Loading...
HomeMy WebLinkAboutNCS000520_Final Permit_20080616o�DF W A tFRQG r � Y Mr. D. Darnel Winstead III PCS Phosphate Aurora P.O. Box 48 Aurora, North Carolina 27806 Dear Mr. Winstead: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality June 16, 2008 Subject: Final NPDES Stormwater Permit Permit NCS000520 PCS Phosphate Bulk Handling Facility - Morehead City Terminal Carteret County In response to your renewal application for continued coverage under NPDES stormwater permit NCS000520, the Division of Water Quality (Division) is forwarding herewith the subject state - NPDES permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection agency dated October 15, 2007 (or as subsequently amended). This final permit includes the following minor changes from the draft permit sent to you on April 29, 2008: • Clarification that the first valid sample during the monitoring period should be compared to benchmarks. If the facility chooses to take "follow-up" samples during the same period, benchmark exceedences would not trigger additional tier responses. Clarification that qualitative monitoring does not need to be performed independently on a semi- annual schedule in addition to analytical monitoring (removal of "and" from text in Part II, Section Section C). Qualitative monitoring should be performed at the same time as the analytical sampling. If analytical monitoring is not required at a stormwater discharge outfall (for example, if representative outfall status is granted), qualitative monitoring is still required (text was also added to the final permit to clarify this point). Revisions to the boiler plate language in Part III (Standard Conditions) to be consistent with the . current NPDES stormwater permit template. Changes include updated references to legal penalties and signatory requirements. Please note that the permit now requires that Qualitative Monitoring Report (QMR) forms provided by the Division be used (Section E). The most recently revised QMR forms are available on our website at: httpJ/h2o.enr.state.nc.ustsu/Forms_ Documents.htm# stonnwaterGP We discussed comments from you during the draft permit public notice period. These included questions about whether certification is necessary for measuring and reporting pH and temperature, and whether the definition of a "grab sample" was appropriate in this permit. You also asked whether the receiving waters should be "Calico Creek" instead of "the Newport River." �n Carolina �vatura!!y North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet. h2a.enustatem.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recyded11046 Post Consumer Paper NCS000520 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, PCS Phosphate Aurora is hereby authorized to discharge stormwater from a facility located at PCS Phosphate Bulk Handling Facility Morehead City Terminal 113 Arendell Street Morehead City, NC Carteret County to receiving waters designated as the Newport River, a class SC water in the White Oak River Basin, in accordance with the discharge limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V and VI hereof. This permit shall become effective July 1, 2008. This permit and the authorization to discharge shall expire at midnight on June 30, 2013. Signed this day June 16, 2008. for Coleen H. S'dlins Director Division of Water Quality By the Authority of the Environmental Management Commission Permit No. NCS000520 TABLE OF CONTENTS PART I INTRODUCTION Section A: Individual Permit Coverage Section B: Permitted Activities Section C: Location Map PART II MONITORING, CONTROLS, AND LIMITATIONS FOR PERMITTED DISCHARGES Section A: Stormwater Pollution Prevention Plan Section B: Analytical Monitoring Requirements Section C: Qualitative Monitoring Requirements Section D: On -Site Vehicle Maintenance Monitoring Requirements PART III STANDARD CONDITIONS FOR NPDES STORMWATER INDIVIDUAL PERMITS Section A: Compliance and Liability 1. Compliance Schedule 2. Duty to Comply 3. Duty to Mitigate 4. Civil and Criminal Liability 5. Oil and Hazardous Substance Liability 6. Property Rights 7. Severability 8. Duty to Provide Information 9. Penalties for Tampering 10. Penalties for Falsification of Reports Section B: General Conditions 1. Individual Permit Expiration 2. Transfers i Permit No. NCS000520 3. Signatory Requirements 4. Individual Permit Modification, Revocation and Reissuance, or Termination 5. Permit Actions Section C: Operation and Maintenance of Pollution Controls 1. Proper Operation and Maintenance 2. Need to Halt or Reduce Not a Defense 3. Bypassing of Stormwater Control Facilities Section D: Monitoring and Records I. Representative Sampling 2. Recording Results 3. Flow Measurements 4. Test Procedures 5. Representative Outfall 6. Records Retention 7. Inspection and Entry Section E: Reporting Requirements 1. Discharge Monitoring Reports 2. Submitting Reports 3. Availability of Reports 4. Non-Stormwater Discharges 5. Planned Changes 6. Anticipated Noncompliance 7. Bypass 8. Twenty-four Hour Reporting 9. Other Noncompliance 10. Other Information PART IV LIMITATIONS REOPENER PART V ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS PART VI DEFINITIONS ii Permit No. NCS000520 PART I INTRODUCTION SECTION A: INDIVIDUAL PERMIT COVERAGE During the period beginning on the effective date of the permit and lasting until expiration, the permittee is authorized to discharge stormwater associated with industrial activity. Such discharges shall be controlled, limited and monitored as specified in this permit. If industrial materials and activities are not exposed to precipitation or runoff as described in 40 CFR § I22.26(g), the facility may qualify for a No Exposure Exclusion from NPDES stormwater discharge permit requirements. Any owner or operator wishing to obtain a No Exposure Certification must submit a No Exposure Certification NOI form to the Division; must receive approval by the Division; must maintain no exposure conditions unless authorized to discharge under a valid NPDES stormwater permit; and must reapply for the No Exposure Exclusion once every five (5) years. SECTION B: PERMITTED ACTIVITIES Until this permit expires or is modified or revoked, the permittee is authorized to discharge stormwater to the surface waters of North Carolina or separate storm sewer system that has been adequately treated and managed in accordance with the terms and conditions of this individual permit. All stormwater discharges shall be in accordance with the conditions of this permit. Any other point source discharge to surface waters of the state is prohibited unless it is an allowable non-stormwater discharge or is covered by another permit, authorization, or approval. The stormwater discharges allowed by this individual permit shall not cause or contribute to violations of Water Quality Standards. This permit does not relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. Part I Page 1 of 2 Section C: LOCATION MAP un , 'b Cra Po' t Neck Permit No. NCS000520 FBulk Phosphate Co., Inc. HandlingFacility - head City Terminal Map Scale 1:24,000 PCS Phosphate Company, Inc. PCS Phosphate Aurora Bulk Handling Facility - Morehead City Terminal Latitude: 340 43' 13" N (Outfall 001) Longitude: 760 41'43" W (Outfall 001) Receiving Stream: Newport River Restricted Area/ Morehead City Harbor Stream Class: SC Sub -basin: 03-05-03 (White Oak River Basin) Part I Page 2 of 2 �r►�1l'f*!° Facility Location Permit No. NCS000520 significant quantities of pollutants to stormwater discharges and data collected through monitoring of stormwater discharges. 3. Spill Prevention and Response Plan. The Spill Prevention and Response Plan (SPRP) shall incorporate an assessment of potential pollutant sources based on a materials inventory of the facility. Facility personnel (or team) responsible for implementing the SPRP shall be identified. A responsible person shall be on-site at all times during facility operations that have the potential to contaminate stormwater runoff through spills or exposure of materials associated with the facility operations. The SPRP must be site stormwater specific. Therefore, an oil SPCC plan may be a component of the SPRP, but may not be sufficient to completely address the stormwater aspects of the SPRP. The common elements of the SPCC with the SPRP may be incorporated by reference into the SPRP. 4. Preventative Maintenance and Good Housekeeping Program. A preventative maintenance program shall be developed. The program shall document schedules of inspections and maintenance activities of stormwater control systems, plant equipment and systems. Inspection of material handling areas and regular cleaning schedules of these areas shall be incorporated into the program. Employee Training. Training schedules shall be developed and training provided at a minimum on an annual basis on proper spill response and cleanup procedures and preventative maintenance activities for all personnel involved in any of the facility's operations that have the potential to contaminate stormwater runoff. Facility personnel (or team) responsible for implementing the training shall be identified. 6. Responsible Parry. The Stormwater Pollution Prevention Plan shall identify a specific position(s) responsible for the overall coordination, development, implementation, and revision to the Plan. Responsibilities for all components of the Plan shall be documented and position assignments provided. Plan Amendment. The permittee shall amend the Plan whenever there is a change in design, construction, operation, or maintenance that has a significant effect on the potential for the discharge of pollutants to surface waters. The Stormwater Pollution Prevention Plan shall be reviewed and updated on an annual basis. The annual update shall include an updated list of significant spills or leaks of pollutants for the previous three years, or the notation that no spills have occurred. The annual update shall include re -certification that the stormwater outfalls have been evaluated for the presence of non- stormwater discharges. The Director may notify the permittee when the Plan does not meet one or more of the minimum requirements of the permit. Within 30 days of such notice, the permittee shall submit a time schedule to the Director for modifying the Plan to meet minimum requirements. The permittee shall provide certification in writing (in accordance with Part III, Standard Conditions, Section B, Paragraph 3) to the Director that the changes have been made. Part II Page 3 of 10 Permit No. NCS000520 8. Facility Inspection Program. Inspections of the facility and all stormwater systems shall occur at a minimum on a semi-annual schedule, once during the first half of the year (January through June) and once during the second half (July through December), with at least 60 -days separating inspection dates (unless performed more frequently). The inspection and any subsequent maintenance activities performed shall be documented, recording date and time of inspection, individual(s) making the inspection and a narrative description of the facility's stormwater control systems, plant equipment and systems. Records of these inspections shall be incorporated into the Stormwater Pollution Prevention Plan. These facility inspections are different from, and in addition to, the stormwater discharge characteristic monitoring required in Part II of this permit. 9. Implementation. The permittee shall implement the Plan. The permittee shall document all monitoring, measurements, inspections and maintenance activities and training provided to employees, including the log of the sampling data and of actions taken to implement BMPs associated with the industrial activities, including vehicle maintenance activities. Such documentation shall be kept on-site for a period of five years and made available to the Director or the Director's authorized representative immediately upon request. ' Part II Page 4 of 10 Permit No. NCS000520 SECTION B: ANALYTICAL MONITORING REQUIREMENTS Analytical monitoring of stormwater discharges shall be performed as specified in Table 1. All analytical monitoring shall be performed during a representative storm event. The required monitoring will result in a minimum of ten analytical samplings being conducted over the term of the permit at each stormwater discharge outfall (SDO). A representative storm event is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. For example, if it rains for 2 hours without producing any collectable discharge, and then stops, a sample may be collected if a rain producing a discharge begins again within the next 10 hours. Table 1. Analytical Monitoring Requirements Discharge Characteristics Units Measurement Fre uenc I Sample Type Sample Location3 Total Suspended Solids (TSS) m semi-annual Grab SDO Total Phosphorus (TP) m semi-annual Grab SDO Total Nitrogen m semi-annual Grab SDO Total K'eldahl Nitrogen TKN m semi-annual Grab SDO Total Ammonia as Nitrogen m semi-annual Grab SDO Chemical Oxygen Demand COD m semi-annual Grab SDO Fluoride m semi-annual Grab SDO Temperature °C semi-annual Grab SDO H standard semi-annual Grab SDO Total Rainfal14 inches semi-annual Rain Gauge Footnotes: I Measurement Frequency: Twice per year during a representative storm event, for each year until either another permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the permittee will be considered for a renewal application. The applicant must continue semi-annual monitoring until the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. 2 If the stormwater runoff is controlled by a stormwater detention pond, a grab sample of the discharge from the pond shall be collected within the first 30 minutes of discharge. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless representative outfall status has been granted. 4 For each sampled representative storm event the total precipitation must be recorded. An on-site rain gauge or local rain gauge reading must be recorded. Part II Page 5 of 10 Permit No. NCS000520 The permittee shall complete the minimum ten analytical samplings in accordance with the schedule specified below in Table 2. A minimum of 60 days must separate Period 1 and Period 2 sample dates unless monthly monitoring has been instituted under a Tier Two response. Table 2. Monitoring Schedule Monitoring periodt'Z Sample Number Start End Year 1 — Period 1 1 July 1, 2008 December 31, 2008 Year 1 — Period 2 2 January 1, 2009 June 30, 2009 Year 2 — Period 1 3 July 1, 2009 December 31, 2009 Year 2 — Period 2 4 January 1, 2010 June 30, 2010 Year 3 — Period 1 5 July 1, 2010 December 31, 2010 Year 3 — Period 2 6 January 1, 2011 June 30, 2011 Year 4 — Period 1 7 July 1, 2011 December 31, 2011 Year 4 — Period 2 8 January 1, 2012 June 30, 2012 Year 5 — Period 1 9 July 1, 2012 December 31, 2012 Year 5 — Period 2 10 January 1, 2013 June 30, 2013 Footnotes: I Maintain semi-annual monitoring during permit renewal process. The applicant must continue semi-annual monitoring until the renewed permit is issued. 2 If no discharge occurs during the sampling period, the permittee must submit a monitoring report indicating "No Flow" within 30 days of the end of the six-month sampling period. Monitoring results shall be compared to the benchmark values in Table 3. The benchmark values in Table 3 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs) in a tiered program. See the descriptions of Tier One and Tier Two. Table 3. Benchmark Values for Analvtical Monitorin¢ Discharge Characteristics Units Benchmark Total Suspended Solids mg/L 100 Total Phosphorus (TP) mg/L, 2 Total Nitrogen (TN) rng/L, 30 Total Kjeldahl Nitrogen (TKN) rng/L, N/A Total Ammonia as Nitrogen mg/L N/A Chemical Oxygen Demand (COD) mg/L 120 Fluoride mg/L 75 Temperature aC N/A pH standard 6 - 9 Part II Page 6 of 10 Permit No. NCS000520 Tier One If: The first valid sampling results are above a benchmark value, or outside of the benchmark range, for any parameter at any outfall; Then: The permittee shall: 1. Conduct a stormwater management inspection of the facility within two weeks of receiving sampling results. 2. Identify and evaluate possible causes of the benchmark value exceedence. 3. Identify potential, and select the specific: source controls, operational controls, or physical improvements to reduce concentrations of the parameters of concern, or to bring concentrations to within the benchmark range. 4. Implement the selected actions within two months of the inspection. 5. Record each instance of a Tier One response in the Stormwater Pollution Prevention Plan. Include the date and value of the benchmark exceedence, the inspection date, the personnel conducting the inspection, the selected actions, and the date the selected actions were implemented. Two If: During the term of this permit, the first valid sampling results are above the benchmark values, or outside of the benchmark range, for any specific parameter at a specific discharge out two times in a row (consecutive): Then: The permittee shall: 1. Repeat all the required actions outlined above in Tier One. 2. Immediately institute monthly monitoring for all parameters at every outfall where a sampling result exceeded the benchmark value for two consecutive samples. Monthly (analytical and qualitative) monitoring shall continue until three consecutive sample results are below the benchmark values, or within the benchmark range, for all parameters at that outfall. 3. If no discharge occurs during the sampling period, the permittee is required to submit a monthly monitoring report indicating "No Flow." 4. Maintain a record of the Tier Two response in the Stormwater Pollution Prevention Plan. Part II Page 7 of 10 Permit No. NCS000520 During the term of this permit, if the valid sampling results required for the permit monitoring periods exceed the benchmark value, or are outside the benchmark range, for any specific parameter at any specific outfall on more than four occasions, DWQ may: • require that the permittee increase or decrease the monitoring frequency for the remainder of the permit; • require the permittee to install structural stormwater controls; • require the permittee to implement other stormwater control measures; or • require that the permittee implement site modifications to qualify for the No Exposure Exclusion. This site discharges to waters contiguous to impaired waters experiencing problems with fecal coliform bacteria. If a Total Maximum Daily Load (TMDL) is approved for this segment of the Newport River, the permittee may be required to monitor for the pollutant(s) of concern in the future and submit results to the Division of Water Quality. The Division will consider the monitoring results in determining whether additional BMPs are needed to control the pollutant(s) of concern to the maximum extent practicable. If additional BMPs are needed to achieve the required level of control, the permittee will be required to (1) develop a strategy for implementing appropriate BMPs, and (2) submit a timetable for incorporation of those BMPs into the permitted Stormwater Pollution Prevention Plan. Part II Page 8 of 10 Permit No. NCS000520 SECTION C: QUALITATIVE MONITORING REQUIREMENTS Qualitative monitoring requires a visual inspection of each stormwater outfall regardless of representative outfall status and shall be performed as specified in Table 4, during the analytical monitoring event. [If analytical monitoring is not required, the permittee still must conduct semi- annual qualitative monitoring.] Qualitative monitoring is for the purpose of evaluating the effectiveness of the Stormwater Pollution Prevention Plan (SPPP) and assessing new sources of stormwater pollution. In the event an atypical condition is noted at a stormwater discharge outfall, the permittee shall document the suspected cause of the condition and any actions taken in response to the discovery. Thisdocumentation will be maintained with the SPPP. Table 4. Qualitative Monitoring Requirements Discharge Characteristics Frequencyl Monitoring Location2 Color semi-annual SDO Odor semi-annual SDO Clarity semi-annual SDO Floating Solids semi-annual SDO Suspended Solids semi-annual SDO Foam semi-annual SDO Oil Sheen semi-annual SDO Erosion or deposition at the outfall semi-annual SDO Other obvious indicators of stormwater pollution semi-annual SDO Footnotes: 1 Measurement Frequency: Twice per year during a representative storm event, for each year until either another permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the permittee will be considered for a renewal application. The applicant must continue semi-annual monitoring until the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. 2 Monitoring Location: Qualitative monitoring shall be performed at each stormwater discharge outfall (SDO) regardless of representative outfall status. SECTION D: ON-SITE VEHICLE MAINTENANCE MONITORING REQUIREMENTS Facilities which have any vehicle maintenance activity occurring on-site which uses more than 55 gallons of new motor oil per month when averaged over the calendar year shall perform analytical monitoring as specified below in Table 5. This monitoring shall be performed at all stormwater discharge outfalls which discharge stormwater runoff from vehicle maintenance Part II Page 9 of 10 Permit No. NCS000520 areas, and in accordance with the schedule presented in Table 2 (Section B). All analytical monitoring shall be performed during a representative storm event. Table 5. Analytical Monitoring Requirements for On -Site Vehicle Maintenance Discharge Characteristics Units Measurement Fre uenc 1 Sample Type2 Sample Location3 H standard semi-annual Grab SDO Oil and Grease mg/1 semi-annual Grab SDO Total Suspended Solids mg/1 semi-annual Grab SDO Total Rainfall4 inches semi-annual Rain gauge New Motor Oil Usage allons/month semi-annual Estimate - Footnotes: I Measurement Frequency: Twice per year during a representative storm event, for each year until either another permit is issued for this facility or until this permit is revoked or rescinded. If at the end of this permitting cycle the permittee has submitted the appropriate paperwork for a renewal permit before the submittal deadline, the permittee will be considered for a renewal application. The applicant must continue semi-annual monitoring until the renewed permit is issued. See Table 2 for schedule of monitoring periods through the end of this permitting cycle. 2 If the stormwater runoff is controlled by a stormwater detention pond a grab sample of the discharge from the pond shall be collected within the fust 30 minutes of discharge from the pond. 3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) that discharges stormwater runoff from area(s) where vehicle maintenance activities occur. 4 For each sampled representative storm event the total precipitation must be recorded. An on-site or local rain gauge reading must be recorded. Monitoring results shall be compared to the benchmark values in Table 6. The benchmark values in Table 6 are not permit limits but should be used as guidelines for the permittee's Stormwater Pollution Prevention Plan (SPPP). Exceedences of benchmark values require the permittee to increase monitoring, increase management actions, increase record keeping, and/or install stormwater Best Management Practices (BMPs), as provided in Part II Section B. Table 6. Benchmark Values for Vehicle Maintenance Analytical Monitoring Discharge Characteristics Units Benchmark pH standard 6 - 9 Oil and Grease mg/L 30 Total Suspended Solids mg/L 100 PartII Page 10 of 10 Permit No. NCS000520 10. Penalties for Falsification of Reports The Clean Water Act provides that any person who knowingly makes any false statement, representation, or certification in any record or other document submitted or required to be maintained under this individual permit, including monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or by both. SECTION B: GENERAL CONDITIONS 1. Individual Permit Exniration The permittee is not authorized to discharge after the expiration date. In order to receive automatic authorization to discharge beyond the expiration date, the permittee shall submit forms and fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date. Any permittee that has not requested renewal at least 180 days prior to expiration, or any permittee that does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will be subjected to enforcement procedures as provided in NCGS §143-2153.6 and 33 USC 1251 et. seq. 2. Transfers This permit is not transferable to any person except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary under the Clean Water Act. The Permittee is required to notify the Division in writing in the event the permitted facility is sold or closed. Sienatory Requirements All applications, reports, or information submitted to the Director shall be signed and certified a. All applications to be covered under this individual permit shall be signed as follows: (1) In the case of a corporation: by a principal executive officer of at least the level of vice- president, or his duly authorized representative, if such representative is responsible for the overall operation of the facility from which the discharge described in the permit application form originates; (2) In the case of a partnership or limited partnership: by a general partner; (3) In the case of a sole proprietorship: by the proprietor; (4) In the case of a municipal, state, or other public entity: by a principal executive officer, ranking elected official, or other duly authorized employee. b. All reports required by the individual permit and other information requested by the Director shall be signed by a person described above or by a duly authorized representative of that person. A person is a duly authorized representative only if (I) The authorization is made in writing by a person described above; (2) The authorization specified either an individual or a position having responsibility for the overall operation of the regulated facility or activity, such as the position of plant manager, operator of a well or well field, superintendent, a position of equivalent Part III Page 3 of 8 Permit No. NCS000520 responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position.); and (3) The written authorization is submitted to the Director. C. Any person signing a document under paragraphs a. or b. of this section shall make the following certification: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 4. Individual Permit Modification. Revocation and Reissuance. or Termination The issuance of this individual permit does not prohibit the Director from reopening and modifying the individual permit, revoking and reissuing the individual permit, or terminating the individual permit as allowed by the laws, rules, and regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina Administrative Code, Subchapter 2H .0100; and North Carolina General Statute 143-215.1 et al. 5. Permit Actions The permit may be modified, revoked and reissued, or terminated for cause. The notification of planned changes or anticipated noncompliance does not stay any individual permit condition. SECTION C: OPERATION AND MAINTENANCE OF POLLUTION CONTROLS Proper Operation and Maintenance The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this individual permit. Proper operation and maintenance also includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems which are installed by a permittee only when the operation is necessary to achieve compliance with the conditions of this individual permit. 2. Need to Halt or Reduce Not a Defense It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the condition of this individual permit. 3. Bypassing of Stormwater Control Facilities Bypass is prohibited and the Director may take enforcement action against a permittee for bypass unless: a. Bypass was unavoidable to prevent loss of life, personal injury or severe property damage; and Part III Page 4 of 8 Permit No. NCS000520 The permittee shall record the required qualitative monitoring observations on the SDO Qualitative Monitoring Report (QMR) form provided by the Division, and shall retain the completed forms on site. Qualitative monitoring results should not be submitted to the Division, except upon DWQ's specific requirement to do so. 2. Submitting Reports Duplicate signed copies of all reports required herein, shall be submitted to the following address: Division of Water Quality Surface Water Protection Section ATTENTION: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 3. Availability of Reports Except for data determined to be confidential under NCGS 143-215.3(a)(2) or Section 308 of the Federal Act, 33 USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices of the Division of Water Quality. As required by the Act, analytical data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in NCGS 143-215.6B or in Section 309 of the Federal Act. 4. Non-Stormwater Discharges If the storm event monitored in accordance with this individual permit coincides with a non-stormwater discharge, the permittee shall separately monitor all parameters as required under the non-stormwater discharge permit and provide this information with the stormwater discharge monitoring report. 5. Planned Changes The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which could significantly alter the nature or quantity of pollutants discharged. This notification requirement includes pollutants which are not specifically listed in the individual permit or subject to notification requirements under 40 CFR Part 122.42 (a). 6. Anticipated Noncompliance The permittee shall give notice to the Director as soon as possible of any planned changes at the permitted facility which may result in noncompliance with the individual permit requirements. 7. Bvoass a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, it shall submit prior notice, if possible at least ten days before the date of the bypass; including an evaluation of the anticipated quality and affect of the bypass. b. Unanticipated bypass. The permittee shall submit notice within 24 hours of becoming aware of an unanticipated bypass. 8. Twenty-four Hour Renorting The permittee shall report to the central office or the appropriate regional office any noncompliance which may endanger health or the environment. Any information shall be provided orally within 24 hours from Part III Page 7 of 8 Permit No. NCS000520 the time the permittee became aware of the circumstances. A written submission shall also be provided. within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Director may waive the written report on a case-by-case basis if the oral report has been received within 24 hours. 9. Other Noncompliance The permittee shall report all instances of noncompliance not reported under 24 hour reporting at the time monitoring reports are submitted. 10. Other Information Where the permittee becomes aware that it failed to submit any relevant facts in an application for an individual permit or in any report to the Director, it shall promptly submit such facts or information. Part III Page 8 of 8 Permit No. NCS000520 PART IV LIMITATIONS REOPENER This individual permit shall be modified or alternatively, revoked and reissued, to comply with any applicable effluent guideline or water quality standard issued or approved under Sections 302(b) (2) (c), and (d), 304(b) (2) and 307(a) of the Clean Water Act, if the effluent guideline or water quality standard so issued or approved: a. Contains different conditions or is otherwise more stringent than any effluent limitation in the individual permit; or b. Controls any pollutant not limited in the individual permit. The individual permit as modified or reissued under this paragraph shall also contain any other requirements in the Act then applicable. PART V ADMINISTERING AND COMPLIANCE MONITORING FEE REQUIREMENTS The permittee must pay the administering and compliance monitoring fee within 30 (thirty) days after being billed by the Division. Failure to pay the fee in timely manner in accordance with 15A NCAC 2H .0105(b)(4) may cause this Division to initiate action to revoke the Individual Permit. PART VI DEFINITIONS 1. Act See Clean Water Act. 2. Arithmetic Mean The arithmetic mean of any set of values is the summation of the individual values divided by the number of individual values. 3. Allowable Non-Stormwater Discharges This permit regulates stormwater discharges. Non-stormwater discharges which shall be allowed in the stornwater conveyance system are: (a) All other discharges that are authorized by a non-stormwater NPDES permit. (b) Uncontaminated groundwater, foundation drains, air -conditioner condensate without added chemicals, springs, discharges of uncontaminated potable water, waterline and fire hydrant flushings, water from footing drains, flows from riparian habitats and wetlands. (c) Discharges resulting from fire -fighting or fine -fighting training. 4. Best Management Practices (BMPs) Measures or practices used to reduce the amount of pollution entering surface waters. BMPs may take the form of a process, activity, or physical structure. Part VI Page 1 of 5 Pages Permit No. NCS000520 5. Bypass A bypass is the ]mown diversion of stormwater from any portion of a stormwater control facility including the collection system, which is not a designed or established operating mode for the facility. 6. Bulk Storage of Liquid Products Liquid raw materials, manufactured products, waste materials or by-products with a single above ground storage container having a capacity of greater than 660 gallons or with multiple above ground storage containers located in close proximity to each other having a total combined storage capacity of greater than 1,320 gallons. 7. Clean Water Act The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33 USC 1251, et. seq. 8. Division or DWO The Division of Water Quality, Department of Environment and Natural Resources. 9. Director The Director of the Division of Water Quality, the permit issuing authority. 10. EMC The North Carolina Environmental Management Commission. 11. Grab Samole An individual sample collected instantaneously. Grab samples that will be directly analyzed or qualitatively monitored must be taken within the first 30 minutes of discharge. 12. Hazardous Substance Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act. 13. Landfill A disposal facility or part of a disposal facility where waste is placed in or on land and which is not a land treatment facility, a surface impoundment, an injection well, a hazardous waste long-term storage facility or a surface storage facility. 14. Municipal Separate Storm Sewer System A stormwater collection system within an incorporated area of local self-government such as a city or town. 15. No Exposure A condition of no exposure means that all industrial materials and activities are protected by a storm resistant shelter or acceptable storage containers to prevent exposure to rain, snow, snowmelt, or runoff. Industrial materials or activities include, but are not limited to, material handling equipment or activities, Part VI Page 2 of 5 Pages Permit No. NCS000520 industrial machinery, raw materials, intermediate products, by-products, final products, or waste products. D WQ may grant a No Exposure Exclusion from NPDES Stormwater Permitting requirements only if a facility complies with the terms and conditions described in 40 CFR §122.26(g). 16. Overburden Any material of any nature, consolidated or unconsolidated, that overlies a mineral deposit, excluding topsoil or similar naturally -occurring surface materials that are not disturbed by mining operations. 17. Permittee The owner or operator issued a permit pursuant to this individual permit. 18. Point Source Discharee of Stormwater Any discernible, confined and discrete conveyance including, but not specifically limited to, any pipe, ditch, channel, tunnel, conduit, well, or discrete fissure from which stormwater is or may be discharged to waters of the state. 19. Representative Storm Event A storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. For example, if it rains for 2 hours without producing any collectable discharge, and then stops, a sample may be collected if a rain producing a discharge begins again within the next 10 hours. 20. Representative Outfall Status When it is established that the discharge of stormwater runoff from a single outfall is representative of the discharges at multiple outfalls, the DWQ may grant representative outfall status. Representative outfall status allows the permittee to perform analytical monitoring at a reduced number of outfalls. 21. Rinse Water Discharge The discharge of rinse water from equipment cleaning areas associated with industrial activity. Rinse waters from vehicle and equipment cleaning areas are process wastewaters and do not include washwaters utilizing any type of detergent or cleaning agent. 22. Secondary Containment Spill containment for the contents of the single largest tank within the containment structure plus sufficient freeboard to allow for the 25 -year, 24-hour storm event. 23. Section 313 Water Priority Chemical A chemical or chemical category which: a. Is listed in 40 CFR 372.65 pursuant to Section 313 of Title III of the Superfund Amendments and Reauthorization Act (SARA) of 1986, also titled the Emergency Planning and Community Right - to -Know Act of 1986; b. Is present at or above threshold levels at a facility subject to SARA Title III, Section 313 reporting requirements; and C. That meets at least one of the following criteria: Part VI Page 3 of 5 Pages Permit No. NCS000520 (1) Is listed in Appendix D of 40 CFR part 122 on Table II (organic priority pollutants), Table III (certain metals, cyanides, and phenols), or Table IV (certain toxic pollutants and hazardous substances); (2) Is listed as a hazardous substance pursuant to section 311(b)(2)(A) of the CWA at 40 CFR 116.4; or (3) Is a pollutant for which EPA has published acute or chronic water quality criteria. 24. Severe Property Damage Means substantial physical damage to property, damage to the control facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production. 25. Significant Materials Includes, but is not limited to: raw materials; fuels; materials such as solvents, detergents, and plastic pellets; finished materials such as metallic products; raw materials used in food processing or production; hazardous substances designated under section 101(14) of CERCLA; any chemical the facility is required to report pursuant to section 313 of Title III of SARA; fertilizers; pesticides; and waste products such as ashes, slag and sludge that have the potential to be released with stormwater discharges. 26. Significant Spills Includes, but is not limited to: releases of oil or hazardous substances in excess of reportable quantities under section 311 of the Clean Water Act (Ref: 40 CFR 110.10 and CFR 117.21) or section 102 of CERCLA (Ref. 40 CFR 302.4). 27. Stormwater Runoff The flow of water which results from precipitation and which occurs immediately following rainfall or as a result of snowmelt. 28. Stormwater Associated with Industrial Activity The discharge from any point source which is used for collecting and conveying stormwater and which is directly related to manufacturing, processing or raw material storage areas at an industrial site. Facilities considered to be engaged in "industrial activities" include those activities defined in 40 CFR 122.26(b)(14). The term does not include discharges from facilities or activities excluded from the NPDES program. 29. Stormwater Pollution Prevention Plan A comprehensive site-specific plan which details measures and practices to reduce stormwater pollution and is based on an evaluation of the pollution potential of the site. 30. Ten Year Design Storm The maximum 24 hour precipitation event expected to be equaled or exceeded on the average once in ten years. Design storm information can be found in the State of North Carolina Erosion and Sediment Control Planning and Design Manual. Part VI Page 4 of 5 Pages Permit No. NCS000520 31. Total Flow The flow corresponding to the time period over which the entire storm event occurs. Total flow shall be either; (a) measured continuously, (b) calculated based on the amount of area draining to the outfall, the amount of built -upon (impervious) area, and the total amount of rainfall, or (c) estimated by the measurement of flow at 20 minute intervals during the rainfall event. 32. Total Maximum Daily Load (TMDLI A TMDL is a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet water quality standards, and an allocation of that amount to the pollutant's sources. A TMDL is a detailed water quality assessment that provides the scientific foundation for an implementation plan. The implementation plan outlines the steps necessary to reduce pollutant loads in a certain body of water to restore and maintain water quality standards in all seasons. The Clean Water Act, Section 303, establishes the water quality standards and TMDL programs. 33. Toxic Pollutant Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act. 34. Upset Means an exceptional incident in which there is unintentional and temporary noncompliance with technology based permit effluent limitations because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment or control facilities, inadequate treatment or control facilities, lack of preventive maintenance, or careless or improper operation. 35. Vehicle Maintenance Activity Vehicle rehabilitation, mechanical repairs, painting, fueling, lubrication, vehicle cleaning operations, or airport deicing operations. 36. Visible Sedimentation Solid particulate matter, both mineral and organic, that has been or is being transported by water, air, gravity, or ice from its site of origin which can be seen with the unaided eye. 37. 25 -year, 24 hour storm event The maximum 24-hour precipitation event expected to be equaled or exceeded, on the average, once in 25 years. Part VI Page 5 of 5 Pages [i