HomeMy WebLinkAbout20180538 Ver 1_channel substrate material_20180425 Carpenter,Kristi From:Barnett, Kevin Sent:Monday, April 23, 2018 3:51 PM To:kristi.carpenter@ncdenr.gov Subject:Fwd: RE: 20180538. Cherokee County, B163 bridge replacement Add info request Attachments:channel substrate material.pdf Kristi, I am out of the office. Could you please add this response to laserfiche? Thanks, Kevin ---------- Forwarded message ---------- From: "Breedlove, Patrick J" <pjbreedlove@ncdot.gov> Date: Apr 19, 2018 7:59 AM Subject: RE: 20180538. Cherokee County, B163 bridge replacement Add info request To: "Barnett, Kevin" <kevin.barnett@ncdenr.gov> Cc: "McHenry, David G" <dgmchenry@ncdot.gov> Good Morning Kevin, I don’t know if you are able to view the project cover letter in the submittal attachments, but it details bypass pipe. The bypass pipe will be 44’ Long X 60” Diameter double barrel reinforced concrete pipe structure. Native materials will be excavated from bypass site and saved until the bypass structures are removed and native materials will be replaced. Since the bridge structure is transitioning from a bridge to a box culvert, additional native material will be needed. Dave and I have discussed this ongoing issue with the NCDOT contracts folks. There is a special provision now for native material sizing and payment for projects. I have attached this new special provision that are to be in contracts needing native channel substrate material. If you have any other question please let me know. Apologies for any confusion. Hope this helps. Thanks, Patrick From: Barnett, Kevin Sent: Wednesday, April 18, 2018 4:24 PM To: Breedlove, Patrick J <pjbreedlove@ncdot.gov> Cc: McHenry, David G <dgmchenry@ncdot.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Subject: 20180538. Cherokee County, B163 bridge replacement Add info request Good Afternoon Patrick: In order for the DWR to further process your application, we require clairification on a couple items. 1 1. Item 4g discusses the bypass pipe. Please clarify the size of bypass pipe to be utilized. 2. Item 4g discusses the use of culvert “backfill material”. Please clarify that excavated stream substrate, or natural river stone sources from off-site will be utili9zed. We look forward to your response. Best regards, Kevin Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2 CHANNEL SUBSTRATE MATERIAL Description (SPECIAL) The work covered by this section consists of the furnishing, stockpiling, placing, and maintaining an approved stone to be utilized to construct streambank protection devices in and along the stream and at other locations designated in the plans or as directed. The quantity of channel substrate material to be installed will be affected by the actual conditions that occur during the construction of the project. The quantity of channel substrate material may be increased, decreased, or eliminated entirely as directed. Such variations in quantity will not be considered as alterations in the details of construction or a change in the character of the work. Materials Channel Substrate Material shall consist of natural field stone or natural river rock. Crushed stone from a quarrv will not be permitted. The channel substrate material shall be sound, tough, dense, resistant to the action of air and water, and suitable in all respects for the purpose intended. Channel Substrate Material may contain small amounts of fine aggregate but shall contain no amounts of soil material. All channel substrate material shall meet the approval of the Engineer. While no specific gradation is required, the various sizes of the stone shall be equally distributed within the required size range. The size of an individual stone particle will be determined by measuring its diameter across the intermediate axis. Channel Substrate Material shall be a mixture containing approximately the following size distribution: 50% Gravel - 0.12 to 3 inch diameter 50% Stone - 3 to 12 inch diameter No more than 60% of the material furnished can be gravel material and no mare than 75% of the material furnished can be stone material. Measurement and Payment The quantity of channel substrate material to be paid far will be the actual number of tons of channel substrate material that has been incorporated into the work, or has been delivered to and stockpiled on the project as directed. Material that has been stockpiled will not be measured a second time. The channel substrate material will be measured by being weighed in trucks on certified platform scales or other certified weighing devices. Such price and payment will be full compensation for all work covered by this special provision, including but not limited to furnishing, weighing, stockpiling, re-handling, placing, maintaining material, and disposal of any material not incorporated into the project. Payment will be made under: Pay Item Channel Substrate Material 17 Pay Unit Tons