vtltliW�oVwil.
IbnM elwM1Ml-Nlart M pll n! iM ninmg aulmil i� h U w Im a ilm
wil'i� tvnpv�nlofAory [bY�. ���wW�LL vyn[�il�unl limni�mc mauuunu
rcmlN 4r �nil inu a�ful lin iM mling mia�w� ru Cc �wJ
iPLia1'lial.I I. f�mmaviri SallnB�. In�vp.ni� limc m a Ja�n� �(91rn1:
in[M1n �5 JiiltiuL.
TeGla 6.Wa
CY�1C YilE6 0� TOp3011
RpWnE far Rppllul�on �o
Vetlaua Dept�s
LINE 326 REPLACEMENT
ENVIRONMENTAL NOTES 3
FORSYTH COUNTY,NC
WMSTONSBLEMRESOURCECENiER,WINSTONSALEM.NC
I�ip'w�l aM wMnil. I!ro �mmtlmetly lu�plpi� iu�upoes�M Laan Ik
n�. amie �r.ua.n a m�M. rcm2.pm��e �rnoa.
tiPRI:.\OI�C.TOPWII.
1'.m(nmilvJiamtW[�npnil�u mry[pJJe�nlin(�mcM1e
1�.1 a1Mn� m0 J nicFn on �Wc SM�wv ln �Mttmiie J'e vnlume of lor
�.����e n��.rri�omm m..n�.. �x. .. tauc ea,. u�Mx mr
wr.,�u .e�i. �� �, m�.�� �r m„�w. �„ .i.,, m� .,�� �..n ar ru
� o� �rts��a,un � nK .�rt..� m.� rt,�m m�m �m�amu M a
„rcrm��M.mr .�umi�.�.,��,.�,�r�rv.+�,.,�.�i,...m.�m:.
Cumpun Yw uyiwil vmuph i�� rnw¢ pvtl <anun �i�F �M uNcly
wil. Wi sruJ e aim aumynNm. w 1� rcrvuo wnRW inM1i
nwl6em�imm�m. LiyJn p.¢4iny vi�M1 u mlini� momimWmlw4re M
mvm¢vn�e Nrf I� 1�. h nuMiMN.
WpN
�InCM+)
3
a
a
e
Per1,000
9y. h
3]
e.i
ea
u<
15.5
188
P�r
•cn
1N
sae
wa
6]6
8�0
Bd
lM �lurn �N um� ilni wll I�!R mauN �M ar6rt mm� le kfl niu�
�p�oJly�, lu(mil. A Ei�k meY M�u[E In pnmuWe M1UM'ng L IM1e in
Mwmn Wc uwnml wE au�wil.
an.. �rond amrK.mM. r�dx�.- wa.Ww.. r�� �d m.w..e�o�.
� ��..�w.,�a.rc. m�.��x �nwW�i �.w in�:�e�i
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF. DWG�S�
SHEET(5) 22 OF 45 DWG SCAIE AS NOTED
)WGDAiE Oy0112018 SOPERSE�EO _
OPPKINGNUMBER REVI51�
PNG-C-326-0001017 A
CISCWLIXEIWIN4NNSµEMqE5011PCECEXtFA1LMClR
8.1)
'• � •� � • '• ••1•
� RECP�
O �o�sw�no� � w
RECP SpecifiwHons F��""'�"'��°i� x �iN � ��b x�rn na,ami.
�y�. x�. . r �roArv�.
II�I ! p.ry�el. mN J M�I eyi 'IIryuWEI'w+�
y� lei J I'r . 4' ye ' I I pva .
'�JeM1e ufve.�f II la I y�nJ���n�mYmtllmn.
�h .ml Yl�w�x � � L� 6.v� u�l^lnuNMrl�nepvnumi.
rn�l n rnJn�e � niul uviliny N tiiu/�xe.11unl(i:� .I AlryEumi nllv.
�Mi.oy,nm a,�n�m� u,��. i.,i n n�� ei�u�a rn,�,��� ��.�:ni� �. sr�'�a
NR�IanN!<YimwlLm .JmW�� � H�'n ealllnrprmcb.dinelnL.
inih.� n.Wva��lnmpr�v'sM1.vMwLnuMTn n��rcr.il�w(aa�
x. ellow (w dim comx� Mu�en �Fe unl whs eitl �Iun0.ECPl
�mmwl��imrtv'M ny ml Rk PmJ J� � varapaa
m�u m�9mmn�a � i i s r � . i r� i w+.r
rtn�TnnM1�uWleu �' fl � M" Jeptl JE" M�nxWN
x'FI[�nlmnl4nlmxl wtlR I(. 1 hyp J6� 1 u4.
IuuxY�be 4� Sbps- Pite We AF.( P:.1(m o�er M i�Rof Wc Jqc
anJ inm an n�aruN mJ vercp mua�mip o�qm�imo�V�� 1_ i�¢M1n Mep
Ip � inoM ri@. Pm i�e RECP u I tmi mimeL �Mntl Ne Numm nt �M
� huMll d �0 0 �Itl Nf(Pdo � I tll hetlqw
..pd' rnn MwanM1c "IW�Rf[VO�tlpbJxen
II � ol. � � A � 0.FC1' h N. yOaple�
p 3(w�avn�.nm�erpa�im Ln�Irt9urnfu�lypM�oy��
an eyM1l[ w m.-0nu¢ Jnlµ+.
Iw��lptleebCbmntl� Fmvne�mniwlwnvLe.IL'li¢hnEemuNf.
mm�.�m.�,�.. u�«Kim m� wm.w m.,�,�w om. e�m mo��.�i
� �.AI�SI�'v�'m�mal�ulnpNetlum�v'I.ma�M�eiAtal�IPoem�f�l�v�
�Mnriel nllu't in n im'I� h� n m�M1 �mrclyv�w b) vn�ilLnp �.�� [Iqtl� �pu[nl
iofarcM1on. L�u��iclanyi�WwJ��m[hnein�InJv:G'vnJwi�h�rWnk
�1w�nfl Np�s Ielv.e uuln lircl �in rAi[M1 lo Fury J¢ w�Yxk PI:LP Nyn.
PIrc�Ju1im51tPutNeJomnrtmmmJOY�AeeFannel Y�u�etliernd�!
n�� rim Re� e �� m. u��wi mrc�� Na n�� � v i r��,m.+w�.m�e mr
Mnnmo(�M1ommh.
Sau: Thc RCt V �M1ruW k plral upuJe dnv m ih im¢A wnF iM1e mll �v
�M1e Juw'nLrmn uR u(iA� hrc�.
Orce pmnni nM Imc�i111N. Jrz RGCP i� i4yWYN by mppmy mn We
�iq� ii! iM �n'ncF nm1 umull�n6 NyMT�. If Jrc eM1ennel ii viJn ilun �I�e
Mu��iJNroI15.CW[�rnJsalWiu[n ru1l�uJm4m wlurn[A,mc�lqpiny
Ji ctljua �u16 � o!] m[M. %n e1 I Im 1m'Wy M[Yflil, ar�J
mmpeot ilnrvll �M' �kFCP 1u ih[ upWvm Ji�nti�m un�il �vocM1iny Yn� pn�
. . u�,�,u- raw m� xtcr mn �.� nb¢ re��i,m�w �� Nn �n
the Jau�uneum alJe al' Ne vercli, wd ulMrr�ng �hv mu� w imfom� �o ��e
vench
8.84
� . • • •�
� ConSWClion ��� � ��-� r-, x�,�
SPecificalions s„�;r „�'" �. ,, r.,. �„i ,�m,� .r e�. ���, , i �F.r,,.., . s,,,:,,.
Nulai� IlocluJing yn.N mukG� N�trn �m.prl.' n�1�N, mvl�A nll�rs a
r.�.ai«m� m�r., �ra.,��mi,�x e���
n e�dpeJ�e h.a�npinolynrv.inlF[nirnfwummmmrnl�nla
vrtprt+emN�nTuM1leM1Win
T�bir6.64 wnx ryp.ot ppy
SpnycME�eaiveMrDw� DlWtlon NoaN WIbW�cn
Coniml on Mlnaral3oll MimewqwA
Bmul61q1 l.l Lmrs�5p2y 1.200
la�memNsbn 1z5:1 Fnesqay x35
Ream�mwala� 41 FineSpray 300
C�Idum ehb�IJ[ mny y oyylxN py n�n'hanlol f�nvin ss Yd(. Jry
����m� o. n.4o a�. r.m wu nTw w..�M e ma� au oo� ti n�en.. w
.uu.c �u�n rulluimnwplm� Jwoy�.
SPrWLllnO-� ��e mny h ry'nkktl umil Usaw4¢ u Wn ti�mnlLn6 u
:,r-:�my �na,�,.� iaa�.a.,.,wi,,. w.i Am. me on�iwm �,��n
5mne uuJ �.� uabilix �m•mnion maN om .Ir M eRav.e lin du�
u.mml.
e..rwn-n n�w r�M�. .;m r�..m�m mMc �� �wng mmn
�ml m mrtrnc xJ Flouintl ��I Pl�m �nina per� NieuWr in
preeullnY �ir mmrn n innmin n�mu 11 uve. �M Iwmtt M1nyN. NMn
J�i.l ia u �r�w�n p�uMein. pTma x�imlbeceY ��g[utiun.
1114g � ILep pl�ix Ip1(� ��xrn iuqliA��h�1 �rtn� anJ diny v'lu�v 4� Ilw.
,�,n„��. rm. �.. mmn�. �m.�n m�.�2 ix��.� x� v��..
nil�l.iv'�.nF���. Ikpinplouin6^^�'x�nJwvdeJyeafJeSitt
Main�enance m.���.��m„� Nim� .�xne��m.�mm�r.++,.++���i�i��nm.wa..i
��,��,. i�����n«,�an�erm�
I racr�syerva e+r�ara�isra5v
1Mi pin IF� R4C'P I�wu Li�enl m I�e NOam ol IM1e �n+w'h b[l�ll. uM
RECP.�„�v.i. com;,,��vw��w�ii.,�m��c�.�iMuro�rm�M��;i�mi
imu'hl rtpm�i tl N N MM1u m � M1n �I Iwy �M'
ppn 1 6.
P Ae pp 1 w11rtM1 yluw rye RFCP f 0 L
IW O��oe upl bhfl�l e M�' uW M1rn Mu�tl Nv Ea �
W�WpulWe4m.4wJ Me. E 13 ; �erlp� Je
Ju'+' Nrtv - 1 m1 P 1 f 1 Iw� R!<P Wbm
w6^^�� f nal,hyn Twil �yk.Iry.eNa�tmlie
�hc u.. mnll! ��n�woeemPl.(P �iirynM�TI� Y. PMee
u+iJv Nyea af�M1v 0.1'{ Pul ln NmgnuJnml �mv�hc� pin. htiNlll. ud
���.
Au'brin� bvYn-I I YmR.�11mNM1 �ineM IMWAEI' 1 ircFv�IM1 W�la
I' M1 LLnp� pq[ W Mtl! M� yJv.
RkCP Je�on�mJ.
�� M m wueu�n rle M r� nm 'xmew+m
wuf . A I u�l RFCP sry 1 f I K . l b� �
v+l p� !e If- I W '! M N f
I � M1c ' 4 y h f c'I,pr W hmJ ee� ] f I y Fe I� p
kuy�I�.Ao11e�uMn�a�.hqllmlln-�.�Ma�inplf IinNeE�mii�nu!
u11wl,.i�I����W`vra'a:uMk'Rmn0lr�Nw�W'.ilihdix .
ilwm4ryv RYl P. �Im om1aP ��wltl h mehrM oi 1!mi apr.inb o�w
NeNItPNIv. 'lly Ipl 'YI h vnuJ�nFefx'my�ll
!an"7+nmaWfilJ IM.MUIJh' �I.�. �IUA
Maintenance � Inf�ea� PnIW f. fi l' IVnJu� b ehly md �M1n eal
�Ipn finnl l l= � pcu 1'( II - rtry mN M}
L (vW��mv� II�Ie6nxMmuulcnawnd.alvmaanmuunx
xcmMmtM1�FaPlCP
J. An)'ertvafWaR[CPtlu�ueEmuyNwnu�in�luu�rnuuuiNse
p��,w.wi m �mo;,.,�.w+w.a.
1. I(om�ion nnvn Cue �o rym1Y ���Ikd Jnlvge. �Iv p�Mlnn Yw�l le
fi�N W nerv4�f m. pm�ciN.
�Mmimr W mprt �M1v X1t'P u m�nwy nmi� EnomJ rn�n u
Miwhd.
8.10
•• �
TS .SPBCI�C2}1005 �amPlee6^�nBf+'IDrcprtrynnyneJhW. J . II�I wnvmvon
u..ir^.n��n,�m..ddn..�N�� mt .�i � rc.r•��r<.
Aaem Nry mnkt mnllled �(umlmm Y1P.vl oW n c I� cn. -n
MmN If�mkh�mm¢mqm�NCunoggm�lm_v.lunv�n,iFem�n�Jq�tliri
nJtm�L.iusmFanpP+.Iwox�.or�h��elClox�
Sif.UDE� �NEPAMTIO]
Iy.N 0.edhH prtpmYun i� wu�nwl m vxeculnl plem oinMlnM1n�rn� A
pwJ.aJ4ill.u<II.puFnuN.Iww.vnJwilenn. WL.�cbYJveeJiq
mnW�Y ve wnL Ne ovfx: mo� R kll xi@ e mwe I�ulv wfse o!
WryecluL�Mumn
1}Ne� q�qylim�wcuNinYbwl¢��mvimuNuiwm.IfiM1cp111nNi��1
or� wa ��. ��n �� mmuau,�� ora���.w+.�wmni i�mm�.�n �
• a(1 M I I:lownne m mor¢M[Nrtd �n�la nnJ �.1 �nm�re m Ilne.
undwila�nuwYlywlli„irnl.5�ylim nil��mJvud�rcapmle
b'iMuplfilrclnio(mil. bd�wvlia�pllnfnmM1�yhnnmlmxh
r�.
YOHIbn IMNqqliblqmmtnonHiilleTSM'M1n��lef[urcnnl�uv�iLle.
�p�lyalRlrvlUyyekrtilinn�Tlrvl.MnMum. �nNlmilisuWLmc
,nemaw��,��mM.wnmMimmr�-n„�n.,�r.,a �ame�.r...�,�,
uu6 N nn mi� xeJ mJ @nili:n nx�rt �M1en 3p minuu� S(we yry�L�imin.
Xrt�n mry,Ge�le�-�f inen� �ill�e yeeurwe Nr� rewl¢d In � Icuss
�wfevp Wdeiniul m�ytlrtoinN �^^) n�x M1e mryirtJ, o�mry m Mea1 up luye
MW. �( min511 muan Ne wr�w'e m M�'wu� knlN or msieJ. leuun I�
i�np�«m ea���¢ M a�me. A�me. x.�w��u.�rw...wme�. ��nw..
lirtnve u Om���u� �Wpn u�eper Yw J'.� nn tM1e �un�uw befun� +eNlog
Iflu[Ike6Yl..{rlueRuuy�enlnAl.
HANTS[LE(TIII\
S9rnene�nptlu¢apetivaM Inminurclvni 1'vFIafiJMlm�mliny
m i.0 «e,��, w e.�iy a���e. *.nie e im rM wM�m..m nxk e. irt ra
lil�.
In tlw Mounuim, Ilarn�M orvl lanuory �eallyp Nre pur e�uvn uf
uava�. NMn i� u rcuwry w pinn� u Nne �inwv ur �mmn�mJutlom
fm M1�I ornl � ueurtly maYN muk�.
tiBF.D�\C
Frcn1Y �1MIY �uiiy� yclme�nJ[r1�NtwAdnll.aWtlrycY�� vWer.
m ��N dn. L¢ uqlinp n�o pl�m in Talk� 6.IQb.lh. &ooE�an
.mlme .oJ chn�.N� 6 uc oal�rc R�.k.v Yuw Mu+c W�c��
mw 4�h'i�en Ilarvl lmWm.linP i� ml rnvmpedN lymix o( IM1[
J�Ilia'ul�;' In n'.�in'InY � uniltmn di.uriW�imt
Fyunl.l)E Tem�reryCMnrML'nW:
u�.�e..�.�.i,�e.o^�
o iws��. q„a.naaw '
RECP �''�., °"""°'°'�
i�' �yirW�M
F,�rtrVltM1
6n�M NnnMl $' 1p pl . Y��
e���nK.eae. v��ua �� _, �
�
Inl�rnunem Wt4 f4t
�nnan�Ml��dW;arGe9nr�
11 M1e[Mf1o�
V�e{an �e I wE appl�f��
'Mmll y bbnkr.ii. :
V�b^v.F��rv¢I M1m
Typw I�attlltbn �
F ' I _
n^bnwn un
� fartenwlrtpn
byitudiM ercM1v InzF
�
uo�Er
1. puqn velecnio vuNng i 1Nsea namrt rempomry emneett man o, rmuor imen m prerm�
5[W aW wrl v�1il �eg[�pim Gacamu eilu0l���ed
S Gqi-I�inJ fl�ere¢It w�h Ctl�gn vde[�I.0 evfutliy O I�/at[ aFwld ni[IUR �ui rtmfwcmw�l
FlpunC.t1� CM1annel��Wx�Woonmtl6bpeliumleuon:
RECP -�
//
�-v
Laq��W�mlxb
F -
Sfo
�--J Tommlebp�ew
oe� w..nor o-.�n
In�Nrhwel �
ercApfrclnCi
� �MQNo I
AV l£
i. m.a.wr. ro e. awnm.�r<e x� ���r�..n?a•=�r��wm.
2 S�aMiy ar »W�•'9 �^Fu� Rr rtaiulaeeurtn+Wnfiemiav.
i SlopafuiweaMllhumsmhN}p-� I/�FertmvMemmtFefepe}
wx.T.m�rvnwaaa�mmn. new,a,�ne.w�aa.or�x.eom.
� s.cqi o...�� ' - _ :.
Igpnunm � �rcM.�n6'�6'minTrekF
per pM�a[luve/ _. . md rtcPl� T IT nttOWh.
mrnRanWv�imu
_ �Mm.6'a�erkp.
� S�apkv�vlcq
mv S' �"y
Cemlx�tndOkrJet//mnn:yfighlallw �'iyimtenNEo�nraol<Waen
��oi�eo�omo�ioo.ro-.y„w�w. r..m�m..��aara�•mir
h�wl�
Fn-alepuleormn3Nlv,nN �+^�./��Ilve,eMaeCbefon�Mollo�ivn.Ilmrug
mqE�plxeG�nbmm��WMriy. afaMAf.rwa.att.lFOWtlauvaflvW�nllnleM1
fmWl pmm shuuW pe plumN w mum �M1on I ineF A�y, uml pnswa nN
Ictumo w mw Nun I: inoM1. bnuGaN u J nwx Ec �m-omd by n\Iny
n iM1�in Jn�yny. wvJ tMn IieM1il> fi�marl witM1 n mlln nr al�lpoain.
��t��� � M1 IJtiM1ukawuJfilerl�elluleielmukM1.
TS ���:�.����,��
ri.�. r mm- ix.,nMi�.�,�R..imi,mmm�w..����m
u mlii a. u W-x nwnt ul n areJ ny au�n� �Mm Aunl u¢ �mtl �mm�
IRu'littf..l�.\/W�A�nMI Ilun�in�mnJnini�tux�luJe:
•¢rJ�nF ^(alllm.imm ann Ix.W �M mWCM vv muwlJnN
,e�ywi� c. m,. �,�.
� aLqyaMtt'pR IAw ]'I.
•��ttNuely IrA u Ny x�nNn.
• Mx ml� iJxliur�. r�lY, m FiYN m clyY a smJi, m�l
vm�a �inpamamnnMllow.
IfileuniwMinulalu�dl.wM1jain miNuanllrv.a.inaluv¢la.
.rcMn mul=Ii xIW rcniN �N's�ia n IamVuWA�n%1
Maimenance x��wA�w�e�...�,...n�o�w�:�;,w�.�.-m,�w�
o h o��ei.. uo ��.�. emua r�.w n.w�� .� �n..
p��ei<�
TaEN 8.10a $99EInp Inlalun
TcmponrySaMinp Sp�cNa
awcmm.ne.uonarorl.m ave�4���1
Wlnbr 0�W EaAY Spllnp Mnual b�pe0ere 11(aEe N
PNtlmcnlaMf ICIP�am.
naun �n Maunulrol
enuel kipEen wMn EunWn al IemPo�ery cauer Ie wl
oerma ��m.
IIpE�Y�
mine-REore }SW Nec FeO. t5 - May f 5
Balow ]900 bet FeG. �-Mq 1
mnhJdn.t-May1
ai w���-0ec � -�n. +s
unMm�nb
r�e4mrrs�ffiIbns ol mJ bfb a eCI�Y 3.� WIKn 9m
nmm im�ew�n erw �w iwaae io-io-�o rore�w.
taoowm.eu.«. acnwmaweYunimwmoo��. �'+m�
vknarclwnrpbd. ACahwITMaEnenrealYstraqMiwn
... �wa�.mr��a ma
i,u�
M���B��bmaNllyeGpueb. ReaeN.nMulheeNm�
aaimy ronm.;ne .m«w� v anr aempa.
PIEDMONi'S NATURAL G0.S FqQLITY DRAWINGS AFE COfiSI0ERE0 WNFI�ENTIAL �OM4095)' DRAWMG IS CURREM ONLY THROUGH THE lATEST REVISED OATE' TO MSIIRE THEqE IS NO PISN OF INAPPROPRWTE
BY
� ENOINEER
� M� re��
qEt 6 STp
� PPIxCIPAL
ENGMEER
Piedmont
Natural Gas
oave
Temponry 9aeEl�p
R�commen0atlom (ar
Summar
TS
wcMa wuliwr+�l
.�mn mJM1 �0
�mmmm.ra nw,m.�m,. unmi-.'emmm sw.�c�ss mar w
�W elanlealS�IWec.e.
paw
tlre-Mry 15 � Nq. 15
n�-MaY t -RuB. 15
I%]Ir�-py 15-qup.15
MnEminh
meneeuem ot m� reats ar epoH 2.00J roreve pmuia l
uM limesima uM ]`A ldave 10.10.t01eNlvx.
y� WOINiP! f�lln. NIOIMiViw b/iHGl�g w11�Biylipl{ MIWq.
ni�ia� enmomq �. aam wim ei.ees so�meny ave�pm m� ee
I ea a mWN am,InX�g kol.
nqrowinnnaN�rywpuau neaeeLL�a�sivezememmm
h IMPvvg 9e08NY1 p dM� Eam0g0.
TabN BdOc I Seatling ml
Tamparary $eetllnB 6p�cln
RwommenEe[ionclerFall Rye�qmin�
LINE 326 REPLACEMENT
ENVIRONMENTAL NOTES 4
FORSYTH COUNTY, NC
WINSTONSPLEMRESOURCECENTER,WINSTONSALEM,NG
Pau IIWwn)
1r1
�s-oa is
Rv9mnHu9.15. Cs. 30
Falow wll ttcu p eppty z WU Mave 9'w^a ephwlwrzl fimmum
.�ai.woiw,a.�a�aiorsnu�w,
4.0� WY[TSIIfN. MC1NMtYeM'YY�YwX1��50NaX. MtlIiN� I
�uIM pnNpi�p Iml. Al�sk WM datln ml MirlYcbalpM cen pe
n e muk� eMiotlnp 1m1. I
vM rtfa�L EampeO emv YnmeUulNy. TO�]r<v MN 50 �
at nl4uqen N MamJ�. If X If mmfsmy b B+bnl lempsa�y
v�oM lura I5. e�eiH+J wIN SO Wgpe KW! (%eEmpnl eM
PWnJ or Kaean (Mdmleine) bepeEue In M1le FeCvery w�
NOT FOR CONSTRUCTION
aeF. owc�s�
AS
�WG�FiE031011201A SUPERSEDE� _
ORANINGIIVM9Eq AEVI51
PNG-C-326-0001018 A
pSOiIWEiWIN$LpiyLN0.5pI1qCFCE4fEP�lMEyX
's
i
a
�
0
Definition nrve.�a ��.A�.. �m���kn�,r�u��.w�m.+nw�nxm�..w�,�.i.,,,
.�mi��.����.�s�m �� �k w�i wna.
COfISSNC�l011 klm � mnerlal bu.N �m .im nM pma�ia ru�wrtrmm¢. anJdilliry o!
SPeeifcatlons ��a��i,��,'.�u`w�rm.•�.T.m.e.u.r�.u..am�as�..am�wi...�d
Belem m�k\1R a'mmMnc tl¢ rtW�M yNm& inemll wtllmiil �mwl
r���.�•�..�a rRn�R ��.wem. nvWr � eera. m„i.niw.um� ��� u.
fallnwinyn�:
• 4ed b n�liN e� Pnn ef � h)Jm�eada durty mmm�iry xeW fiper
m�i�n
• AIrvJn�mbr+I�mi�elTlinlmn��nu
APPLICATIUY UPDX4UIf MILCH
Ory•nm� mu lo�c vrt e fl�m�ire o Xerc tlry eun Xv m�FN vmvaly io iM �urtme.
M�rurial onJ y¢�Nemmruue 0i.en in fnMe M1.Hu.
.\ircWinul.FwiimnlpqNN.w+WiamuL�pW'm Whaq�wlinp
.. mulaM1 b� M1wW. Jrvi6 �h art w h mu1�M1N m Knw of
rm�"��my i.ixw m..� n�w�� m-ai ie,.o�.... � i n m� mi�i m..=n
CH. n1Nh[ililuleunl�mmJum�mion. AMrynrceyngmul[M1,mmq�Jun
( �M1e prt.unJ �wfu�o dxwlC Y rlxMe In FyJm¢Nlnp opna�iun� a
gm� J�a. aui4.1 m�M1c tlum. nmmn um4mm.��kun.m
ABCIIORI]G pR4AN1[>ICLC�I
9nn' molo� m u M�xMreO Ie�mNblel! ��er ynMlq. Re
follnwinp mvJwJoutmmMnny mWvh inuy M wN:
n�.me..�e,nM��or� n��x.,w.��mmi��m�w���=�noumn
� �M -I lah Iw�mp Ipo"Jn mrd�nF
.n i r ma �N=a e u, �+r um .ow�w..
w n m i��rv.il•� m� �i.n n.� n� rMe'awne
n.n.m xn e *m�� na r� n .mr.*M
.epe M1 ]�I wAa�rteqtipmen��nnqa�wiw(el� O�n.mu�h�wrynn
M�.N.
LIyWCu�kSWWm Appli.wi000llwmJmWcAMrvknnNm[Yifim
JwuW 4 I�evvlea� e� Je Nye� �if ercaa ind u nnn af Afyn W Ee��.
H�-.,m n�m.�.i�,.,ua k wrnN ���r�.,,,n e n. Rv �r �n�.�a
�w.,. ,� m.nri�N.n.-, ���iro �,.rv.w. o �w�r e� wn.w m, m�
mukli a� i�i� 4_inf Al�un.xnn �li� nil. AqJpy e�vv� wJ �iivlr Iuy.hR�
i�iMnunieltaiiveimhM I.WuiJFimlminLuksspFdiWanmYef
.wu�.,..n. �..,wni�,r��n,. mw�„
FmN�ilial u�Mii u ili[ �mu �mmnnnry wnl mula� �inJn My I�ye Ihin
m�,�,ae��e�m...��rm„wA,�.v���,,,�n�.m�.r�mo. mM�ouu.i.«mm
ev.vNwy w �Iw �iw� it mknw �vrt. R O�J �enmg iRti m CRS Miyim�wn�
n lmmuln¢J !m cvnnb In Irn ilw A M1un. crn MnnY I`�^� �f M1IYh
IuuniJlry', 11 �� hN iuN in qnig eM (oll N[Jluin rltiig IMS m CMSI i�
lurmnh�N fn aunng wuXin _L io �X Mua uW rluw x Wny IR m C55� i�
lumlululN! u.vtlwml���Jrr ntM. nuiriry�axM1ounmmunc nny
w��. e.ia�
6.&l � .
_' . � _ C �
DesignCri�eria �raw.:n.mu.mmiaM�n.n..=unyas,n.nm�:
� M bumq vn �u Ilm �N eme IW ��ue
� M«0 �^ u r w� Irz Llu u�2 fM v Rr m�ttrnfl�cMn
xa� �v anm ol �M rAak dm a leu 9 iotlw lown iGm �tr uukr
NYa � m�w�I VasO elm m
• I(¢p�M1eeL4 Yep ef4u tlmi u3'.I a flenu
� lnsuR An �Ae mNmum 4�^i M�een �bmi I'�� LLe Ne of N
upsucn� Jun n iFe vrc ekvuna u tle Wp e! W nweWm Am
lFiqurt e eiol.
� Su�nix ouPuw enn �loo¢N[ aliwuel w�viNnahn,
� llz NC �OI CLo B Nv mE ILrc J.e upLmm Ji uflle Jmn wMh
u' n�rn m ar co�..
� cm n.,� �xe u� aircn dw.mmia.i n Mma u. amm�.
niinunwe o(1 f 4a�u rvelY wrMw fMi arrspor�uW iNEm�.
ConaWction �. v�=u�w�tii�.mesna�.�..eneo���nwnma
Spectllwtions ��tl1"'
f. KspNe�ieNemtvntlkW9lo[hnMlwvluJpwtlknl
wM1ne �Ae Eam eM �he ebnM bmY�
l. P.nrnJpwnkWl.1(n�bpN�ImdXdHek(FV�bhb)mkep
va�n ham mnM9 mvtl Ihe ervb af N[ [h[k Jm.
�. F<11peLgh�vm6m�bnlurttlyllh�eln�MeXlbppa(IFe
In+nl�n n 44 ewo u h �a elc�oao af Ib qp l
s rw�m..w.m.e..o.i,...A«�m.r�esnm.m.mwa
ma emke.
♦ Na�uew�Neerenm�mmno.eJamaiuNmmJ�m6mEk.
�. F muwv.mcfroemmee4•�eewwnm�mwo.w
�� e.�. �..a .al=� n m�> ewaw� w� e4ema wm
L � 11re6LercesucM1�Mlpvinu
� en0 B N O� pJBlObvetWn
A B
����
np..aax.sa..ea.. m.w�weiuwe..�am.�.....r..��r..aamn.xw�.wa,
u�.i
�
m wrz � xa. �:�a�+n�u �N een:t� �r rn,n�.,.w �� m�
bnya.Amhioyar. Uu�pe�R5ulR5wminiM'rtnxM1Auhm..
Slmlrtii� bWm w� e. Pnn�vt lvmucl. �nJ Anupny mn> .Y uxJ, v.
.��,a.v n. �m nw� mr��,. u,.�.iw. mm.n. n.�K oR �.om�,�..
nnJ �M1�'mc muelly usN in muAl men w in mWentlnl nrca xMrt uspNl�
m+y R n m�M1�.'m �uMorcwu n.m�. a.v �m..w.�ew. w ean.,mrcmi.
AIu4Yw�My� t'qMuny�i�Wui�.�q�n.Ne.wn.nr�ry�rci�mnypt
nupkJmxriMmuhhwi'�xdrnV�^�k^'^nue.ium\iecommrnbiirmlree
..Me¢�mlAlmi M�iWI.
Pq �etl wlnrMmue ii n lubur.imnulvo. �liia me�hN i� farlF�a iml) ni
.m.n.2.,.�2eu.�mn�w�.e�.,.x�w. �M�..�in�xw..ti�
qya ioxiUlnLrcM�ofi�o uil awln'c,erma @av In tll Jim.ioci Su4n
wr k.4i�a hf�ne ur oM wsv u pRil fmire mukF Ey +rc��M1iny
rce..i...,,r�s.� .�w�o-�=w�.T�
mu�,a a.n xe. �wNe mer e� uWiv� e.e ine mukn ny
tlnrin¢pegafunM1�r��mnUepmwiL
\epYMo—R><�gnunl mu> M1e uvJ m oa�liw mu1�M1 in full plwmN W
t:.mmen millc� in ynry. bmWuu n If mvm hfm qqipng mu4A.
f�1f\I�CA�. ML�I.CIIF_G
(lti'inu'al muLM1n mu„ h ertain'[ (pqil alubilLulkm Ifu�eE Mran M1Liy
IunJlurclS.urSPtlfumlO:L1).ryor1hi11u1Nerort Wm�l.�r+eo
��np�+ iM1an i. I. nnJ �N� pq�n �eJhil pryaulun Fu hrn xmmpl i�M1M
�.wdme�r....,.wen.�s,.ti nv�..�
(Ix�m�nl m�ilclrc. mn� h uxJ inhiNONnmekM1n m�i�M1 umd fiM in v
M1�4rmadcJnlurtyn�w)�im� iollowNemonulrc�umim'ommrnlu�imm
i,...,nre�n�„m
�n .�nmcn
♦ I f II) ��Je I k ' 4u6n md �mlr
J rn . PneW Ir II) µil 1�' un
1 ' I'h M1
I��n � w I�IG.I �nwN �Y�M1 WN'v�4�. IINo�n
I��m�I�M1. \\� iJlArmurh'y�m)N�n pnlw ollalM.
\le�i i�x'IUJinp ..[�[[Fiui' Ix�nxl fiMl Mun\tY. �rc �uurM[J ryec�i+•
�i�i.i.,.�m ��,y e. �...�.i,��.. ��o.���W�em y.a.. we e�rme.n rorc. orm.
.�ur. PLx'e�M1emnninM�^h^^.�munx�n�iAcmfl.mJnuplexvwely
I\STAllAilllA (If \YRI\41\� MAITI\(.
Ih�4x�u �kuPnN w mm�rvl mxim� �MUW le inu�llN m wcuJane ri�h
�Mr:�; ,�,������, n�y ��m �� em,nn,sv� vw�n �w .�
mMKv.� iwirn.u,mn rn,���.���« oroua�um.ar�.�.rx�.n.x u
i�n�pliM Irt�lallallnnuilliiN�uiNlnFiyurc�.lda.
i. ani�, i��r. i:.��un�. wa..w e�m�. �.��r � Mi � m.i
3. Len la.mp �Iw m tmm Nc wpoliM1e �hvin.l nr nlnp:. W wvll n J.nn
Ne paJv. Mo� eenNi �o b� borF an M n� w muk4 mv b�l
wltbo� nrinYlerde �a urtk�
�
'� i"".
�""� �h � A". �. �+a�,..
������ } ��
��t���Y
IToiIYCOia5oru5]
wr.a �.o.,. .
ce..ea�r�x
p�nmhrn
i �2v n
1' ��:5�
CI'oS5�5e<ti0� Vi[w
�un Me 54w e�a ean M eau e� poa v.' e. w.�n w�u m �wp wr e..n wmq vwe w
Malnlenance �^ro��a��mm,.ma�.���n�m.aurmuer�ends*'r..�.iin
M[�o�pnim)nIeM1IlnmlmOrtplelmmaJWely. Cbnw�aJimmi�
N�x'.Ilmk, w n�lrr hFnull�p� m�ld[try M[ e�unnel nhn rmLQ
Mi1�4aewMnWe'¢.Mhp�xwn�d� ibrFehN�n W mnimlmn
Wy�flwnwuNlMeJeeoltlRym. [enm�llNm�yelm�mEuxly.l!
��;nory nam oe��.. � a.ma .eumsi.+..� � m w..
.�n o:w.nm� .�,nm�.. �r�c �:• �m� w�� w rtr woH�
Ihrvi¢ 6 J I. P�pnM�^+� PmN CAianv4F
Ramw� W Imm rcumubW trOW ih 6vu oemtled ioprt�m�bm�ge
wa4e�ircl vryn�Ian.�IWvpeMmtlbEnuMau�iM1�mtluattl�m,
mE A�+am bIF N�n M1vm ominB�nvm nw iAe Jw. .W Ywo io
0munmdeGmmnlm�inGtignheldamdawwirn
PIEDMONPS NATIIRPl GAS FACILITY
o �r��.����,,M����,�,.�M,rt�«�,h.�o��
����� .,.,,e,�w,�m�„��,...�,.�,�F�2��.a,e��,.
� �.. rvm i_ mm.. a���.. n�� �,�.w a,i ��.�,. � n.,a�e nti aua,�d
w�.�. u'i.,.�:.uir. orM�.�.� wa �im e> �w.. �m aei"�.��..i�„nwma
4wR� � �n.,.,a�wi..i �.enm. r.x ��.���r�n���c ���id �.,
4.bpIW Euvn iFe�min, e�en J IL Oo w n�ruh �N M�M �ppl}ler
u�p4�.
tln�ni inCr. a niM1in rs�nr4aenJofNen rci. UroluA�Fc
,. ui Irt .��rn�nFiyun'rv.I�u.amlWUPkc� .
n cnennals. mu out snps o� mniny paranai m mz
�y., aVecuonoillowan4ovan�opmiecuvemNcn
/ � _.
s '�'�r
natlinq in � ��'
I .-�¢h Irenc�
12nrJ� . `
ovariap � e^,�sn,psoyancnom
.�au�u.,i..�>. w•emunl..sfaeaunva W nraaFl �overlaPp�ng.
Mainlenance m,rcnmi���w�n�:�..��,.�viy,,mu�,,.�m��.wmRkn.,m�,o„�n
did« nGilurc. Wlamnmimis�ibmnN.o�qlyuJJniiwlmWCM1.If
.uJ�nn���omamryiriM1c+luPP�'h'.mae�mJ2imm11muI�A ('annvue
im�'uom nnul �ay. an�m e OnMy nuN�eM1.
;ONFIOENTW. ALL RIGHiS RESERVED' DO NOT SG4lE THIS �RAWING't1SE DIMENSIONS ONIY
CONFI�ENTIAL �OM-tU95�' DRAWING IS CURREM ONLY THROUGH THE LATESi FEVISED �ATE • TO INSURE TMERE IS NO RISK OF IN�PPROPRIAIE
kEGIJNAI
ENGINEEf1
MGR 1ECM
PEL 6 Si0
FRINCIPAL
FNG1NEEa
e.�ia
so-�.
WCW Nlpe
wmo noe.
PaM
Cam ewxn
Snlna
IeepBJBie
e00EdOMnq
lema
HIbllltl YM��
Ju�e M
�
1.2bm Dryx.umJ�rypeY. S�aW�uvraM1mnr.twalawb:
aa1MleO:eveN ¢pWbyMMwmecMre:mucl
weMe. Mlarketltlqrn.
5-Blone Nrtlry TwtwINt3lbaniVqpMan.MplY
x'M mWC� qawer. Wp �a�er. w
�YNM. NdMinBInllMliul.
0 61 bns pyp rplenM Io af wxE ullWme.
F4YM�MrwenhE. Wralu»In
11a1. tll}'Ntl01f.IN.
35wEkWa �bCry.e�mlWEp pppywMmukliQbwat.cNp
�mn-muw.aww. n.�aiw.aorre�m. oo�a�e
aspMll4w'k
�amiu unamremeem�b MWrvninmNmebwaraM�a.
In.1qqlM. NdNuaelnM�whM.
1�3meu Greenwary:elwutl
NnWn THWfB �!!C.
Coverame Haery.unibrm:wwen WlWundeweieMuv. Bm�wnen
olelrqb�ubyem. uzMwlNaryenl[muk�.
F�p�M Crvre�yya WII�slaMswdMllw. BmlwM1m
ucM wA� aqMic mulU.
E�lela Cwe�vee Willnbmlt�+flemv.r
�wooEflEx)
i
F�beM�..�v Os�a.+� Com��wemenar /vnnwnnammwe+seaetrmem.
anv..+B`�caeouna reclwm�muismeeesoneueie
uomne..nu�e�,�m,c rebcrxsasqavi000wn.
e�anl
LMmIUI8Y0111on'
pyueleln ftlbw Nol Eemfitiel b�Aartt �gwM.
��MMeY �^��'6
a�.sanrc eoaenui�wm
PeVme15B
Terre Ted
CNn15]0
Gnpue ]<J
l.F165
'fteler lo Pmt, b No. 6.30, G�w UneO CNnnNa.
'Ufe albeEe remn Ewn ml MdY mEonEmant of p�[dW
e.�u
Piedmont LINE 326 REPLACEMENT
Natural Gas ENVIRONMENTAL NOTES 5
AEOMo�.�A.��«�oaP. FORSYTH COUNTY, NC
'.armneornoxtnawaave WINStON-SALEMRESOUftCEGENTER,WINSTONSALEM,NC
JLLOTTE NC W)0
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF.OWG�S�
�wconre avoinoie suaEasEoeo
I]MNINGNVMBER REVI51
PNG-C-326-0001019 A
Runi.vSi.nAeW� end,Cprrplcurlom
8.86
�` -. .
DBflOIGOfI �anmMie�wvM�.�L�md uu�uFuluraJ'rn�wnwlaMunm�wuk.
mnuR Jeviav Npimlk u�N Ibr m'nm.v� � val nf �nlimnn nnl vtluMe
poll�nan a iwii �u Gh.�aplw� us ervl Mw1.vm�LyJ�xerMnil. un mJ umimJ
�iuiun. fomMni ue4� mp nn4mom arvl mher pollwenu in
null x,vur m' ii ry.crer �MwyM1 iM1<nwW� ol �Lo.rck md bY ollo.in6 we�er w
kmM�+�ily �nuW hhind �M1a .iw�k, dlming @pusition of cucpcWN salidr.
C�m�m wak. nm alra u J i�� Mm�v rvmfi Onw volai�in an slapd rurlx�s.
co�mo.i r�,u��. ,..�m�xi� m. m�, +rnin�ou� .n��in �e � �n.,m.m.
pM1paal nn� biulugical prupenia.pm?icJ fur IRanko 6.IX. (Lmp�.n BIw�4�•.
Design Criteria i�n.� ,..i�m.,n ��n wnm.n am,Mi m�.0 �w�.+m,��� �, ,�„mr�+�� ,«k
vllnws Eryoai�ion nf senling v�lid�. PmJing w wM1cn x xr IWwinµ io �M1c
suh � vmuleu� le�� r iM1w �M M1�dmulia �ow NrvuyL•r uf p¢ m�k.
I>9iaaly. iial Lydnula Onx'iM1rvu� m¢f fin e cumpm�yc4 ve Slle�
�nln IM1w� pnNcxiilv fabnc Rill f<nM. Ilon<rvr, irmlxllulimi anJ mvinl¢mu¢e
i,a �.p�laliy impuMnl fw pmp fwce�n wd prfrmwm<. pesipn
,�a� �,nowe x e�•m �,� im u�o� �r m. r�in� �,i o� �r
Jir'wrWno nin(u11.rvrvHTpolrnli�I.miltmsinnW�rnlinl.anJslimenilrvW�nb`
wi�.��.rv•,ry��E o mmrvu wt.
RnmRFM:
The Jcylh U(wwRrymMl nLuve IM1e <unryuYl ru:1 fA.uIJ mN (u'aN IM1e M1eiyhl
oflM1ecumpoawcL I(nacrllnanf�F[tlei. oµv'sihili�Y.uln�ya+Jioman
stt1 Jwu�d be wwun.d. o�h.e srdiircm�ca��ml Jc.ica maY be uied, rc
innyemem prsuao io mdu`e rvnol( iluwlJ M1c iwvlld. Aikmvi�cl}. •
H�+onJ �4 ma)' M c .atl e uud m wmM1mn wiiM1 Rnctitt n.11.
IIiJ k".minn Cnmml IbJ��a. oi Ihvti¢o M1ix. Couywr.� tllnM..0 io eL�w
��W rt ��d rca�.. m.,��.
I.e.vl Conlour:
TLa[nm�m.a.w,'k.M1ouWMplp dnnlcrvlcmWw+mmsi.tinJlui�utingbw
m�N On. ni o�M1n� Onx aM MucinN n�nnlY Onw �eluai�y. 0.� iw
W��p„�.<�,w,�„M�n<wwrr�,.n.����i.,u�. sM�n,,..�r
Plotnn��.ulJ M�cndiculur io IM uw1 u Im�un an� u en121N.
ny mmryo� �.v'1. unJixwrh�l Hnl wdl mWa iM1e�ry�¢mial L+r
wdcnni �in! M1y ���emruml runuROuxn.
RunoR�nE Stllmeel,�ttum Wtllun:
Tlm <ninpm� eoc4 �M1oulA It plo[ 1 a u 111 fid ininnnwnliaaMe mny (mm 1M1e
<�rm�.i,�w,iw.-u.mm�*���,rc> m��m��r,�,,.r�n��uo�
unU m ullou fur n Winrcnl aunge n4^'+�i�Y �binJ II¢ dcdae. On Oul
me.u.Ncwcl�M1wldMpbcNw�M1aNb o(�M1elwtldi.wrtoiwe
Entl ArounJ Flm.:
InnNermprtv x a0owinpamuWYeeMsoflhemi�psluck.lhcmds
el �Ac H�4 mw� be c �u��N piiniinN u�nlu�w� w iM1e e d. m w a M1ipM1er
<Im w 1�n mumaf*IOlinearfs�upcM1endplazNniatOJeyree�ngleia
mumnnM<J.'�n
eE6.1
��
1��, r o�&�v
�icrtc�tu
,.�.M,KT _z.,.:�
STGYES
SERIOH
�RMP
S�
�JI�)N[�LM�OItW M r
ON
Pn�Hrc SronbNr enP SpniJlrv�ium
°�'�i ' �oarn-a�au
IIiNMM `
SiPKES �
SERION
e�Mrx.
S�
�ncrup�W��a
Nn
� Pernessrud.NrandS/rn'1/��artmu
V anbd [ i Sx4
�e w
r� i n mrv. . n n�a' i- m.,aw n .Ba
ebl In*I d' �h ilu� h� .\'R � M Je anWx vck
11 "u" .I �np R 1'if�l � sMdvT..t n fPii -.Th
ou� a oI WE n6 ��6'���� n eM1oulp be eMa'n un �Ye muion und wti mmtTion
wl 01"^. Nu vlJivawl wil vn�W�nu �v f<nflien ert rtyuircJ fur
vek[Iatio�plfbli9lYM'n1inlF[�CjCLIk`dNn�pAsw:�
Sbpe Sp�tln¢ 6 Onlnqs wrtc
Sfu�mum Nairv�ge am �n vW arvcin8 �cm iM1e ca�rywu �oa�N u deq+den�
.� wnrul� inirnviry mid eum�ion me0 rur �ifn� dcrilwrwn..IN+' nm��n..
�ain �r.R, ao����e �o m<wxu.
A[wvqni wwt wauaa We full IrngW uf We aiv(t ix mmnlly usN ir m+urt �tuu
unmmreur Jo.a mv Nnk i�rouyM1 u iM1e imemmian ol uK4a plrcN rnJao<ntl
Gv6 �rtl�inutl mpe�her br sl<eviny om� aw�\ enJ inm �he niM1er. The Jiemnv
of �k m�rasi eoa�k uuJ will rary EeMMiny urym iAe .n-crnes+ wM kny�M1 u!
IM flope; avnWle vL.pex ami nluM Icng�hs uscA niiM1 Jilimml diumna m�roa
vrdv nrc yrr.ni d� TnM1R n MF.
iWMl.l6p-�tBochs,�ungv uepnenMiSlopc
�Clunnd&oql%1 9 �eNn BNwnnSo[ka IM
� 61ncM1 OlemNn 9ock 12Jnc� OlameW So4t
1 e� — �oo
z aa w
] ]I �,1
� ♦ 11 26
I 5 1] 10
Sau¢c H Pouctl.-!010
AInMd
TM1e .omqw� nMw aM1all h dvnvaJ hum relW.xa�ussJ mpnlo mJttt
. wcv R��N U� «m�ml�N uerubi� IFlolnuinll i4i'nmryui�ian tM1u� M1v Mrn
�nilind tlimuyh Nv g.�nna�iun af Imul nnd unM1ilircd m�Iw prim iMt p 6
.rr�rv��v r�. n��. �anR�m� �piw�m�un. c��mn�� mamri.,i .�u n� �,�.u,..i
iM1muEM1 pqw� �M1em�hihv .�ompoqin4. iin! Ibc lS Em mnul
Nn�e� n Agen.y'.. Jeiini�um fin e'Prw�� funM k.du�e PeiM1ogrns
IPFRP6 ��nml m+n ax rm <n�. rti� mm�,i wnw� :nou �i m�
Chcminl. ph1'mca� wei bm1�iW prvpn�ln sp ifN in Pmni.e 6.Itl. Cmnprsl
BlunAm TeLle M1.Itla. x'iN �M e ceM�on u! pwlitic sve. Sliphlly murt �versa
�ompou u rcmmm�n�.J fa� N<ui.'lu. ss follnu.:
Pmkk Slie Dhrtlbu lav
Skrellu YertemPmlviSelaeted5lveMa45itt.DryNd{hiBWa
E' WXI]"MrtlmumP�rlkleSlnl
�re• �o-w v.
5[[ I4w'lice fi.IN, (iun�x��i BfunXr�e f complM �infumnl�on ��n fvT�nnt
punmmm enJ k+�.. Inaulla ilmulJ ryviJe Emwunimi�m in auQ�+n
cnmpliamcaf�mine rc4uirol in J�v minpnu spevifrniun.
IX/MFfRIC VIEW
vnoi%ii.>
Flgure 6 68b Composl Sock Ine�ellatlon
6MJ
� ....�s..mw.�rs,n+n�.,;�„
nd..m�r rv. m� u r ,. h ers ��.i.
fir uu at " �.N 1 urt .I mN ' . The
��a�., . r� � n � n.,.a n m � en ' � n n� vmu.na
�n IM1e neui.d I rc, p I) ipn rywl W� mn-� �I 001 �abl ua wd
fNerol �etl� la� an. penvin ny u� "ts ryalu.lion wW Jnlnbuliun nw�� M wetl In
�huuppli�'v��rvApprv�N�'um�wYp�Wuc rtI�INs�NcwtlfJeml
.lumcnl [ �wnl �e.g. M1firy mclaln.��oliciJn <I�'.1 0nd pnlFugen liinll
e�emleNi pmo�ininy �o @e frnln.wb I�rti mmnia6l in uM1ieL i� nrt dm�aN.
llfi.a I I O.M.0
pNpJ MarylantlSOMarESaMSpe[Illotlons
forSellf�MlonantlSeClmeniContml,
3411. MarylaM peW �✓^�10l
FnNmmmenl. WrtnMnmgemenl
ndmimnnemn
In rcFim�e wMmN w niNhn m .,f �ncTiniion wd�nr A�'e�n ninrall
naiq. le�per rnm�mi srck. eM1 �uW M1c u-0. In Jk-z part�mW reywrt�.
����u mou n� n2r.�e .. �n. ���r�.i .,,.�e �, � mm��� r�� �
inryrmN wmm pen�do�i��n nie The �l iy�x+ e�x�ulJ eMct �M1e Oax me per
fwl of YM1 N uN[f lo cli5ure �4awnge rnl[ af Ne [mp�fl eu[4 6[in�; ufN b
W V���. TM1c rquinW 1Wu� nw�a uc emlinN in TUFip O.hic.
TaE46.6fic-CompoelSocM Initlel Fbw Aatea
CumpasiSOR tlW<h 131oob lelac6 AIxE � IIloab
Dni n Mameier (EOOmm 100m 1. LOmml I��mml �1
11�almum�l�e 6000 'IWO I.WOfl I.IWM1 ' 1.6iY0�
lenR�F{Q%1 IltJml IE39m) (JOSmI U%ml ISWmI
IIlpAnullcFlu. )StV�� IIJQpmlll IS.Ogpw� II.SrpmlO � JO.OWm/f�
Tlvau¢hR�m , IWYe�m1 II�IIPMmI IIBBUw'm1 Iitlllfoilm) I O)iVMm� I
tiMm�e B. f:un<no311111
CA03[NCBOO 1\STALI.�TION
SpCCI(�C2IIOf15 L Matennis mwN in ��c mmpari .wck musi m.x� it< sMeifcmimie oinlinN
atave v� �n erynia n.ix. co,�pw ei,��eu.
.. Canipou ssw'Fv �M1wW F� Lx�utN m nMxn on iM1c crmim aml uvlinwnuiinn
.,rm,tom�.
J. Rvx lo imullLion. tlw di upswnianc mcludin6 �I:. d�. entl a1M
debns yrtarcr �Mn we invh �Mi nnY Imederc wi�h Pmper Poncuon of �be
mmrya� wck
J. �ampw� sactr ��uWJ be iiudllN PoAlkl io ilk �oc o! o QratN YeP, s
m ol 10 (m M1[mmE Il�c ux nf �he duM' S^�'�' 6n+md M1elnu pul
ew �M1wid M luat d m iM Wgc ul�M le�xl4nwrbons Thv m6� uf �M1v
wc4 nlauld M1� IumN rliph�lY uP sl� �� prc�rn� �wuR h�+m goin6 �nd
N�rnJofiM1csz4c
t �ai.�c� �m��y ��r ir .,m m��p„�� ia me �ar.v� irnWn s�cn ��� i„p
do mn Jc!
6. i}uk m mMr JunMv M1UNwmW a�oke+!' S T in .rw uninn �M1ould bc
Ari•v� vmii'ally plwM. iM1�wpA thc ny�m nf W mmpai wct SUA .
exouWlw�p�ottaa in¢retola&v�,aramnaimumlmmalof8
(m if �M1a �ncY is placsJ fin nnl Ir�cM1 Imnv'M1. tivc lipnr. M1 W�M1. T¢ veXca
PROPRIETARY 8 CONPIOENTNL ALL RIGHI'S RESERVE� • �0 NOT SCALE THIS DRAWING' USE DIMENSIIXJS ONLV
PIEDMONTS NAW RN. G.4S FAGLItt DRFWINGS ARE CONSIDERE� W NFlOENML �OM-1�95)' DRAWING IS CURRENT ONLY THROUGH THE IATEST REVISED DATE' TO INSl1RE THERE IS NO PISK OF IW+PPROPFNTf
OISCLOSER ALL PREVI005 PAPER LOPIES OF THIS pR4WING MUST BE OESiROYE� IN qCCOR�ANCE WI7H RECOROS 8 WFO. MANAGEMEM �RIM) POIJCY 1001
I ev I�rKlaPvol oescwvnoH � qPpROV4s
°"'°"°` piedmont
ENGINEER
MGRTECH 'I Natural Gas
REC 6 6iD
4RINLIPNL COVYipGMA15RE0MOMWliWWLWSCOPP.
ENGINEEP �OPO.OiFlGF<]20%EDMOMROWpRNF
� P.uaNr.S�uneuN.e.eSMnl.unum
�wex�.rnme -- eo�nori - n.. �i N���w�ora
ircM1cspmmWinyabvsNsronm�'u�l_ �
i. In �he mrni :ukin6 ii mx �va'bl li.e.. wM1en . L ussvf m ryvrnxmp
Aea�yoon�rembLwW:M1OIIbeuuJMiumlJewl oM1nW� inplu.eJunny
rv�ulf c��mu.
P. If th� e �yaa� suct ie iu be Ic� e.� pon o(ibe �utwW Iwdssvpe. �i miv be
r.cJ.d u� emc uf imullvian for ��swhlifM1mcm ul Pnnnrcm v<pnaion uti�
�ItisttJingyiait �imin�laemn.maM+ulimceviimicmwlpim
Y. Cnm�unlxre\�art�uvwMuu�linpnnmidmimmniurn�avanu,
Maintenance i�,a.�i,o�.i.�k...ny.Nann��m.c��r�,m�nmrwi:�-m��r;�,�n
nrM�uep. Rnroveacwnulu�Nxdimmnond�nydeMir. Thv[onipe�x.�
usllv� replv:N if cluygtJ oe I.�m. 11 ran�finN Mnin.e nttesi�e Nc au�l nu��
nx� �n bc rt�lacN xi1F u Luger diamner �n n JiRrn�n� mlu�we. T1¢ vw'1
n.eb�M - IleJifwJmnneEwJi.l.dg:dTM1�nmq�.n�.uK4.hallh�
inxpnuJ "II Jdivur��¢in.an�ClnundFeurtauWee�M1emcawmM1n.
M1ttn�emmn I . aFilucJ
LINE 326 REPLACEMENT
ENVIRONMENTAL NOTES 6
FORSYTH COUNTY, NC
WINSTON�SALEM RESOIIPCE CENIER, WINSiONSALEM, NC
C.M.]
90°/a SUBMITTAL
NOT FOR CONSTRUCTION
REF. DWG�S)
SHEB�S� 25 OF 45 DW65CALE q5 NOTED
>wconreoa�ovzoie suaERseoro _
IXNNINGNIIMOEq qEV151�
PNG-C-326-0001020 A
� RIGHT.OF-WAV DIVERSIONS (Wafcr earsl
Design Cnlena ime��–i���rn mi�i���,.m �„�„�,�a e�,m m..w.�ui n.n.�.. u� �n� �ee�
.r
NJe�lope—' I nrlW�n
]'.I m Ilu�lv xl¢m rd�icl� cmi�
fl��� wiG�� a( Mpo. n fn� minimwn If ipwe n3]!1.
tiP�elnN a! � un 4an n Ywxn In LM1b 1Jo:
TaEI<8.20a1 91owf%1 EWcbq
Sppcln9olWNarBanon .s �n
RlpM1to4WaY�e1M1�n� 5bt0 iW
100flWltlai fObiO ]5
YOb35 'A
% 2$
r,,.a...e •=ak—n.,,,.,;,�.�em m.wie e� r�ara inrm.�. w��u.�
pmdem���nceN:'ti
Ou1M—OrfNw ilwlJ hm-c fulk wllili �'i1M eYUN wMebuvYN.
Sile aryu'inp mnY � m h aljuuW tm fi[IE mnNliem p.at IIM nlml
.��wsi�.R.,r .vRy+ww.
Cons[ruction �� ���� �" a�...� ., .� u e. �¢n�oc.n m, e..,, �mm ,,,n
Specificalions i.��n.n..r��n�,����,m.w�en�n..�r�m;�sei�
J.Trx4�MriJpe�nininpucii�iu�luJe�ipn<rte�xninn.
i. LeavN� iM' w�lm on cn nnJ�pmkJ ue�. Aymi fielJ qaNy uf IF<
Jivervion �n uv �pe mm� nWM1le wllt� nmp. M'Mn xYwul weu m na�
�kmN ss�i.tia'�m.: �nnvitle wi�n nbn�pn Imn.��m+fi ai�, [.��N M�mNr..
mJ 6JI.Outln f�cAilLvmu km rvrcl.
!. Imnwlinely� �aW unl inu�h �b ryni�na u(Ne N�mMiu m� �uFµe� m
aaiu�weanml6c Su�ilnvwFpnuel�rtvmh�mw<by�eFivin
�� B� �� EanM1ennEge
t �
g 1e, SIoOe
� l � ' _' —
I— � I� I ��� ���' I ��� '1 I �� IIiC
rq..�nesoo,...a,..u.w ��SLOPESWITHIN
DUKEENERGV
TRANSMISSION ROW
x.,.ir.o SHALLNOTE%CEED4:1 av.�
TJC
Design Cnteria
Small avum flcro+mny tr divmN wunJ w.h sa� u'ii� ecuM1'mLun uW
pump IweoJ ulmum¢tionafa bpm e�wnel
If pvmmumn�wilirv mm��np uvpMrN veun vws�nF� ^evh hnN u
�M1n N�atimm m min�miv.v xrmm 1mry�u
Li Wdmuo m rnmm� uxl rulimvmNui �vmnJ. vuwmN nvbllnY uillm.
un� v'�(e�� m w�Iw R in\m ido owuiJmiiw, vMn J�Ibi�nY �^�W�^
�a>I^G. IInEti� �InIY^U In Yw�Wnt Yauld be wtl�rtLen 15 u
yi[Ii1lNentl�nen.
� Tno anuv'ipn�N li@ ol � mmrymry �mun a'mss�ng uMwrt in uwdly
wiM+nlmbe�yurmle.x Rmwreilem�uwmimmNualyoflerii
��nnlnnpv+nttdN.
� A. a minimum, dnpn �Ft x�murt b �ms hankfull Om� rc pnk Onn:
•M1ioM1n�nnlnx.frmmo].ynrry lw�+m.xiJw�mnm�m�np Enwm
il�u� rocmmxill mul� rynn Nc 10.�rnrpul sWm
� f�iwrt iM1al �bip� 11�rv �[hwiry a� IM wIM n! IM cmnintl Nn�lu�:
- e fw iFv .�mr�p yrmn a{mmel I&'kmm M�I�i
Ymx nn1 y
. t'muM4+���eM�Mvi.� (�r umm.6rM1T �Mn �FedeuP£ anrm, vMM^'�h •
�,�i..�uda.�mw�.w.
• n�ee�.,a.�,�.o�wi omu�a.�i.m�.�m w�.u.1�.��rvi m
�omrvl e�uum (rom �iW�e wwRu iM1e.�ouinY vW Au^W � ILLYav
puY�wem�woR
Cansltuclion �. �^v��w.w.u.��wWor�,e�ew�.wnNwwr�*In�
Specifications "'"�M°��'
i. un�e„n.�.rx..m.,r���v.w.mn..�.�m�u,�wm.,a.m�
wi����ere ik ��.
}. AnTu�vmrnn�ing�n�iyM1�nnFlnw�Aaure�m�ow.
l ALyi�mJn�mmM1nWiiA�ImammlircufNvvmsin�fw�minim�m�
�inw�vnfJnLei Rm�Mi�S�olvimunisnWoulrmfilb�minhmimu(I
Lxw uM�.e WLe WMwnin� ���ueL �a. m. w lee n fn.mi n�fa��
nimiRaN alln �fluvlfl iopwmmMil vru.Wrc
. AnM1iliunllniMw4Ju�u��ylijn•I�nfl�m�inYxYn.imliqlutplw�ad
o.vnw�.reu..��m nn.r �'+�xe..wueL� meo�.ItJaiw.d,.��ry r..��ek
Ile e�Mx�Lk Iw IFe in�plµe nil ITaEk M 0]y AryrtxJu x I1fl.
6. Lumue ihul L)yui �luwrc6 rcmwr u y+'Nn iM [maJop vb we
�uElc lefurt Ji��mirp Ja .vmm. Uryn �vnpkuun of �h �rvvwy. fl�l.
�uinl�^�'twdevLilin�Mb��.uaclunrcly�qxuiely.
i. Rrnwve¢mp+nrvruounmwlnyyimnudindYwlun�M,vremlon{ar
nadN. Rnwrtilmmenm<Mnrclwmaryi�ulonss��WrtuW�mwiM1
.m onn�n.�vay mxn�x mi ain��Me.��,..
c n�> �� �� ..,u���� ����„n ��.,.tirt. mm x R�,m u�,�
,��,�,,,,,,,� ��,�,� u�.
i1p�n6bWvm epoirttWprqv.%�ry
Maintenance ^",N�aiym.rv•+�e��*c..>a:.n.;m�.r,.,..,,mn4,�mn�,.�
n�i,nn m. �io,�w mmne� �mmm�aiy m�.,��o ,vc�nm� mr. �le xo.
md Tuir �M JiYa. C���v� nMtt vm�. uW mNa umelY 9�in aa
ixaWJ. NLni Mmwnani nnA Jmiv•y' b enuLli�hr� unJ �M1., urte aWvs
iFa irn�pvery nyM1iol-uu: Jnminnr i� �emuimnil� �mLilleeJ. rtnw.e iln
Jile oN lill il� ��.Lunml x� FIeW unL ilu wunil ynwnl. eW �ryimpnumly
aiuFilia �IK J�uurteJ urta.
Glll
TSC �
PIE�MONTS NATUPAL WS FAGILitt ORAWINGS ARE
�ISCLOSEft FLl PREVIOU'�
in pmrni
6.70
� T� 1'mJ. t�n�F. riuJe al nn� Iv� .n ma �wl w.b ri mat wa�•.nlm u.N in
w.w ara� mM1„�a n M.M1 O�xImF. "M� ^^^^': ��"` �.N�Ilou Ilav tlum
r� n..,�r„ . �,w.m,�ie„�rtn�wawx�� ,��e���.
�nlrtyuen�. I�md��mc aya��idlr Wa�nN !m rnm.my wWe. Yiullou u�mm
TSC....�,.,iFie�.�e�u,�
N'M1m preperly Io.b14LLluM ull'vlii@wm ubunrctiam lu Om��, ean nfek
hwll�� huvy IWiny� m rt1u1���lr WY b W Wlmd mtinNm, mW in mm�
f� m+Y �' 4'� m pirce Y We eoJ u(� [uums+lm
r�m�.,�. a.o.�'wa.�m r,� �iw.��x r.n,�.ma
I. ArymrF �m'wn� m vkjc� �a ero�lun. 4mmllY. � nin uu' foN�
•hart �h bm4lnyXi ea�W.S fm.
I:�u�Mien fw �M� imiollumm u( Je n�ny4m�.1 N�wm W filia
nnl �u molu .i n� Aiunrlarca. In n fNs mu�� Ee
nJryuoiel�' um+mi�ul �y JUIF'w llliny viJxxn ul u�a m.
�. n.xaummu�=��•r�.n���n�.nm.��.eNxw��w�v,���na.,.«i
m.ymu��2imio���.
NUJ nN niler n « MauyAi �invly in n �M s�rtwn on
�e��iel�rw�l�v�.n in�.r�in.�nli� .�flnu�..�Wiiiq�e
v'olY'�Fla�
_ snfu�Flmr `
� m..�,e. � ,
— ` �y
ew�s�K r.a�.,i..
ra..�.n...ei�����mmei�i�.a�.w�a..,m..,,. r m a ePnme�.y.
TSC
� -tum��wn
�
N� ELEV.�iF1N
.0 e+"wl'w�w�ai .�.w'..
TYPICAL MAT BAIDGE
WITHOUT CULVER?5
EOUIPMENT CROS5ING
PROC – 2
TSC
NCOOTtlSw
b5]vw\FW StoM
y
MS]
} µlmn�v ol p�pa o� 13'
�¢Few Ix 9^^�v
fbn
�'T, CWSBEnnon
�� 51en�
Ir � �
� ' \ I � �
' � r� �`'; -� � � _� \
I �
� �
S�rcmn
�zi
Gpa(�ly u/ P�pe drcnf
i.yerM1v+WnMlullp�r
/'
Mv B Fvf•w
S�w
/
,' 1 �
..�..1 . �F`.
fibvqaeh
nv��.croe ramm,�y��n.na.��nnw«m.+o+.
i HESERVEO' DO NOT SCALE 11i15 �RAWWG USE CIMENSIONS ONLY
' �RAWING IS CURREM ONLY THROUGM THE UTEST REVISE� DATE' TO INSURE THERE IS NO RISK OF INPPPROPftWTE
�T6E�ESTROYE�INACCOR�RNCEWRHRECOR�581NF9.MANAGEMENT RIM POLICY1pp1
�v�� LINE 326 REPLACEMENT
� �= E����� �f��I piedmont
"G"�`" �V Natural Gas ENVIRONMENTAL NOTES 7
� REC85*�
,q,N�,,,� �oP.a�M,�„P�EomoM�A,����a�. FORSYTH COUNTY, NC
�� cOHV. OFFI4E C1A PIF➢MON! 0.0W �PNE
Erv���EEA cuec�nmucxam WINSTON-SP1EhIReSOl1RCECENTERWINSTON-$ALEM.NC
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF. DW��S)
oaTe na�ovmis
ORAVflNGNl1MBER REVI51�
PNG-C-326-0001021 A
�
k
Z
4
S
b
s
e
FLOW TAG
W1 11NNFD qVl11W M11�i
T Icaiecuwr �
L mw�vaxoe�c rnxov ioortsrtx
VALVE IDEN7IFICA710N
13�-VA-Ii
sia n�+�s7 �
vuuc rmc
��
wo eaxecne«
VALVE TYPE DESIGNATION
v� u¢ vu�
ve e�u vwve
� � �u�
K 9.111p5LY VK�£
w cwac vu�c
N WF.E VN.K W/ BI£IIFA AVO 0.11C
N! XFIDI£ VKK
W %LG VK�£
v� �-rur v.u�c
PRESSURE CLA55 DESIGNATION
u a�55 iu
1 CLl4 150
� a.�s �oo
4 nws �oo
6 WSS &p
B flA4 BM
IS CU6 15[O
i0 lqp P9 Lw
]0 ]CCO 31 CAP
MOLE: w a� � �
u mwEcr rwHc wma� mcc�am'a row am+
m¢wr¢ uu wnv vox �ae wcsuu a�s
END CONNECTION DESIGNATION
/. $MMi Wf1D
B SCPEWfp
C Burt YEID
E Mi fNFD itAYf.m
( PK£a 0 fMFD il/llfiU
G B'lfl'qD } RNSfD iM3D FlN.GEp
N BJR KLp M flWE .pMM FlAYFD
J ,�NG .YMM f1AVGf0
LINE NUMBER IDENTIFICATION
TT-Tso-aj(sTc-jiproi
N:YIx4 GIPE AIE N PN:16 �
PRF YNF➢NF
W1lF.4 WM
LWE 9M10E
PPiSLM CU4
SEWCNIW. IIXE MN19fA
MATERIAL GRADE DESIGNATION
YW IA SL %fl5
Y!0 IA SL FW
A3 Ki 5L 163
%�] IA SL X�3
N IIIMINNI N&NG
B IA 5L (ANF 9 pl ASIY GVix B
wa .�m.uixwrttm
RS ISIM 01)65 PoLnIML PIIpdCE
4 ISTI ]16 A 5£WIF4 NMEVID NBPIG
rn
a.
�
�
CG
�
BSD
Ux
2
�
N
WI
�
�
Llq
�
v°pic
�
w
FN
Y
'Y
i/[
�
ME
RO
LINE SERYICE DESIGNATION
A
�
G
m
0
u
EC
IX
a
n
c
a
xo
N
c
�
�
Y
a
GL
R
�c
w
W
�DEIBITI� �
LMi]N OqX�E
�
�9. NR
'0.YFSIIC M411fP
F1411Y I6P
Pl�i fA5 (Eq)
FM'LSt
m¢ �a
wa ns
mE wnrtx
wmcts c�t
c�ca.
Kmnouneox oxux
IfiCPYIlS PL
wirto wrtn
asi�¢xr in
'1tiIRWFM CIS
vrons w�no
u� ac
YE111�11)l
CYY Y41[R
L9MLY 4l5
wc�e�c w�im
a�w urtn
a�cr�xc cas
scaiourv w+m as
urc�rc wa
�vn
x�srt wim
ABBREVIATIONS
usr. ua co�w. caxmr, r.wa
ux m[lUrtn vu�E
� �,,m �
w�aunc/uwuu s wsrun srmcx
a�sc smwwr e rurzn
VP 4AL ¢OIID
VA SUL lYill
CP/.%
sr�11M FYL4EN.r 4xlNom
WIIIRJL PqFL C �'G6E'
&MDRM: FLFPf.�ICI AMWI�N
� P,�. o _ �•
EIFLIFO-xtO0.WllC /t�WRW
D]VIR1
rui c�osm
fNl N USt @YMX
FNL CPFN
us wourzn vu�
us wuurto wicvaa
YNIo-CiT-WIO SI�1MH
1M5191YIXf Nfl SUPRY
IMSIPoIMFM US .WPIRT
lCdl C116m
ILUt CNIFCL PWN
I110�XC WMd£ VKVE GASm
1000XE WNdE V.1L`.E OPEN
ina w,
�wmw co.ump. cuam
YOIW OPW.1f0 VILYE
V031M1E U�II�R
PRIW.VLL�O£ LCPC WMAtlIIFA
PE0.VlILVF1 MJ1EC14''!!
Pfq6E M;fIM^,
flEPNAfiR 51AINM fOHIFIX PN1R
0.�30 iKE
flfY]R 1FIOIWI �Mf
Sf.11KK1 D]NIROL PY0
YHNID FM
SEi PqM
1NP1�11'CG.MCIf
IIYF Gf1AY ql/.Y
fpR@.�R GYIIFOL VAYEt
�41If
M}10 ENU
R'�URE �L VKVE
xamcrur� awna
VALVES
xme � attuur m'mcuwnav ra+ vu�x meas swn s
�s rcn/MEIfEDIOVQI. iPf i1NAFU VKMS M �U3➢ MLHS YF M
V.W%ES SqNI.
pd c� vu�2 /wunm/maiixn/�w)
H G1E W.K (/flDm��XpFILm/C1Il4�)
��� G1E V.4�f (RM1CF0/q4M)
I►tI GrtVK�In.w.m/a�n)
� raut vKve
C0� avi vKve
C�0 fxaec vK�t
� amrt vu�t
N eimcro2r vwv�
I���...�!!!lll��� OFIM VILYL
� �ffCM VKYE PSfCN ttK
smv ptu vuuc
bq uu¢ vxvt w/atmw
DI4 xEm[ rra�
[� nu vri�
� N�IP-YMY VHVE
� nntt-vur vu�
ACTUATED VALVES
HpIL VKK d.'q6 W 1H6 ffLT]N NE yqFN h5 31RE UIF� N1GIF Ofl
NA¢ Mnr vu�. nrt �cw.row cw ec �w++ a+ urc ttrc or va�
�RW.E W.1Y SOIFNW YK4E
�116YE NAT SIXEKU VNYF MIH WIPHL f24i
� ROL/bMN1IX VN.K
� �vmn[/v,�cuuu �m.sr vurc
�AVpE Sqf11IX0 VI11E
�AYfAF SOILWA V4`h MM Y.WIkL �RT
� AVpE VHK MIN PAIIf/L'hR1FR
� wm xruv ni�[
PL
� %iESSME OR VI4UIW MIEf VK4F
ry� n5fu� AcnV�rto v�l�£
� w»w.�u .�nwim eu�
YAfH V4VE P691MYIFR
SYMBOLS ANDLEGEND
ACTUATEDVALVES
�PoOi /LTNIFD VKVE
DG Pmsaxe ttwuron
(mr�oxcwml
� a�ac � �av.mn
fmrtmrt,wrnl
��amn rnwnn vuv[
I Del I w,at-�cniw varari .�nwicn
viLrc (n�w w�ME c�s)
I� F6fCN MIIMIF➢ VKYE
�f— oa�t um�
ICI�I �T�'�rtnvuv2
SNGE IG1RiG (YRMG C14T)
I� P610N ACIWIF➢ VN.K
�����
FITTINGS
I$�I � � (�J
�II P.WIE 9dl0 (C104D)
�� SPfC1.VaF 01�9 (CPE1)
lil ssm�ac ew�o lciucn)
� aM¢ au1E Ix WKx
CWf�4F 4111MG
I� L�TME f1.VN.E CP
9)l10l:IKKl NNiLE
O 111BNG !Il�➢IW
=I 11PFILfD FRi
m LtlPi tM� �IIXIG)
I
�— 119NN1ELL (INflFMm)
♦ �
p swnc
p NfDLRA
i-¢-5 UAFM q41fICE
y�s 1�61PA1FD fLYFlYlC CH UMAY.
(CqU1R. FTf CR 11191M)
� RID.YAINlG f1AVCf
'rp-1 I!@4A1Pc JW1f IYolnl)IWC)
^ FIN GP
�-'/ 9YE SORN
}S XOY MYIFL'IAM
5'--'i PIPE BRF/1(
�
�
�
�
�
�
YQ
I
Ol�e
0
s s
�
�
fi
' �y� �
ESV NMM
��
�
` LJ '
�
N[SJH
`i �
�
J L
FITTINGS
MISCELLANEOUS
ttnr.wn um w wnm mvnEnwx aTMcv wwaa
tLW'.FD WHNECII�f1
OY.M2 NPPIF �
anFcimc uHxw
unn,
�IISCELUINEOUS
wsuur,p� wim nncnies (nx�rcs) y
wswHa v�mrtnwn oo xm raaa*
�a.a rw� wm� �unax O
mmiws ox��R+cmi¢ iaurr �
�
MIPNIIE q5C-V.WIW Po16 �
n�uc ��arz �
�
fIDIDF NCSE ❑
��� �
v
C1O511Pf ❑
Y
16f Ofl &FID PIXL (W/�tNf V4V�
mv v�1'2 �
SIFPIFA WIM SfAP!/Sf W �^^
nm�eunar� sima
WNLL4.ICIWiCN OP PLQi
xoau .�c
R-IVNf
Nfllf
c�vu�on .quns
ca[-mc smuxm
B�SNR SIRbiN (5)
1F£ SIIVlflCfl
MhP (�
+-mE swNFA
iLL1IX CF 105! IXM/.Clpf pFlpli
51ME BP/NCN
WIMCNCO1LYf
RO/ A91qN
IIFY SN4lR➢ B!
FqfAlflR V[11p]9
YWPF11 6lV IdD lEC
PROPRIETAHY 8 GONFlOENMLlLLL RIGHiS PESERYEp • pp NOTSLnLE 11US INUWING' USE OIMENSIONS ONLY
PIE�MONi'S N4it1RAL G4S FqCILItt pRAMNGSARE COrv51DERED CONFIDEMUt �OA4f 095)' �RqWING IS CUFRENi ONLx iHROUGxTHE IFtEST PEYISFD DAiE' TOINSUFE THEAE IS NO FISK Cf IN4PPftOPFIATE pSCl0.5ERP11PREVI0U5 PAPER CD�IES OF THIS
p`�°"" �/��I piedmont
EXCANEEP
MGPiEGX �l, Natural Gas
REC66R1 V
19LOP 40AY IIM1
QSiWfR 9RRY IIWI
D]SIWI: SllRiY I1Nf
snv[
corc nux �xrtn
mm nac P�wtE]
mot na (A'rac vwrt7
M6RM 05RKMNf Yfl@
narx+n[xn�c vu+�s
nwere u�
w,� ��,w
VFMJPo Yflfll
RFYOE �EIFA
WOE Pf1SIMiKK1
90°k SUBMffTAL
NOT FOR CONSTRUCTION
AUST BE DESTPOYE� IN ACCORDANGE WIiH RECOR0.5 6 WFO. fMN46EMENt IRIM) GOt1CY iW1
SHEEqS) t OF 3 pWGSLFLE NONE
LINE 326 MLV/REGULATOR STATION �c�� ����a suPeeseoec
LEGENDSHEET o�,m�„�„s�a a�,s,
FORSYTH COUNTY, NORTH CAROLINA PNG—M-326-0001000 A
w�ns�oµsuFrn. NORn� cr�aouNa „,„�,�»s,�...,��„.,�,. �.v,:o,,,u�.0
ucnvrtn w
wn�nxc vua'a�
�
• uui�ss
e a.wwa/cweumw
[ U¢p'S OIpS
o usn•s owi¢
[ rau¢
f ROw N��C
0 RM W/�Tn
T FlDMPATrtI
G I13A5 WqQ
x wuw
I qIRREIIT
J PPnEP
K res
t t[�¢
u u3�fs aa¢
H u¢R5 pqR
o USIXS aa¢
_ �rv�
q �, pfiFHIllll/L
o aumn
x xw�na
5 ��(iRFWENCY
i 1FYPfRI.ME
m irlsw�nne o�so¢xn.LL
u wxnv.wuaF
V N�/.TW/M.IOIIMRTINµY9$
w Xppll/i[HtE
q MtWI?tliGE qfiF]LL1111K
INSTRUMENTATIONIDENnFICATIONLETTERS
�USE� INSIDE INSTRUMENT BqLLOONS)
Ch11NGllYc ,ff/Dpli SMiORs t
�
MOIE /.WI11tlIK ilI51RWFHi.�QNAlIGlS, I( PEpIKfD. 9WL U¢ TAS TIpE AS � 1iIILf
H. Y'. �IN'. tll �lL� SURIYID N iA6 M SM106
N0IAARO IXMQS RAIGIE NARI W 91111IXIW AS imimR,
x• rew xx . wa wa
�- wM '� u- �aw ia } s�ummw
RELAY FUNCTION DESIGNATIONS
�ADJACENT TO INSTROMENT BALLOON�
�f OIA4AC1ERff
� �„� O O
Q muurt xam �
o ,or,� �
ILCN O�IAY
O Md 9dK 41£Li roiw�
O LM 44VK Y1ECi
� �IMENLI�PFAhA
� awm1. m rnca.wc m.xsourm
� vrinw�nc ro a�xr m.v�mumr
� �asr�.ua ro cuxxExr cw�mnhn
� �ar�cc m ¢scmou.wsnc
� ear�x m �u�x.
$ � �a � ����`���
25C. Wi SM1fN 66ff
b0 � W! SNltll fPG�'
sw . wFxao vk� �[x
svc - spu�m vuv[ ao2
m . nu mcc�m
Aa - uswcnw oona
ac = cr.s onccmx
LINE SYMBOLS
U'AII!At 1L8.XG
wuwiex c�wx[ciwx
utv�wrn �un
(HT �IMI�������C 94Tt�1
M9X4NC LLVE
9"JlLL PHEIPA111C IM
$N� IlYil$
SYMBOLS ANDLEGEND
���,��,� INSTRUMENTBALlOONS
Y�µNLE MCU1 ID�NNW GIRVI
�'w oi.oia.0 es�r oo.aolu aimir
OLOCK YOJNIFD 1611dWpi
S e IRM'J1E PINR YGW1fD NSIFyIENi
� � r3 � � � � (mar a ruul I�w+*7
iack rutt ya.wnn xsm�uwr
x �v f� a� au¢1 (uiwwnn
M BG BZ �
ffY01E PNIFt VpMIEp HSrtNNpi
(REM [f PNS1I iPI4YM1)
¢
iL {Y � LOCK PM1F1 YpIN1Ep IHSIRVYFNi
NV (RFM fi PNYl) (.WpLURY)
M �/ �/
IHS1fNMp1i fCq ryq YFA9.AEp
� vun�ars m rw�rnaxs cmuua
Q1f14311�)
6 �
++ v�a�nc smrtr ro ws�aurNr
�
r ic iv
� n[fmN'x 9avlr ro uam�uon
9ID
rrv w
� � SfATIXI CAIIMY SIYIEV
e usiancr�r MTM cwnox (s�wm)
r u asur(a0
� LIX'.LL PN16 YWN1Fp MSM1Yqi
Y lff N Y!M 6YIKKI (91.1Vf�) IMffIAY (Oi�
r mu
�' su� Rc �uxc�wx m n�nax cm
y( iPRIYAILY19F Lp}C 0.MM0.1➢i)
K
� � I.IXAI RL NMC11W PI UXIi IXN1RM PMY4
n OEA3NCY 3NNON11
N O (W1P�M1�)
IDV � flENLflICY 91IYJVMI
(N/0]YN�)
O M01lR Cplip0. �IIfR
O V,Ub.�HE 2qIA.'CY li�1E
LOGIC
OI GF1:fW1IIID iCfl UNCEFlNm qV Ctl1P1£Y WRAfCN lMlC
Oixrtaa� a vrtcmh anr r iu us�ns Qar
OWRALCM R 6iECINE F µT IXlE qt IppE IN%IR LVSf
OP PIR2 WIE - P14 LIS. IGAY
UMC6WE0 WNIf10. IlCK (UAWLY IMM %Y4LFF CAS CR
rws/�. vr�c rnwma)
MISCELLANEOUS
`J. �xra ur+rt ox tc�n,7
�/. mwn�uc uan ar (xm)
N` M1PlRIG I1fN! IS.Y�T (ILBER)
s s nu�rt" "^" nw^/smr
ausManmv smrcH
MISCELLANEOUS
MISCELlANE0U5
PROPWEfA0.v fl CONFlDEMIAI ALL RIGNTS RESER4ED • 9p NO? SULE THIS �R4WING • U� DIMENSIONS O4LY
PIEDMONi S'MNR4 G45 FACIJTV ORAWI.4G5 PRE CONSI�ERED CONFlpEMWL IOAtt095i' OMWING IS C�RRENtONIY T1930UGHTHE IAiESi REVISEOOAiE' TO INSUFE THERE IS NO RISN OF INP➢PROPRIATE qSCIOSER ALL PFEVIOUS PAPER COPIES OF TNIS �RAWING MUSi BE DESiR0YE0IN ACCORDANrc yy�P{ RECOR�S 8 MFO. MANAGEMENT �FtM) PoLICY 1 W t
""'°�` Piedmont
ENWNEEP
m`w"`� O'I Natural Gas
ncc s sro
rawavu wcxrmisvreornox.Mnruraiwncortv.
EHai�,Eeq onv.orv¢EomnEOMouraawawe
LINE 326 MLV/REGULATOR STATION
LEGEND SHEET
FORSYTH COUNTY, NORTH CAROLINA
lMNSTpttSAIEM, NORtH LPROIJNA
90%SUBMfTTAL
NOT FOR CONSIRUCTION
YG MTE 0]/tYN1B ISUPEftSE�ED _
OMNING NI1MyFy
PNG-M-326-0001002
�
i
/ r / i
/ � 1
� P
so� �:
i �
.
i ,� /
/ , /
a/ / �
/
/ / � //
°�. / / �
' Q' �
`\ / � / }
/ � / /
�s � � � �
� / � �
, , +
d / �/
� �s �
a \/ �i aS�
. / � / /}
% / i� /
\ � / � � k
/ @
,r , 3
i h�
/ /
� �
� �
\ \
� \
\ ��
\ \
\
�
� \Y9s� - I NGRO� _ 4
/ � �, =�- �
i ; s
� � �, \k�
�� x�
i r \�` \ '
! �%¢ ���� \ "_
s / \
�\�\ j��� �� �
\� � �5 ' EGST/ / `-
i � A Ex�g NGp� k �
�� i.._ T/N�.p/P� Fe Cy .
.�O .j \ ^ \�S /
/ \ G�\ �U /
i� ����ep3�
Ny \ /� `�r� L
1'. � '' P�'S\
GONTROL POINT
N.06+9i198'-0'
E.1&ri5158'-0'
�
J�
\�
���C --
\�\rR� —�
��N I E%ISTING
��rFy sraucniRe
��
� — —.
�
�
�
�
� —
�
� �+usnNc
�E � � STRUCNRE I
_ _ _ _ _ �
_ � _ ' _ _ _ _ — _ _ _ _ _
SEE TYPICAL FENCE DETAILS�. z I
PNGGOW-0001031
IXISTING � I
STFiUCNR
'^'n. CONTROLPOINT �I
N.00�9i163'A'
E 16�15208'd' � I
¢I
L@ � °�2� \ � 8 �
`� �` `. �I
- _- _ :
� —_ ___ _ \-- — - __--- _ �I
___---__—�> -�-
� �
��
�J - _ PROPOSEDPIPEIINEFOUIE
--__=_a_
-_-_--_ _ �
A ___ _ _
----_ —______ II II
—x- QI
/ ._� y�6�R � � -- y -- v __ EY1571NG ��
/ / c� _
/ \� /
/ P� V o \
" � o, ��
�i h � �`
' i \ \ / ¢� 444,.
� b"i' \ / � ,�✓+t���/
�'-., \ / \ \ \ �_ } SO.PEPMANENTEASEMENT 6'
i \ � _ `Q¢'_ J`�—
i T\ \\ � /
.. �J� _ — —.. ;� ___ FENCE
L4S � �� C/.c _- �us �II " - _ _ K _
GAi� ��XIS� Gu61NE cas �- - -
x E/ "> __
` . ,r�' EXISTINGPIPELI E
CAS Y., .
/_V�WS�� � •- I
� _' _� —. cn.._�
y� i � x
zoI � m
� �� �
� % g � H __N.OBaBi110•l•
— _ _' _ _ _ _ _ _ — E.16.152�2'.9• — k � % _
EL9�Y.B' - _ _ — _ _ _—_ _ x _ _ _
% - Y
�s — ur5
` THROWAWPY
STOPPLE
BVPA55 FITTING
LP
m
NELN FXISiING
a F
m ¢
m x —z r__y—
WllRKP01NT
NB9N11] 8':
E16�15282'-0'i
.. _, -- �n.. .
/ i � � - -_-- - � -- - - —
\ \ } j o / —. _' _ _ _ _ T—_ _ _ _
/- / � V � � \ �� � __�___-° --'_ _
j�e�� � � �� ¢40 � x_ __ -e"-"e:-'_r_'_
� ` � � .
\
\ �i
� � �
. �\ �\ }\\ /� / /,.
��� � � t�'_-�� � �i
� •\ \\ �/a
� — — — — — — — — ZS' TEMP CONSiRUCTION EpSEMENT � � - - �
� \ � \ . _ — _ _ _ _ — — _ _ _ i � �,
��\ `'/ � \ _ _ _ _ _ _ _ _ _ _ _ _ _ _ i �.eo-."
l \ / � � `4-.__
NOTES- \ V I ��a-'_v�
1. COPRRACT�R TO FlELp VERIFY hLL DIMENSIONS. ELEVATIONS, ANO � �� � } -- ee
E%ISTINGCONDRi0N5PRI0RTDFPBRICRiIONpNDINSTNLIATIONOF`_ � , � i E
PIPE. VALVES, ANp SUPPORTS. �� -- --'� 90°h SUBMITTAL
2. CONrRACTOR TO fiIIILT FENCE AND G4TE5 PER PNG STANOAR� �1M1Ti \ � i
PNccaoaoomoai. � � � NOTFORCONSTRUCTION
� �� �
�
PROPRIEfARYBCON:l0EMV1P11RIGHiSRESERVED'DONOTSGIEIHISDRPWING'USEOIMENSIONSONIY PEF.OWC,�S) �
PIEDMONi S N4iUPFl GAS FAGILI iY ORAYr1NG5 nAE CONSIOEAEO CONFlOEMWL �OM1085)' OPAWING IS CURREM ONLY THROUGH TME UTESi fiEVISED OAiE' TO INSURE MERE IS NO RISN OF IW�PAOPPWTE q5CLO5ER PLl PREVIOUS PAPEF COFIES OF iH15 DRAri1NG MlISi BE OESTRpYE01N aCCOR�ANCE WITN RECOROS d MFO. MAN4GEMFM �RIM� PW LV 1001
Piedmont LINE 326 MLV/REGULATION LOCATION
Natural Gas MECHANICAL SITE PLAN
q�,.o„.„..����„�,�.. FORSYTH COUNTY, NORTH CAROLINA
�,nronEmno� nvn owve
... , YVINSiO&SN.EM.NOFTIG4FOlIN4
VL1921HB�SUPEFSEOE� _
PNG-M-326-00010041 A
F�� �� �, .�� •���( � ��� �\'�
� ; � � �i � y.A' � ��P � �� c��pHs.. --I
P I_--__—_- I
I / ���mp \ ���Cn E%ISiING
� � � i / � ���� § ��N.e� 4 STRUCTURE
� � �
i� i� �``Ne �\F. 2 I I
% ^� O/ . / N `\ m �\t . -- --_—I
i -
N / / \ a � � u
' tif � / �W ��...�
\ � F � � \ NOB�8T105'.0' � � � � � � � � � � � �
�� i � �% � �; PNG-M-326-0001008 �� � �� .
i ' ` �
�' . . ,
f, . � �
� , / : � �
E%ISTING
� °� N \ STRUCNFE
� � i / \ \ ( } � � _ � _ _ _ _ _
p` I ��_
/ / \/ � � �� � 1 �`� � _ _ _ _ _ _ _ _ _ �-�
� a } � 1 1 il
j � �� � � �� IXISTWG �I
� STRIICTU
i �
/ � / �� � � \ � J � I � �I
% m� �. � � �` � �
� � � � �I
;
9S �\ / % p�
�e �`��3�LNT y� � ��
A
� i z
� \ I, � o
� � €L WI
; S \x --':. '` _.1 .-�.-_ -��,�
/ @ `6\� \ , �`� n.� _ _. __ . ��va. � _. " � -- —___ --_- _— _ —__—' _-F __ -- _ . _-�--
� S\� k�\ x N08.9]t.f5-[ � � � � � � � � �� � `��.� -
@� ¢\ � �� � ��� �i�
/ �ts �ar �-r �PNG-M-326-0001009 � _� ����� �,�.�,��.,�.,`�.�.��
IVB9�i1�Z'-0'
�� \ \ � � �� �� PNG-M-326-OG01010 �_�_
�i� � �ts �r r--_ / �
C+ �� � / \ G\ ^<�iyy� i� R __ `. _ .. , `��`A 4,,)/ ' _ _��SEDPNEUMER�UIE
, \.� � �\Ensr������ei �.. I ' �=1�- __ � _____ ___________z� �
� \,��( -.�'�' �s _ n (
"�O a � _ � �is � ... � _ �.
[/ �\ / !•�\ �\�S t� ` :� �".I� 'n -- I - 11 �
\ I II �. — FNI511N FQiCE �� �
� /\ �S�v� �� 4� � � '. � i
/ I �\ } . 1 : Wi / _ _ ,� _1}Xic1 _ _ ' __ �'`� I _ ' — , .., �. II m � —
\i / � f+l.' � , '.'C �' - CMI5PM1'pPIPELINE •,,� �_� m I -- x -- x —
/ �♦ � � � "� � I � _,. — aR . _� Y.`� _ - F. -_ _
� \ yi i 'i"� �. �. � . 1 I� . ~"� 1 u- i L:5 — -... -
�/i � � � !w _— G'r-� $k cw I
\ / / 1 c{��"�_3i¢._��._ "'_�.
�� � , '
�` , �aa.s,�os: L--r--- _ . ,
� � � �_ } 60'PERM4NENTBSEMENT i �- _�—
. . \ / \ \ _ _ — ,�� _� '� ��'
�
Q / - .\ � �— — — — J — -- — ------------------ :9s.,,�-0.
, �� � -- — --
�, � _ -—-
, , ' � � � � / �' — - �.
/ ., � � /' � ,.a•. °. --e
,.
, y° � � - -�-
,� � \ � �
�� �� �� /- ��.
`� � �_-_�' j �r'
, �
,
, �, � � p
--
VL' \ \ \ � — — — — — — — — — — — — — — — — — — — — — 25' TEMP CONSTRIIC110N EASEMENr I i � ��
„ \ � \ /
......... � �_�.__� _��.__ -<a.__
� _
I � �
� '`- \\� \ \ I � _nre�__ `i_- r.
NOTES - I
\ \ � i
1. CONTRACTORTOFIEL�VERIFYALLOIMENSIONSELEVATWNS.FND ` � -- - - �'� � �
EYISTINGCONOITIONSPRIORTOFABRICATIONFN�INSThLUlT10NOF � \ 90%SUBMfTTAL
Piae.va�ves.auosuaroRTs. \ � � � NOTFORCONSTRUCTION
2.� CONiRACTORTOBUILTfENLEFNOGRTE$PERPNGSTAN�FRDDWG \ � ,
PNGG-000.00DfOJ1. - . .. . ...
PROPRIETMYBCONFIDENTIPLALLPIGH�SRESEFVFD•pONOTSGILLETHISORAWING'USE�IMENSIONSONLY ftEF.pWG�S) -
PIEOMOM'S N4NRAL G45 FALILItt DMWINGS0.R'c CON9DERFD CONPIDENR4 �OMtp95)' ppqWING IS LURREH� ONLv THROUGH iHE IATEST REVISE� �ATE' TO INSUFE THE0.c IS NO RISN OF INP➢PRpPRIATE q5LL�5FA ALL PREVIOVS PPiEH COPIES OF THIS OPAWING MUSi BE OESiHOYE� IN ACCOR�ANCE WIT1i RECGRDS 81NFG. M4NAGEMENT �flIM� PIX1CY 1 Wt
M2 IIFMWN6ICFGGPoTpN �� CKK I.PPD LE[PWIpM IATOV�L[
�orzo+e eo,suemirrn� sn Rr Ac �Rencone zaoo �� -� LINE 326 MLV & REGULATOR STATION �EETis� 'a' ov'�scuE ��s°=r-0
pE"°"" piedmont
ACC.^,L'hl'NVhtf3E9 XXX%X �� � ErvaxEEa 411 �M1'GWTEDL1Y10�BSUPERSFDED _
rao�r�rvuMo�a o3s,sv � -^w „�,F�„ KEY PLAN �,.��a �,,,�
��;,�,„�a,, S,. �� � AE�.sro Natural Gas FORSYTH COUNTY, NORTH CAROLINA PNG-M-326-0001006 A
'.,t1'Jril.� yT-WSNr)995 '^w. cor�wrrtmcrimxairtrwruw�wmw
PPINCIPfLL �pp.0 �E�ISOVSq.pMROMOWVF
��H=_r.�E���,�iva; ec rxnwm�ue � e���xcen ,�or,��.s:�o wwsrow5a�m,ivoRTMwwuw� m,�.o»s.uE.,���.,�,,,�p��w..�,
O
B'
MONOLITHICINSULATOR
DR4WING lIMRS N.08+97185'-0"
FOR CONT SEE DWG PNGM82&-0OOt00fi
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
■
I
QRpPo I
SFO�
F�PF(�,yF, ■
I
■
�� '
■
+5� s y' � �
��/ �6 �g
/ ��� I q �b
�b' ��o. ■� �
2 ■� <y
�; w a
� � a�� 'c �
�4� �� � s°j coNlaaPOINT �o
� � � N.8911&M1.00' �� w
5: . �:F' ` E. 1615208.31' ■ z �+
i 4 6 \�`� � 's� I Q O
�: � � � 1 �
�a � o
�qPo� � 1 " � \ � LL
s�, ��.x � e'l'�Ni),4� h � I
�a � � � �E�S �Sa'�.'Oih \ \
"ve ` � � � ��'>;-• T
EF ,�• v� ■
h�° � � Cq�'N ■
��` � P
0 � �� � P
� ? '
�� �: , �;
7� \ \ � �c�'4 �
F �
`\ �O '
— E%ISTINGROW_ \� � Q� .9
.—.—__ __—__--___—____��\Q2�__—� —.__ —_"—_ ___
�� —__—_i –_ _--_ ■
.
: - ,� ■
o`�� � � ``� I
!� �,'•
�� �
�U � ■
� �\ 3b' ��Op \��\�
■��������������� ������������������������■ ■�� ���� �������
/h MATCHLME N. �8�97145'-0"
�{` FOR CONT SEE DWG PNG-AM326-0001009
CONTHACTOR TO FlELD VERIFY ALl DIMENSIONS. ELEVRTWNS. ANO
E%ISTMG CONOITtONS PRIpR TO FABRICATION FNO INSTALLATION OF
PIPE VALVES. AND SUPPORTS.
CONiPACTOR TO BUILT FENLE AND GATES PER PNG STANDARD OY�
PNGGOG0.0001�31.
PftO�FIEiA2v d CANFIOEMNLNLL RIG4i5 RESfAVFD' p0 NOT SCPIE TM�S INWWING' USE �IMENSIONS ONLY
%EDMONi'S NANPAL GAS FACNIV �PPWINGS PRE LONSIOEREO CONFIOENTIPl �0lh1095�' �RAWING IS CURRENi ONLY THFOUGM THE LRiEST flEVISED OATE' TOIxSURE iHERE IS NO RISKOF IWNPROPFWiE q$CLOSEN PLL PREVIOUS PPPQt GO%ES OF iHJS �MWING MUST BE OESTfiOYED IN ALL09DANCE WI?H RECOROS B INFO. MMWGEMEtdI�NIM� Pol1GY 10p1
CO�IPiedmont
Natural Gas
CCPlMM3%!%FDM i M}IlML4000PP
" v� '�'- +� 'WL�
LINE 326 MLV & REGULATION AREA
PIPING PLAN
FORSYTH COUNTY, NORTH CAROLINA
WINSTON-SAtEM, NORTH CnROtlfu
90%SUBMITTAL
NOT FOR CONSTRUCTION
so�se-�-o . .
�:GY9H9Y
�r,�f,:,n::
PNG-M-326-00010081 A
O
� \
■
■
I
■
■
I
■
■
I
■
■_ _
� ��
NOTES:
1. CONTRACTORTOFlELOVERIFYALL
DIMENSIONS,ELEVATIONS,AN�
IXISTING CONDRIDNS PRIOR TO
FABRICATION AND MSTALIATIQ4
OF PIPE VI�lVES. ANO SUPPoRTS.
z. coumacroRroauarFerucenNo
GATES PER PNG STANDRR� OWG
PNG6-OOD0001091.
�:.
.,
.
\ � � � MATCHLINE N.OBig71p5'-0"
\\��\� �����������������i��N��iPN�2: 0010��������■
\\\
�
�
�
� �
�
�� �
�\`` (\�T
��B \ � a`�� 24.
� '�4-.y.y
\ �" 4W
■ � � � � � � � �
■ � � � ■
�s� DRAWING LIMITS N.08�9714Y'-0"
��`�=ry. FORCONTSEEDWGPNGM3P600007008
�\ic.� �������
� \'�b, ■
\\ `\\ § O4�'i xl �
\ \ � o � I
�O'
\ —
�\` $ Q
� � � � ■
\\ \ ml �
\ \ I� _ _ _ _ _ _ _ ' �
� O _ �
d _� w � � � �
�
�_> ".,_ . Ofv� � � '
.� ,_ x � �^,� � �
/G45 - aP:— �A[ [.{�5
j u
OP/
�'y�,/
� � , Qe�
� �.,s _ �.
.. -\. A YB_1y �I�
` . `o
I �qf
} II
I I ��
�_�Y�.e�y—_—x_—Y _ III '��
— K � FXISnNG FENCE UNE
� h� 1—__a— I I ��a
■
_"� � :: _ _ . a _ i �
r
��RryF I I I .' - __ - - _ _
I I '� �
� �� Gt5 Gf� � �':
tOF EL93J-0' ■� O
,tS�cas� �yg—_.. _ � �
� �� � �'_—_�' � �
- '`v , — � � I �
. ��" — r-„ ___ E%6TING aIPELINE � �
�� m�� -� � cr5 Gn. �-5 _—_ C 5__
i i —�
r __ �� � � �
cu _ -- ., --- � � � � I
■ —` N -_ ( I I
� � � t45 � �
. /
r.ns �'� � I �
�
I / ,
■ �
■ �
I
■ %
■ �
����� � �� �� �
cns '. � I�I ■
�Oy�'�>c, _- � e•
M I
4S_� WS — o
` ' � G45 � � �
�� � } �5 � Cav � � EJfIS=1NGpIPELWE � � ■
Wl � � W ■
[j''y 5—(Ft�_____--_ I
�d'P P/ � _ _ _ G/S —_ 4A5 — :'..tc
� t W9RMPOINT � �FlELOVERIFYE%ISiINCa
/ N.89.if10'.T 02 PIPEIJNEOEPTH �
E. 16�15202'-9" � ■
� ■�����������Y���������������������������■ )���������� 90%SUBMITTAI
osANnNG uMITS r+. oe+WiaS'-0" NOT FOR CONSTRUCTION
FOR CONT SEE DWG PNGh}326W01006
PqOPRIEf0.4V d CON:IDENT�A1 pll RIGHiS RESERVE➢' Dp NOT SWi 1HI5 �MWING • USE qMENSI0N5 �NLY
PIEpMONT'S W1tUPPLG45 Fh^.IJiY DWIR1NG5 PRE CONSIDEFED CONFlpEMW. (OM-1 WS)' ORAWIHG IS CURREM CNLY iHROUGH THE NTEST REVISED 0.4TE' i01NSUPE THEPE IS NO FISK OF INPPPROPflWTE qSCLOSER A11 PREVIOUS PAPFe COPIES OF TMIS �PAWING MlIST BE OESTROYE� INALCOR�ANCE WIiH REC00.p58 RVFO. MfuWGEMEM IR�M� PoIICV t00t
ENGINFER
Piedmont LINE 326 MLV TIE-IN AREA
Natural Gas PIPING PLAN
�„�„,„,.�„.,a„�,�. FORSYTH COUNTY, NORTH CAROLINA
.'�°.°2�;"0,. :.PG°i°� mNsroNsotEm.Noanlca2ouru
PNGN.316W001006
SH[tI�S) tOF1 DWGS.^ALE 3I0"=1'-0"
VG �NTE 029YEOfB SUPEft5E�E0
ov.vnno'awaen r¢visu
PNG-M-326-0001009 A
0
�RAWING LIMITS N. OB9+7145'-0"
FOR CONT SEE DWG PNGM3260W 1006
r.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._..�
.
. •
46'4� 16 •
��� I
�\ \ 15.�.
� . I'-0' ■
■ _ _ _ _ _ _ 5.ST0.%521G-ep001 _
■ .' _ _ _ _ _ _ _ - _ _ _ _
" __-__ _ _____________
______________ _
' _ _________________
______________ _
W9RKPOINT — — ---------
__--__----__
_ _ _ - - _ _ _ _ - _ _ -".
N.009i1136'-11' - - -
E.161a51]0'�P
� ,�t � ■
� j4 ■
I II I I
II
� II
II �
� -I I •
I �I I � I
■ '�"�I� �
■ �II R �o
I I � •• $
ml � � ��
ml' I0�
� � I I �
PS�__—__n.___--:•_____`: II oa I ��a
�nl . —_K�—.,_
__ � _ I � NEW E%ISnNG � o
.n� x___x��, � I I � �c�w
'� I K—"--- �-- _ K__ E%ISTING FENCE LINE I I � N
uia� X V X-- —
tE � x —o X—a'�¢.r-- � o
F � ■ N � % - — X _ _ y
� o - - - - _ L _ _ _ _ _ _ 8'ST0.%511G-6�Iqfi ,
i\
r____ '• •�
z v� I �� L— - - - - - — :,ns — Go5 — EC'19TiNGPIPE�INE ''. �"--.. _ _ _ _ _ _ _ _ _ _ _ "
_ _ m y � O
�w _-_ .._,5_—c5--�.n _ :5—is5- 'm
:., __ I ...,I _ _ —
��■'-i.-.--�'�—�-�'--�—� ---- / --- C' --- --_- E
" FiELD VERIFY J� _ _T_
�40 � PIPEUNEOEPM TMROWAWAY `FIEIDVERIFV � �
o�� E STOPPLEFITfING
O I , I �2B_ PIPFIINE�EPiH
oVmmx I
I WORI( POINT
N 89+1i1i94
� � x E16N5182'-0'x
■ ' I �
I ■
' W y 5� I I
� �
VX
� } �I O g I �
r..:..... — — f.ei]—! �' r I '� ■
I �
�% � a I
� I 30'-0' � I ■
■
FOR CONT SEE �WG PNGMa2600001009 � I
��� ��■ i p�6•
�
■ I — — _
� — — � i 6'-5
� � � � � � � � � � � � � � � � � � � � � � � � � � t � � � � � � � � � � � � � � � � � � � � � � � � � � � � � \ � � � � � � �
DFAWING LIMITS N. 089a7105'-0"
FOR COM SEE OWG PNG-NU326-OOOtD06
rvores:
L CON'IRqCTORiOFlELOVERIFYALL�IMEN$IONS.ELEVATIONS.PND
EXISTING CON�ITIONS PftIOR TO FA6RIGATION AN� INSTALLATION OF
PIPE,VALVES.ANp SUPPORTS.
Y. CONTRACTORTOBULLTFENGEANDG/TES�ERPNGSiANDAR�DWG
PNGG000-0001031.
PFOPRIEfARY b CONFlOEMIPLPL, RIGHiS RESEFVED' p0 NOi SC1LLE THIS �PAWING' USE qMEN510N5ONLY
FlEOMONT 5 NAiURai GNS fACWtY �R4IMNGS OAE CONSI�EREO CONFlOEMIPL �qN1085)' DR4WIYG IS �VRREM 0'.LY TNnOUGH THE tATEST REYISE� OAiE' TO WSURE THERE IS NO RISR OF IN4FPFOPRIATE OISCLOSER ALL PREYIOUS FPPER COflES OF TFNS �RAWING A1USi BE DESTROYE� IN ACCORPWCE WITM RECORDS 81NF0. MANqGEMENT �RIM� �Ol1CY 1W1
'""`%f20'� ""x '�`�°'"` C4�I Piedmont LINE 326 EAST STOPPLE BYPASS TIE-IN
ENGINEER
� � "`"'�`" Natural Gas PIPING PLAN
"`"sT° FORSYTH COUNTY, NORTH CAROLINA
A���,ok �.�,.�.�.�M,�.,�..
Y.NxXf10%K Y.%% sHawess .omcenzovivnxoxrrwwomi wlrvStoN.SnLEM,NORiHVFouN4
cwuotr�ncmio
90°k SUBM(TTAL
NOT FOR CONSTRUCTION
s�oe•-i-a . .
EF.pWC15� PNGM1L?26-W01WC
WGMJ160001W6
SHEETISI tOFi DWGSCPIE �8"=1'-0"
VG�ATE OL1Y1018 SUPERSEDE� _
IXUNINGMII.BEP qFVWC
PNG-M-326-0001010 A
2'
t2'-ST0.X52(Gb)OW2 "• T1R'0
ELB52'-0' 2, Z, CLOSURE
CLB00 CL600 mP �
r e�o r e�o
tEL918'-0' CObT$' CDdT$'NPT
SEE DETFII t Z' �' NPT �� Z�
(1VPP) I�ICLfi00 CL600�I1
sxa �� 4� sxa II tr2
TOP912'b' REOTEE�� ���R�-- ----REOTEE CONCRED
( fi'�ST6%52'G6 0001 ►
G 6•
CL600
HOLD HOLD
SECTION �
swt �/a'=r-a' �¢e-oo�coiooe
c 6'-STD-X52(Gb1001
c 1'�Si0.X511G6)0002
ELHSZ-0'
tH4NOWHEEL
EL945b'
fF1818-0 _
(iYP I)
r
TNRD
CIOSURE 2°BLD
� C08T�'
i EL BG6'-0'
�o �" T
CLB00 I I
II
I
II
II
� L91G i I �
I
�I I//' �
c8'ST0.%52(�OW�t ,�Z{ CONCRED
W
SECTION � DETAIL �
seue �/e'_t'-a' �ae-aaaa aae scue t'-t'-o' �ae-oo�a�aoe
EOP EL 95]'A" ��TNER CPP BQ 6#
3# CONCPE� CONCRE�
aa aeueF p n
GONCREO ��. �. axx �, y. rx� ��
c 6'-S1R%SI(GL70005 _ _ _ _
6x 6.. -- 2" �. — 2' ,.
flEDTEE CL600 CL600
fi'
MONOLIiHICINSUTATOft �
(IN VERT) �
HOLD
iDR GEOIECXNIGL PEPoRf
SECTION �
scuE �A'-��-o' �zs-0000iaae
FIELD VERIFY FIElO VERIFY
PIPE OEP�H PIPE OEPTH
c 6'-$T0.%Si(G-61000fi .i. — � — — — — — — — —
_ _ _ _
_"
—__—_ ------ -------- '___—"___"_ -- T---_--_
SECTION �
scuc ��e•-,•-o• a¢e-0000iaae
i0P E�.9dfA'
c 6'�STU%Sil�)OW 1
FXISTING
PIPELME �
I
II
I�I
II
II
II
II
II
II
II
I�I
TOP EL 93J'-0" 1 I
-�
t 6'-ST6X52L p001 _ _ _ _ _ _ _ _ _ _ _
___ _ __________
- _____________
G
FlELO VERIFV
PIPFIINE �EPTH
NOTES'.
i. CONTIWLTORTOFIELDVERIFYALL�IMENSIONS.ELEVATIONS,BN�
E%ISTING CONORIONS PFIOR TO FABqICNT10N ANO INSTPLLATION OF
PIPE,VALVES.AN� $UPPORTS.
SECTION �
SGLE ]/B�=1'-0' S]fi-P.^N1010
c 6'�ST0.%52�G61011
FIEID VERIFY
vive oeair
� t 6'=STD�XSP(G6)0008
SECTION n
54LLE ]/0'�1'-0' d2B-Ov00ID11
FIELO VERIFY
PIPE DEPTH
PROPRIETARY 6 fANFlOENTIPI ALL FIGHIS RESERVED' CO NOT SCiLE iH15 �PAWING' USE qMEN510N5ONLY
REDM�NT'S W1TUW4 G4S fACNtt �PAWINGS ME CONSIOEPE� W NFIOENiW IOM.1095)' ORAWING IS C:'R9ENi pNC� iHR00Gti t4E fATESi REVISED MTE' TOINSURE THERE IS NO RISK Oi INAPPROPflIATE qSCIOSER AL PREVIW S 4PPFR COPIES OL MIS DPoIWING MUSi BE OEStAOYE� INACCORDPNrE YVITa RECORO58 MFO. M4H4CEMFM IRIM� POIICY 1C91
°"'°""` Piedmont
EHGINEEN
M`p�"� O'I Natural Gas
nec n sro
PRINCIiN �lAGMA16PIBAI..^MWNMl4qpNpp.
. EOM.ORFE011Op6MOMP4YlORNE
LINE 326 MLV/REGULATOR STATION
SECTIONS & DETAILS
FORSYTH COUNTY, NORTH CAROLINA
w�r+sTor�sn�M, NOAn� canouw�
INSUTATING KIT
9�°h SUBMITTAI
NOT FOR CONSTRUCTION
PNGlhJ2WJ0�1W0 PNGM32fiU0�1010
PNGM326-0001009 PNGM3360W1011
1 OF 1 �WG SCIuE AS NI
01/152018 SWERSmEO _
auwwvu�aw rcnu
PNG-M-326-0001012 A
fr
a
3
8
�
}
�
TIE IN POINT 1
� scn�E , -,.o�.v
0 5' 10' Xl JO' �
SCALE: 1" = 10'
PROCESSVALVES(NP.)
DETAIL 2 ON SHEET
a
��
�4 4\
4
Y�y\Y `
��
�w�
PIFDMOM'S N47URAL GAS FACIl1iY DPANINGS
/ENT LWE (TVP.)
N SHEET
0001004
exisriNc
STRUCTURE
EXISTING
STRUCTURE
� EXISTING
STRUCTURE
''.�r
�z_�-�KQe__a�_<=..o�._,._���'
PROCESS VAL
OETAI� 2
PNC F-1
��1 LINE 326 MLV/REGULATION LOCATION
l L / scue r=+oa
�/
CONSIOEREO W NFlDEN�IHL (OM-1095) • �FFIMNG IS WRREN� ONLY THftOUGH
i PAPER COPIES OF 1H15 �RNWING MUST BE DESTROYEO IN ACGORDANCE WIiH
DESCNPIION pPppOVpLg
zaoo a,= .�„ A����;.
UMBER XXXXX ���� � E���EFA
JMBER 03515T1 ���x '� a[cn�sto
Y JLR
3'T-W$N1�¢�$ �`6 '�"�`� GqINCIPFL
41S M.IR ������8 'ti'�` ENGMEER
THE lATEST REVISED OATE' TO INSURE THERE IS M� PISN Of IWIPPROPRIAIE
��
NOTES:
1. SEE PNGE-32FOOOt00J FOR ELECTRICAL
GROUN�ING PL4N.
2. PLL EIECTRICAL WORK IN HPZHR�OUS AREAS
SHALL BE IN ACCOR�ANCE IMTH NATIONAL
ELECTRIGAL CODE. ARTICLES 500. 501 AN� SM
FOR CLASSIRCATION INDICATEO.
3. AREA CLASSIFICATION IS PURSUPNT TO
AMERICAN GAS ASSOCIATION CATALOG
kXL1001.
4. IN ACCORDANCE WITH 49CFR 192.46�(e). NO
INSULCTING GASKET SETS. INSULATING
TUBING UNIONS. OR LIKE DEVICES SHALL 8E
INSTALIED INSIDE MEASUREMEM FAqUTV
BUILDINGS THAT AftE CLASSIFlED AS CLASS I,
DIVISION 1 OR 2. UNLESS ARC SUPPRESSION
DEVICES ARE PROPERLY EMPLOYED.
�. CLASSIFICATION LEGEND:
CLA551. DIVISION i. GROUP D
FIAZARDOUS PREA (T3, 392•F
MAX)
�CLAS51. OIVISION 2. GROUP D
FIAZAROOUS AREA (f3. 392'F
MAXJ
�NONCLASSIFIEO
AREA
o s in m w
SCALE: 1" = 10'
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF.DNG(5)
LINE 326 REPLACEMENT sHe�res� <zoF<s owcscn�
Piedmont ELECTRICAL HAZARDOUS AREA CLASSIFICATION owcan� avoirzma suveaseoEo
Natural Gas °�^�^�G�°Ma�
�EOMo„��,N����. FORSYTH COUNTY, NC PNGE-326-0001002
:e��°.,"�.�.,,M.�„;,�0� YNNSTONSALEMRESOURCECENiEA,1SiN5TON�5ALEM.NC R��,w.c�v..«�.�z.�.�,��k,,.
�
�
a
Y
4
e� ;
�s GROUND TEST WELL jTYP.)
� ' d0 DETAIL 3 ON SHEET
. a� PNGE�3269001005
.. �°m
a
' WELDTABGROUN�
CONNECTION (TVP.) °'.�
�ETNLIONSHEET �e
PNGE326-0001005 �
C�ROUN� ROD (TYP.)
DETAIL 2 ON SHEET
PNGE32fi-0007005
���b����
SITE FENCE
LINE �
SITE FENCE
l ���'�.:. � LINE
\c� -
\�
\�'�
\ r4.,
� 'a
a
�'s
\�� �ea
�°a
� a,���� "\p> �-f<.�
ri
/a� ti� �\ .
/ \O�\ �q C�\ � ..
4� \
h
�\W^b C2
Y Y � Z \ Vh
�ti\ a - �_
� . - >i,
GROUN� CONNECTION$ (TVP.)
DETAIL OON SHEET
PNGE32&D001005
FENCELINE GROUNDING (TYPJ
REFER TO TYPICAL FENCE AND
CaATE C+ROUN� DETAILS ON
CIVIL DRAlMNGS
EXISTING
STRUCTURE
EXISTING I
STRUCTURE
� EXISTING
STRUCTURE
U���T� yE;�
�%' �;
aa
Ury �.c�c-s��-�-ma,x-�.n.._.��_ .�ox -��
/
�� e
oh � �, + � � I ' ' _. — I�I
/ 11
/ '�'�� � s�v I
r _
.. _+r�y r o_r�w�P_s—u—B �, sz_ � ... Ib a�.s-l.. ,. -c^�6r+
..,_e,_„i+�-..—�, ..j '
PIEDMONTSNATUFULGl�SFACWiY
WGNiS RESERVEO' �0 NOT SCALE THIS DPAIMNG' USE OIMENSIONS ONLV
N WSj' DPRN7NG IS CURREM ONLY TIROUGH hiE lATEST REVISED DAiE' TOINSURE h1ERE IS NO ftiSK OF IN4PPROPRWTE
p",��I piedmont
ENGINEER
M°�'E°� Natural Gas
r+wasro
VRINCIPPL �OPYWAMiy115VIE0MOMNANMLG(1$CORV.
ENGINEEF �ONPAcqCER]U%EDMCNTRGWOPoVE
NOTES:
1. SEE PNGE-32b0001002 FOR ELECTRICAL
HAZAROOUS AREA CLPSSIFICATION PL4N.
2. ALL GROUNDING SHALI BE IN ACCORDANCE
WITH THE LATEST EDITION ANO ftEVISION OF
THE NATIONAL ELECTRICAL CODE AND THE
REGULATIONS OF THE STATE AN� LOGAL
C��ES. ALL EQUIPMENT SHAIL BE
UN�ERYJftITER'S LABORA70RY APPROVEO.
3. GROUND RODS SHALL BE 3/4" NOMINAI
DIPh1ETER. 10 FL LON6 COPPER CLAD STEEL.
9. GROUND ftODS SHALL BE �RIVEN IMO
UN�ISTURBED EARTH. IF ROCK IS
ENGOUNTERED. DFIVE ROO AT A MAXIMUM Of
45 ANGLE FROM VERTICAI SO THAT THE ENTIRE
LENGTH OF ROD IS USED. TOP OF RO� SHALL
BE 18" MINIMUM BELOW GH.4�E. EXCEPT IN
TEST WELLS. THE COMPLETE SYSTEM SHALL
MEASURE LESS THAN 5 OHMS OR LE55 AS
DETERMINED BY TEST READINGS. DRIVE
ADDITIONAI RO05 AS REQUIREO TO OBTAIN
THIS VALUE.
5. MAIN GROUND lOOP TO BE BARE STRANDED,
SOFT �RANM GOPPER W1RE #2/0. TAP RUNS TO
BE %7J0 (UNLE55 OTNERWISE NOTE�)
STRAN�ED COPPER. MINIMUM BURIAL �EPTH
SHALL BE 18'l FINAL ROUTING TO BE
DETERMINED BY CONTRAGTOR IN THE FIEID.
6. ALL BURIED GONDUCTORS SHALL BE WD
SLACK IN TRENCHES TO PREVENT STRESS AND
BRE4KAGE.
7. AREA FOR EXOTHERMIC WELD SHALL BE
PREPARED BY GRINDING OR WIftE BRUSH
CLEANING. AfTEft COMPLETION ON
GROUNDING GONNECTION, PiL AFFECTED
SURFACES TO BE PAINTED WITH RUST
INHIBITING PAINT.
e. ALL ABWE GROUND CABIE CONNECTIONS
SHALL BE MPDE BY MECFVWICAL TYPE
GONNECTIONS UNLESS OTHERWISE NOTED.
BOLTS AND NUTS SHALL BE SIIICON BRONZE
MATERIAI AN� SHALL BE SECl1RED BY LOCK
WASHER OR EQUIVPIENT. PBOVE GROUND
CONNECTIONS SHALL BE BY BURNDV.
OUICKLUG OR APPROVEO EDUAL.
9. P1L BELOW GRAOE GONNECTIONS SHALL BE
EXOTHERMIC NlELD.
10. E%POSED GROUND RUNS SHALL BE R1/0
STRANDED COPPER GROUND CABLE UNLESS
OTHERWISE NOTED.
GROUNDING SYMBOLS:
� caourvorEsrwEu
0 &4"x1�'-0"COPPERCLADSTEELGROl1N�ROD
• GROUNDCABLECONNECTION
O—G2— k9JOBAPECOPPERGftOUNOCONOUCTOR
N
0 5' ID' 20' 30'
SCALEt 7"= 10'
90% SUBMITTAL
NOT FOR CONSTRUCTION
FEF. �WG(S)
LINE 326 REPLACEMENT pyy�DATE0.V012018'SUVERSEDE� u
ELECTRICAL GROUNDING PLAN �„�����MeEa R�,�,
FORSYTH COUNTY, NC PNG—E-326-0001003 A
WINSTONSW.fMRE50URCECENTER,WIN5i0NSALEM.NC oscrvu�iwwsiweuFxr�miixsaumn.iurc�
CU GROUN�ING LUG EXOTHERMIC WELD OR
HYOR4ULIC CRIMP CABLE TO WG. BURNDV
YA265ERIE5 OR EOUA�
DETAIL NOTES:
1. INSTALLATION OF THE WELO TAB
SHALL BE DONE PRIOR TO PIPE
ASSEMBLY qND PAINTINGAS WEIL
AS PRIOR TO INSTpLIATION OF
COMPONENTS. E�UIPMENT AN�
�EVIGES. DO NOT WELD ON THE
PIPE ONCE IT IS PFUNTED AND
E�UIPMENTISINSTALLED.
TO GROUNO ROD OF GROUND
GRID
2"�"z1/9" A53 CS (TYP)
9/B" 0 HOLE
(TMPl
#2l� BARE COPPER WIRE
�� WELD TAB GROUND CONNECTION
� SCPLE �IOT LO SCRL
INSTALL FLUSH WITH
FINISHEO GRADE
12" �IA. CONCRETE
PIPE W7TH BELLEO
END 78" LONG
GRAVELORCRUSHED
ROCK, MINIMUM 0'
TO G'
GRIO. SE
DRP
COPPER-CL4D STEEL
GROUNDROD
GROUND TEST WELL
3
swe nvrroscuF
�
` ���//%
�(� � 1�
E%OTHERMIC WELD
CONNECTION (T'PJ
GROUNDING
CONDUCTORS(TYP.)
�� GROUND CONNECTIONS
�
6CALE NO1iO5CfLLE
•a�: �..v_ a�. .;.r �..
CASTCONCRETE
COVER WITH
HAN�LE
FINISHEO GRADE
GROUND ROD CLAMP
T88 GGH SERIES OR
APPROVEDE�VAL
(NP.)
USE ONE CLAMP FOR
EACH WIRE
PIEOMONPS NANI7AL GAS FAqlltt
EXOTMERMIC WELD CABLE TO
GROUND RO� CONNECTION.
TOP OF GROUND ROD SHALL BE
18" MINIMUM BELOW GRP.�E.
3!4' X tU'0" COPPER-CLA� STEEL
GROUND ROD. ftEFER TO
PLFW FOR L4YOUT
Z GROUND ROD
SCALE NrJiT05'.ALE
R115 �MN1NG' lISE f/1MEN51UNS ONLY
THROUGH iHE tATEST REVISED DATE' TO INStIAE THERE IS NO RISK OF IN4PPROPRIATE
1NCE'MTH RECORDS d WFO. AMNAGEMENT RIM POl1CY 1001
pE61°""` �A�' piedmont LINE 326 REPLACEMENT
ENGINEEq
MGF iECry �1` Natural Gas ELECTRICAL GROUNDING DETAILS
FEC65ID r FORSYTH COUNTY, NC
PPINCIPq� COVTWGXiA15V1EOMOMNANPN.60SCOPV.
E^'p�n�EEF �OPP'Ofr��no�r�EUMa»n��E �M1'INSTONSAlEMRESOURCEGENTER.IMNSTONSALEM.NC
90% SUBMITTAL
NOT FOR CONSTRUCTION
REF. DWG�S�
45 OF 45 I DWG SC4lE NONE
)WG OATE OJ101Q018 SUPERSE�ED _
ORPWINGNIIME�R FEV151
PNG-E-326-0001005 A