Loading...
HomeMy WebLinkAboutSmoke Bomb Hill AAFES Mini-Mall ExpressFrom: Branch Smith To: Randall, Mike; Ward. Lee P CIV USARMY IMCOM ATLANTIC (US); David Heins (david.a.heins.civCd)mail.mil) Subject: RE: Smoke Bomb Hill AAFES Mini -Mall Express Date: Monday, March 30, 2015 3:10:12 PM Attachments: 2222 001.odf Mike: I see there were a few numbers reported incorrectly. Sorry about that. Also, the intent of this SW design needs clarification. As you'll see from the revised pages and DA Map, the drainage area AAFES wants to treat within the BMP (Infiltration Basin) is only what they are redeveloping. Out of the total project area of 6.65 acres, 6.20 acres is going to the Infiltration Basin. Out of the 6.20 acres, about 54% is impervious, which results in the revised treatment storage of about 21,752 cf. The provided storage is above this at 22,484 cf, so we should be ok. There is approx. 22 acres (based on a rough GIS storm drainage area) that supposedly comes through this infiltration basin. So that is offsite, but I didn't include any offsite in these numbers. Not sure how you report this? Take a look at these revised numbers and let us know. Thanks Branch From: Randall, Mike [mai Ito: mike. randaII@ncdenr.gov] Sent: Friday, March 27, 2015 10:20 AM To: Ward, Lee P CIV USARMY IMCOM ATLANTIC (US); David Heins (david.a.heins.civ@mail.mil); Branch Smith Subject: Smoke Bomb Hill AAFES Mini -Mall Express I have some questions regarding the Smoke Bomb Hill AAFES Mini -Mall Express Application form and Supplement Form. Page 3 of 6 of the application form. 1. The total Drainage area is identified as 431,375 ft2 (or 9.9 acres) the Total property is 6.65 acres. I take that to mean that the additional drainage area is outside the "Property Area" 2. The onsite drainage area is 289,888 and the offsite drainage area is 746,122 (1,036,010). The Onsite Drainage area and Offsite Drainage Area (1,036,010) should equal the Total Drainage Area (431,375)? 3. The Proposed Impervious Area (275,402) should equal the Total Impervious Surface Area (222,156)? The supplement form indicates that the both the Drainage Area and the Impervious Area is 222,156? It appears that the Water Quality Treatment Volume Provided (22,484 ft 3) is not adequate based on the P95 Storm, BUA and DA? Volume = 3630 * Rd * Rv * Ac Where Ac=(Drainage Area in sf)/43,560 sf/ac = 431,375 ft2 /43,560 ft2/ac = 9.9 acres Rd = Design Storm = 1.8 in (Fort Bragg) I = Impervious Portion / Drainage Area = 222,156/431,375 = 51.5 % Rv=0.05+(0.9 * 1)=0.05+(0.9 *0.515)=51.34 Fort Bragg requirement to meet the Energy Independence and Security Act, Section 438 95th % rainfall event (1.8 inches) Volume Fort Bragg 95%storm= 3630 * 1.8 * 0.51 * 9.9 Acres= 33,000 W Estimate volume provided 180 ft * 40 ft * 3.0 feet deep = 21,600 ft3 Mike Randall Stormwater Permitting Program INC Division of Energy, Mineral and Land Resources (DEMLR) 1617 Mail Service Center Raleigh, INC 27699-1617 Office: 919-807-6374 Cell: 919-389-7801 Email correspondence to and from this address may be subject to public records laws This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e-mail in error please notify the system manager. Please note that any views or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e-mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e-mail.