May 5, 2009
DWQ Project # 09-0040
Wake County
Mr. Patrick Denton
Beacon Lake Industrial Commons, LLC
5112 Departure Drive
Raleigh, NC 27616
Subject Property: Beacon Lake Industrial Commons
Ut to Crabtree Creek [030402, 27-33-(10), C, NSW]
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River
Buffer Protection Rules (15A NCAC 2B.0233) with Additional Conditions
Dear Mr. Denton:
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise impact 0.0015 acres of 404/wetland, 188 linear feet of perennial stream (148 linear
feet of permanent impact and 40 linear feet of temporary impact), and 8,545 square feet of Zone 1 Neuse
River basin protected riparian buffer, and 4,631 square feet of Zone 2 Neuse River basin protected
riparian buffer, as described in your application dated January 9, 2009, and received by the Division of
Water Quality (DWQ) on January 9, 2009, with additional information received on February 26, 2009,
March 12, 2009, and April 29, 2009, to construct a light industrial park at the site. After reviewing your
application, we have decided that the impacts are covered by General Water Quality Certification
Number(s) 3704 (GC3704) and 3705 (GC3705). The Certification(s) allows you to use Nationwide
Permit(s) NW 14 and NW39, respectively, when issued by the US Army Corps of Engineers (USACE).
This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian
buffers per 15A NCAC 2B .0233. In addition, you should obtain or otherwise comply with any other
required federal, state or local permits before you go ahead with your project including (but not limited
to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with
your proposed impacts or to conduct impacts to waters as depicted in your application shall expire
upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604
Phone: 919-733-17861 FAX: 919-733-6893
Internet: http://h2o.enr,state.nc.us/ncwetlands/
NorthCarohna
11'aturall?
An Equal Opportunity 1 Affirmative Action Employer
Beacon Lake Industrial Commons, LLC
Page 2 of 4
May 5, 2009
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Type of Impact Amount Approved nits Plan Location or Reference
404/Wetland 0.0015 (acres) PCN page 4 of 10
Stream - perennial 188[(linear feet) 148 linear feet
permanent impacts and 40 linear feet
temporary impacts) PCN page 4 of 10
Buffers Zone 1 8,545 (square ft. PCN page 8 of 10
Buffers Zone 2 4,631 (square ft.) PCN page 8 of 10
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
3. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in
order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
4. Sediment and Erosion Control Measures
Sediment and erosion control measures shall not be placed in wetlands or waters without prior
approval from the Division. If placement of sediment and erosion control devices in wetlands and
waters is unavoidable, design and placement of temporary erosion control measures shall not be
conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks,
adjacent to or upstream and down stream of the above structures. All sediment and erosion control
devices shall be removed and the natural grade restored within two (2) months of the date that the
Division of Land Resources or locally delegated program has released the project;
5. Diffuse Flow
Beacon Lake Industrial Commons, LLC
Page 3 of 4
May 5, 2009
All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at
non-erosive velocities through the protected stream buffers such that it will not re-concentrate
before discharging into a stream as identified within 15A NCAC 2B .0233 (5). If this is not
possible, it may be necessary to provide stormwater facilities that are considered to remove
nitrogen. This may require additional approval from this Office.
6. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities;
7. Stormwater Management Plan Implementation Procedures (No Further Approval Needed)
• The approved SMP must be constructed and operational before any permanent building or
other structure is occupied at the site. If a development is phased, then the approved SMP for
each future phase must be constructed and operational before any permanent building or other
structure associated with that phase is occupied.
• The approved SMP, including the signed and notarized Operations & Maintenance
Agreement, as well as drainage patterns must be maintained in perpetuity.
• The SMP may not be modified without prior written authorization from the SMP approval
authority. If the SMP falls under another state stormwater program, then a copy of the
approval letter and the modified SMP must be submitted to the 401 Oversight/Express Unit
prior to the commencement of the modifications.
8. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B.
Beacon Lake Industrial Commons, LLC
Page 4 of 4
May 5, 2009
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act and the Neuse riparian buffer protection rule as described within 15A NCAC 213 .0233. If you have
any questions, please telephone Cyndi Karoly or Ian McMillan at 919-733-1786. 1,4
CHS/gym
Enclosures: GC3704 and GC3705
Certificate of Completion
cc: USACE Raleigh Regulatory Field Office
Lauren Witherspoon, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Nicole J. Thomson, S&EC, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614
Filename: 090040BeaconLakeIndustrialCommons(W ake)401_NBR