Loading...
HomeMy WebLinkAbout20180558 Ver 1_D-1125 & D-1126 - Washington Drainage 2017 - Bid Plans_20180424CITY OF WASHINGTON 2017 DRAINAGE IMPROVEMENTS & BANK STABILIZATION LEGEND: EXISTING PROPOSED R/W – RIGHT OF WA Y BIB – BACK OF CURB TO BACK OF CURB 0 PAP – POWER POLE o EIP – EXISTING IRON PIPE o IPS – IRON PIPE SET ® C/B – CATCH BASIN ® D/I – DROP INLET 0/H – O VERHEAD MIH – MANHOLE S/S – SANITARY SEWER STM – STORM SEWER o G/V – GAS VAL VE F/0 – FIBER OPTIC WITNESS POST ❑ FIV – FIBER OPTIC VAULT RCP – REINFORCED CONCRETE PIPE CMP – CORRUGATED METAL PIPE U/G – UNDERGROUND 0/H – O VERHEAD ® PAP – POWER POLE ® LIP – LIGHT POLE G/W – GUY WIRE C/0 – CLEANOUT INV. – INVERT TBM – TEMPORARY BENCHMARK SIGN DEMOLITION / TO BE REMOVED STORM DRAINAGE PIPE — S — — — SANITARY SEWER MAIN/SERVICE — w — — — WATER MAIN / SERVICE FIRE MAIN / SERVICE —GAS — — – GAS MAIN / SERVICE BAFFLE LIMITS OF DISTURBANCE SIL T FENCE TEMPORARY DIVERSION DITCH rVW� TREE LINE GROUND ELEVATION ■ ■ s W_ F GAS —o-0—o— LOD or SF TDD .rti. X PG 22.00 Hodes Avenue & Cherr Run Pum Station Sheet Index: 1 REVISIONS: v � Sheet No. C-1 Cover Sheet Sheet No. C-2 Drainage Improvements Construction Plan Sheet No. C-3 Drainage Improvements Notes Sheet > .0 Sheet No. C-4 Drainage Improvements Details Sheet a U Sheet No. C-5 Bank Stabilization Construction Plan Z Z Sheet No. C-6 Bank Stabilization Notes Details Sheet W Q Cl) -t v+ 0 a Z Drainage Improvement Survey 1 Sheet W N 0 (Gary S. Miller and Associates, P.A.) > J Bank Stabilization Survey 1 Sheet 0_ 0 (Gary S. Miller and Associates, P.A.) W m V co a > 0 �a4-- W Qi o WZ� Survey Notes: v 0 6 02 DRAINAGE IMPROVEMENTS � BOUNDARY AND TOPOGRAPHIC INFORMATION SHOWN HEREON WAS 0 0) PREPARED BY GARY S. MILLER AND ASSOCIATES, P.A., AS SHOWN ON r_ i DRAWING ENTITLED TOPOGRAPHICAL SURVEY FOR CITY OF WASHINGTON, Z 0 BEAUFORT COUNTY, NORTH CAROLINA., DATED JULY 31, 2017. ATTACHED Z Z, N TO THIS DRAWING SET FOR REFERENCE. U BANK STABILIZATION N BOUNDARY AND TOPOGRAPHIC INFORMATION SHOWN HEREON WAS (1) O PREPARED BY GARY S. MILLER AND ASSOCIATES, P.A., AS SHOWN ON DRAWING ENTITLED TOPOGRAPHICAL SURVEY FOR CITY OF WASHINGTON, i CHERRY RUN PUMP STATION, WASHINGTON, BEAUFORT COUNTY, NORTH CAROLINA., DATED SEPTEMBER 29, 2017. ATTACHED TO THIS DRAWING SET V FOR REFERENCE. Owner: CITY OF WASHINGTON 102 E. SECOND STREET WASHINGTON, NC 27889 (252) 975-9300 Deed / Man References: D.B. 680, PG. 53 D.B. 813, PG. 673 M.B. 20, PG. 9 a 0 Know what's below. 0111 before you dig. 1-800-632-4949 i ����''lllllt�lf't11rr`��• Project Manager: Drawn By: Checked By: Project Number: Drawing Number: 03/15/18 O U Q O 00 L Ln > 0o r\ � m N 4. QJ U 0000 vii C Z 00 C O O U — 00 Y Ln m L!1 N 3 Ln a) Ln ?) " cD 3 C-1 Date: 1-23-2018 BCF EW STA 17033 D-1125 C� - - PROTECT EX. STREET - - 223.67 E 258533228 , ELEV. = 24.34 -------------- -�-� -23 ^ 19' 44' E / 3 ------------ HOD GES A VENUE 60 R/W - 20, GRA VEL 5-4 c P1 Z :4 - IPS (CONTROL POINT) -----/S 34' S6" 49'" E 249.08"/�1CT6393124-f-- -21CZO- � E2585178.80 \ --------_T LPO NT \ r�_� _ELEV. = 21.490�-\______ - - - - ------ 6, - _�®� - \ TEMPORARY CONSTRUCTION / / / 01 ttt��ae+ a01 a01 a0i_ R/W 0 �/ / - -E 2585036.>3 0 / / / Y r, - ENTRANCE REFER TO DETAIL / /� -19 � ELEV. = 24.17 ° ( ) / ------ \ -- \ TOP OF SEHER LMS S7M M ACCESS TO PIPE \ / _ X - -aFV.- = 15 40 / 5 / i ' 021 44 \ TOP = 24.99 \ � � / /\ \ \ \ 209- " //// / \\ INV = 18.17 ACTUAL /NV. OF 42" CMP PROTECT - NOT ACCESSABLE v / 30"- / PINE / -�/ / \ \ \ - -19 o ti� \\ ti \ /c/o ///--- JI 76v v v \ ti APPROXIMATE 0 G Qo- -*,;-/-% ® / / - \ \ \ \ \ LIMITS OF DISTURBANCE _ ti , � / / p� � \\\ TPP = 20.39 / \ \® LOCATION OF - - F NV. = 18.52 \ a � i \\ - ---- (���\\ ,EXISTING PATH / \ \ ` a / ®� \ 1st \ \ \ \ - -1g- - - - -I� (3.83 ACRES) - - - _ _ - _x - - - - X - - - - X - - - - X - - - - X_8. /\ °��o 16- \\\--------- I I --- --- \ \V A /Oh'Fhv12 \ � (REJVIOVE �EPLACE) v v 4 of ) I I \\ \\ \\` _ I 0 \ TOP CMP�NV. _111..07 I I \ V I3\ 48" CMP V. -8.I v v - \\ \ \ 'I \ \ \ \ ® PROTECT EXISTING 118" RCPsn� t11.00' I ®ry' ANO ' / \ ^ 12 \ \ \ z IN - - - (TYP.) I \ oye \I I 1 2 N / \ ®� \ \ - - - _ \ r EXISTING \\ \ STORM PIPES o -Ilk v v v - - -° - z � CITY OF WASHINGTON ELECTRICAL SUBSTATION cc�� \ \ \ / ✓% I o I \// � ,\\ ,may` / \ \\ - \1 - Q V A / I //A \ \�� �• Moi 01 ��� PROTECT EXISTING \ \ °� 48" CMP UTILITY (TYP.) v - - - INV. =.67 0 --- \ \ \ \/ / F \ \ \ t FJ / ye 0tF - OHE - - \ �0 E - OHE - -`OHE x / _ // \ oHE - - - - OHE _ \ _ \ \ O/H PON£R LINES \ \ // � \ \ \\ \ \�. \� ®\ /oh HE- - - -OHE- - _ -OHE- - -OHE- - - -OHE- -OHE- \\ OHE ®/- /? \ \ 4 \ \ 2� o 7 P/P G - HE E - - - OHE C/O \ \ \ \ \ \ \ V / \ N� 7 d �p \\ 011.34 !O 'C OHE 9 V VA \\\ �VAVv� A - - - - - OHE - - - OHE� - - OH - o \ 1 \Q, \ \ \ \ \ � ° \\\\ \20 PROTECT EXISTING P/P - \ \ \ I PROTECT EXISTING PROTECT EXISTING a \\ \\ -0 \ \�\ 1F� UTILITY (TYP.) . - \ x LIGHTPOLE (TYP.) PROTECT EXISTING FENCE (TYP.) x ° PROTECT EXISTING \ �\ ®\\ \ \�\F\�\\�\\ ^�� / 2 �\ o I UTILITY (TYP.) I (TYP.) QIT \ UTILITY TYP. \� ZONE\ \ aOl aOl $7 \ M - - X - - - X - V10 0 EX 6' CHAIN LINK XNCE _ =X - / �1 8 _ \ \ \ -13 -'-_ -o- 1H POWER 3 - /P \P^ a 0 00� 20 0' O� \ �a \\ n 2 \\ \ -3RD - �- _ SHO- �H6- ��Q// N\\\ � \\\\ \ H2O -1�� - ---y P/P -12--- 00-1 - Z' 2 �0 // \ \ !O \ \ \ \ \ �\\ \\ \ \ \ \\� \\� �. NE 1 \ - -ZONE 2 - - - ry � ao1 a01 i� ao1 __pN ?f- - o}-� \ o \ \ \ \ \ \ �\ �; �^ \ \ \ DEMO -ZONE 2 - - ^) - - -ZONE 2 - ZONE 2 ®'s \ ZEE Z o 10- 11_- - _ _ _ -9 \O ZONE 2- - - - - - - - // PINE ✓ 36" PINE Z NE 07.22 ��� �_ / v 1 REMOVE EXISTING�� DEMO ONE 1 �� - - // ( \ \ I \ YF3s a _ \ TREE (TYP.) 1�_ - - - -ZONE 1 0.4; \ ZO M Z ° 48" CMP \ p OCA \ \ �\ \ 1 \ w \ �� ® TOP i i 'g"=-- ZONE 1'ZO 1=-10�9NE -� TOP = 6.68 \ \ \ \ \\\ 8641 BgN/� \ \ ZONE 1 \ = = ZON (DEMO ® / \ ® _ _ - - - -8 - - - _ - - - - y�V - 12.68 �l \ \� ®7.34 a - - ,9 - -ah - -9- -�- o �� _ STMM/H \ �'\\20 \ \\ \\ � _ ® ----- -a \°--®---- EDGE°P TOP = 25.41 ®� \ I00 \ i� \ 2 \ \ ���� \� \Iyg7Fjr' 99 \ �o - - - -� -- ^ - - - - - - 7- -off - OF gATJK /NV. =20.61 \ \ ? ONF \ \ ° \ ®?S \-= i / ^ - ^� 7--®�---- qh ® 70P S ��\ 82 � - " - - `O - -6- - o i w LIMITS OF DISTURBANCE \ �� �\ \ \ \ \ ��°, _ -_ s`s�- \ ®6.33 - �S.Ou 53 = O s (3.83 ACRES) - - -6 - -- - - - - - VA Io v -_Z U-_ ��--------- �- X11 \ \ o \ I ?ON N ONE 1 \ - 9, - - s - - - - _ ° s2-TO>ro>`BAAIC� 36" \ ®� - - -8- - y8� sj - �a -EDGE OF WYYTE ® y / \ \ 2 \ \ \ 010.48 �10� R- - - c PINE M - 6- foo i \ 2 ?ONE 1 _ _ ®_ ®'O MEM 199j- 36" ®9.58 \ d� \ �/P / P �\ \ ONE >> o 10 m PINE 8 -xONE 1 - _7' / \ \\ \ ? \ ZONE ZONE 1 - - - - ZONE 1 - - - - ZONE 1 �--(D�� O)ZONE 1 - - - - 9NE 1 - - - - ZONE 1 - \ / ° \ \ \ (OD 2 - ZONE 1 - 0\ \ \ o % Existing Conditions and Demolition \ �\ ^� \ LOD _ ZO _ _ _ - - - - `\ - _ ZONE 2-i - Zo SCALE: 1"-4O' \ NE 2 _ - - -ZONE 2 ZONE 2 - - ZONE 2 - - - - ZONE\ - ZONE 2- - ZONE 2 - - - / \ \ \ \ lop -ZONE 2 - V \ \ V / I goo / \ \ \ LOD LOD mill1111111111111 LOD � LOD R1111111111111111 LOD LOD LOD LOD LOD/ I W V)I wl 1II Q I / ®12.26 N1 w ( z ° N Z I PROTECT EXISTING / STORM PIPE Know what's below. 0111 before you dig. 1-800-632-4949 TEMPORARY ROCK ®2 / CHECK DAM PROTECT UTILITY 40' 0 20' 40' POLE (TYP.) SCALE 1 inch = 40 ft / -5--43-"------------------ HOD GES A VEV UE 60' R/W - 20' GRA VEL J II \ I°- 22_ SEED 5:1 SLOPE W/ SEED 12:1 SLOPE W/ SEED 6:1 SLOPE W/ / j?_ (C - -- PERMANENT SEED MIX C - �/ _ _ _ �� IPS (CONTROL POINT) 21 \ PERMANENT SEED MIX PRIOR TO INSTALLING TSRM / 249.08" - Ar 659312.41 - _ _ - - - HERBACEOUS WETLAND PRIOR TO INSTALLING TSRM >_ / / - < S 34' 56" 49' E c10 E 2585178.80 SEED MIX PRIOR TO `T --------------- TALLINGPSRM PROPOSED IPS (�T OL POINT ELEV. = 21.49 20� - \ \ - - - - - - - - - - - - TIE TO EXISTING GRADE INS 59 6.3 E 2585036.13 )/ / / -79 _ _ -ELEV. = 24.17 \ ° / / E - - � \ -- - 5 12' TOP OF SEWED L4NE� / R% / - - - \ \ 1 \ \ \ N 1' STM M ACCESS TO PIPE \ - - - - -ELEV_ = 15.40 / / - - \ 8 - 12' TOP = 24.9s \ 5�/� / /� v v v v - 20� =111=1I 1 -1I -I1'- / INV. = 18.17 / / / / j - - - \ \ \ \ =1 �- 10` ACTUAL /NV. OF 42" CMP p \ � \ / / / � � - 1 _ 4' BOTTOM -" NOT ACCESSABLE 30. \\\ /\ \ /-- j j j � -_1 \\ \\ ---19-- -- o ti \ \ \G- ,-/� / \\ --_ Section View O I \ CONTRACTOR SHALL UNIFORMLY - _ //�F/p\CNV. = 18.52// \\\\ / \ \ �--------- -- - - - -X- - - -X- - - -X- - - -X- - - -X- (� // o I \ \\�\ \ \ / \ \ / o / r- � SPREAD EXCAVATED MATERIAL IN \ \ \ � // / T = 8. I THIS AREA. PROVIDE POSITIVE- II� I \\ \ \ yF o \off \ \ lV 14 '14 DRAINAGE ACROSS GRADED AREA \ °- 4; n \ /\ �� I TO FACILITATE DIFFUSE OVERLAND FLOW TOWARDS STREAM. PROPOSED DROP INLET 3 MATCH EXISTING TOP- \ AND INFLOW INVERTS 12 \ SCALE: 1" = 5' 1 1 6' EXISTING GRADE 11 i1 1 7 VARIES STABLIZATION NOTE: SEED ALL STREAM BANK SLOPES AT UPSTREAM & DOWNSTREAM TIE-IN POINTS THAT ARE STEEPER THAN 5:1 W/ PERMANENT SEED MIX PRIOR TO INSTALLING TSRM E, A / oy V //\ �c/o\\ ��l/ of -8.22'STABILIZE ALL DISTURBED AREAS WITH �/s - - - - - - I CONSTRUCTION SEQUENCE. c \ O \ \ o / o INV. OUTSEEDING AND MULCH IN ACCORDANCE o THE WORK CONSISTS OF STORM DRAINAGE IMPROVEMENTS TO REPLACE EXISTING oN�o o\\ / �� // \ I I I I WITH SEEDING SCHEDULE ° \ 4 \ STORM DRAINAGE INFRASTRUCTURE AND STABILIZE AN EXISTING DITCH BEHIND oa =D707 I I \ - x x THE EASTERN ELEMENTARY SCHOOL IN THE CITY OF WASHINGTON. THE TOTAL 42" CMP�NV. SILT FENCE (TYP) 13\ \ - - - - ANTICIPATED PROJECT DURATION IS 60 CALENDAR DAYS. 48 CCP IN.. \ --- --- U � 18" RCP 1NV. '= 111.00' \ � \ I \ \ I I Z 3NO2 , ys 12 \ \ - - - - - �I 1. CONTRACTOR MUST NOTIFY NCDEQ AND THE ENGINEER PRIOR TO INITIATING oke \I I 1 / N - - \ \ - - - - o r EXISTING LAND DISTURBING ACTIVITIES. (REFER TO EROSION CONTROL PROVISIONS) \ v �O I o I / 48„ \� �' 48" CORR. ALUM. FES \ - _ -S \ CITY OF WASHINGTON o qT s yE I' INV. 6.67' \ - - - - _ - \ \ Zx " 2. INSTALLATION OF EROSION CONTROL MEASURES \ / C% I // cORRU I \ \, \,S - - - , \ �I ELECTRICAL SUBS TA TION G CLASS I RIP RAP W/ FOq<U 1�04�� 1 _ UNDERLINED (RD 1) - - - - - \ \ °I I 3. CLEARING & GRUBBING ROCK INLET 4l/ I 1 ys (REFER TO DETAIL, SHEET C-4) \ \ W I I SEDIMENT \ SILT FENCE BREAK \ /�j �\ \ \ \ I I 4. STORM DRAINAGE INSTALLATION TRAP (TYPICAL) plpF� \Z - \ �/ / / /✓' \ \ 1, So ONF2 y -p - OHE - - \ ��E - - - OHE AND RE -GRADE STREAM BANKS - - `oHE HE - x / \ // s ----oHE ---gip/F \ I O/H POWER LINES \ \ \ 5. SEEDING & MULCHING 1 WEEK 1 WEEK 5 WEEKS R OHE - v - - - OHE - - - - OHE - - HE - - OHE - - 1 WEEK c = HF - �5 \ -\- \ - REFER TO EROSION CONTROL CONSTRUCTION I \N M OHE - 7 P/P - OHE - - SEQUENCE AND BYPASS PUMPING DETAIL '� g -- _ \ \ \ II SEVERAL OF THE ITEMS LISTED ABOVE MAY BE CONSTRUCTED SIMULTANEOUSLY (SHEET C Dov/' v _ o�E oHE - _HL cOo POORE- 3) FOR DAILY WORK ZONE AND tiF \ \ LE DEEP P/P \ I SEQUENCING REQUIREMENTS FOR RE -GRADING v RE GRADE STREAM BANKS REFER TO SECTION VIEW (THIS SHEET) FOR OF STREAM SLOPES (TYP) x AND STABILIZE PER SECTION LIMITS OF PERMANENT SOIL REINFORCEMENT a / \PSRM MATTING AND TEMPORARY SOIL I I a \ \ / DETAIL (THIS SHEET) o ( ) 19 8 6, S 4 \ o g REINFORCEMENT MATTING (TSRM) ALONG / \ \ Ip �0� ZONf\ RE GRADED STREAM BANKS. 1 - - X - - - - X - - - EX s' CHAIN L/NK FXNCE - - - X - \ a01 001 ' - � X13-- - _ - - 13= / _12 -3RD - 1H POWER- - -P/ _SHO- " 00l a01 2 \�0 \ \\ \ \\ / \ZONE ONE \\ IIOi 711 . aOl ao1 i� ao1 11 - 12 - 11 0 \ 1 -ZONE 2- - - - ZONE 2 - - - \ SONE 2 - - =ZONE 2 - - - _ �� 10 \ ZON ONE Z - - - ZONE o2 10- \ / - - 11- - _ZONA y0 99 8 7- RADE DEEP 9. F GRADE DEEP `b - \\ 6 1 \ 9 POOL X10 _ Z I - 6 XXI 8 1 6_ 10 � $ ZONE - - - - - y - r 9- - - - 10-�^ w - 60 9 \ \ 8 ONE 8 9 se y� - --- -- 61 \ SIMM/H 5 - -- -------8----EOGEOF 1- \ Fo ---�a 7 - 3 - TOP=25.41 \ \ 100 LF 20 \ ��\gTER\ 7 43 6 7----- - _ 0 /NV. = 20.61 \ \ \ \ \ NF �� `- - - - _ _ i 5 6- 4 = - - - 5= / 0 0 I \ - - _ -6 \ t \ 2 \ --a_ `nom- - - - �4- - - - - - 2- 6 \ \ 0o ONF O^ZZ - 10 9 7 9 _ - _ - - - - - 8 - __5__ - --EDGE-0- t WFRE - 4 3 - / tk \ \ �\\ 9- 6 5�/P P\ REFER TO EROSION CONTROL CONSTRUCTION \ LOD 120 _ o� 7 SEQUENCE AND BYPASS PUMPING DETAIL NE 2 ZONE 1 _ _ ONE 1 - - - - -ZONE 1 - - 8- - .9, (SHEET C-3) FOR DAILY WORK ZONE AND \ \\ I _ - -ZONE 1 - g� 8 w SEQUENCING REQUIREMENTS FOR RE -GRADING \ /O k� - i, L OF STREAM SLOPES (TYP) \\ \\� \ o Z� `2 - _ _ 10 \ RE- GRADE STREAM BANKS o) L0p \ _ 20 \ AND STABILIZE PER SECTION ZONE 2 -t`0 ZO ^Ile \ ONE - DETAIL (THIS SHEET) 6 y Proposed Improvements \\ \\ \ _ _ _ - -ZONE 2 - - - -ZONE 2 - - - -ZONE 2 - - - -ZONE\ - - - -ZONE 2 - \ LOD ZONE 2 - SCALE: 1"=40' \ \ \ LOD \ \ *ftlllllllllllll LOD R1111111111111111 LOD R1111111111111111 LOD LOD LOD LOD LOD LOD / �C) MAINTAIN TEMPORARY ROCK CHECK DAM 40' 0 20' 40' SCALE 1 inch = 40 ft 1 REVISIONS: 1 Q o r -I r••�F SS/ i SEAL 037468 ,',,��/N/1111111111111``, z'- uw J aQ d Of Z OLU w z A/ Z li (D Ul7w Project Manager: Drawn By: Checked By: Project Number: Drawing Number: 03/15/18 i� O U CL 00 O L Ln OA > 00 OA n S OD N 4- Ln U 0000 vii L Z 00 C O O 7ciU- 06Y Ln i CO > Ln L!1 a) Ln ?� N U' 3 C-2 Date: 1-23-2018 BCF EW STA 17033 D-1125 > .O FM a� z W �-t a z J LV > c a 0 r_ O O ca V Ha U > a� O '^LU - W z p O -0 V a `04-0 o co Z 0 _ 11111111111 a }i � V / N L a) y... O 0 V r••�F SS/ i SEAL 037468 ,',,��/N/1111111111111``, z'- uw J aQ d Of Z OLU w z A/ Z li (D Ul7w Project Manager: Drawn By: Checked By: Project Number: Drawing Number: 03/15/18 i� O U CL 00 O L Ln OA > 00 OA n S OD N 4- Ln U 0000 vii L Z 00 C O O 7ciU- 06Y Ln i CO > Ln L!1 a) Ln ?� N U' 3 C-2 Date: 1-23-2018 BCF EW STA 17033 D-1125 �] I :� X11 [�7 ► [�l � � ��DitC PUMP SUCTION END DAILY WORK ZONE BYPASS PUMPING DETAIL (NOT TO SCALE) EROSION CONTROL PROVISIONS: 1. OBTAIN AND POST A COPY OF THE CERTIFICATE OF EROSION CONTROL PLAN APPROVAL AT THE PRIMARY ENTRANCE TO THE PROJECT AREA. CERTIFICATE SHALL REMAIN UNTIL THE SITE IS PERMANENTLY STABILIZED. 2. NOTIFY ENGINEER AT (252) 558-0888 AND NCDEQ - DIVISION OF ENERGY, MINERAL AND LAND RESOURCES AT (252) 946-6481 PRIOR TO COMMENCING CONSTRUCTION OPERATIONS. 3. SCHEDULING OF A PRE -CONSTRUCTION CONFERENCE WITH THE ENGINEER IS REQUIRED PRIOR TO INITIATING LAND DISTURBING ACTIVITIES. FOR INSPECTION CALL (252) 558-0888. 72 HOUR NOTICE IS REQUIRED. 4. CLEAR SITE ONLY AS NECESSARY TO INSTALL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS OR SPECIFIED IN THE SPECIFICATIONS. 5. NO LAND DISTURBING ACTIVITY BEYOND THAT REQUIRED TO INSTALL APPROPRIATE EROSION CONTROL MEASURES MAY PROCEED UNTIL EROSION CONTROL MEASURES ARE INSPECTED AND APPROVED BY THE ENGINEER. 6. INSTALL ROCK INLET SEDIMENT TRAPS AROUND ALL CATCH BASINS, DROP INLETS, AND YARD INLETS. 7. PROVIDE 20'X 50'X 6" STONE CONSTRUCTION ENTRANCES AS SHOWN ON PLAN. 8. MAINTAIN EROSION CONTROL DEVICES AS NECESSARY DURING CONSTRUCTION. INSPECT DEVICES AND DOCUMENT INSPECTIONS AFTER EVERY RAINFALL EVENT. 9. CLEAN OUT TRAPS, WADDLES AND/OR CHECK DAMS WHEN HALF FULL. 10. DURING CONSTRUCTION, INSTALL ADDITIONAL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, OR AS NEEDED OR DIRECTED BY THE ENGINEER. 11. SEED OR OTHERWISE PROVIDE GROUND COVER DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION FOR ALL EXPOSED SLOPES WITHIN 7 DAYS OF COMPLETION OF ANY PHASE OF GRADING ON PERIMETER AREAS AND SLOPES STEEPER THAN 3:1. ALL OTHER AREAS SHALL BE STABILIZED WITHIN 14 DAYS. 12. CONTRACTOR SHALL INSPECT AND MAINTAIN AS NEEDED ALL EROSION CONTROL DEVICES ON A WEEKLY BASIS AND AFTER EACH MAJOR STORM EVENT. FAILURE TO KEEP ALL EROSION CONTROL DEVICES IN PROPER WORKING ORDER MAY RESULT IN A STOP WORK ORDER OR CIVIL PENALTIES UP TO $5000.00 PER DAY OF VIOLATION. 13. AFTER SITE IS STABILIZED, REQUEST AN INSPECTION BY THE ENGINEER. UPON APPROVAL OF SITE STABILIZATION, REMOVE TEMPORARY EROSION CONTROL DEVICES, FINE GRADE AREA, AND SEED AND MULCH. PERMANENT EROSION CONTROL DEVICES SHALL BE INSTALLED BY CONTRACTOR AND APPROVED BY ENGINEER 14. THE ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL EROSION CONTROL MEASURES SHOULD THE PLAN OR ITS IMPLEMENTATION PROVE TO BE INADEQUATE. 15. ACCEPTANCE AND APPROVAL OF THIS PLAN IS CONDITIONED UPON THE CONTRACTORS COMPLIANCE WITH FEDERAL AND STATE WATER QUALITY LAWS, REGULATION AND RULES. IN ADDITION LOCAL CITY AND COUNTY ORDINANCES OR RULES MAY ALSO APPLY TO THIS LAND DISTURBING ACTIVITY. APPROVAL OF THE EROSION CONTROL PLAN DOES NOT SUPERSEDE ANY OTHER PERMIT OR APPROVAL. 16. BE ADVISED OF THE RULES TO PROTECT AND MAINTAIN EXISTING BUFFERS ALONG WATERCOURSES IN THE NEUSE AND TAR / PAMLICO RIVER BASINS. THESE RULES ARE ENFORCED BY THE DIVISION OF WATER RESOURCES (DWR). DIRECT ANY QUESTIONS ABOUT THE APPLICABILITY OF THESE RULES TO THE PROJECT TO THE REGIONAL WATER QUALITY SUPERVISOR, WASHINGTON REGIONAL OFFICE AT (252) 946-6481. EROSION CONTROL GENERAL NOTES 1. IN THE EVENT OF A CONFLICT BETWEEN THE REQUIREMENTS OF THE SEDIMENTATION POLLUTION CONTROL ACT, THE SUBMITTED PLAN AND/OR THE CONTRACT SPECIFICATIONS, THE MORE RESTRICTIVE REQUIREMENT SHALL PREVAIL. 2. THE LAND -DISTURBING ACTIVITY SHALL BE CONDUCTED IN ACCORDANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. 3. THE LATEST APPROVED EROSION AND SEDIMENTATION CONTROL PLAN WILL BE USED DURING PERIODIC UNANNOUNCED INSPECTIONS TO DETERMINE COMPLIANCE AND A COPY OF THE PLAN MUST BE ON FILE AT THE JOB SITE. IF IT IS DETERMINED THAT THE IMPLEMENTED PLAN IS INADEQUATE, THE ENGINEER MAY REQUIRE THE INSTALLATION OF ADDITIONAL MEASURES AND/OR THAT THE PLAN BE REVISED TO COMPLY WITH STATE LAW. 4. IN ORDER TO COMPLY WITH THE INTENT OF THE ACT, THE SCHEDULING OF THE LAND -DISTURBING ACTIVITIES IS TO BE SUCH THAT BOTH THE AREA OF EXPOSURE AND THE TIME BETWEEN THE LAND DISTURBANCE AND THE PROVIDING OF A GROUND COVER IS MINIMIZED. 5. UNLESS A TEMPORARY, MANUFACTURED, LINING MATERIAL HAS BEEN SPECIFIED, A CLEAN STRAW MULCH MUST BE APPLIED, AT A MINIMUM RATE OF 2 TONS/ACRE, TO ALL SEEDED AREAS. THE MULCH MUST COVER AT LEAST 75%± OF THE SEEDED AREA AFTER IT IS EITHER TACKED, WITH AN ACCEPTABLE TACKING MATERIAL, OR CRIMPED IN PLACE. 6. NEW OR AFFECTED CUT OR FILLED SLOPES MUST BE AT AN ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER, AND MUST BE PROVIDED WITH A GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN A MAXIMUM OF 7 CALENDAR DAYS OF COMPLETION OF ANY PHASE (ROUGH OR FINAL) OF GRADING (ANNUAL RYE GRASS IS NOT IN THE APPROVED SEEDING SPECIFICATIONS NOR IS IT AN ACCEPTABLE SUBSTITUTE FOR THE PROVIDING OF A TEMPORARY GROUND COVER). 7. INSTALL SILT FENCE AROUND SPOIL PILES AND ALONG TRENCHES TO MINIMIZE SEDIMENT FROM ENTERING DRAINAGE WAYS. 8. PROVIDE EROSION CONTROL MEASURES AROUND STOCK/WASTE PILES AND STAGING AREAS AS NEEDED OR AS DIRECTED BY ENGINEER. 9. PROTECT STORM PIPE INLETS FROM SEDIMENT RUNOFF FROM LAND DISTURBING ACTIVITIES WITH SILT FENCE, STONE CHECK DAM, OR ABC FILTER AS APPROPRIATE FOR SITE CONDITIONS. 10. EROSION CONTROL MEASURES SHALL NOT BE PLACED IN OR BELOW THE NORMAL WATER SURFACE OF A STREAM UNLESS SPECIFICALLY INDICATED ON THE APPROVED PLAN OR AS DIRECTED BY THE ENGINEER, NCDEQ or USACE. 11. PROVIDE EROSION CONTROL MATTING WHERE INDICATED UNLESS DIRECTED OTHERWISE BY THE ENGINEER. 12. PROVIDE PERMANENT SEEDING IN ACCORDANCE WITH THE SEEDING SCHEDULE. 13. ALL EXCESS AND/OR UNSUITABLE EXCAVATED MATERIAL SHALL BE DISPOSED OF ONSITE AS INDICATED ON THE PLAN. SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3" DEEP. 2. RIP ENTIRE AREA 8" DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLE SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME AND FERTILIZER UNIFORMLY AND MIX WITH SOIL. 5. CONTINUE TILLAGE UNTIL A WELL PULVERIZED, REASONABLE UNIFORM SEEDBED IS PREPARED 4" TO 6" DEEP. 6. SPREAD SEED ON FRESHLY PREPARED SEEDBED AND COVER LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACKER AFTER SEEDING. 7. SEEDBED SHALL BE IMMEDIATELY STABILIZE AFTER PREPARATION. PERMANENT SEEDING SCHEDULE (JANUARY 1 - MARCH 31) COMMON BERMUDA GRASS (UNHULLED) 20 LBS/ACRE (APRIL 1 - JULY 31) I� COMMON BERMUDA GRASS (HULLED) 15 LBS/ACRE CENTIPEDE 8 LBS/ACRE (AUGUST 1- DECEMBER 31) COMMON BERMUDA GRASS (UNHULLED) 15 LBS/ACRE TALL FESCUE 120 LBS/ACRE CENTIPEDE 8 LBS/ACRE HERBACEOUS WETLAND SEED MIX FOLLOW MANUFACTURER'S RECOMMENDATIONS AS TO APPLICATION RATE, SEEDBED PREPARATION AND SEED APPLICATION TIMES SOIL AMENDMENTS LIMESTONE FERTILIZER (10-10-10) STRAW MULCH EMULSIFIED ASPHALT TACK 2 TONS/ACRE 1000 LBS/ACRE 2 TONS/ACRE (VISUAL) 0.03 GALLONS/SQ. YARD TEMP. SEEDING (SUMMER) SPECIES RATE (LBS/ACRE) GERMAN MILLET 40 SEEDING DATES 4/15-8/15 SOIL AMENDMENTS LIMESTONE 2000 LBS/ACRE FERTILIZER (10-10-10) 750 LBS/ACRE STRAW MULCH 4000 LBS/ACRE EMULSIFIED ASPHALT TACK 435 GALLONS/ACRE TEMP. SEEDING (WINTER SPECIES RATE (LBS/ACRE) RYE GRAIN 120 SEEDING DATES 8/16-4/14 SOIL AMENDMENTS LIMESTONE 2000 LBS/ACRE FERTILIZER (10-10-10) 750 LBS/ACRE STRAW MULCH 4000 LBS/ACRE EMULSIFIED ASPHALT TACK 435 GALLONS/ACRE GENERAL NOTES EROSION CONTROL MEASURES 1. CONTRACTOR SHALL CONTACT NC ONE -CALL AT 811 AT LEAST 72 HOURS IN ADVANCE OF ANY LAND 1. All work will be done in accordance with the Sedimentation Control Act of 1973 and requirements of the North Carolina DISTURBING ACTIVITY OR EXCAVATION AND HAVE ALL UNDERGROUND UTILITIES LOCATED PRIOR TO Department of Environmental Quality. No land disturbing activity beyond that required to install the appropriate erosion EXCAVATING OR TRENCHING. control measures may proceed until measures are inspected and approved by the Engineer. w 2. THE CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE OWNER AND/OR ENGINEER FOR ANY AND 2. Prior to demolition operations, a temporary gravel construction entrance and temporary silt fence shall be installed as shown o ALL INJURIES AND/OR DAMAGES TO PERSONNEL, EQUIPMENT AND/OR EXISTING FACILITIES IN THE on the construction drawings. J DEMOLITION AND CONSTRUCTION DESCRIBED IN THE PLANS AND SPECIFICATIONS. � 3. Disturbed areas shall be seeded to stabilize the soil. Seed bed preparation shall be conducted according to North Carolina �, � Department of Transportation Standard Specifications for Roads and Structures (D.O.T.). The ground surface shall be cleared z o 3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE SITE AND BE FAMILIAR WITH EXISTING w u of stumps, stones, roots, cables, wire, grade stakes, and other materials that might hinder proper grading, tillage, seeding or 2 z CONDITIONS PRIOR TO BIDDING ON THE WORK FOR THIS PROJECT. IF CONDITIONS ENCOUNTERED DURING 2 O (.9EXAMINATION ARE SIGNIFICANTLY DIFFERENT THAN THOSE SHOWN, THE CONTRACTOR SHALL NOTIFY THE subsequent maintenance operations. Grades on the area to be seeded shall be maintained in a true and even condition. O Z-, z ENGINEER IMMEDIATELY. Maintenance shall include any necessary repairs to previously graded areas. All graded areas shall be thoroughly tilled to a " 0 o depth of at least four (4) inches by plowing, disking, harrowing, or other approved methods until the condition of the soil is w m 4. ALL DEMOLITION WASTE AND DEBRIS SHALL BE REMOVED BY THE CONTRACTOR AND DISPOSED OF IN A acceptable. On sites where soil conditions are such that high clay content and excessive compaction cause difficulty in getting a o STATE APPROVED WASTE SITE AND IN ACCORDANCE WITH ALL LOCAL AND STATE CODES AND PERMIT clods and lumps effectively pulverized, the Contractor shall use the rotary tillage machinery until the mixing of the soil is o REQUIREMENTS. acceptable and no clods or clumps remain larger than 1 1/2 inches in diameter. A firm and compact seed bed is required and > after being graded, the seed bed shall be lightly compacted with a land roller, such as a cultipacker, before and after seeding. � I Ln 5. THE BURNING OF CLEARED MATERIAL AND DEBRIS SHALL NOT BE ALLOWED. Limestone shall be dolomitic agriculture ground limestone containing not less than 10 percent magnesium oxide. Lime shall be oo oo uniformly applied at the rate of 2 tons per acre. Fertilizer shall be uniformly applied at a rate of 500 pounds per acre ofw o 6. ASBESTOS OR HAZARDOUS MATERIALS, IF FOUND ON SITE, SHALL BE REMOVED BY A LICENSED HAZARDOUS 10-20-20 analysis. The fertilizer shall be incorporated into the upper three or four inches of prepared seed bed just prior to o MATERIALS CONTRACTOR. CONTRACTOR SHALL NOTIFY OWNER IMMEDIATELY IF HAZARDOUS MATERIALS the last tillage operation, but in no case shall it be applied more than three days prior to seeding. Fertilizer shall be used o 0 ARE ENCOUNTERED. immediately after delivery or stored in a manner that will not permit it to harden or destroy its effectiveness. 2k c -I N 7. CONTRACTOR SHALL PROTECT ALL CORNER PINS, MONUMENTS, PROPERTY CORNERS, AND BENCHMARKS When hydroseeding equipment is used for seeding, fertilizer shall be applied simultaneously with seed, using the above rates REVISIONS: DURING DEMOLITION AND / OR CONSTRUCTION ACTIVITIES. IF DISTURBED, CONTRACTOR SHALL HAVE of application. Seed shall be certified seed or equivalent based on North Carolina Seed Improvement Association requirements DISTURBED ITEMS RESET BY A LICENSED SURVEYOR AT NO ADDITIONAL COST TO THE OWNER. for certification. All seed shall be furnished in sealed standard containers. Seed which has become wet, moldy, or otherwise damaged prior to seeding will not be acceptable. Seeding shall be accomplished with hand planters, power- drawn planters, 8. CONTRACTOR SHALL ADHERE TO ALL LOCAL, STATE, FEDERAL, AND OSHA REGULATIONS. hand packers, or hydroseeding equipment at the rates prescribed in the Permanent Seeding Schedule at left: 4. Ground Stabilization (Per NCG010000) L 9. CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH THE a. Soil stabilization shall be achieved on any area of a site where land -disturbing activities have temporarily or permanently Z CURRENT ADDITION OF THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), NCDOT ceased according to the following schedule: STANDARDS, AND AS REQUIRED BY LOCAL AGENCIES WHEN WORKING IN AND/OR ALONG STREETS, ROADS, i. All perimeter dikes, swales, ditches, perimeter slopes and all slopes steeper than 3 horizontal to 1 vertical (3:1) shall be 0 _-- 1 HIGHWAYS, ETC. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN APPROVAL AND COORDINATE provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 7 WITH THE LOCAL AND/OR STATE AGENCIES REGARDING THE NEED, EXTENT, AND LIMITATIONS ASSOCIATED calendar days from the last land -disturbing activity. Q WITH INSTALLING AND MAINTAINING TRAFFIC CONTROL MEASURES. ii. All other disturbed areas shall be provided temporary or permanent stabilization with ground cover as soon as practicable x 10. CONTRACTOR SHALL NOT CROSS A STREAM WITH EQUIPMENT OR PERSONNEL OR PERFORM WORK IN THE but in any event within 14 calendar days from the last land -disturbing activity. Q STREAM BELOW THE NORMAL WATER SURFACE ELEVATION EXCEPT WITHIN THE "CURRENT DAY WORK b. Conditions - In meeting the stabilization requirements above, the following conditions or exemptions shall apply: ZONE". CONTRACTOR IS RESPONSIBLE FOR CREATING A TRAVEL WAY AS NEEDED TO NAVIGATE UP AND i. Extensions of time may be approved by the permitting authority based on weather or other site-specific conditions that make compliance impracticable. DOWN THE STREAM BANKS WITHIN THE CONSTRUCTION LIMITS. MAINTENANCE OF THE TRAVEL WAY IS ii. All slopes compliance in length or rester shall apply the round cover within 7 days except when the slope is flatter than 4:1. THE CONTRACTOR'S RESPONSIBILITY AND WILL NOT BE A SEPARATE PAY ITEM. p g g pp Y g Y p p Slopes less than 50' shall apply ground cover within 14 days except when slopes are steeper than 3:1, the 7 11. CONTRACTOR SHALL PROTECT AT ALL TIMES ADJACENT STRUCTURES AND ITEMS FROM DAMAGE DUE TO day -requirement applies. DEMOLITION OR CONSTRUCTION ACTIVITIES. iii. Any sloped area flatter than 4:1 shall be exempt from the 7 -day ground cover requirement. iv. Slopes 10' or less in length shall be exempt from the 7 -day ground cover requirement except when the slope is steeper j 0 12. CONTRACTOR SHALL CONTACT THE CITY OF WASHINGTON ELECTRIC DEPARTMENT TO SCHEDULE than 2:1...� i RELOCATION OR BRACING OF EXISTING UTILITY POLES. V. Although stabilization is usually specified as ground cover, other methods, such as chemical stabilization, may be allowed ■ }..� ■■■ VVV Z on a case-by-case basis. 13. CONTRACTOR SHALL COORDINATE EXISTING FACILITIES UTILITY DISCONNECTS WITH THE OWNING UTILITY vi. For portions of projects within one mile and draining to trout waters and High Quality Waters as classified by the REPRESENTATIVE A MINIMUM 7 DAYS PRIOR TO ANTICIPATED DEMOLITION OF STRUCTURES OR Environmental Management Commission, stabilization with ground cover shall be achieved as soon as practicable but in INTERRUPTION OF SERVICE. any event on all areas of the site within 7 calendar days from the last land -disturbing act. vii. For portions of projects located in Outstanding Resource Waters watersheds as classified by the Environmental 14. REMOVE EXISTING ON-SITE TREES, SHRUBS, HEDGES, FENCES TO LIMITS OF DISTURBANCE OR CLEARING Management Commission, stabilization with ground cover shall be achieved as soon as practicable but in any event on all LIMITS UNLESS OTHERWISE NOTED. areas within 7 calendar days from the last land -disturbing act. viii. Portions of a site that are lower in elevation than adjacent discharge locations and are not expected to discharge during 15. TREES OUTSIDE OF LIMITS OF DISTURBANCE OR ON ADJACENT PROPERTY SHALL BE PROTECTED AT ALL construction may be exempt from the temporary ground cover requirements if identified on the approved E&SC plan or TIMES DURING CONSTRUCTION. added by the permitting authority. 16. ALL CONSTRUCTION OF STREET, DRAINAGE, WATER AND SANITARY SEWER IMPROVEMENTS SHALL COMPLY 5. Self Inspection and Reporting Requirements (Per NCG010000) WITH CITY OF WASHINGTON STANDARDS. Minimum self inspection and reporting requirements are as follows unless otherwise approved in writing by the Division of 17. ALL CONSTRUCTION WITHIN NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RIGHT RIGHT OF WAY Environmental Quality Division of Energy, Mineral and Land Resources. > O SHALL COMPLY WITH THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 2012 STANDARD a. A rain gauge shall be maintained in good working order on the site unless another rain monitoring device has been L SPECIFICATIONS FOR ROADS AND STRUCTURES. approved by the permitting authority. 18. CONTRACTOR SHALL NOT PERFORM ANY WORK OR DISTURB ANY AREA OUTSIDE OF THE PUBLIC RIGHTS OF b. A written record of the daily rainfall amounts shall be retained and all records shall be made available to DEQ or Z U WAY, EXISTING EASEMENTS OR LIMITS OF DISTURBANCE WITHOUT APPROVAL OF ENGINEER AND LAND authorized agent upon request (Note: if no rainfall occurred, the permittee must record zero ). OWNER. C. Erosion and sedimentation control measures shall be inspected to ensure that they are operating correctly. Inspection UJ E records must be maintained for each inspection event and for each measure. At a minimum, inspection of measures must 19. WETLANDS AND STREAMS ARE VALUABLE NATURAL RESOURCES THAT PROVIDE IMPORTANT ECOLOGICAL occur at the frequency indicated below: 0 FUNCTIONS. BE ADVISED THAT ACTIVITIES WITHIN WETLANDS, STREAMS AND STREAM BUFFERS ARE i. All erosion and sedimentation control measures must be inspected by or under the direction of the permittee at least once a Z REGULATED BY THE STATE OF NORTH CAROLINA AND THE FEDERAL GOVERNMENT. WETLANDS AND every seven calendar days, and STREAM BUFFERS SHOWN ON THESE PLANS ARE BASED UPON FIELD OBSERVATIONS AND DO NOT ii. All erosion and sediment control measures must be inspected by or under the direction of the permittee within 24 hours UJ ' REPRESENT JURISDICTIONAL DETERMINATIONS. REFER TO SPECIFIC PERMIT REQUIREMENTS AS CONTAINED after any storm event of greater than 0.50 inches of rain per 24 hour period. A-0 IN THE PROJECT SPECIFICATIONS. iii. Times when a determination that adverse weather conditions prevented inspections should be documented on the r Inspection Record. � O d. Once land disturbance has begun on the site, stormwater runoff discharge outfalls shall be inspected by observation for W O erosion, sedimentation and other stormwater discharge characteristics such as clarity, floating solids, and oil sheens. W Inspections of the outfalls shall be made at least once every seven calendar days and within 24 hours after any storm V event of greater than 0.50 inches of rain per 24 hour period. e. Inspections are only required to be made during normal business hours. When adverse weather conditions would cause � O the safety of the inspection personnel to be in jeopardy, the inspection can be delayed until it is deemed safe to perform 4 -- these duties. If the inspection cannot be done on that day, it must be completed on the following business day. (n Q f. Twenty-four Hour Reporting for visible sediment deposition W N i. The permittee shall report to the Division of Environmental Quality central office or the appropriate regional office any visible sediment being deposited in any stream or wetland or any noncompliance which may endanger health or the MM LIST OF UTILITY OWNERS: environment. (See Section IX of this permit for contact information.) Any information shall be provided orally or 0 W electronically within 24 hours from the time the permittee became aware of the circumstances. Visible discoloration or Z W O suspended solids in the effluent should be recorded on the Inspection Record as provided below.C TYPE OWNER/CONTACT PERSON PHONE ii. A written submission shall be provided to the appropriate regional office of the DEQ within 5 days of the time the C = C permittee becomes aware of the circumstances. The written submission shall contain a description of the sediment � 4-1 deposition and actions taken to address the cause of the deposition. The Division of Environmental Quality staff may waive O 0) GAS PIEDMONT NATURAL GAS (252) 617-0400 the requirement for a written report on a case-by-case basis. •� DAVID KENNEDY g. Records of inspections made during the previous 30 days shall remain on the site and available for agency inspectors at all O S 111 EXECUTIVE PARKWAY times during normal working hours, unless the permitting authority provides a site-specific exemption based on unique NEW BERN, N.C. 28562 site conditions that make this requirement not practical. Older records must be maintained for a period of one year after N project completion and made available upon request. The records must provide the details of each inspection including V WATER/SEWER CITY OF WASHINGTON(252) 975-9302 observations, and actions taken in accordance with this permit. The permittee shall record the required rainfall and a FRANKIE BUCK monitoring observations on the Inspection Record for Activities Under Stormwater General Permit NCGO10000 form L 102 E. 2nd STREET provided by the Division or a similar inspection form that is inclusive of all of the elements contained in the Division's form. 0 WASHINGTON, N.C. 27889 Electronic storage of records will be allowed if approved by the permitting authority. Q h. Inspection records must include, at a minimum, the following: ELECTRIC CITY OF WASHINGTON (252) 975-9303 i. Control Measure Inspections: Inspection records must include at a minimum: 102 E. 2nd STREET 1. identification of the measures inspected, U WASHINGTON, N.C. 27889 2. date and time of the inspection, 3. name of the person performing the inspection, 4. indication of whether the measures were operating properly, TELEPHONE CENTURYLINK (252) 321-9401 5. description of maintenance needs for the measure, CECELIA PRICE 6. corrective actions taken and 1528 BRIMLEY DRIVE 7. date of actions taken. GREENVILLE, N.C. 27834 ii. Stormwater Discharge Inspections: Inspection records must include at a minimum: 1. identification of the discharge outfall inspected, 1% CABLE TV SUDDENLINK (252) 948-3363 2. date and time of the inspection, MELVIN HART 3. name of the person performing the inspection, •�•� 910 HACKNEY AVE. 4. evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, •; WASHINGTON, N.C. 27889 5. indication of visible sediment leaving the site, 6. actions taken to correct/prevent sedimentation and STATE ROAD N.C.D.O.T. (252) 946-3689 7. date of actions taken. GENE PITTMAN iii. Visible Sedimentation Found Outside the Site Limits: Inspection records must include: ��•.��' <` 1701 W. FIFTH STREET 1. an explanation as to the actions taken to control future releases, '�; '•• �' ��� WASHINGTON, N.C. 27889 2. actions taken to clean up or stabilize the sediment that has left the site limits and ���ii�%% 3. the date of actions taken. iv. Visible Sedimentation Found in Streams or Wetlands: All inspections should include evaluation of streams or wetlands CITY STREET CITY OF WASHINGTON (252) 975-9302 onsite or offsite (where accessible) to determine if visible sedimentation has occurred. 03/15/18 FRANKIE BUCK V. Visible Stream Turbidity - If the discharge from a site results in visible stream turbidity, inspection records must record that 102 E. 2nd STREET evidence and actions taken to reduce sediment contributions. Sites discharging to streams named on the state's 303(d) list a U w WASHINGTON, N.C. 27889 as impaired for sediment related causes may be required to perform additional monitoring, inspections or application of J z more stringent management practices if it is determined that the additional requirements are needed to assure J a compliance with the federal or state impaired -waters conditions. If a discharge covered by this permit enters a stream J W06 a EROSION CONTROL CONSTRUCTION SEQUENCE segment that is listed on the Impaired Stream List for sediment -related causes, and a Total Maximum Daily Load (TMDL) v CA � U) E has been prepared for those pollutants, the permittee must implement measures to ensure that the discharge of Z Z 0 w pollutants from the site is consistent with the assumptions and meets the requirements of the approved TMDL. The DWQ 1. WORK PERFORMED TO REGRADE THE SLOPES OF THE STREAM SHALL BE CONFINED TO AREAS WITHIN THE LIMITS 0 z 303(d) list can be found at: http://h2o.enr.state.nc.us/tmdl/General 303d.htm/ L OF DISTURBANCE SHOWN ON THE PLAN. - V 0 w -600 2. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE AND THE ROCK ARC FILTER AT THE DOWNSTREAM END OF THE 6. All erosion and sedimentation control devices shall remain in place and be maintained by the Contractor until all seeding is 5 on r S LIMITS OF DISTURBANCE SHALL BE INSTALLED PRIOR TO BEGINNING CLEARING OR DEMOLITION WORK OR established and construction areas have been stabilized. m N oo =3 Z°OGRADING WORK FOR STREAM BANK STABILIZATION. " Z C 7. Temporary Seeding- Seed in accordance with the Temporary SeedingSchedule with regard to seed type, rate of application, 0 0 3. TEMPORARY SILT FENCE SHALL BE INSTALLED WHERE INDICATED ON THE PLAN PRIOR TO BEGINNING WORK. fertilizer, etc.U U Ln C9 > Ln co 4. TEMPORARY SILT FENCE MAY BE REMOVED UPON COMPLETION OF GRADING WORK AND STABILIZATION OF cn a) N 3 DISTURBED AREAS. AREAS DISTURBED BY THE REMOVAL OF TEMPORARY SILT FENCE SHALL BE UNIFORMLY N � 3 GRADED AND IMMEDIATELY STABILIZED WITH SEEDING AND MULCH AS INDICATED ON THE PLANS. 5. CONTRACTOR MAY TRAVERSE ALONG EACH SIDE OF THE BANK OF THE STREAM WITHIN THE LIMITS OF DISTURBANCE AS SHOWN ON THE PLANS. CONTRACTOR SHALL NOT CROSS THE STREAM WITH EQUIPMENT Project Manager: BCF EXCEPT WITHIN THE "CURRENT DAY WORK ZONE". Drawn By: EW 6. PRIOR TO BEGINNING WORK EACH DAY, CONTRACTOR SHALL PLACE SAND BAGS AT THE UPSTREAM AND Checked By: STA DOWNSTREAM END OF THE "CURRENT DAY WORK ZONE". THE STREAM BASE FLOW SHALL BE PUMPED FROM Project Number: 17033 THE UPSTREAM SIDE OF THE SAND BAGS TO THE DOWNSTREAM SIDE OF THE SANDBAGS, LEAVING NO BASE Drawing Number: D-1125 FLOW WITHIN THE "CURRENT DAY WORK ZONE". THE BASE FLOW SHALL OUTLET THROUGH A SEDIMENT BAG LOCATED ON THE TOP OF THE STREAM BANK ON THE DOWNSTREAM SIDE OF THE SANDBAGGED AREA. 7. THE CONTRACTOR SHALL STABILIZE THE "CURRENT DAY WORK ZONE" AT THE END OF EACH DAY. STABILIZE ALL DISTURBED AREAS WITHIN THE 5:1 STREAM BANKS BY SEEDING WITH A HERBACEOUS WETLAND SEED MIX, MULCHING AND INSTALLING PERMANENT SLOPE REINFORCEMENT MATTING. DISTURBED AREAS WITHIN THE 12:1 STREAM BANKS SHALL BE STABILIZED BY SEEDING AND INSTALLING EROSION CONTROL MATTING. ALL C-3 OTHER DISTURBED AREAS SHALL BE STABILIZED BY SEEDING AND MULCHING. Date: 1-23-2018 E 0 0 0 p z w � gzw w w v 3 TIMES PIPE DIA. .0 O n %00 O d0co �01 coa00 0> > O��O VARIABLE MESPIPEDIA�I 1 �I TYPICAL ENERGY DISSIPATER WITH RIP -RAP PIPE DIA. NOTES: VAR/,4,9L,FLARED END PIPES GREATER THAN 36" WILL REQUIRE CONC. SLAB AND OR RIP -RAP TO PROTECT BOTH ENDS OF PIPE ))) RIP -RAP DIMS. AS SHOWN IN TABLE BELOW JJJJJJJJJJJJJJ f/ 4" FILTER STONE BED OR FILTER CLOTH NOTES: INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (2 INCH OR GREATER) RAINFALL EVENTS TO TYPICAL CONCRETE /� Q�Q� �� SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS FLARED END SECTION r mak`' OJy.1 TAKEN PLACE, OR IF THE STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL REPAIRS NEEDED TO PREVENT FURTHER RIP -RAP PROTECTION AT OUTLETS �P NOTE: FOR PIPES ON MILD SLOPES TX7T>Ill !'n A T T�ATT�rInXJr rNT1-4C4Tr% A M1-%T%fN NOT TO SCALE INSTALL TEMPORARY SILT FENCEWHERE NECESSARY TO RETAIN SEDIMENT TEMPORARY STOCKPILE 3:1 `Mp,X.I TEMPORARILY SEED AS SOON AS POSSIBLE (NO MORE THAN 21 CALENDAR DAYS AFTER FORMATION OF THE STOCKPILE.) IF STOCKPILE WILL NOT BE USED WITHIN 90 DAYS STABILIZE WITH PERMANENT VEGETATION. H 2 3,1 (MAX/ X a 0 TEMPORARY STOCKPILE Drawing No. EC -22 (NOT TO SCALE) Rip Rap 1 (RR -1) ONE FOOT BELOW THE SHOULDER OR ANY DIMENSIONS ENTRY WIDTH 12.0 FT LENGTH 24.0 FT EXIT WIDTH 28.0 FT MIN. THICKNESS 24 IN MIN. STONE DIAMETER 13 IN STONE CLASS Class 1 WOOD STAKE, SEE DETAIL 2/10 PSRM OR TSRM WOOD STAKE, SEE DETAIL 3/10 w w SEE DETAIL y y y 4/10 y y y y y y y y y y y y'`II AEC PREMIER STRAW WATTLES y y yW y IIIA y y y y y WOOD STAKE, SEE DETAIL 4/10 y y y y y \ y y y y y I y y y y y y y y w ✓ � .✓ m � y y y y y y WOOD STAKE m w STRAW WATTLE y y y y y y I W J W W .✓ y y y y y W W W J w S( Olti�t W W W W W W W W W Of% C TOP OF TSRM OR PTRM SLOPE DETAIL NO SCALE AEC PREMIER STRAW WATTLEWOOD STAKE / SLOPE N SURFACE STRAW WATTLE WOOD STAKE STAKE DETAIL (SECTION VIEW) 4 NO SCALE 10 WOOD STAKE TSRM OR PTRM STAKE DETAIL (ON BARE SC NO SCALE STAKE DETAIL (ON TOP OF NO SCALE - SLOPE SURFACE TEMPORARY STRA W WATTLE NTS ISOMETRIC VIEW SILT FENCE 9 FT. POST 2' WOODEN STAKE 4 FT.i 2 FT. / 12" WATTLE J VIEW FROM SLOPE M NO. 57 STONE 2:1 CLASS I RIP -RAP A -A B -B TEMPORARY ROCK SILT CHECK DAM A c. NOTES: P. SEDIMENT CONTROL STONE SHALL BE NO. 5 ..0. OR NO. 57 AND SHALL BE PAID FOR AT THE PCONTRACT UNIT PRICE PER TON "SEDIMENT v �" " CONTROL STONE." c c c WIRE MESH SHALL BE HARDWARE CLOTH 23 GAUGE MIN. AND SHALL HAVE 1/4 INCH MESH ESH OPENINGS 1/4" WIRE M TOP OF WIRE MESH SHALL BE A MINIMUM OF MAXIMUM POST SPACING 4 FT. ONE FOOT BELOW THE SHOULDER OR ANY A DIVERSION POINT. NOTES: STEEL POST SHALL BE 5 FT. IN HEIGHT, BE A 1. ROCK CHECK DAM SHALL BE CONSTRUCTED 12" OF THE SELF -FASTENER ANGLE STEEL TYPE. OF CLASS I RIP -RAP WITH 12" THICK NO. 57 WOOD POST SHALL BE 6 FT. IN HEIGHT, BE Ll STONE FACE ON UPSTREAM SIDE. 6" 3 INCHES IN DIAMETER. POST SPACING SHALL 2. H=VARIES ACCORDING TO LOCAL BE A MAXIMUM OF 4 FT. CONTROL STONE LV6 CONDITIONS. INSTALL AS DIRECTED BY INSPECT INLETS AT LEAST WEEKLY AND AFTER ENGINEER. EACH SIGNIFICANT (I INCH OR GREATER) NO. 57 STONE 2:1 CLASS I RIP -RAP A -A B -B TEMPORARY ROCK SILT CHECK DAM A c. NOTES: P. SEDIMENT CONTROL STONE SHALL BE NO. 5 ..0. OR NO. 57 AND SHALL BE PAID FOR AT THE PCONTRACT UNIT PRICE PER TON "SEDIMENT v �" " CONTROL STONE." c c c WIRE MESH SHALL BE HARDWARE CLOTH 23 GAUGE MIN. AND SHALL HAVE 1/4 INCH MESH ESH OPENINGS 1/4" WIRE M TOP OF WIRE MESH SHALL BE A MINIMUM OF MAXIMUM POST SPACING 4 FT. ONE FOOT BELOW THE SHOULDER OR ANY 0 DIVERSION POINT. STEEL POST SHALL BE 5 FT. IN HEIGHT, BE 2' INSTALLED 1.5 FT. DEEP MINIMUM, AND BE 12" OF THE SELF -FASTENER ANGLE STEEL TYPE. 2' WOOD POST SHALL BE 6 FT. IN HEIGHT, BE Ll INSTALLED TO 1.5 FT. DEEP MINIMUM, AND BE 6" 3 INCHES IN DIAMETER. POST SPACING SHALL SEDIMENT2, BE A MAXIMUM OF 4 FT. CONTROL STONE LV6 IIII111111N%%% INSPECT INLETS AT LEAST WEEKLY AND AFTER a EACH SIGNIFICANT (I INCH OR GREATER) a U w RAINFALL EVENT. CLEAR THE MESH WIRE OF AVERAGE BOX ANY DEBRIS OR OTHER OBJECTS TO PROVIDE DIMENSION VARIABLE ADEQUATE FLOW FOR SUBSEQUENT RAINS. FILTERED TAKE CARE NOT TO DAMAGE OR UNDERCUT WATER THE WIRE MESH DURING SEDIMENT LU 0,Wnz z REMOVAL. REPLACE STONE AS NEEDED. NTS MULTI -DIRECTIONAL FLOW NOTES: USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE AND LENGTH OF 10 FT. EXCAVATE A 1 TO 2 INCH TRENCH FOR WATTLE TO BE PLACED. DO NOT PLACE WATTLE ON TOE OF SLOPE. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. WATTLE INSTALLATION CAN BE ON OUTSIDE OF THE SILT FENCE AS DIRECTED. INSTALL TEMPORARY SILT FENCE IN ACCORDANCE WITH SECTION 1605 OF THE STANDARD SPECIFICATIONS. SILT FENCE INSET A NILL SILT FENCE WATTLE BREAK DETAIL NOT TO SCALE GENERAL FORMS TO BE USED FOR CONSTRUCTION OF BOTTOM SLABS. ALL MORTAR JOINTS TO BE 1/2" PLUS OR MINUS 1/8". JUMBO BRICK WILL BE PERMITTED. JUNCTION BOXES SHALL BE PROVIDED WITH STEPS V-2" ON CENTER. m m EX. 42" CMP STORM DRAIN A LOCATE FRAME AND GRATE TO ACCESS STEPS a a ``��\IIIIIIIIIII�I 0 IE > •0 o lo, -71 4YL'-0" Ll z WIt �1 �I1 AX i� o� n, PLAN z� 48" CORRUGATED ALUMINUM PIPE �A DROP INLET FRAME AND GRATE — (EAST JORDAN IRON WORKS V-5660, OR APPROVED EQUAL 8" BRICK WALL EX. 42" CMP STORM DRAIN 3000 PSI CONC SLAB WITH NO. 5 BARS AT 12" 6„ O.C. EACH WAY DROP INLET NOT TO SCALE SIDE VIEW EX. 18" RCP STORM DRAIN I � I � SECTION "A" ILT FENCE POST EE INSET A DOWNSLOPE STAKE 3000 PSI CONC. SLAB WITH NO. 6 BARS AT 6" O.C. EACH WAY 8" BRICK WALL 48" CORRUGATED ALUMINUM PIPE �L� ROCK INLET SEDIMENT TRAP NOTES: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. (NOT TO SCALE) 8' MAX. STANDARD STRENGTH FABRIC W/ WIRE FENCE 6' MAX. EXTRA STRENGTH FABRIC W/O WIRE FENCE 12 GAUGE, 4"x 4" WELDED WIRE FABRIC REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. STEEL POST N II � , WIRE FABRIC OQ UV RESISTANtv GEOTEXTILE F N TAMPED BACKFILL 11111 -GROUND LINE 8" DOWN & 4" FORWARD ALONG THE TRENCH TEMPORARY SILT FENCE (NOT TO SCALE) FINISHED GRADE BACKFILL j\ X\:::: j� III III III III /� 12MIN. EMBEDMENT / / PIPE / j1/6 O.D. MIN. GRANULAR EMBEDMENT �\ X\�� 6" MIN. CLASS"C" TRENCH SECTION DETAIL FOR THE INSTALLATION OF STORM DRAINAGE PIPING NOTES: 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS. 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION BY ALL CONSTRUCTION VEHICLES. 3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. 4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED UP IMMEDIATELY. 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE. 6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO BE DETERMINED BY THE ENGINEER. 7. USE CLASS'A' STONE OR OTHER COARSE AGGREGATE APPROVED BY THE ENGINEER. 8. INSTALL CONSTRUCTION ENTRANCES IN A WAY TO PREVENT VEHICLES FROM BYPASSING CONSTRUCTION ENTRANCE LEAVING PROJECT SITE. NCDOT TEMPORARY GRAVEL CONSTRUCTION ENTRANCE (CONSTRUCT IN ACCORDANCE WITH NCDOT DETAIL No. 1607.01) (NOT TO SCALE) NOT TO SCALE z z w O 2 U �E O O n z V w p w m Cr a o p o L4 w > > w w p T -r.,---, 1 REVISIONS: 1 C-4 Date: 1-23-2018 E w ``��\IIIIIIIIIII�I > •0 Q�� •� a LM z WIt IIII111111N%%% M 0 03/15/18 a a U w W 0 J a CL > J � 0(�=O ♦.>'+ r LU O LU 0,Wnz z 0 LU LU i O L -6 Ln >00 U r` m N a > 0 a LU � ro O t ai 00 O Y a W 0 _ w 0 Lh N N a 0 0) BCF Z 0 's STA Project Number: 17033 v ca � O Q /7 V C-4 Date: 1-23-2018 E w ``��\IIIIIIIIIII�I S+ Q�� •� • SEAL 037468 •I NF IIII111111N%%% M 0 03/15/18 z a U w 6 ~ii z J a CL J � 0(�=O E Z Ow O LU 0,Wnz z Q UQw 00 O L -6 Ln >00 CA r` m N - +J Ln U 0000 L Z 00 C ro O t ai 00 O Y U = L > m u1 co Lh N N 3 l (v L N U 3 Project Manager: BCF Drawn By: EW Checked By: STA Project Number: 17033 Drawing Number: D-1125 C-4 Date: 1-23-2018 E w CENTER OF BRIDGE OF US HWY. 264 s /Q BENCHMAR4. K US H / 264 EX. SQUARE CUT IN Erosion Control Provisions: TOP OF BRIDGE WALL 100' PUBLIC R/W - 69' BIB 1. OBTAIN AND POST A COPY OF THE CAMA GENERAL PERMIT ONSITE PRIOR TO 9 c 6> T�y� / CONSTRUCTION. PERMIT SHALL REMAIN UNTIL THE SITE IS PERMANENTLY STABILIZED. C ° A , ° `r�ro d ° d ° e ° d ° u ° e 4 d G/ 2. NOTIFY ENGINEER AT (252) 558-0888 AND NCDEQ- DIVISION OF ENERGY, MINERAL AND °d ° ° d ° d AD �P LAND RESOURCES AT (252) 946-6481 PRIOR TO COMMENCING CONSTRUCTION d° d a ° v ° d �� 8j ° 4 ° Q Q OPERATIONS. ° ° ° ° d d ° - ° J °° VISIBLE E46E OF CONCRETE �QO/ P 4, ° d d ° 4 ° ° `� ° ° EXACT L OCA TION%6T 19ETERya'NED ° / ° d °d d ° ° ° d ° ° ° d d ° d ° a ° ° d a- Q ---- --a---------'-�- a ea --� a -� d° dd d- ° ° ° d d ° ° - - - - - - - - - 3 SCHEDULING OF A PRE -CONSTRUCTION CONFERENCE WITH THE ENGINEER IS REQUIRED -- - ---- - �, _____ % --_------�- =====A==d °--+--------°-�- ,�-° ---------_--- - d° _�- --- Ex.DRIVE CUT PRIOR TO INITIATING LAND DISTURBING ACTIVITIES. FORINSPECTIONCALL (252)558-0888. d ° - - - - - a - - - a - - - a .� - --- a - -- - - -a - - e - - d - -� d/111r" � - - - - - - - -O- - - ��'TOTT - - - - �- - - - - - - - - - �' - - - --C>:FzE - - - - - - 2 d d d d ° /•'•0- C ° d ° d e ° d ° d Q &09 ° - - - �° d azo - / so 72 HOUR NOTICE IS REQUIRED. A d ° ° d °C®NC. WALK ° ° 4 ° ° d 1.89 d� ° 4 ° d ° d d ° 4 ° ° d ° ° d ° d CITY WIDE � - - - --'I-d- - - - - - - - - - - - -° - - - ° SPEED L IMI T / 4. CLEAR SITE ONLY AS NECESSARY TO INSTALL EROSION CONTROL DEVICES AS INDICATED ON 3--�- ° d °° ° ��-- a--- a �- a d �� ° SIGN --J------------------ ----y--�-- ���80so-®1o.zs / o s/s•lato THE DRAWINGS OR SPECIFIED IN THE SPECIFICATIONS. CONC. 46 d d WATER o ° ° / \ 70 MIH 5. NO LAND DISTURBING ACTIVITY BEYOND THAT REQUIRED TO INSTALL APPROPRIATE E[)OE i �1 CONC. BENCHMARK WASHINGTON L - EROSION CONTROL MEASURES MAY PROCEED UNTIL EROSION CONTROL MEASURES ARE g 3.97 pj / CITY LIMIT SILT FENCE (TYP) 1 PROTECT EXISTING 4"I \91 COTTON SPINDLE SIGN 10- INSPECTED AND APPROVED BY THE ENGINEER. PROTECT EXISTING 0.29 STRUCTU E(S) (TYPICAL) 40 �� IN PIP UTILITY(S) (TYPICAL) / ��4p/. EL. - 10.51 G� - R/W S 27' 46' 00" E 67.66' 7 s s 27' 4s' oo" E6. MAINTAIN EROSION CONTROL DEVICES AS NECESSARY DURING CONSTRUCTION. INSPECT A sAS - is js- _ 21oL /o cur w/RE_ -9- 129.47' o° DEVICES AND DOCUMENT INSPECTIONS AFTER EVERY RAINFALL EVENT. M - Comm - - COMM - -COMM- COMM- -COMM -COMM- - (DEM6�MM- COMM-/ �M-" COMM- CKM- , 2 7w F/0 C O/H FIBER OPTIC LINE />B�cH 06 3 j � � � � � � � ,� S 50 16 00" E 9 7. CLEAN OUT EROSION CONTROL DEVICES WHEN HALF FULL. (DEM --9 -Q� o z 18" BIRCH / 5 7� i ®8.11 21.38' 08.16 ®s.so J EXISTING EDGE OF T 5� - / 8. DURING CONSTRUCTION, INSTALL ADDITIONAL EROSION CONTROL DEVICES AS INDICATED WATER (NOT TO BE �0 / 6� - s -- GO1 - ao1 - ooi ° ° ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, OR AS NEEDED OR DIRECTED BY PROTECT EXISTING GUY WIRE dol ao' ooi - DISTURBED BELOW k - / 77s THE ENGINEER. WATER SURFACE) 8 7 07.64 - - aoi ao1 GOI ° ° ° ° AREAS DISTURBED BY THE REMOVAL ® � pop 9. SEED OR OTHERWISE PROVIDE GROUND COVER DEVICES OR STRUCTURES SUFFICIENT TO ✓�\ OF TREES AND STUMPS SHALL BE �kf� f f/fief/f/f/f// RESTRAIN EROSION FOR ALL EXPOSED SLOPES WITHIN 7 DAYS OF COMPLETION OF ANY UNIFORMLY GRADED PRIOR TO CHAIN LINK FENCE o �, �,_,,� . <�� ° ( INSTALLING RIP RAP (TYPICAL) o (DEMO) H'r MAINTAIN EXISTING ACCESS To ° ° - MoD RIGHT-OF-WAY PHASE OF GRADING ON PERIMETER AREAS AND SLOPES STEEPER THAN 3:1. ALL OTHER v S 2T 46 00' E PUMP STATION AT ALL TIMES -goo AREAS SHALL BE STABILIZED WITHIN 14 DAYS. 5 0� y REMOVE, SALVAGE & (D. B. 813, PG. 673 �l � '� - ' DURING CONSTRUCTION too REMOVE EXISTING TREES, STUMPS �� &, 46 k REINSTALL EXISTING �� <'1240' 27'46' 00" W 10. CONTRACTOR SHALL INSPECT AND MAINTAIN AS NEEDED ALL EROSION CONTROL DEVICES AND VEGETATION FROM EXISTING 12" MAPLE CHAIN LINK FENCE Aft?"', ORIVEw 97.50' EMBANKMENT IN AREATO BE 3 �S (DEMO) (DEMO)7,s h - ON A WEEKLY BASIS AND AFTER EACH MAJOR STORM EVENT. FAILURE TO KEEP ALL STABILIZED WITH RIP RAP. - - - - o _ a_ - EROSION CONTROL DEVICES IN PROPER WORKING ORDER MAY RESULT IN A STOP WORK / (DMO)I / �, o a� ORDER OR CIVIL PENALTIES UP TO $5000.00 PER DAY OF VIOLATION. 10" OAKj O � 07.89 p SILT FENCE (TYP) 66 �Ysa 06.8 �� 7.96 � V� �0 11. AFTER SITE IS STABILIZED, REQUEST AN INSPECTION BY THE ENGINEER. UPON APPROVAL OF r7- �q 99 s/s 0' 16, 00 SITE STABILIZATION, REMOVE TEMPORARY EROSION CONTROL DEVICES, FINE GRADE AREA, SER S Z \I �iz I I �coroc. a ° S/N N 5 AND STABILIZE AREA AS INDICATED ON THE PLANS. 4663 Sq.Ft. o PROTECT EXISTING 0 0.107 Ac. OO° ®7.ss G� o f I BUDDING , I - 9 UTILITY(S) (TYPICAL) F.� m �V 07.68N o OO 12" TREE 12" OAK p (DEMO) (DEMO I ❑g I I� cONc.1 / I I � T' -a--- - 9.15 m 4 I 31 I2B ;�� 7-T 20. ®7.69 DEMO) ^ T a h ®6.18 I�7.30 &I7.7o �s.r9- - ft4'- - .01 I ° I °j� I GENERATOR I k WILLIAM H. PAGE TRUST 12" TREE � � � � - - I H -FRAM - - ' i a.o3 ELECT. �1 - - -_ 9.14' I3 NOTE: D. 8. 1739, PG. 356 8 1 06.42 I I WOOD I PANEL I ANY AREAS WITHIN LIMITS OF LOT 1 05.59 ((( PLATFORM _ DISTURBANCE THAT ARE DISTURBED AND CHAIN LINK FENCE - 8 e 4 / - - L-= �� -OAy 75--- - - -X- _ - _j ARE NOT PROPOSED TO BE STABILIZED CHERRY RUN PROPERTIES, LLC 12. THE ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL EROSION CONTROL MEASURES SHOULD THE PLAN OR ITS IMPLEMENTATION PROVE TO BE INADEQUATE. 13. ACCEPTANCE AND APPROVAL OF THIS PLAN IS CONDITIONED UPON THE CONTRACTORS COMPLIANCE WITH FEDERAL AND STATE WATER QUALITY LAWS, REGULATION AND RULES. IN ADDITION LOCAL CITY AND COUNTY ORDINANCES OR RULES MAY ALSO APPLY TO THIS LAND DISTURBING ACTIVITY. APPROVAL OF THE EROSION CONTROL PLAN DOES NOT SUPERSEDE ANY OTHER PERMIT OR APPROVAL. 14. BE ADVISED OF THE RULES TO PROTECT AND MAINTAIN EXISTING BUFFERS ALONG I'll89 07.63 WITH RIP RAP OR STONE SHALL BE P.C. G, SLD. 77-8 WATERCOURSES IN THE NEUSE AND TAR / PAMLICO RIVER BASINS. THESE RULES ARE SILT FENCE (TYP) f ®6.30 &s 471 d7 PERMANENTLY SEEDED AND STABILIZED ENFORCED BY THE DIVISION OF WATER RESOURCES (DWR). DIRECT ANY QUESTIONS ABOUT WITH GROUND COVER. ALL AREAS THE APPLICABILITY OF THESE RULES TO THE PROJECT TO THE REGIONAL WATER QUALITY 52 SF S / SF SF SF SF &7 os SF SF OUTSIDE OF THE LIMITS OF DISTURBANCE SUPERVISOR WASHINGTON REGIONAL OFFICE AT 252 946-6481. SHALL REMAIN UNDISTURBED AND BE ( ) EXISTING EDGE OF WATER (NOT TO BE DISTURBED BELOW WATER SURFACE) CUT EX. UPROOTED TREES 18" ABOVE ROOT BALL LEAVING STUMP AN"OOT BALL INTACT. REMOVE TRUNKS, BRANCHES AND DEBRIS. STABILIZE AREA DISTURBED BY TREE REMOVAL. 2.06 I ' I1 \ \ I ®Q.90 I I // 02.42 I I \ 05.69 ii I ®7.04 ®6.96 / I 07.09 EIP PROTECTED AT ALL TIMES DURING CONSTRUCTION. CENTER OF BRIDGE OF US HWY. 264 / l �/���/ /Q BENL. CHMARK s 6. US / / VV / , 264 / EX. SQUARE CUT IN TOP OF BRIDGE WALL c qT 100' PUBLIC R/W - 69' BIB / c d ° ° �(i s° e ° ° 0 a d ° a 4 d ° d ° ° e 4° ° d [�/P� 4 d o ° ° 4 ° /Q�' UTILIZE EXISTING GRAVEL DRIVE J ° �G9°4 VISIBE EDGE OF CONCRETE AS CONSTRUCTION ENTRANCE - ° °° e ° d ° 4 ° a d a ° c ` d ° EXACT' L-OC-A�TION°yPT IaETERAJa'NED_ °d n ° d ° d ° / _-_-_- aQ -_Q_ --� a c A a d° a �_ •T O?2 _ G -_ a -_ -_ � -_ - - - - Q- a _ - - d d- d3 ° n ° 4 d e dd ° d - 7' °/ / AO '64 n d - - - - - a - - - - - - - - - -a- - -a - - - -- a n____ � -= =-_- _-° _________ d e d ° c Q ° ®T �� A ° ° 4° °°C®NCWA4K °e&0.91 44.20 60 ° ° ° 1.89 d °/ d 4 d ° d 4 d CITY WIDE ° d -A- -d- e A d 4 SPEED L IMI T _ d SIGN ---------�------ ° ''--------�-----°-- --- ° - y --A -- .11-�---T - - - 1�.80®10.50 / CONC. .46 CUT/REMOVE NATIVE MATERIAL AS ° ° d4 ° d /-- WATER REQUIRED TO INSTALL RIP -RAP SUCH THAT = \ 10- 010.25 e s/s GE OFRIP-RAPO /�� WASHINGTON M� Eo TOP OF ELEVATION IS ESTABLISHED S'1 3.97 `CONC. BENCHMARK r CITY LIMIT L - O BELOW NATURAL GROUND ELEVATION 4' �G• /� �9 COTTON SPINDLE 1 SIGN CITY 10 - PROTECT EXISTING 0.29 INSIDE PUMP STATION SITE FENCE. d< IN PIP UTILITY(S) (TYPICAL) EL. = 10.51 / R/W / S 27' 46' 00" E 67.66' �t.87 M -COMM- -COMM- -COMM-COMM- -COMM - 0/H FIBER OPTIC LINE) o A G \\ �k 3 S CLASS II RIP -RAP 36" DEEP WITH UNDERLINER (TYP.) �p1 4S aoa - ER .9 EGGS � O 1 T I 8 I CLASS II RIP RAP o \ N 36" DEEP WITH 1 I UNDERLINER (TYP.)4 sz SF 0.95 l e I2.06 ®T�.90 I I ®2.42 I \ / / I 05.69 I DEMOLITION LEGEND Existing Conditions and Demolition SCALE: 1"=10' 10' 0 5' 10' SCALE 1 inch = 10 ft - ��i+6�iiGlG = • , . EX. DRIVE CUT � !!!!!!!!!!!1111 .. ' ' • , �; , .� IN 1110014-11. ', .•� �• •.. •.,. �, ///rGG/001//11 � .. � . ,. ;.r-•,� •,i�, . •'.�r.;� .� ,.� .,.� ,;� ... •.r,�•.r'• • • • - � . 1"Irl FIR ���.����������S��l�e���l�l����� �• �• - _ .- s e _u 1 _.l .( �. c.1..1, .1 - �.:-3�����d., 1r •tl�•�•� •� �����• �._�� ���.��.,•�. ���� �� �` ������ • �' •' • •r���r�� • ��r�• �• �•"�. �•'�• • 97.95 ENCE �-GRADE /COMPACT CORNER TO CHAIN LINK FGRVL � GRVL SUBGRADE ELEVATION PRIOR �1' 7.30 TO REINSTALLATION OF FENCE 8.0 a6 S 27' 46 00 E O X1fY a 12 40' INSTALL 4" DEPTH WASHED #57 0 STONE WITHIN FENCED LIMITS 10' GRAVEL DRIVE 5 AFTER BANK STABILIZATION - - - - x WORK HAS BEEN PERFORMED o0 U -.X- 7.96 R ®. i fix` I I CONC. 4663 Sq.Ft. a IIJ i I I I 0.107 Ac. BUD7. 9 DING a I ® & 7.68 , $_ O I a I CONC. 7. 46, 00 11 14 II\1I 20. I�7.30 7.70 ®8.1.9-- - 11.4 - - .01 I ° 113 I GENERATOR Il H-FRA---Tk ELECT M C L-1 - 9.14 13 I GRVL WOOD � � ® 7.30 L PLATFORM _ CHAIN LINK SNjCF 8 - -x-- 8# -X7.76- - - X- - - - - GRVL 6.30 ®7.63 06.47 8_0 -07. F SF SF &7 08 SF SF N 27' 46 00" W 95.43 EIP ILIMITS OF / DISTURBANCE (0.16 ACRES) ®7.04 \ ®7-09 ®6.96 � I N I MAINTAIN EXISTING ACCESS TO PUMP STATION AT ALL TIMES DURING CONSTRUCTION - 1---a UTILIZE EXISTING GRAVEL DRIVE AS CONSTRUCTION ENTRANCE 00„ � -1/350 16 MIH N 0 0/ 59 WILLIAM H. PAGE, TRUST D. B. 1739, PG. 356 LOT 1 CHERRY RUN PROPERTIES, LLC P. C. G, SLD. 77-8 07.55 LOD .� .� 1• •�• .. is 7 ii i Proposed Improvements SCALE: 1"=10' 10' 0 5' 10' SCALE 1 inch = 10 ft Erosion Control General Notes 1. IN THE EVENT OF A CONFLICT BETWEEN THE REQUIREMENTS OF THE SEDIMENTATION POLLUTION CONTROL ACT, THE SUBMITTED PLAN AND/OR THE CONTRACT SPECIFICATIONS, THE MORE RESTRICTIVE REQUIREMENT SHALL PREVAIL. 2. THE LAND -DISTURBING ACTIVITY SHALL BE CONDUCTED IN ACCORDANCE WITH THE EROSION AND SEDIMENTATION CONTROL PLAN. 3. THE LATEST APPROVED EROSION AND SEDIMENTATION CONTROL PLAN WILL BE USED DURING PERIODIC UNANNOUNCED INSPECTIONS TO DETERMINE COMPLIANCE AND A COPY OF THE PLAN MUST BE ON FILE AT THE JOB SITE. IF IT IS DETERMINED THAT THE IMPLEMENTED PLAN IS INADEQUATE, THE ENGINEER MAY REQUIRE THE INSTALLATION OF ADDITIONAL MEASURES AND/OR THAT THE PLAN BE REVISED TO COMPLY WITH STATE LAW 4. IN ORDER TO COMPLY WITH THE INTENT OF THE ACT, THE SCHEDULING OF THE LAND -DISTURBING ACTIVITIES IS TO BE SUCH THAT BOTH THE AREA OF EXPOSURE AND THE TIME BETWEEN THE LAND DISTURBANCE AND THE PROVIDING OF A GROUND COVER IS MINIMIZED. 5. UNLESS A TEMPORARY, MANUFACTURED, LINING MATERIAL HAS BEEN SPECIFIED, A CLEAN STRAW MULCH MUST BE APPLIED, AT A MINIMUM RATE OF 2 TONS/ACRE, TO ALL SEEDED AREAS. THE MULCH MUST COVER AT LEAST 75%± OF THE SEEDED AREA AFTER IT IS EITHER TACKED, WITH AN ACCEPTABLE TACKING MATERIAL, OR CRIMPED IN PLACE. 6. NEW OR AFFECTED CUT OR FILLED SLOPES MUST BE AT AN ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER, AND MUST BE PROVIDED WITH A GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN A MAXIMUM OF 7 CALENDAR DAYS OF COMPLETION OF ANY PHASE (ROUGH OR FINAL) OF GRADING (ANNUAL RYE GRASS IS NOT IN THE APPROVED SEEDING SPECIFICATIONS NOR IS IT AN ACCEPTABLE SUBSTITUTE FOR THE PROVIDING OF A TEMPORARY GROUND COVER). 7. PROVIDE EROSION CONTROL MEASURES AROUND STOCK/WASTE PILES AND STAGING AREAS AS NEEDED OR AS DIRECTED BY ENGINEER. 8. EROSION CONTROL MEASURES SHALL NOT BE PLACED IN OR BELOW THE NORMAL WATER SURFACE OF A STREAM UNLESS SPECIFICALLY INDICATED ON THE APPROVED PLAN OR AS DIRECTED BY THE ENGINEER. 9. PROVIDE PERMANENT SEEDING IN ACCORDANCE WITH THE SEEDING SCHEDULE. Construction Seauence: THE WORK CONSISTS OF STREAM BANK STABILIZATION LOCATED BEHIND THE CHERRY RUN PUMP STATION IN THE CITY OF WASHINGTON. THE TOTAL ANTICIPATED PROJECT DURATION IS 30 CALENDAR DAYS. 1. CONTRACTOR MUST NOTIFY THE CITY OF WASHINGTON AND THE ENGINEER PRIOR TO INITIATING LAND DISTURBING ACTIVITIES. (REFER TO EROSION CONTROL PROVISIONS) 2. INSTALLATION OF EROSION CONTROL MEASURES 1 WEEK 3. CLEARING & GRUBBING 1 WEEK 4. STABILIZE EMBANKMENT 1 WEEK 5. SEEDING & CLOSEOUT 1 WEEK SEVERAL OF THE ITEMS LISTED ABOVE MAY BE CONSTRUCTED SIMULTANEOUSLY. Erosion Control Construction Seauence 1. WORK PERFORMED TO STABILIZE THE EMBANKMENT OF THE STREAM SHALL BE CONFINED TO AREAS WITHIN THE LIMITS OF DISTURBANCE SHOWN ON THE PLAN. 2. TEMPORARY EROSION CONTROL MEASURES SHALL BE INSTALLED WHERE INDICATED ON THE PLAN PRIOR TO BEGINNING WORK. 3. TEMPORARY EROSION CONTROL MEASURES MAY BE REMOVED UPON COMPLETION OF GRADING WORK AND STABILIZATION OF DISTURBED AREAS. AREAS DISTURBED BY THE REMOVAL OF TEMPORARY EROSION CONTROL MEASURES SHALL BE UNIFORMLY GRADED AND IMMEDIATELY STABILIZED AS INDICATED ON THE PLANS. 4. CONTRACTOR MAY TRAVERSE ALONG THE BANK OF THE STREAM WITHIN THE LIMITS OF DISTURBANCE AS SHOWN ON THE PLANS. CONTRACTOR SHALL NOT CROSS THE STREAM WITH EQUIPMENT OR GRADE BELOW THE WATER SURFACE. 5. INSTALL TEMPORARY SILT FENCE ALONG THE STREAM SLOPE AS INDICATED ON THE PLAN PRIOR TO BEGINNING TREE REMOVAL OR LAND DISTURBANCE. 6. REMOVE TEMPORARY SILT FENCE AFTER COMPLETION OF RIP RAP PLACEMENT & STABILIZATION OF ALL DISTURBED AREAS. 1 REVISIONS: 1 l ;Ooz REMOVE VEGETATION EW (STUMP, ROOT BALL, TRUNK, BRANCHES AND DEBRIS) M i CUT EXISTING UPROOTED TREES 18" ABOVE ROOT Z BALL NG STUMP AND ROOT BALL INTACT. IU D-1126 REMOVE TRUNKS, BRANCHES STABILIZE BED B AREA DISTURBED TR E REMOVAL. REMOVE, SALVAGE & REINSTALL EXISTING FENCE Existing Conditions and Demolition SCALE: 1"=10' 10' 0 5' 10' SCALE 1 inch = 10 ft - ��i+6�iiGlG = • , . EX. DRIVE CUT � !!!!!!!!!!!1111 .. ' ' • , �; , .� IN 1110014-11. ', .•� �• •.. •.,. �, ///rGG/001//11 � .. � . ,. ;.r-•,� •,i�, . •'.�r.;� .� ,.� .,.� ,;� ... •.r,�•.r'• • • • - � . 1"Irl FIR ���.����������S��l�e���l�l����� �• �• - _ .- s e _u 1 _.l .( �. c.1..1, .1 - �.:-3�����d., 1r •tl�•�•� •� �����• �._�� ���.��.,•�. ���� �� �` ������ • �' •' • •r���r�� • ��r�• �• �•"�. �•'�• • 97.95 ENCE �-GRADE /COMPACT CORNER TO CHAIN LINK FGRVL � GRVL SUBGRADE ELEVATION PRIOR �1' 7.30 TO REINSTALLATION OF FENCE 8.0 a6 S 27' 46 00 E O X1fY a 12 40' INSTALL 4" DEPTH WASHED #57 0 STONE WITHIN FENCED LIMITS 10' GRAVEL DRIVE 5 AFTER BANK STABILIZATION - - - - x WORK HAS BEEN PERFORMED o0 U -.X- 7.96 R ®. i fix` I I CONC. 4663 Sq.Ft. a IIJ i I I I 0.107 Ac. BUD7. 9 DING a I ® & 7.68 , $_ O I a I CONC. 7. 46, 00 11 14 II\1I 20. I�7.30 7.70 ®8.1.9-- - 11.4 - - .01 I ° 113 I GENERATOR Il H-FRA---Tk ELECT M C L-1 - 9.14 13 I GRVL WOOD � � ® 7.30 L PLATFORM _ CHAIN LINK SNjCF 8 - -x-- 8# -X7.76- - - X- - - - - GRVL 6.30 ®7.63 06.47 8_0 -07. F SF SF &7 08 SF SF N 27' 46 00" W 95.43 EIP ILIMITS OF / DISTURBANCE (0.16 ACRES) ®7.04 \ ®7-09 ®6.96 � I N I MAINTAIN EXISTING ACCESS TO PUMP STATION AT ALL TIMES DURING CONSTRUCTION - 1---a UTILIZE EXISTING GRAVEL DRIVE AS CONSTRUCTION ENTRANCE 00„ � -1/350 16 MIH N 0 0/ 59 WILLIAM H. PAGE, TRUST D. B. 1739, PG. 356 LOT 1 CHERRY RUN PROPERTIES, LLC P. C. G, SLD. 77-8 07.55 LOD .� .� 1• •�• .. is 7 ii i Proposed Improvements SCALE: 1"=10' 10' 0 5' 10' SCALE 1 inch = 10 ft Erosion Control General Notes 1. IN THE EVENT OF A CONFLICT BETWEEN THE REQUIREMENTS OF THE SEDIMENTATION POLLUTION CONTROL ACT, THE SUBMITTED PLAN AND/OR THE CONTRACT SPECIFICATIONS, THE MORE RESTRICTIVE REQUIREMENT SHALL PREVAIL. 2. THE LAND -DISTURBING ACTIVITY SHALL BE CONDUCTED IN ACCORDANCE WITH THE EROSION AND SEDIMENTATION CONTROL PLAN. 3. THE LATEST APPROVED EROSION AND SEDIMENTATION CONTROL PLAN WILL BE USED DURING PERIODIC UNANNOUNCED INSPECTIONS TO DETERMINE COMPLIANCE AND A COPY OF THE PLAN MUST BE ON FILE AT THE JOB SITE. IF IT IS DETERMINED THAT THE IMPLEMENTED PLAN IS INADEQUATE, THE ENGINEER MAY REQUIRE THE INSTALLATION OF ADDITIONAL MEASURES AND/OR THAT THE PLAN BE REVISED TO COMPLY WITH STATE LAW 4. IN ORDER TO COMPLY WITH THE INTENT OF THE ACT, THE SCHEDULING OF THE LAND -DISTURBING ACTIVITIES IS TO BE SUCH THAT BOTH THE AREA OF EXPOSURE AND THE TIME BETWEEN THE LAND DISTURBANCE AND THE PROVIDING OF A GROUND COVER IS MINIMIZED. 5. UNLESS A TEMPORARY, MANUFACTURED, LINING MATERIAL HAS BEEN SPECIFIED, A CLEAN STRAW MULCH MUST BE APPLIED, AT A MINIMUM RATE OF 2 TONS/ACRE, TO ALL SEEDED AREAS. THE MULCH MUST COVER AT LEAST 75%± OF THE SEEDED AREA AFTER IT IS EITHER TACKED, WITH AN ACCEPTABLE TACKING MATERIAL, OR CRIMPED IN PLACE. 6. NEW OR AFFECTED CUT OR FILLED SLOPES MUST BE AT AN ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER, AND MUST BE PROVIDED WITH A GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN A MAXIMUM OF 7 CALENDAR DAYS OF COMPLETION OF ANY PHASE (ROUGH OR FINAL) OF GRADING (ANNUAL RYE GRASS IS NOT IN THE APPROVED SEEDING SPECIFICATIONS NOR IS IT AN ACCEPTABLE SUBSTITUTE FOR THE PROVIDING OF A TEMPORARY GROUND COVER). 7. PROVIDE EROSION CONTROL MEASURES AROUND STOCK/WASTE PILES AND STAGING AREAS AS NEEDED OR AS DIRECTED BY ENGINEER. 8. EROSION CONTROL MEASURES SHALL NOT BE PLACED IN OR BELOW THE NORMAL WATER SURFACE OF A STREAM UNLESS SPECIFICALLY INDICATED ON THE APPROVED PLAN OR AS DIRECTED BY THE ENGINEER. 9. PROVIDE PERMANENT SEEDING IN ACCORDANCE WITH THE SEEDING SCHEDULE. Construction Seauence: THE WORK CONSISTS OF STREAM BANK STABILIZATION LOCATED BEHIND THE CHERRY RUN PUMP STATION IN THE CITY OF WASHINGTON. THE TOTAL ANTICIPATED PROJECT DURATION IS 30 CALENDAR DAYS. 1. CONTRACTOR MUST NOTIFY THE CITY OF WASHINGTON AND THE ENGINEER PRIOR TO INITIATING LAND DISTURBING ACTIVITIES. (REFER TO EROSION CONTROL PROVISIONS) 2. INSTALLATION OF EROSION CONTROL MEASURES 1 WEEK 3. CLEARING & GRUBBING 1 WEEK 4. STABILIZE EMBANKMENT 1 WEEK 5. SEEDING & CLOSEOUT 1 WEEK SEVERAL OF THE ITEMS LISTED ABOVE MAY BE CONSTRUCTED SIMULTANEOUSLY. Erosion Control Construction Seauence 1. WORK PERFORMED TO STABILIZE THE EMBANKMENT OF THE STREAM SHALL BE CONFINED TO AREAS WITHIN THE LIMITS OF DISTURBANCE SHOWN ON THE PLAN. 2. TEMPORARY EROSION CONTROL MEASURES SHALL BE INSTALLED WHERE INDICATED ON THE PLAN PRIOR TO BEGINNING WORK. 3. TEMPORARY EROSION CONTROL MEASURES MAY BE REMOVED UPON COMPLETION OF GRADING WORK AND STABILIZATION OF DISTURBED AREAS. AREAS DISTURBED BY THE REMOVAL OF TEMPORARY EROSION CONTROL MEASURES SHALL BE UNIFORMLY GRADED AND IMMEDIATELY STABILIZED AS INDICATED ON THE PLANS. 4. CONTRACTOR MAY TRAVERSE ALONG THE BANK OF THE STREAM WITHIN THE LIMITS OF DISTURBANCE AS SHOWN ON THE PLANS. CONTRACTOR SHALL NOT CROSS THE STREAM WITH EQUIPMENT OR GRADE BELOW THE WATER SURFACE. 5. INSTALL TEMPORARY SILT FENCE ALONG THE STREAM SLOPE AS INDICATED ON THE PLAN PRIOR TO BEGINNING TREE REMOVAL OR LAND DISTURBANCE. 6. REMOVE TEMPORARY SILT FENCE AFTER COMPLETION OF RIP RAP PLACEMENT & STABILIZATION OF ALL DISTURBED AREAS. 1 REVISIONS: 1 l ;Ooz Project Manager: BTO Drawn By: EW Checked By: M i Project Number: Z Drawing Number: D-1126 O L O - V - F -Z 037468 L QO Z Q cl) F 03/15/18 a ( o N ;✓ Z O EN �J JZ a � a 0 J j a m�° Ut o6 u) Z ZOw co O U m Z n U V w 00 L00 n L U00 V .� kn CO N -- aC 4J U 0000 m i Z 00 LV UU N 00 Y i C? > Lr) M Ltl 41 N Lr) 3 L_ NC7r O V Project Manager: BTO Drawn By: EW Checked By: BCF Project Number: 17038 Drawing Number: D-1126 i •� - SEAL - 037468 03/15/18 o Z`) U w JZ a J j a a` a Ut o6 u) Z ZOw O 0 Zz n U V w 00 L00 n L U00 .� kn CO N -- aC 4J U 0000 Ln i Z 00 t) UU N 00 Y C? > Lr) M Ltl 41 N Lr) 3 L_ NC7r Project Manager: BTO Drawn By: EW Checked By: BCF Project Number: 17038 Drawing Number: D-1126 C-5 Date: 01-23-2018 E 0 0 oo 0 M Mf EXI; 3 CONCRETE FOOT (4,000 3' FILTER FABRIC ON GROUND CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. 2"-3" COARSE AGGREGATE NOTE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2 -INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT A! NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NOTES: 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 4' MIN. FILTER STONE J FRONT VIEW FILTER OF 1" DIA. WASHED STONE BURY 6" OF UPPER q-"-- BURY WIRE FENCE AND EDGE OF FILTER HARDWARE CLOTH FABRIC IN TRENCH U SECTION VIEW NOT TO SCALE 8' MAX. STANDARD STRENGTH FABRIC W/ WIRE FENCE 6' MAX. EXTRA STRENGTH FABRIC W/O WIRE FENCE 0110000000000001 01 =MEI (APRIL 1 -JULY 31) MI1EENNEENEE MI1EEMENEENE .11■■■■■■■■■M ■I - 15 LBS/ACRE CENTIPEDE '• (AUGUST 1 - DECEMBER 31) WIRE FABRIC OQ UV RESISTANT �\\�5� GEOTEXTILE FABRIC m TAMPED BACKFILL GROUND LINE 77 7171 > 8" DOWN & 4" FORWARD ALONG THE TRENCH TEMPORARY SILT FENCE NOT TO SCALE TOP OF SILT FENCE MUST BE AT LEAST V ABOVETHETOP BURY WIRE FENCE, FILTER FABRIC AND HARDWARE CLOTH IN TRENCH STEEL FENCE POST SET MAX 2' U APARTI8" INTO SOLID GROUND Pf B( SILT FENCE OUTLET NOT TO SCALE I_9:0;,u/"IffolLIN 961DI:11 1k1r1_'t►f#" MWD (JANUARY 1 - MARCH 31) COMMON BERMUDA GRASS (UNHULLED) - 20 LBS/ACRE (APRIL 1 -JULY 31) - 2 TONS/ACRE COMMON BERMUDA GRASS (HULLED) - 15 LBS/ACRE CENTIPEDE - 8 LBS/ACRE (AUGUST 1 - DECEMBER 31) (VISUAL) COMMON BERMUDA GRASS (UNHULLED) - 15 LBS/ACRE TALL FESCUE - 120 LBS/ACRE CENTIPEDE - 8 LBS/ACRE HERBACEOUS WETLAND SEED MIX Q- FOLLOW MANUFACTURER'S RECOMMENDATIONS AS TO APPLICATION RATE, SEEDBED PREPARATION AND SEED APPLICATION TIMES SOIL AMENDMENTS Drawn By: LIMESTONE - 2 TONS/ACRE FERTILIZER (10-10-10) - 1000 LBS/ACRE STRAW MULCH - 2 TONS/ACRE D-1126 (VISUAL) EMULSIFIED ASPHALT TACK -0.03 Z Z0 GALLONS/SQ. V YARD TEMP. SEEDING (SUMMER SPECIES RATE (LBS/ACRE) GERMAN MILLET 40 SEEDING DATES 4/15-8/15 SCILAMENDMENTS LIMESTONE 2000 LBS/ACRE FERTILIZER (10-10-10) 750 LBS/ACRE STRAW MULCH 4000 LBS/ACRE EMULSIFIED ASPHALT TACK 435 GALLONS/ACRE TEMP. SEEDING (WINTER) SPECIES RATE (LBS/ACRE) RYE GRAIN 120 SEEDING DATES 8/16-4/14 SCILAMENDMENTS LIMESTONE 2000 LBS/ACRE FERTILIZER (10-10-10) 750 LBS/ACRE STRAW MULCH 4000 LBS/ACRE EMULSIFIED ASPHALT TACK 435 GALLONS/ACRE STANDARD CHAIN LINK FENCE NOT TO SCALE Rip -Rap Lined Slope NOT TO SCALE PROPOSED STONE SECTION NOT TO SCALE GENERAL NOTES 1. CONTRACTOR SHALL CONTACT INC ONE -CALL AT 811 AT LEAST 72 HOURS IN ADVANCE OF ANY LAND DISTURBING ACTIVITY OR EXCAVATION AND HAVE ALL UNDERGROUND UTILITIES LOCATED PRIOR TO EXCAVATING OR TRENCHING. 2. THE CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE OWNER AND/OR ENGINEER FOR ANY AND ALL INJURIES AND/OR DAMAGES TO PERSONNEL, EQUIPMENT AND/OR EXISTING FACILITIES IN THE DEMOLITION AND CONSTRUCTION DESCRIBED IN THE PLANS AND SPECIFICATIONS. 3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE PERMITS REQUIRED FOR DEMOLITION WORK. 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE SITE AND BE FAMILIAR WITH EXISTING CONDITIONS PRIOR TO BIDDING ON THE WORK FOR THIS PROJECT. IF CONDITIONS ENCOUNTERED DURING EXAMINATION ARE SIGNIFICANTLY DIFFERENT THAN THOSE SHOWN, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 5. ALL DEMOLITION WASTE AND DEBRIS SHALL BE REMOVED BY THE CONTRACTOR AND DISPOSED OF IN A STATE APPROVED WASTE SITE AND IN ACCORDANCE WITH ALL LOCAL AND STATE CODES AND PERMIT REQUIREMENTS. 6. THE BURNING OF CLEARED MATERIAL AND DEBRIS SHALL NOT BE ALLOWED. 7. CONTRACTOR SHALL PROTECT ALL CORNER PINS, MONUMENTS, PROPERTY CORNERS, AND BENCHMARKS DURING DEMOLITION AND / OR CONSTRUCTION ACTIVITIES. IF DISTURBED, CONTRACTOR SHALL HAVE DISTURBED ITEMS RESET BY A LICENSED SURVEYOR AT NO ADDITIONAL COST TO THE OWNER. 8. CONTRACTOR SHALL ADHERE TO ALL LOCAL, STATE, FEDERAL, AND OSHA REGULATIONS. 9. CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH THE CURRENT ADDITION OF THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), NCDOT STANDARDS, AND AS REQUIRED BY LOCAL AGENCIES WHEN WORKING IN AND/OR ALONG STREETS, ROADS, HIGHWAYS, ETC. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN APPROVAL AND COORDINATE WITH THE LOCAL AND/OR STATE AGENCIES REGARDING THE NEED, EXTENT, AND LIMITATIONS ASSOCIATED WITH INSTALLING AND MAINTAINING TRAFFIC CONTROL MEASURES. 10. CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL MEASURES IF REQUIRED. 11. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL PROPERTY AT ALL TIMES, EXCEPT THAT THE CONTRACTOR MAY TEMPORARILY BLOCK ACCESS DURING TRENCHING OPERATIONS DIRECTLY IN FRONT OF DRIVEWAYS UPON APPROVAL FROM PROPERTY OWNER AND ENGINEER. CONTRACTOR SHALL GIVE PROPERTY OWNER A MINIMUM OF 48 HOURS NOTICE PRIOR TO BLOCKING DRIVEWAYS TO ALLOW OWNER TO MAKE ALTERNATE ARRANGEMENTS. 12. CONTRACTOR SHALL NOT CROSS A STREAM WITH EQUIPMENT OR PERSONNEL OR PERFORM WORK IN THE STREAM BELOW THE NORMAL WATER SURFACE ELEVATION. CONTRACTOR IS RESPONSIBLE FOR CREATING A TRAVEL WAY AS NEEDED TO NAVIGATE UP AND DOWN THE STREAM BANKS. UNDERCUT EXCAVATION AND SELECT BACKFILL, IF REQUIRED TO MAINTAIN A SUITABLE CONSTRUCTION TRAVEL WAY, IS THE CONTRACTOR'S RESPONSIBILITY AND WILL NOT BE A SEPARATE PAY ITEM. 13. CONTRACTOR SHALL PROTECT AT ALL TIMES ADJACENT STRUCTURES AND ITEMS FROM DAMAGE DUE TO DEMOLITION OR CONSTRUCTION ACTIVITIES. 14. CONTRACTOR SHALL CONTACT THE CITY OF WASHINGTON ELECTRIC DEPARTMENT TO SCHEDULE RELOCATION OR BRACING OF EXISTING UTILITY POLES. 15. CONTRACTOR SHALL COORDINATE EXISTING FACILITIES UTILITY DISCONNECTS WITH THE OWNING UTILITY REPRESENTATIVE A MINIMUM 7 DAYS PRIOR TO ANTICIPATED DEMOLITION OF STRUCTURES OR INTERRUPTION OF SERVICE. 16. REMOVE EXISTING ON-SITE TREES, SHRUBS, HEDGES, FENCES TO LIMITS OF DISTURBANCE OR CLEARING LIMITS UNLESS OTHERWISE NOTED. 17. TREES OUTSIDE OF LIMITS OF DISTURBANCE OR ON ADJACENT PROPERTY SHALL BE PROTECTED AT ALL TIMES DURING CONSTRUCTION. 18. ALL CONSTRUCTION WITHIN NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RIGHT RIGHT OF WAY SHALL COMPLY WITH THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 2012 STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. 19. CONTRACTOR SHALL NOT PERFORM ANY WORK OR DISTURB ANY AREA OUTSIDE OF THE PUBLIC RIGHTS OF WAY, EXISTING EASEMENTS OR LIMITS OF DISTURBANCE WITHOUT APPROVAL OF ENGINEER AND LAND OWNER. 20. WETLANDS AND STREAMS ARE VALUABLE NATURAL RESOURCES THAT PROVIDE IMPORTANT ECOLOGICAL FUNCTIONS. BE ADVISED THAT ACTIVITIES WITHIN WETLANDS, STREAMS AND STREAM BUFFERS ARE REGULATED BY THE STATE OF NORTH CAROLINA AND THE FEDERAL GOVERNMENT. WETLANDS AND STREAM BUFFERS SHOWN ON THESE PLANS ARE BASED UPON FIELD OBSERVATIONS AND DO NOT REPRESENT JURISDICTIONAL DETERMINATIONS. REFER TO SPECIFIC PERMIT REQUIREMENTS AS CONTAINED IN THE PROJECT SPECIFICATIONS. LIST OF UTILITY OWNERS: TYPE OWNER/CONTACT PERSON GAS PIEDMONT NATURAL GAS DAVID KENNEDY 111 EXECUTIVE PARKWAY NEW BERN, N.C. 28562 WATER/SEWER ELECTRIC TELEPHONE CABLE TV STATE ROAD CITY OF WASHINGTON FRANKIE BUCK 102 E. 2nd STREET WASHINGTON, N.C. 27889 CITY OF WASHINGTON 102 E. 2nd STREET WASHINGTON, N.C. 27889 CENTURYLINK CECELIA PRICE 1528 BRIMLEY DRIVE GREENVILLE, N.C. 27834 SUDDENLINK MELVIN HART 910 HACKNEY AVE. WASHINGTON, N.C. 27889 N.C.D.O.T. GENE PITTMAN 1701 W. FIFTH STREET WASHINGTON, N.C. 27889 CITY STREET CITY OF WASHINGTON FRANKIE BUCK 102 E. 2nd STREET WASHINGTON, N.C. 27889 SEEDBED PREPARATION PHONE (252)617-0400 (252)975-9302 (252)975-9303 (252)321-9401 (252)948-3363 (252)946-3689 (252)975-9302 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3" DEEP. 2. RIP ENTIRE AREA 8" DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLE SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME AND FERTILIZER UNIFORMLY AND MIX WITH SOIL. 5. CONTINUE TILLAGE UNTIL A WELL PULVERIZED, REASONABLE UNIFORM SEEDBED IS PREPARED 4" TO 6" DEEP. 6. SPREAD SEED ON FRESHLY PREPARED SEEDBED AND COVER LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACKER AFTER SEEDING. 7. SEEDBED SHALL BE IMMEDIATELY STABILIZE AFTER PREPARATION. EROSION CONTROL MEASURES 1. All work will be done in accordance with the Sedimentation Control Act of 1973 and requirements of the North Carolina Department of Environmental Quality. No land disturbing activity beyond that required to install the appropriate erosion control measures may proceed until measures are inspected and approved by the Engineer. 2. Prior to demolition operations, silt fence and straw wattles shall be installed as shown on the construction drawings. 3. Disturbed areas shall be seeded to stabilize the soil. Seed bed preparation shall be conducted according to North Carolina Department of Transportation Standard Specifications for Roads and Structures (D.O.T.). The ground surface shall be cleared of stumps, stones, roots, cables, wire, grade stakes, and other materials that might hinder proper grading, tillage, seeding or subsequent maintenance operations. Grades on the area to be seeded shall be maintained in a true and even condition. Maintenance shall include any necessary repairs to previously graded areas. All graded areas shall be thoroughly tilled to a depth of at least four (4) inches by plowing, disking, harrowing, or other approved methods until the condition of the soil is acceptable. On sites where soil conditions are such that high clay content and excessive compaction cause difficulty in getting clods and lumps effectively pulverized, the Contractor shall use the rotary tillage machinery until the mixing of the soil is acceptable and no clods or clumps remain larger than 11/2 inches in diameter. A firm and compact seed bed is required and after being graded, the seed bed shall be lightly compacted with a land roller, such as a cultipacker, before and after seeding. Limestone shall be dolomitic agriculture ground limestone containing not less than 10 percent magnesium oxide. Lime shall be uniformly applied at the rate of 2 tons per acre. Fertilizer shall be uniformly applied at a rate of 500 pounds per acre of 10-20-20 analysis. The fertilizer shall be incorporated into the upper three or four inches of prepared seed bed just prior to the last tillage operation, but in no case shall it be applied more than three days prior to seeding. Fertilizer shall be used immediately after delivery or stored in a manner that will not permit it to harden or destroy its effectiveness. When hydroseeding equipment is used for seeding, fertilizer shall be applied simultaneously with seed, using the above rates of application. Seed shall be certified seed or equivalent based on North Carolina Seed Improvement Association requirements for certification. All seed shall be furnished in sealed standard containers. Seed which has become wet, moldy, or otherwise damaged prior to seeding will not be acceptable. Seeding shall be accomplished with hand planters, power- drawn planters, hand packers, or hydroseeding equipment at the rates prescribed in the Permanent Seeding Schedule at left: 4. Ground Stabilization (Per NCG010000) a. Soil stabilization shall be achieved on any area of a site where land -disturbing activities have temporarily or permanently ceased according to the following schedule: i. All perimeter dikes, swales, ditches, perimeter slopes and all slopes steeper than 3 horizontal to 1 vertical (3:1) shall be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 7 calendar days from the last land -disturbing activity. ii. All other disturbed areas shall be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 14 calendar days from the last land -disturbing activity. b. Conditions - In meeting the stabilization requirements above, the following conditions or exemptions shall apply: i. Extensions of time may be approved by the permitting authority based on weather or other site-specific conditions that make compliance impracticable. ii. All slopes 50' in length or greater shall apply the ground cover within 7 days except when the slope is flatter than 4:1. Slopes less than 50' shall apply ground cover within 14 days except when slopes are steeper than 3:1, the 7 day -requirement applies. iii. Any sloped area flatter than 4:1 shall be exempt from the 7 -day ground cover requirement. iv. Slopes 10' or less in length shall be exempt from the 7 -day ground cover requirement except when the slope is steeper than 2:1. V. Although stabilization is usually specified as ground cover, other methods, such as chemical stabilization, may be allowed on a case-by-case basis. vi. For portions of projects within one mile and draining to trout waters and High Quality Waters as classified by the Environmental Management Commission, stabilization with ground cover shall be achieved as soon as practicable but in any event on all areas of the site within 7 calendar days from the last land -disturbing act. vii. For portions of projects located in Outstanding Resource Waters watersheds as classified by the Environmental Management Commission, stabilization with ground cover shall be achieved as soon as practicable but in any event on all areas within 7 calendar days from the last land -disturbing act. viii. Portions of a site that are lower in elevation than adjacent discharge locations and are not expected to discharge during construction may be exempt from the temporary ground cover requirements if identified on the approved E&SC plan or added by the permitting authority. 5. Self Inspection and Reporting Requirements (Per NCG010000) Minimum self inspection and reporting requirements are as follows unless otherwise approved in writing by the Division of Environmental Quality Division of Energy, Mineral and Land Resources. a. A rain gauge shall be maintained in good working order on the site unless another rain monitoring device has been approved by the permitting authority. b. A written record of the daily rainfall amounts shall be retained and all records shall be made available to DEQ or authorized agent upon request (Note: if no rainfall occurred, the permittee must record zero ). C. Erosion and sedimentation control measures shall be inspected to ensure that they are operating correctly. Inspection records must be maintained for each inspection event and for each measure. At a minimum, inspection of measures must occur at the frequency indicated below: i. All erosion and sedimentation control measures must be inspected by or under the direction of the permittee at least once every seven calendar days, and ii. All erosion and sediment control measures must be inspected by or under the direction of the permittee within 24 hours after any storm event of greater than 0.50 inches of rain per 24 hour period. iii. Times when a determination that adverse weather conditions prevented inspections should be documented on the Inspection Record. d. Once land disturbance has begun on the site, stormwater runoff discharge outfalls shall be inspected by observation for erosion, sedimentation and other stormwater discharge characteristics such as clarity, floating solids, and oil sheens. Inspections of the outfalls shall be made at least once every seven calendar days and within 24 hours after any storm event of greater than 0.50 inches of rain per 24 hour period. e. Inspections are only required to be made during normal business hours. When adverse weather conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection can be delayed until it is deemed safe to perform these duties. If the inspection cannot be done on that day, it must be completed on the following business day. f. Twenty-four Hour Reporting for visible sediment deposition i. The permittee shall report to the Division of Environmental Quality central office or the appropriate regional office any visible sediment being deposited in any stream or wetland or any noncompliance which may endanger health or the environment. (See Section IX of this permit for contact information.) Any information shall be provided orally or electronically within 24 hours from the time the permittee became aware of the circumstances. Visible discoloration or suspended solids in the effluent should be recorded on the Inspection Record as provided below. ii. A written submission shall be provided to the appropriate regional office of the DEQ within 5 days of the time the permittee becomes aware of the circumstances. The written submission shall contain a description of the sediment deposition and actions taken to address the cause of the deposition. The Division of Environmental Quality staff may waive the requirement for a written report on a case-by-case basis. g. Records of inspections made during the previous 30 days shall remain on the site and available for agency inspectors at all times during normal working hours, unless the permitting authority provides a site-specific exemption based on unique site conditions that make this requirement not practical. Older records must be maintained for a period of one year after project completion and made available upon request. The records must provide the details of each inspection including observations, and actions taken in accordance with this permit. The permittee shall record the required rainfall and monitoring observations on the Inspection Record for Activities Under Stormwater General Permit NCGO10000 form provided by the Division or a similar inspection form that is inclusive of all of the elements contained in the Division's form. Electronic storage of records will be allowed if approved by the permitting authority. h. Inspection records must include, at a minimum, the following: i. Control Measure Inspections: Inspection records must include at a minimum: 1. identification of the measures inspected, 2. date and time of the inspection, 3. name of the person performing the inspection, 4. indication of whether the measures were operating properly, 5. description of maintenance needs for the measure, 6. corrective actions taken and 7. date of actions taken. ii. Stormwater Discharge Inspections: Inspection records must include at a minimum: 1. identification of the discharge outfall inspected, 2. date and time of the inspection, 3. name of the person performing the inspection, 4. evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. indication of visible sediment leaving the site, 6. actions taken to correct/prevent sedimentation and 7. date of actions taken. iii. Visible Sedimentation Found Outside the Site Limits: Inspection records must include: 1. an explanation as to the actions taken to control future releases, 2. actions taken to clean up or stabilize the sediment that has left the site limits and 3. the date of actions taken. iv. Visible Sedimentation Found in Streams or Wetlands: All inspections should include evaluation of streams or wetlands onsite or offsite (where accessible) to determine if visible sedimentation has occurred. V. Visible Stream Turbidity - If the discharge from a site results in visible stream turbidity, inspection records must record that evidence and actions taken to reduce sediment contributions. Sites discharging to streams named on the state's 303(d) list as impaired for sediment -related causes may be required to perform additional monitoring, inspections or application of more -stringent management practices if it is determined that the additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. If a discharge covered by this permit enters a stream segment that is listed on the Impaired Stream List for sediment -related causes, and a Total Maximum Daily Load (TMDL) has been prepared for those pollutants, the permittee must implement measures to ensure that the discharge of pollutants from the site is consistent with the assumptions and meets the requirements of the approved TMDL. The DWQ 303(d) list can be found at: http://h2o.enr.state.nc.us/tmdl/General_303d.htm/ 6. All erosion and sedimentation control devices shall remain in place and be maintained by the Contractor until all seeding is established and construction areas have been stabilized. 7. Temporary Seeding - Seed in accordance with the Temporary Seeding Schedule with regard to seed type, rate of application, fertilizer, etc. Z zp W V 2 o O N z 0 0 o W m a 0 0 0 00 N W W � � N c W ti ' N Q N l) N 0 0 1 REVISIONS: R ' •� SEAL •i 037468 - 03/15/18 Z a U w Drawn By: EW ~aZ M i Project Number: Z Drawing Number: D-1126 O L 0 Z Z0 V 0 Z6 �Z Q- V w L L QQ -6 Ln >c CO N 00 U0 on +1 Z J_ LLA i 00 � LU � N to N o 0 J �v Q i 41 N a Ln v u, r, C 4 (D 3 Z Q ZUJ _ = p Z OC Z Q o � % W300 i V 4- 0 f+ V R ' •� SEAL •i 037468 - 03/15/18 Z a U w Drawn By: EW ~aZ BCF Project Number: J a Drawing Number: D-1126 a`a J o6 U tAD U Z Z0 o 0 Z6 Q- V w L -6 Ln >c CO N 00 U0 on +1 - U 0000 LLA i 00 00,0- 10 J UU 0 Lin zm 41 N 3 Ln v u, r, C 4 (D 3 Project Manager: BTO Drawn By: EW Checked By: BCF Project Number: 17038 Drawing Number: D-1126 r Date: 01-23-2018 E 0 0 0 27.29 v P/PP 25,85 GHE OHE - - P�P - UNE OHE - OHL - O V - O/H POWER PSP HODGES A VENUE 60' R/W - 20' GRA VEL IPS (CONTROL POINT) N 659312.41 22 S 43' 19 44 » E 223.6 R/W EIP N 659149.70 E 2585332.28 ELEV. = 24.34 S 3� ✓v+� C/o E 2585178.80 �J / _ _ W (CONTROL POINT) - - - - - - i _ _ STM M/H (ACCESS TO PIPE) �� �� N N 65C 8 (CONTROL ELEV. = 21.49 TOP 24.17 - 1 0 0 INV = 1a.8.n C E 2585036.13 / R/W ACTUAL INV. OF 42" CMP / ELEV. = 24.17 S J(� NOT ACCESSABCE+21998 J m / TOP OF SEWER LINE ELEV. = 15.40 LEGEND: 214,15/ 30" 5/ Pwc:7 /+ C/O ;�P PTOP = 20.39� / �yF INV. = 18.52/�D// - -X - - - -X - - - -X - - - -X - - - -X- TOP = 18.88 -'8.25 \ OyF \ p/y po R \ \\\\ INV. = 14.44 J \ \\ �' C/O olle PRO % POSED / \V 11 D P TOP = 17.07 42'" CMP INV. = 11.07 2 fj 48" CMP INV. = 8.22 18" RCP S INV. = 111.00 SUBS TA TION k / �x16IF \ rT0 oy 48" CMP F h WI �%\o q� \NV. = 6.67 xo h hF � �• - OHE - - - - OHE - OHE - - - k OHE - - k - - - OHE - ti do o _ hFF _ - _ - OHE - - O/H POWER LINES - // �' 55 �� G -E - - - OHE - - - OHE - - • - OHE - OHE - - OHE OHE - - C O // ° �5. �2 \ o p/p c/� HE - - - - P/P q 7.65 b - OHE - - 1 +11.34 \ ' - OHE - - // OHE - - - - OHE - - - OHE - OHE s)O QEF//WD Ap \ \ ^ 10.34 bh b^ ^� bb bcb OD Zb B - �� - - - �2. EX 6' CHAIN LINK FENCE �M' - - % -X -X - -X - - -X - -X 12.68 e", - 3H0 - 3H0 - • - 3H0 - a - - 3H0 LIP „ O/H POWER h P/P 2 x I JS.9 J0"_ do ? o 9 PINE o2 36„ \, ' q PINE 2 00 7.22 °j�i °' g Ir 10.47 48"' CMP24" > x � �,39 � � � 2� � o TOa OF qNk b PINE q~ qb \ A INV. f2.68 a6 e W \ 34 \ Pcbi lb�bo STM M/H 2° 4J�37 Epcf 01 \ _` o EDGE of WATER 2o- \ bb x 2^ 2 0 TOP = 25.41 b R� 2 M b OF _- � lYq� 99 b b b X 22 BANK INV. = 20.61 0, _ �� x>S6 \ ^ 1' b �� b� 0h 70P h _ �\ , 8.39 �b - - --+') ,b2 �I _� �_ h V *3.�8 +633 +5.08 +4.54 +4.831_ - - _ �'"- �� O S _ W -- _ - _ 69 S +ss TOP OF BANK oA x~ V b + 8.98 "S °' +10,48 ' 36" S 9> EDGE OF WATER 9 ° cD PINE O w Xao x99> ' 36„ +9.58 %8 ° s PINE 9 r�4 O Q) O R :2 I 1 q'x O 2 I W h xo. ^ OZ hb q I Z O I NO TES: P/P R/W - RIGHT OF WA Y BIB 0� ® D/I - 2bo 2b2b _♦ - OHE- P/P - - OHE • M/H - MANHOLE SIS - SANI TAR Y SEWER STM CAB RCP- REINFORCED CONCRETE PIPE CMP - CORRUGATED METAL PIPE / - PROPERTY LINE U/G II O/H - OVERHEAD MIH - POWER POLE / - LIGHT POLE G/W II ® C/O - CLEANOUT INV. / h - EXISTING SPOT ELEVATION CSB 2btie 7' N A GHE OHE - - P�P - UNE OHE - OHL - O V - O/H POWER PSP HODGES A VENUE 60' R/W - 20' GRA VEL IPS (CONTROL POINT) N 659312.41 22 S 43' 19 44 » E 223.6 R/W EIP N 659149.70 E 2585332.28 ELEV. = 24.34 S 3� ✓v+� C/o E 2585178.80 �J / _ _ W (CONTROL POINT) - - - - - - i _ _ STM M/H (ACCESS TO PIPE) �� �� N N 65C 8 (CONTROL ELEV. = 21.49 TOP 24.17 - 1 0 0 INV = 1a.8.n C E 2585036.13 / R/W ACTUAL INV. OF 42" CMP / ELEV. = 24.17 S J(� NOT ACCESSABCE+21998 J m / TOP OF SEWER LINE ELEV. = 15.40 LEGEND: 214,15/ 30" 5/ Pwc:7 /+ C/O ;�P PTOP = 20.39� / �yF INV. = 18.52/�D// - -X - - - -X - - - -X - - - -X - - - -X- TOP = 18.88 -'8.25 \ OyF \ p/y po R \ \\\\ INV. = 14.44 J \ \\ �' C/O olle PRO % POSED / \V 11 D P TOP = 17.07 42'" CMP INV. = 11.07 2 fj 48" CMP INV. = 8.22 18" RCP S INV. = 111.00 SUBS TA TION k / �x16IF \ rT0 oy 48" CMP F h WI �%\o q� \NV. = 6.67 xo h hF � �• - OHE - - - - OHE - OHE - - - k OHE - - k - - - OHE - ti do o _ hFF _ - _ - OHE - - O/H POWER LINES - // �' 55 �� G -E - - - OHE - - - OHE - - • - OHE - OHE - - OHE OHE - - C O // ° �5. �2 \ o p/p c/� HE - - - - P/P q 7.65 b - OHE - - 1 +11.34 \ ' - OHE - - // OHE - - - - OHE - - - OHE - OHE s)O QEF//WD Ap \ \ ^ 10.34 bh b^ ^� bb bcb OD Zb B - �� - - - �2. EX 6' CHAIN LINK FENCE �M' - - % -X -X - -X - - -X - -X 12.68 e", - 3H0 - 3H0 - • - 3H0 - a - - 3H0 LIP „ O/H POWER h P/P 2 x I JS.9 J0"_ do ? o 9 PINE o2 36„ \, ' q PINE 2 00 7.22 °j�i °' g Ir 10.47 48"' CMP24" > x � �,39 � � � 2� � o TOa OF qNk b PINE q~ qb \ A INV. f2.68 a6 e W \ 34 \ Pcbi lb�bo STM M/H 2° 4J�37 Epcf 01 \ _` o EDGE of WATER 2o- \ bb x 2^ 2 0 TOP = 25.41 b R� 2 M b OF _- � lYq� 99 b b b X 22 BANK INV. = 20.61 0, _ �� x>S6 \ ^ 1' b �� b� 0h 70P h _ �\ , 8.39 �b - - --+') ,b2 �I _� �_ h V *3.�8 +633 +5.08 +4.54 +4.831_ - - _ �'"- �� O S _ W -- _ - _ 69 S +ss TOP OF BANK oA x~ V b + 8.98 "S °' +10,48 ' 36" S 9> EDGE OF WATER 9 ° cD PINE O w Xao x99> ' 36„ +9.58 %8 ° s PINE 9 r�4 O Q) O R :2 I 1 q'x O 2 I W h xo. ^ OZ hb q I Z O I NO TES: P/P R/W - RIGHT OF WA Y BIB - BACK OF CURB TO BACK OF CURB ® D/I - DROP INLETN ® C/B - CATCH BASIN • M/H - MANHOLE SIS - SANI TAR Y SEWER STM - STORM SEWER RCP- REINFORCED CONCRETE PIPE CMP - CORRUGATED METAL PIPE P/L - PROPERTY LINE U/G - UNDERGROUND O/H - OVERHEAD • PIP - POWER POLE • LIP - LIGHT POLE G/W - GUY WIRE ® C/O - CLEANOUT INV. - INVERT + 7214 - EXISTING SPOT ELEVATION 1. ELEVA TIONS SHOWN ARE NA VD 88 DA TUM FROM NCGS MONUMENT "OAKDALE" 2. NO 811 CALL WAS MADE THIS DATE. UNDERGROUND UTILITIES SHOWN ARE FROM INFORMATION FOUND ON THE GROUND. SURVEYOR'S CERT/F/CA T/ON 1, GARY S. MILLER, CERTIFY THAT THE TOPOGRAPHICAL SURVEY, AND HORIZONTAL AND VERTICAL CONTROL SHOWN HEREON WERE COMPLETED UNDER MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL GROUND SURVEY MADE UNDER MY SUPERVISION, THAT THE TOPOGRAPHIC SURVEY WAS PERFORMED TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS AS APPLICABLE- THAT THE TOPOGRAPHIC DATA WAS OBTAINED ON JUL Y 11, 2017 THA T THE SURVEY WAS COMPLETED ON __ ✓UL Y 13, 2017 THA T THE CONTOURS SHOWN AS BROKEN LINES MA Y NOT MEET THE STA TED STANDARD; THA T VERTICAL CONTROL WAS ESTABLISHED AT THE SITE TO THE CLASS `A" STANDARD; AND THAT THIS MAP MEETS THE REQUIREMENTS OF THE `STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA" (21 NCAC 56.1600). WITNESS MY ORIGINAL SIGNATURE AND SEAL THIS THE 31st DAY OF JULY___, 2017 SIGNED ---------------------------------- GARY S. MILLER, PROFESSIONAL LAND SURVEYOR REG. NO. L-2562 REFERENCE.' DEED BK. 680, PG. 53 MAP BK. 20, PG. 9 OWNER(S) CITY OF WASHINGTON ADDRESS PHONE GARY S. MILLER SURVEYED: MCP GM & ASSOCIATES, P.A. LAND SURVEYORS DRAWN. BL GARY S. MILLER, RLS 1803 South Charles Blvd. Phone (252)756-7878 Greenville, N.C. 27858 Fox (252)756-0785 License # C-0225 CHECKED: GSM Bar Sccle 40 20 0 40 80 DA TE I EXPLANA TION APPROVED: GSM REWS/ONS DATE.• 07-31-17 SCALE: 1" = 40' 1_24_18 REKSE NAME & ADD REFERENCES 0 1 WCINI TY MAP HODGES AVE Q W c� °o z S/ TE MAPLE ST. TOPOGRAPHICAL SUR VEY FOR Cl TY OF WA SHIN TON WASH/NG TON NO SCALE BEAUFORT COUNTY, NORTH CAROL/NA SCALE: 1" = 40' JUL Y 31, 2017 WO 17143 FB 379 17143. dwq/17143. psd �5 WCINI TY MAP HODGES AVE Q W c� °o z S/ TE MAPLE ST. TOPOGRAPHICAL SUR VEY FOR Cl TY OF WA SHIN TON WASH/NG TON NO SCALE BEAUFORT COUNTY, NORTH CAROL/NA SCALE: 1" = 40' JUL Y 31, 2017 WO 17143 FB 379 17143. dwq/17143. psd