Loading...
HomeMy WebLinkAboutNCG120000_Reissuance Letters with COCs FILED_20121204A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Barry Edwards Catawba Co PO Box 389 Newton, NC 28658-0389 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Catawba Co- Landfill COC Number NCG120001 Catawba County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Barry Edwards December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120001 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Catawba Co is hereby authorized to discharge stormwater from a facility located at: Catawba Co- Landfill Rocky Ford Rd Newton Catawba County to receiving waters designated as South Fork Catawba River, a class WS -V waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Robeson Co Solid Wst Mgt PO Box 366 Saint Pauls, NC 28384 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Robeson Co Solid Waste Mgmt-St Pauls COC Number NCG120005 Robeson County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vaturalltf December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120005 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Robeson Co Solid Wst Mgt is hereby authorized to discharge stormwater from a facility located at: Robeson Co Solid Waste Mgmt-St Pauls 246 Landfill Rd Saint Pauls Robeson County to receiving waters designated as Big Marsh Swamp (Marsh Swamp) (Lake McNeill, Odom Pond), a class C;Sw waterbody in the Lumber River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Energizer Battery Manufacturing Inc 533 Maryville University Saint Louis, MO 63141 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Energizer Battery Manufacturing Inc COC Number NCG120006 Randolph County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vaturalltf December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120006 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Energizer Battery Manufacturing Inc is hereby authorized to discharge stormwater from a facility located at: Energizer Battery Manufacturing Inc 1254 County Land Rd Randleman Randolph County to receiving waters designated as DEEP RIVER, a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jan Winters Gaston County PO Box 1578 Gastonia, NC 28053-1578 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Gaston Co Landfill COC Number NCG120012 Gaston County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Jan Winters December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120012 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Gaston County is hereby authorized to discharge stormwater from a facility located at: Gaston Co Landfill 3155 Philadelphia Church Rd Dallas Gaston County to receiving waters designated as South Fork Catawba River, a class WS -V waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Steve Drew City of Greensboro 2602 S Elm -Eugene St Greensboro, NC 27406-9787 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal City of Greensboro - White Street Landfill COC Number NCG120013 Guilford County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Steve Drew December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120013 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, City of Greensboro is hereby authorized to discharge stormwater from a facility located at: City of Greensboro - White Street Landfill 2503 White St Greensboro Guilford County to receiving waters designated as North Buffalo Creek, a class WS-V;NSW waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Robert Howard Cumberland Co 698 Ann St Fayetteville, NC 28301-8106 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Cumberland Co- Ann St COC Number NCG120017 Cumberland County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Robert Howard December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120017 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Cumberland Co is hereby authorized to discharge stormwater from a facility located at: Cumberland Co- Ann St 698 Ann St Fayetteville Cumberland County to receiving waters designated as CAPE FEAR RIVER, a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Greg Greene Rowan County 2727-D Old Concord Rd Salisbury, NC 28146 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Rowan Co -Landfill COC Number NCG120019 Rowan County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Greg Greene December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120019 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rowan County is hereby authorized to discharge stormwater from a facility located at: Rowan Co -Landfill 789 Campbell Rd Woodleaf Rowan County to receiving waters designated as Second Creek (North Second Creek), a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor David Cooke Wake County PO Box 550 Ste 1100 Raleigh, NC 27602 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal North Wake Landfill COC Number NCG120020 Wake County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff David Cooke December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120020 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Wake County is hereby authorized to discharge stormwater from a facility located at: North Wake Landfill 9025 Deponie Dr Raleigh Wake County to receiving waters designated as NEUSE RIVER, a class C;NSW waterbody in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor David Cooke Wake County PO Box 550 Ste 1100 Raleigh, NC 27602 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Feltonsville Landfill COC Number NCG120021 Wake County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff David Cooke December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120021 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Wake County is hereby authorized to discharge stormwater from a facility located at: Feltonsville Landfill 500 Old Smithfield Rd Apex Wake County to receiving waters designated as Little River (Lower Little River), a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Tim Rogers Wayne County 460 B So Landfill Rd Dudley, NC 28333 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Wayne County Landfill COC Number NCG120030 Wayne County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Tim Rogers December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Washington Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120030 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Wayne County is hereby authorized to discharge stormwater from a facility located at: Wayne County Landfill 460b S Landfill Rd Dudley Wayne County to receiving waters designated as Edwards Branch, a class WS-IV;NSW waterbody in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jan McHargue City of Winston-Salem PO Box 2511 Winston Salem, NC 27107-9998 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Winston Salem - Hanes Mill Rd Sanitary Landfill COC Number NCG120034 Forsyth County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Jan McHargue December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120034 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, City of Winston-Salem is hereby authorized to discharge stormwater from a facility located at: Winston Salem - Hanes Mill Rd Sanitary Landfill 325 Hanes Mill Rd Winston Salem Forsyth County to receiving waters designated as Grassy Creek, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Robert Hyatt Davidson County PO Box 1067 Lexington, NC 27293 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Davidson Co. Solid Waste Fac. COC Number NCG120038 Davidson County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Robert Hyatt December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120038 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Davidson County is hereby authorized to discharge stormwater from a facility located at: Davidson Co. Solid Waste Fac. 1242 Old Hwy 29 Thomasville Davidson County to receiving waters designated as Hamby Creek, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Tony Brown Halifax County PO Box 38 Halifax, NC 27839 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Halifax Co -Solid Waste Facilty COC Number NCG120040 Halifax County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Tony Brown December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120040 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Halifax County is hereby authorized to discharge stormwater from a facility located at: Halifax Co -Solid Waste Facilty 921 Liles Rd Littleton Halifax County to receiving waters designated as Marsh Swamp, a class C;Sw,NSW waterbody in the Tar - Pamlico River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Ron Smith Iredell County PO Box 788 Statesville, NC 28687 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Iredell County Solid Waste COC Number NCG120042 Iredell County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Ron Smith December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120042 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Iredell County is hereby authorized to discharge stormwater from a facility located at: Iredell County Solid Waste 354 Twins Oaks Rd Statesville Iredell County to receiving waters designated as Fourth Creek, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Craig Honeycutt Alamance County 124 W Elm St Graham, NC 27253 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Alamance Co -Solid Waste COC Number NCG120043 Alamance County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Craig Honeycutt December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120043 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Alamance County is hereby authorized to discharge stormwater from a facility located at: Alamance Co -Solid Waste Sr 2148 Saxapahaw Alamance County to receiving waters designated as HAW RIVER, a class WS-V;NSW waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Bobby Darden Coastal Reg Solid Waste Mgmt PO Box 128 Cove City, NC 28523 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Coastal Reg Solid Waste Management COC Number NCG120044 Craven County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Bobby Darden December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Washington Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120044 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Coastal Reg Solid Waste Mgmt is hereby authorized to discharge stormwater from a facility located at: Coastal Reg Solid Waste Management 7400 Old Hwy 70 W New Bern Craven County to receiving waters designated as Beaverdam Branch, a class C;Sw,NSW waterbody in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Drew Isenhour Republic Services of North Carolina LLC 1220 Commerce St S W Conover, NC 28613 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Republic Services Of NC LLC - Aulander COC Number NCG120045 Bertie County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Drew Isenhour December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Washington Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120045 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Republic Services of North Carolina LLC is hereby authorized to discharge stormwater from a facility located at: Republic Services Of NC LLC - Aulander 1922 Republican Rd Aulander Bertie County to receiving waters designated as Cashie River, a class C;Sw waterbody in the Roanoke River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Charles Wakild, P. E. Director William Dillard Santek Environmental of North Carolina LLC 650 25th St Nw Ste 100 Cleveland, TN 37311 Dear Permittee: December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Haywood Co -White Oak Sanitary COC Number NCG120047 Haywood County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff William Dillard December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120047 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Santek Environmental of North Carolina LLC is hereby authorized to discharge stormwater from a facility located at: Haywood Co -White Oak Sanitary 3898 Fines Creek Rd Waynesville Haywood County to receiving waters designated as PIGEON RIVER (Waterville Lake below elevation 2258), a class C waterbody in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Drew Isenhour Republic Services of North Carolina LLC 1220 Commerce St S W Conover, NC 28613 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Republic Services of NC LLC - Mt. Gilead 2 COC Number NCG120051 Montgomery County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Drew Isenhour December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120051 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Republic Services of North Carolina LLC is hereby authorized to discharge stormwater from a facility located at: Republic Services of NC LLC - Mt. Gilead 2 500 Landfill Rd Mount Gilead Montgomery County to receiving waters designated as Rocky Creek (Rocky River), a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Bart Keller Bfi Waste Systems of Na Inc 5105 Moehead Rd Concord, NC 28027 Speedway Landfill Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal BFI Waste Systems of NA dba Charlotte Mator COC Number NCG120053 Cabarrus County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina Amurallty Bart Keller December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120053 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Bfi Waste Systems of Na Inc is hereby authorized to discharge stormwater from a facility located at: BFI Waste Systems of NA dba Charlotte Mator Speedway Landfill 5105 Moorehead Rd Concord Cabarrus County to receiving waters designated as Rocky River, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Bryan Wuester Sampson County Disposal LLC 7434 Roseboro Hwy Roseboro, NC 28382 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Sampson County Disposal Incorporated COC Number NCG120054 Sampson County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Bryan Wuester December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120054 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Sampson County Disposal LLC is hereby authorized to discharge stormwater from a facility located at: Sampson County Disposal Incorporated 7434 Roseboro Hwy Roseboro Sampson County to receiving waters designated as Bearskin Swamp (Turlington Millpond), a class C;Sw waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Thomas Robinson Rockingham County 371 NC 65 Wentworth, NC 27375 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Rockingham County Subtitle D Landfill COC Number NCG120055 Rockingham County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Thomas Robinson December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120055 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Rockingham County is hereby authorized to discharge stormwater from a facility located at: Rockingham County Subtitle D Landfill 281 Shuff Rd Madison Rockingham County to receiving waters designated as Little Mill Creek, a class C waterbody in the Roanoke River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Drew Isenhour Republic Services of North Carolina LLC 1220 Commerce St S W Conover, NC 28613 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Upper Piedmont Evironmental Landfill COC Number NCG120056 Person County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Drew Isenhour December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120056 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Republic Services of North Carolina LLC is hereby authorized to discharge stormwater from a facility located at: Upper Piedmont Evironmental Landfill US Hwy No 158 Roxboro Person County to receiving waters designated as Cub Creek, a class WS-IV;NSW waterbody in the Tar -Pamlico River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Ashe County Environmental Ser PO Box 1327 West Jefferson, NC 28694 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Ashe County Environmental Ser COC Number NCG120057 Ashe County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vaturalltf December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120057 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Ashe County Environmental Ser is hereby authorized to discharge stormwater from a facility located at: Ashe County Environmental Ser 739 Fred Pugh Rd Crumpler Ashe County to receiving waters designated as Unnamed Tributary to North Fork New River at Knox Knitting Co., a class C;ORW waterbody in the New River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Management Facility Buncombe County Solid Waste - Mgmt Facility 85 Panther Branch Rd Alexander, NC 28701 Dear Permittee: Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Buncombe County Landfill COC Number NCG120058 Buncombe County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Management Facility December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120058 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Buncombe County Solid Waste - Mgmt Facility is hereby authorized to discharge stormwater from a facility located at: Buncombe County Landfill 85 Panther Branch Rd Alexander Buncombe County to receiving waters designated as Blevin Branch, a class C waterbody in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Drew Isenhour Republic Services of North Carolina LLC 1220 Commerce St S W Conover, NC 28613 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Republic Services Of NC LLC - Lenoir COC Number NCG120060 Caldwell County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Drew Isenhour December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120060 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Republic Services of North Carolina LLC is hereby authorized to discharge stormwater from a facility located at: Republic Services Of NC LLC - Lenoir 2800 Cheraw Rd Lenoir Caldwell County to receiving waters designated as Abingdon Creek, a class C waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Frank Clifton Orange County Government PO Box 8181 Hillsborough, NC 27278 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Orange County Landfill COC Number NCG120065 Orange County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Frank Clifton December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120065 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Orange County Government is hereby authorized to discharge stormwater from a facility located at: Orange County Landfill 1514 Eubanks Rd Chapel Hill Orange County to receiving waters designated as Old Field Creek, a class WS-V;NSW waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Kent Brandon Wilkes Co PO Box 389 Roaring River, NC 28669 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Roaring River Landfill COC Number NCG120066 Wilkes County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Kent Brandon December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120066 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Wilkes Co is hereby authorized to discharge stormwater from a facility located at: Roaring River Landfill 9219 Elkin Hwy Roaring River Wilkes County to receiving waters designated as YADKIN RIVER, a class WS -V waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Carson Fisher Burke County General Services PO Box 1486 Morganton, NC 28680-1486 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal John's River Waste Management Facility COC Number NCG120067 Burke County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Carson Fisher December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120067 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Burke County General Services is hereby authorized to discharge stormwater from a facility located at: John's River Waste Management Facility 2500 Marsh Trl Morganton Burke County to receiving waters designated as CATAWBA RIVER (Rhodhiss Lake below elevation 995), a class WS-IV,B;CA waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Joseph Hack Mecklenburg County Solid Waste 700 N Tryon St Charlotte, NC 28202 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Mecklenburg Co -Highway 521 Landfill COC Number NCG120068 Mecklenburg County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Joseph Hack December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120068 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Mecklenburg County Solid Waste is hereby authorized to discharge stormwater from a facility located at: Mecklenburg Co -Highway 521 Landfill 17131 Lancaster Hwy Charlotte Mecklenburg County to receiving waters designated as Sixmile Creek, a class C waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Chris Coudriet New Hanover County 230 Government Center Dr Wilmington, NC 28403 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal New Hanover County Landfill - US Hwy 421 N COC Number NCG120069 New Hanover County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Chris Coudriet December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Wilmington Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120069 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, New Hanover County is hereby authorized to discharge stormwater from a facility located at: New Hanover County Landfill - US Hwy 421 N 5210 Hwy 421 N Wilmington New Hanover County to receiving waters designated as Fishing Creek, a class C;Sw waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Transylvania County 21 E Main St Brevard, NC 28712 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Transylvania County Landfill COC Number NCG120070 Transylvania County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vaturalltf December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120070 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Transylvania County is hereby authorized to discharge stormwater from a facility located at: Transylvania County Landfill 500 Howell Rd Brevard Transylvania County to receiving waters designated as Woodruff Branch, a class C;Tr waterbody in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Cherokee County 75 Peachtree St Murphy, NC 28906 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Cherokee County Municipal Solid Waste Landfill COC Number NCG120071 Cherokee County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vaturalltf December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120071 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Cherokee County is hereby authorized to discharge stormwater from a facility located at: Cherokee County Municipal Solid Waste Landfill 10160 US Hwy 19 Marble Cherokee County to receiving waters designated as Valley River, a class C;Tr waterbody in the Hiwassee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Edward Bailes Cleveland Co PO Box 1210 Shelby, NC 28151 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Cleveland County Landfill COC Number NCG120072 Cleveland County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Edward Bailes December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120072 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Cleveland Co is hereby authorized to discharge stormwater from a facility located at: Cleveland County Landfill 250 Fielding Rd Cherryville Cleveland County to receiving waters designated as Long Creek, a class WS-III;CA waterbody in the Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Ashe County Environmental Ser PO Box 1327 West Jefferson, NC 28694 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Ashe County Municipal Solid Waste Landfill COC Number NCG120073 Ashe County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vaturalltf December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120073 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Ashe County Environmental Ser is hereby authorized to discharge stormwater from a facility located at: Ashe County Municipal Solid Waste Landfill 739 Fred Pugh Rd Crumpler Ashe County to receiving waters designated as North Fork New River, a class C:+ waterbody in the New River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Raymond Allen City of Albemarle PO Box 190 Albemarle, NC 28002-0190 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Albemarle City Municipal Solid Waste Landfill COC Number NCG120074 Stanly County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Raymond Allen December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120074 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, City of Albemarle is hereby authorized to discharge stormwater from a facility located at: Albemarle City Municipal Solid Waste Landfill 40592 B Stony Gap Rd Albemarle Stanly County to receiving waters designated as Jacobs Creek, a class WS -IV waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Dennis Thompson Surry County 118 Hamby Rd Ste 320 Dobson, NC 27017 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Surry County Municipal Solid Waste Landfill COC Number NCG120076 Surry County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Dennis Thompson December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Winston-Salem Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120076 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Surry County is hereby authorized to discharge stormwater from a facility located at: Surry County Municipal Solid Waste Landfill 237 Landfill Rd Mount Airy Surry County to receiving waters designated as Ararat River, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 John Roberson Wake County Solid Waste Management Division Wcob 7th Floor Raleigh, NC 27602 Dear Permittee: Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal South Wake Landfill COC Number NCG120080 Wake County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff John Roberson December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120080 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Wake County Solid Waste Management Division is hereby authorized to discharge stormwater from a facility located at: South Wake Landfill 6124 Old Smithfield Rd Apex Wake County to receiving waters designated as Little Branch, a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jim Huff Madison Co Board of Commissioners 271 Craig Rudisill Rd Marshall, NC 28753 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Madison Co. Solid Waste Facility COC Number NCG120082 Madison County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Jim Huff December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120082 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Madison Co Board of Commissioners is hereby authorized to discharge stormwater from a facility located at: Madison Co. Solid Waste Facility 271 Craid Rudisill Rd Marshall Madison County to receiving waters designated as FRENCH BROAD RIVER, a class B waterbody in the French Broad River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Charles Wakild, P. E. Director Chris Stahl Macon County Dept of Solid Waste Mgmt 109 Sierra Dr Franklin, NC 28734 Dear Permittee: December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Macon County MSW Landfill COC Number NCG120083 Macon County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Chris Stahl December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Asheville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120083 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Macon County Dept of Solid Waste Mgmt is hereby authorized to discharge stormwater from a facility located at: Macon County MSW Landfill 1448 Lakeside Dr Franklin Macon County to receiving waters designated as LITTLE TENNESSEE RIVER (Including the backwaters of Lake Emory), a class C waterbody in the Little Tennessee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Bobby Banks Union County Public Works Department 500 N Main St -Ste 500 Monroe, NC 28112-4730 Landfill) Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Union County Solid Waste Mgmt. Facility (C & D COC Number NCG120085 Union County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina Amurallty Bobby Banks December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120085 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Union County Public Works Department is hereby authorized to discharge stormwater from a facility located at: Union County Solid Waste Mgmt. Facility (C & D Landfill) 2125 Austin Chaney Rd Wingate Union County to receiving waters designated as Richardson Creek, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Charles Wakild, P. E. Director Kevin Grant Cabarrus County Solid Waste Management 4441 Irish Potato Rd Concord, NC 28025 Dear Permittee: December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Cabarrus County C&D Landfill COC Number NCG120086 Cabarrus County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Kevin Grant December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120086 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Cabarrus County Solid Waste Management is hereby authorized to discharge stormwater from a facility located at: Cabarrus County C&D Landfill 4441 Irish Potato Rd Concord Cabarrus County to receiving waters designated as Little Cold Water Creek, a class C waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Timothy Broome Johnston County Department Of Public Utilities PO Box 2263 Smithfield, NC 27577-2263 Dear Permittee: Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Johnston County Landfill COC Number NCG120087 Johnston County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Timothy Broome December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Raleigh Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120087 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Johnston County Department Of Public Utilities is hereby authorized to discharge stormwater from a facility located at: Johnston County Landfill 680 County Home Rd Smithfield Johnston County to receiving waters designated as Middle Creek, a class C;NSW waterbody in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mike Gurley Republic Services Inc 5105 Moorehead Rd Concord, NC 28027 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Lake Norman C & D COC Number NCG120088 Lincoln County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Mike Gurley December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120088 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Republic Services Inc is hereby authorized to discharge stormwater from a facility located at: Lake Norman C & D 7099 Quarry Ln Stanley Lincoln County to receiving waters designated as Forney Creek, a class C waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Richard French Alexander County 621 Liledoun Rd Taylorsville, NC 28681 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Alexander County Landfill COC Number NCG120089 Alexander County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Richard French December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Mooresville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120089 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Alexander County is hereby authorized to discharge stormwater from a facility located at: Alexander County Landfill 2500 Payne Fairy Rd Taylorsville Alexander County to receiving waters designated as Catawba River and Lower Little River, a class WS-IV;CA waterbody in the Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. t5 r �- - for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Marty Lawing Brunswick County PO Box 249 Bolivia, NC 28422-0249 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Brunswick County Landfill Facility COC Number NCG120090 Brunswick County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Marty Lawing December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Wilmington Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120090 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Brunswick County is hereby authorized to discharge stormwater from a facility located at: Brunswick County Landfill Facility 172 Landfill Rd Ne Bolivia Brunswick County to receiving waters designated as Beaverdam Swamp, a class C;Sw waterbody in the Lumber River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jerry Blanchard County of Harnett PO Box 940 Lillington, NC 27546 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Anderson Creek Landfill COC Number NCG120091 Harnett County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Jerry Blanchard December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120091 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, County of Harnett is hereby authorized to discharge stormwater from a facility located at: Anderson Creek Landfill 1086 Poplar Dr Lillington Harnett County to receiving waters designated as McLeod Creek, a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Jerry Blanchard County of Harnett PO Box 940 Lillington, NC 27546 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Dunn -Erwin Landfill COC Number NCG120092 Harnett County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Jerry Blanchard December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HQW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120092 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, County of Harnett is hereby authorized to discharge stormwater from a facility located at: Dunn -Erwin Landfill 449 Daniels Rd Dunn Harnett County to receiving waters designated as Stewart Creek, a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission A� 4 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Gregory Bean Directorate of Public Works Ft Bragg Imbg-PW 2175 Reilly Rd Stop A Fort Bragg, NC 28310 Dear Permittee: Division of Water Quality Charles Wakild, P. E. Director December 4, 2012 Dee Freeman Secretary Subject: NPDES Stormwater Permit Coverage Renewal Lamont Road C&D Landfill COC Number NCG120093 Cumberland County In response to your renewal application for continued coverage under stormwater General Permit NCG120000 the Division of Water Quality (DWQ) is forwarding herewith the reissued General Permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as subsequently amended). The following information is included with your permit package: • A new Certificate of Coverage (COC) • A copy of General Permit NCG120000 • A copy of the Technical Bulletin for the General Permit • Two copies of the Discharge Monitoring Report (DMR) Form • Two copies of the Qualitative Monitoring Report Form The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the permit to update your current SPPP to reflect all new permit requirements. The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable, report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this permit and do not count prior exceedances. The more significant changes in the General Permit since your last COC was issued are noted either in the Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current- notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information for your specific General Permit carefully. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterguality.org An Equal Opportunity \ Affirmative Action Employer ne NorthCarolina ;Vatura!!ff Gregory Bean December 4, 2012 Page 2 of 2 Some of the changes include: • Part II: • Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated to the most current language of our permits. Additional conditions for specific industry sectors have been added to the SPPP requirements in some cases. • Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring that the permittee begin a monthly sampling scheme. • Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these more sensitive waters. • Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other analytical monitoring requirements. • Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined in the "Definitions" section of the permit. • Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm Event." A measurable storm event is defined in the permit. • Section D: If the permittee fails to respond effectively to problems identified by qualitative monitoring, DWQ may require the permittee to perform corrective action. Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit, including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than 30 days from the date the facility receives the sampling results from the laboratory. Also note that existing permittees do not need to submit a renewal request prior to expiration unless directed by the Division. Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300. Sincerely, for Charles Wakild, P.E. cc: DWQ Central Files Stormwater Permitting Unit Files Fayetteville Regional Office STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG120000 CERTIFICATE OF COVERAGE No. NCG120093 STORMWATER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Directorate of Public Works Ft Bragg is hereby authorized to discharge stormwater from a facility located at: Lamont Road C&D Landfill 2175 Reilly Rd Stop A Fort Bragg Cumberland County to receiving waters designated as Bones Creek, a class C waterbody in the Cape Fear River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached. This certificate of coverage shall become effective December 4, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 4th day of December, 2012. for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission