HomeMy WebLinkAboutNCS000292 Review DocumentNC Division of Energy, Mineral and Land Resources
Review of Permit Renewal — NCS000292
Resinall Corporation
• SIC 2851— Paints, varnishes, enamels and allied products -> Rosin resins, hydrocarbon resins and
specialty resins.
• Monitoring —The facility has been monitoring for COD, TSS, TN, TP and pH. Previous permit did
have tier system (2 tiers)
o Data summary was given as averages. Most numbers low enough that exceedances
unlikely. Checked Central Files for 2015, 2016 and 2017 numbers. Data was okay and
did not exceed benchmarks.
o TN and TP monitoring because it is an NSW watershed. Data do not indicate nutrient
problems. Drop these parameters.
o Maintain COD, TSS and pH monitoring.
o Tier structure adjusted to have the three levels in current permits.
o VM monitoring changed to be consistent with current permits.
o Parameter codes added to permit.
• Facility drains to a UT to Kirbys Creek 25-4-4 in the Chowan River Basin, class C NSW. 2014
Assessment Report shows no listing for this stream segment other than the statewide Hg listing
and this facility has no indication of Hg source. Basin is NSW, but facility monitored for nutrient
parameters since 2007 with no benchmark exceedances. There is no specific strategy or TMDL
developed for the Chowan river basin for nutrients that would impact this facility.
• NC National Heritage review —The letter in the file and map indicates two aquatic resources
near the project site. However, the Resinall site actually drains away from the location of these
resources. Note added to the NHP map. See NHP letter and map on next page.
• RRO — Email from Thad 3/1/2018 indicated he would try and get to the site but may not be
before time to issue. Indicated that we could move forward and he would inspect as soon as he
could. BIMS indicates the facility was inspected 3/26/18 but the only thing in the inspection
report is the date of inspection. Message to Thad for more info. Thad responded 4/23/2018
that we could go ahead with issuance of permit and he would schedule an inspection.
Facility drains
to UT to
Kirbys Creek Severr
. ..Io
NHP
areas
Facility doesn't drain to the sections noted with elements in NCNHP report.