Loading...
HomeMy WebLinkAboutSW5180301_Add Info Request_20180411Energy, Mineral and Land Resources ENVIRONMENTAL QUALITY April 11, 2018 T. Chase Massey, PE FLM Engineering, Inc. P.O. Box 91727 Raleigh, NC 27675 Subject: Request for Additional Information Stormwater Permit No. SW5180301 Crawford Townes — Franklinton, NC Franklin. County Dear Mr. Massey, ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. TORY VINSON, JR. Interim Director The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on March 19, 2018. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide a signed and notarized Operation and Maintenance Agreement. 2. Please provide a detail depicting the forebay, including the forebay depth and elevations of the forebay inlet and outlet. 3. Please provide calculations demonstrating that the proposed riprap apron is sufficient to prevent erosion as a result of discharges from the SCM. 4. Please revise the SCM design to address the following deficiencies: a. The detail on Sheet C-9 shows that the forebay comprises approximately half the surface area noted in the Supplement Form. Therefore, is comprises less than 10 percent of the wetland surface area. The forebay must comprise 10 to 15 percent of the wetland surface area. b. The drawdown time calculations do not accurately calculate the drawdown time from the SCM. The actual drawdown time under the proposed conditions is below the minimum of two days. Please revise the design to ensure the design volume will drain to the permanent pool level in between two to five days. 5. Please provide a landscape plan that shows the delineation of planting zones and the plant layout with species names and locations. 6. Provide pdfs of all revisions, 2 hardeopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: htt s://edocs.de .nc. ov/Forms/SW Project Submittal PIease note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to May 4, 2018, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application. fee. Please reference the State assigned project number SW5180301 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Corey. Anengnedenr•gov or (919) 807-6378. Sincerely, 40- Corey Anen Environmental Engineer Stormwater Program cc: Raleigh Regional Office Bill Wynn - Crosswinds Development Jason Gordon - Crosswinds Development Nothing Compares -,,,,- State of North Carolina Environmental Quality I Energy, Mineral and Land Resources 512 N. Salisbury Street f 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 919 707 9200