Loading...
HomeMy WebLinkAbout20151012 Ver 2_Sheet7_stream impacts_20180420OFREV DATE DESCRIPTION DRAWN DATE PROJECT DESIGNED BY SURVEYED SCALE CHECKEDSHEET NO.POWELLMARTINDAVIS E N G I N E E R S & S U R V E Y O R S 6415 OLD PLANK RD, HIGH POINT, NC 27265 T: (336) 886-4821 | F: (336) 886-4458 | WWW.DMP-INC.COM | LICENSE: F-0245 080037 APL APL WINSTON-SALEM / FORSYTH COUNTY UTILITIES WATER TRANSMISSION SYSTEM IMPROVEMENTS NEAR THOMAS WTP AND W-S STATE UNIVERSITY STREAMBANK GRADING & STABILIZATION PLAN MAR. 2018 AS SHOWN DMP713MLS 1 3/9/15 ALIGNMENT SHIFT APL 2 3 4 5 6CONTRACT BSTREAM CROSS SECTION NO. 1 (DOWNSTREAM END OF CULVERT)STREAM CROSS SECTION NO. 2 (UPSTREAM END OF CULVERT)PROPOSED STREAM BANK GRADING & STABLIZATIONPRELIMINARYNWP 13:AREA=3,298 SFLENGTH=150 LFNWP 18:AREA=201 SFLENGTH=38 LFNWP 12:AREA=305 SFLENGTH=35 LFNWP 12:AREA=388 SFLENGTH=15 LFNWP 13:AREA=2,203 SFLENGTH=96 LFNWP 18:AREA=223 SFLENGTH=38 LFNWP 12:AREA=213 SFLENGTH=34 LFAREA (S.F.)LENGTH (L.F.)NWP 12NWP 13NWP 189065,5014248424676