HomeMy WebLinkAboutNCGs_Expired Paying Reissuance COCs FILED_20121212A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
John Hartnett
ABB Inc
406 Banner Ave
Greensboro, NC 27401 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
ABB Inc-Edgecombe
COC Number NCG030006
Edgecombe County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
John Hartnett
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030006
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
ABB Inc
is hereby authorized to discharge stormwater from a facility located at:
ABB Inc-Edgecombe
Hwy 43 N
Pinetops
Edgecombe County
to receiving waters designated as Town Creek, a class C;NSW waterbody in the Tar -Pamlico
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Pathrico McClain
Eaton Corporation
744 S Battleground Ave
Kings Mtn, NC 28086 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Roxboro plant
COC Number NCG030027
Person County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Pathrico McClain
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030027
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Eaton Corporation
is hereby authorized to discharge stormwater from a facility located at:
Roxboro plant
2564 Durham Rd
Roxboro
Person County
to receiving waters designated as North Flat River, a class WS-III;NSW waterbody in the Neuse
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Rob Malone
Purolator Filters Na LLC
3200 Natal Rd
Fayetteville, NC 28306 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
PurolatorFilters NA LLC - Guilford
COC Number NCG030035
Guilford County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Rob Malone
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030035
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Purolator Filters Na LLC
is hereby authorized to discharge stormwater from a facility located at:
PurolatorFilters NA LLC - Guilford
3200 Natal Rd
Fayetteville
Guilford County
to receiving waters designated as East Fork Deep River, a class WS -IV:* waterbody in the Cape
Fear River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, 1I, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
John Cornelius
Contech US LLC
1600 Woodhurst Ln
Albemarle, NC 28001 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Contech US, LLC -Rock Creek
COC Number NCG030059
Stanly County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
John Cornelius
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030059
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Contech US LLC
is hereby authorized to discharge stormwater from a facility located at:
Contech US, LLC -Rock Creek
1600 Woodhurst Ln
Albemarle
Stanly County
to receiving waters designated as Poplin Branch, a class C waterbody in the Yadkin River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Grant Mast
Moen Inc
2609 Cox Mill Rd
Sanford, NC 27330 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Moen Incorporated
COC Number NCG030061
Craven County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Grant Mast
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Washington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030061
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Moen Inc
is hereby authorized to discharge stormwater from a facility located at:
Moen Incorporated
101 Industrial Dr
New Bern
Craven County
to receiving waters designated as Deep Branch, a class C;Sw,NSW waterbody in the Neuse
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Morris & Associates Inc
PO Box 1046
Raleigh, NC 27602 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Morris & Associates Incorporated
COC Number NCG030111
Wake County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030111
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Morris & Associates Inc
is hereby authorized to discharge stormwater from a facility located at:
Morris & Associates Incorporated
803 Morris Dr
Garner
Wake County
to receiving waters designated as Mahlers Creek, a class C;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Jerry Ledwell
J & J Machine Works Inc
PO Box 7683
High Point, NC 27264 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
J & J Machine Works Incorporated
COC Number NCG030129
Randolph County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Jerry Ledwell
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030129
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
J & J Machine Works Inc
is hereby authorized to discharge stormwater from a facility located at:
J & J Machine Works Incorporated
1300 Corporation Dr
High Point
Randolph County
to receiving waters designated as Uwharrie River, a class WS -III waterbody in the Yadkin River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Jean Pare
Alfiniti Inc
PO Box 177
Winton, NC 27986 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Alfiniti, Inc.
COC Number NCG030135
Hertford County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Jean Pare
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Washington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030135
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Alfiniti Inc
is hereby authorized to discharge stormwater from a facility located at:
Alfiniti, Inc.
600 N Metcalf St
Winton
Hertford County
to receiving waters designated as CHOWAN RIVER, a class B;NSW waterbody in the Chowan
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Anil Shah
W A Brown Inc
209 Long Meadow Dr
Salisbury, NC 28147 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
W A Brown Inc
COC Number NCG030195
Rowan County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Anil Shah
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030195
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
W A Brown Inc
is hereby authorized to discharge stormwater from a facility located at:
W A Brown Inc
209 Long Meadow Dr
Salisbury
Rowan County
to receiving waters designated as Grants Creek, a class C waterbody in the Yadkin River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Minute Man Anchors Inc
305 W King St
East Flat Rock, NC 28726 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Minute Man Anchors Incorporated
COC Number NCG030218
Henderson County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030218
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Minute Man Anchors Inc
is hereby authorized to discharge stormwater from a facility located at:
Minute Man Anchors Incorporated
305 W King St
East Flat Rock
Henderson County
to receiving waters designated as King Creek, a class C waterbody in the French Broad River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Michael Kincaid
Kaba Ilco Corp
2941 Indiana Ave
Winston Salem, NC 27105-4425
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Kaba Ilco Corp -Nash
COC Number NCG030244
Nash County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Michael Kincaid
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030244
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Kaba Ilco Corp
is hereby authorized to discharge stormwater from a facility located at:
Kaba Ilco Corp -Nash
400 Jeffrey's Rd
Rocky Mount
Nash County
to receiving waters designated as Horn Beam Swamp, a class C;NSW waterbody in the Tar -
Pamlico River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Roberts Company The
PO Box 1109
Winterville, NC 28590 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Roberts Company The
COC Number NCG030267
Pitt County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Washington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030267
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Roberts Company The
is hereby authorized to discharge stormwater from a facility located at:
Roberts Company The
133 Forlines Rd
Winterville
Pitt County
to receiving waters designated as Swift Creek, a class C;Sw,NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Dixon Quick Coupling
PO Box 790068
Charlotte, NC 28206 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Dixon Quick Coupling
COC Number NCG030283
Mecklenburg County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030283
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Dixon Quick Coupling
is hereby authorized to discharge stormwater from a facility located at:
Dixon Quick Coupling
332 Atando Ave
Charlotte
Mecklenburg County
to receiving waters designated as Little Sugar Creek, a class C waterbody in the Catawba River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Luis Nieves
Gerdau Ameristeel Corporation
PO Box 31328
Tampa, FL 33631-3328
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Charlotte Rebar Division
COC Number NCG030284
Mecklenburg County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Luis Nieves
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030284
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Gerdau Ameristeel Corporation
is hereby authorized to discharge stormwater from a facility located at:
Charlotte Rebar Division
301 Black Satchel Dr
Charlotte
Mecklenburg County
to receiving waters designated as Stewart Creek, a class C waterbody in the Catawba River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
William Moody
Vanguard Pailung LLC
PO Box 9
Monroe, NC 28110 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Vanguard Supreme-Plt #1
COC Number NCG030286
Union County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
William Moody
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030286
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Vanguard Pailung LLC
is hereby authorized to discharge stormwater from a facility located at:
Vanguard Supreme-Plt #1
601 Mac Arthur Cir
Monroe
Union County
to receiving waters designated as Bearskin Creek, a class C waterbody in the Yadkin River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Bryant Van Vlaandere
United Tool & Stamping Co of NC Inc
2817 Enterprise Ave
Fayetteville, NC 28306 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
United Tool & Stamping Co of NC Inc.
COC Number NCG030307
Cumberland County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Bryant Van Vlaandere
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Fayetteville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030307
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
United Tool & Stamping Co of NC Inc
is hereby authorized to discharge stormwater from a facility located at:
United Tool & Stamping Co of NC Inc.
2817 Enterprise Ave
Fayetteville
Cumberland County
to receiving waters designated as Blounts Creek, a class C waterbody in the Cape Fear River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Robert Whitehead
Honda Power Equipment Mfg
PO Box 37
Swepsonville, NC 27359 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Honda Power Equipment Mfg
COC Number NCG030329
Alamance County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Robert Whitehead
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030329
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Honda Power Equipment Mfg
is hereby authorized to discharge stormwater from a facility located at:
Honda Power Equipment Mfg
NC Hwy 119 Honda Dr
Swepsonville
Alamance County
to receiving waters designated as Haw Creek, a class WS-V;NSW waterbody in the Cape Fear
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Dale Goldman
Goldman Metals Inc
P Box 12185
New Bern, NC 28561 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Goldman Metals, Inc.
COC Number NCG030333
Craven County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Dale Goldman
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Washington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030333
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Goldman Metals Inc
is hereby authorized to discharge stormwater from a facility located at:
Goldman Metals, Inc.
2912 Neuse Blvd
New Bern
Craven County
to receiving waters designated as NEUSE RIVER, a class C;Sw,NSW waterbody in the Neuse
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Merchants Metals
PO Box 949
Statesville, NC 28687 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Merchants Metals
COC Number NCG030379
Iredell County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030379
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Merchants Metals
is hereby authorized to discharge stormwater from a facility located at:
Merchants Metals
165 Fanjoy Rd
Statesville
Iredell County
to receiving waters designated as Fourth Creek, a class C waterbody in the Yadkin River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Susan Rothecker
SMT Inc
7300 Acc Blvd
Raleigh, NC 27613 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
SMT Incorporated - Raleigh Plant
COC Number NCG030388
Wake County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Susan Rothecker
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030388
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
SMT Inc
is hereby authorized to discharge stormwater from a facility located at:
SMT Incorporated - Raleigh Plant
7300 Acc Blvd
Raleigh
Wake County
to receiving waters designated as Sycamore Creek (Big Lake), a class B;NSW waterbody in the
Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
William Noethling
Universal Steel of NC LLC
PO Box 1862
High Point, NC -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Universal Steel of NC, LLC
COC Number NCG030402
Davidson County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
William Noethling
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030402
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Universal Steel of NC LLC
is hereby authorized to discharge stormwater from a facility located at:
Universal Steel of NC, LLC
Business 85 - albertson r
Thomasville
Davidson County
to receiving waters designated as Hunts Fork, a class C waterbody in the Yadkin River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Farrell Mauldin
Steel Specialty Inc
PO Box 985
Belmont, NC 28012 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Steel Specialty Incorporated
COC Number NCG030408
Gaston County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Farrell Mauldin
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030408
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Steel Specialty Inc
is hereby authorized to discharge stormwater from a facility located at:
Steel Specialty Incorporated
5907 Wilkinson Blvd
Belmont
Gaston County
to receiving waters designated as South Fork Catawba River, a class WS -V waterbody in the
Catawba River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
M Gira
Quality Truck Bodies & Repair
917 Raleigh Rd
Wilson, NC 27896 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Quality Truck Bodies & Repair
COC Number NCG030457
Wilson County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
M Gira
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030457
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Quality Truck Bodies & Repair
is hereby authorized to discharge stormwater from a facility located at:
Quality Truck Bodies & Repair
5316 Rock Quarry Rd
Elm City
Wilson County
to receiving waters designated as Town Creek, a class C;NSW waterbody in the Tar -Pamlico
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Roger Mewborn
Kinston Steel Company
PO Box 2354
Kinston, NC 28502 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Kinston Steel Company
COC Number NCG030473
Lenoir County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Roger Mewborn
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Washington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030473
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Kinston Steel Company
is hereby authorized to discharge stormwater from a facility located at:
Kinston Steel Company
2300 Albermarle Paper Co
Kinston
Lenoir County
to receiving waters designated as NEUSE RIVER, a class C;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Wynne Ellis
Draka Elevator Products Inc
2151 N Church St
Rocky Mount, NC 27802 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Draka Elevator Products Inc - Corporate Parkway
COC Number NCG030519
Nash County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Wynne Ellis
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030519
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Draka Elevator Products Inc
is hereby authorized to discharge stormwater from a facility located at:
Draka Elevator Products Inc - Corporate Parkway
6809 Corporation Pkwy
Rocky Mount
Nash County
to receiving waters designated as Swift Creek, a class C;NSW waterbody in the Tar -Pamlico
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Jeff Morris
Advanced Machine Group Inc
PO Box 650
Holly Ridge, NC 28445-0650
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Advanced Machine Group - Holly Ridge
COC Number NCG030586
Onslow County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Jeff Morris
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030586
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Advanced Machine Group Inc
is hereby authorized to discharge stormwater from a facility located at:
Advanced Machine Group - Holly Ridge
114 N Hines St
Holly Ridge
Onslow County
to receiving waters designated as Cypress Branch, a class SA;HQW waterbody in the Cape Fear
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Derek Pringle
Elkay Plumbing Products Company
880 Caton Rd
Lumberton, NC 28360 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Elkay Plumbing Products Company
COC Number NCG030589
Robeson County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Derek Pringle
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Fayetteville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030589
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Elkay Plumbing Products Company
is hereby authorized to discharge stormwater from a facility located at:
Elkay Plumbing Products Company
880 Caton Rd
Lumberton
Robeson County
to receiving waters designated as Raft Swamp, a class WS-IV;Sw waterbody in the Lumber
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Ed Arceneaux
O'Neal Steel Inc
105 W Florida St
Greensboro, NC 27406 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
O'Neal Steel Inc
COC Number NCG030607
Guilford County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG030000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG030000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Ed Arceneaux
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG030000
CERTIFICATE OF COVERAGE No. NCG030607
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
O'Neal Steel Inc
is hereby authorized to discharge stormwater from a facility located at:
O'Neal Steel Inc
105 W Florida St
Greensboro
Guilford County
to receiving waters designated as Mile Run Creek, a class WS-V;NSW waterbody in the Cape
Fear River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG030000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Bill Peterson
Pepsi Bottling Ventures
4141 Parklak Ave #600
Raleigh, NC 27612 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Pepsi Bottling Ventures -Raleigh
COC Number NCG060004
Wake County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Bill Peterson
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060004
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Pepsi Bottling Ventures
is hereby authorized to discharge stormwater from a facility located at:
Pepsi Bottling Ventures -Raleigh
1900 Pepsi Way
Garner
Wake County
to receiving waters designated as Crabtree Creek, a class C;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Division of Water Quality
Charles Wakild, P. E.
Director
Ralph Edwards
Simeus Foods International -Forest City Inc
212 Nuway Packing Rd
Forest City, NC 28043 -
Dear Permittee:
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Simeus Foods International
COC Number NCG060063
Rutherford County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Ralph Edwards
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060063
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Simeus Foods International -Forest City Inc
is hereby authorized to discharge stormwater from a facility located at:
Simeus Foods International
212 Nuway Parking Rd
Forest City
Rutherford County
to receiving waters designated as Second Broad River, a class WS -V waterbody in the Broad
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Dewey Clark
Mbm Inc
2641 Meadowbrook Rd
Rocky Mount, NC 27801 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Fast Food Merchandiser -Rowan
COC Number NCG060065
Rowan County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Dewey Clark
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060065
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Mbm Inc
is hereby authorized to discharge stormwater from a facility located at:
Fast Food Merchandiser -Rowan
40 Cir M Dr
Salisbury
Rowan County
to receiving waters designated as Grants Creek, a class C waterbody in the Yadkin River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Wayne Black
Perdue Farms Inc
PO Box 460
Lewiston, NC 27849-0460
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Nashville facility
COC Number NCG060097
Nash County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Wayne Black
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060097
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Perdue Farms Inc
is hereby authorized to discharge stormwater from a facility located at:
Nashville facility
1835 US Hwy 64-A
Nashville
Nash County
to receiving waters designated as Little Sapony Creek, a class C;NSW waterbody in the Tar -
Pamlico River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Lee Butler
Perdue Farms Inc
416 S Long Dr
Rockingham, NC 28380 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Elkin Feedmill
COC Number NCG060099
Surry County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Lee Butler
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060099
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Perdue Farms Inc
is hereby authorized to discharge stormwater from a facility located at:
Elkin Feedmill
105 Greenwood Cir
Elkin
Surry County
to receiving waters designated as YADKIN RIVER, a class C waterbody in the Yadkin River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Alberdingk Boley Inc
6008 High Point Rd
Greensboro, NC 27407 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Alberdingk Boley Inc
COC Number NCG060104
Guilford County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060104
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Alberdingk Boley Inc
is hereby authorized to discharge stormwater from a facility located at:
Alberdingk Boley Inc
6008 High Point Rd
Greensboro
Guilford County
to receiving waters designated as Bull Run, a class WS -IV:* waterbody in the Cape Fear River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts 1, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Spencer Faurot
Eastern Minerals Inc
PO Box 1310
Bainbridge, GA 39817 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Eastern Minerals, Inc.
COC Number NCG060140
Vance County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Spencer Faurot
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060140
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Eastern Minerals Inc
is hereby authorized to discharge stormwater from a facility located at:
Eastern Minerals, Inc.
170 Eastern Minerals Rd
Henderson
Vance County
to receiving waters designated as Lynch Creek, a class C;NSW waterbody in the Tar -Pamlico
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Eastern Minerals Inc
PO Box 1436
Bainbridge, GA 39817 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Eastern Minerals Incorporated
COC Number NCG060142
Vance County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060142
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Eastern Minerals Inc
is hereby authorized to discharge stormwater from a facility located at:
Eastern Minerals Incorporated
Old US 1 Bypass S
Henderson
Vance County
to receiving waters designated as Lynch Creek, a class C;NSW waterbody in the Tar -Pamlico
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Ronnie Charles
Sunset Feeds Inc
145 Barnes Rd
Winston Salem, NC 27107 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Sunset Feeds Inc
COC Number NCG060178
Forsyth County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Ronnie Charles
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060178
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Sunset Feeds Inc
is hereby authorized to discharge stormwater from a facility located at:
Sunset Feeds Inc
145 Barnes Rd
Winston Salem
Forsyth County
to receiving waters designated as South Fork Muddy Creek, a class C waterbody in the Yadkin
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Case Farms LLC
259 Sandhill Dr
Goldsboro, NC 27530 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Case Farms Processing Plant
COC Number NCG060227
Wayne County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Washington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060227
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Case Farms LLC
is hereby authorized to discharge stormwater from a facility located at:
Case Farms Processing Plant
330 Pecan Rd
Dudley
Wayne County
to receiving waters designated as Caraway Creek, a class C;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
David Fussell
Duplin Wine Cellars Inc
PO Box 756
Rose Hill, NC 28458-0756
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Duplin Winery Processing Facility
COC Number NCG060276
Duplin County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
David Fussell
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060276
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Duplin Wine Cellars Inc
is hereby authorized to discharge stormwater from a facility located at:
Duplin Winery Processing Facility
310 Yellow Cut Rd
Rose Hill
Duplin County
to receiving waters designated as Cabin Branch, a class C;Sw waterbody in the Cape Fear River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Jeff Novak
Land O'Lakes
173 McNess Rd
Statesville, NC 28677 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Land O'Lakes Purina Feeds, LLC
COC Number NCG060306
Iredell County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Jeff Novak
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060306
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Land O'Lakes
is hereby authorized to discharge stormwater from a facility located at:
Land O'Lakes Purina Feeds, LLC
173 McNess Rd
Statesville
Iredell County
to receiving waters designated as Third Creek (Third Creek WS No. 37), a class C waterbody in
the Yadkin River Basin in accordance with the effluent limitations, monitoring requirements,
and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as
attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Charles Setliff
Alltech Inc
11761 Hwy 761 E
Eden, NC 27288 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Alltech Eden
COC Number NCG060308
Rockingham County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Charles Setliff
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060308
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Alltech Inc
is hereby authorized to discharge stormwater from a facility located at:
Alltech Eden
11761 Hwy 770 E
Eden
Rockingham County
to receiving waters designated as Dry Creek, a class C waterbody in the Roanoke River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Lowe's Companies Inc
PO Box 1111
North Wilkesboro, NC 28656-1111
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Iredell County Distribution Center
COC Number NCG060327
Iredell County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060327
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Lowe's Companies Inc
is hereby authorized to discharge stormwater from a facility located at:
Iredell County Distribution Center
711 Tomlin Mill Rd
Statesville
Iredell County
to receiving waters designated as Rocky Creek (Rocky River), a class C waterbody in the
Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Robert Johnson
House of Raeford Farms Inc
PO Box 699
Rose Hill, NC 28458-0699
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Rose Hill Fresh / IQF Chicken Processing Plant
COC Number NCG060329
Duplin County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Robert Johnson
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060329
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
House of Raeford Farms Inc
is hereby authorized to discharge stormwater from a facility located at:
Rose Hill Fresh / IQF Chicken Processing Plant
3333 US Hwy 117 S
Rose Hill
Duplin County
to receiving waters designated as Beaverdam Branch & Cabin Branch, a class C;Sw waterbody
in the Cape Fear River Basin in accordance with the effluent limitations, monitoring
requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No.
NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
John Blackford
Brooks Food Group
2701 Simpson St
Monroe, NC 28112 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Brooks Food Group
COC Number NCG060330
Union County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
John Blackford
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060330
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Brooks Food Group
is hereby authorized to discharge stormwater from a facility located at:
Brooks Food Group
2701 Simpson St
Monroe
Union County
to receiving waters designated as Richardson Creek, a class C waterbody in the Yadkin River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
James Patterson
AgNatural LLC
23 N Congress St Ste B
York, SC 29745 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
AgNatural LLC
COC Number NCG060331
Halifax County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG060000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG060000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
James Patterson
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG060000
CERTIFICATE OF COVERAGE No. NCG060331
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
AgNatural LLC
is hereby authorized to discharge stormwater from a facility located at:
AgNatural LLC
802 Julian R Allsbrook Hwy
Weldon
Halifax County
to receiving waters designated as Chockoytte Creek, a class C waterbody in the Roanoke River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG060000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Truck Service Inc
PO Box 390
Forest City, NC 28043 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Truck Service Incorporated
COC Number NCG080007
Rutherford County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80007
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Truck Service Inc
is hereby authorized to discharge stormwater from a facility located at:
Truck Service Incorporated
241 Vance St
Forest City
Rutherford County
to receiving waters designated as Second Broad River, a class WS -V waterbody in the Broad
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
John Pfleger
Waste Industries LLC
3301 Benson Dr
Raleigh, NC 27609 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Newport - Roberts Rd Terminal
COC Number NCG080015
Carteret County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
John Pfleger
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80015
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Waste Industries LLC
is hereby authorized to discharge stormwater from a facility located at:
Newport - Roberts Rd Terminal
427 Roberts Rd
Newport
Carteret County
to receiving waters designated as Blakes Branch, a class C waterbody in the White Oak River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P. E. Dee Freeman
Governor Director Secretary
December 12, 2012
Winston Salem Transportation Authority
1060 N Trade St
Winston Salem, NC 27102 -
Subject: NPDES Stormwater Permit Coverage Renewal
Winston Salem Transit Authority -Trade St
COC Number NCG080023
Forsyth County
Dear Permittee:
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80023
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Winston Salem Transportation Authority
is hereby authorized to discharge stormwater from a facility located at:
Winston Salem Transit Authority -Trade St
1060 N Trade St
Winston Salem
Forsyth County
to receiving waters designated as Salem Creek (Middle Fork Muddy Creek), a class C
waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring
requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No.
NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Marcus Hackler
Rea Contracting LLC
8205 Wilkinson Blvd
Charlotte, NC 28214-7006
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Rea Contracting Asphalt Materials
COC Number NCG080024
Mecklenburg County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Marcus Hackler
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80024
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Rea Contracting LLC
is hereby authorized to discharge stormwater from a facility located at:
Rea Contracting Asphalt Materials
11420 Texland Blvd
Charlotte
Mecklenburg County
to receiving waters designated as McCullough Branch, a class C waterbody in the Catawba
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Michael Burriss
Wake County Public School System
1551 Raock Quarry Rd
Raleigh, NC 27610 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Wake Co Boe-Public School Sery
COC Number NCG080026
Wake County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Michael Burriss
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80026
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Wake County Public School System
is hereby authorized to discharge stormwater from a facility located at:
Wake Co Boe-Public School Sery
1551 Raock Quarry Rd
Raleigh
Wake County
to receiving waters designated as Walnut Creek, a class C;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Fred Durham
Independence Oil LLC
584 E Mail St
Independence, VA 24348 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Smethport Bulk Plant
COC Number NCG080062
Ashe County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Fred Durham
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCG080062
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Independence Oil LLC
is hereby authorized to discharge stormwater from a facility located at:
Smethport Bulk Plant
167 Smethport Dr
West Jefferson
Ashe County
to receiving waters designated as Little Buffalo Creek, a class C;Tr:+ waterbody in the New
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Howard Transporatation Inc
PO Box 586
Laurel, MS 39441 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Howard Transporatation Incorporated
COC Number NCG080066
Johnston County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80066
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Howard Transporatation Inc
is hereby authorized to discharge stormwater from a facility located at:
Howard Transporatation Incorporated
Rt1Box 10
Kenly
Johnston County
to receiving waters designated as Little Buffalo Creek, a class C;NSW waterbody in the Neuse
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Unity Oil Company
1404 Angier Ave
Durham, NC 27701 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Carolina Biodiesel (Green Oil)
COC Number NCG080079
Durham County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCG080079
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Unity Oil Company
is hereby authorized to discharge stormwater from a facility located at:
Carolina Biodiesel (Green Oil)
1404 Angier Ave
Durham
Durham County
to receiving waters designated as Little Lick Creek, a class WS-IV;NSW waterbody in the Neuse
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Keith Russell
NC State University
804 Cedar Ln
Reidsville, NC 27320 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
North Carolina State Univ -Wake
COC Number NCG080128
Wake County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Keith Russell
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80128
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
NC State University
is hereby authorized to discharge stormwater from a facility located at:
North Carolina State Univ -Wake
Sullivan Dr
Raleigh
Wake County
to receiving waters designated as Rocky Branch, a class C;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Joey Cupp
Pilot Travel Centers LLC
5508 Lonas Rd
Knoxville, TN 37909-3221
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Pilot Travel Centers LLC #68
COC Number NCG080134
Northampton County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Joey Cupp
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80134
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Pilot Travel Centers LLC
is hereby authorized to discharge stormwater from a facility located at:
Pilot Travel Centers LLC #68
Rt 1 Box 202
Pleasant Hill
Northampton County
to receiving waters designated as Jacks Swamp, a class C;NSW waterbody in the Chowan River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Stephen Williams
AT Williams Oil Company
PO Box 7287
Winston Salem, NC 27109-7287
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
A T Williams Oil Co - Winston Salem
COC Number NCG080142
Forsyth County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Stephen Williams
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCG080142
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
AT Williams Oil Company
is hereby authorized to discharge stormwater from a facility located at:
A T Williams Oil Co - Winston Salem
5446 University Pkwy
Winston Salem
Forsyth County
to receiving waters designated as Leak Fork, a class C waterbody in the Yadkin River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Joey Cupp
Pilot Travel Centers LLC
5508 Lonas Rd
Knoxville, TN 37909-3221
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Pilot Travel Centers LLC #56
COC Number NCG080143
Cabarrus County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Joey Cupp
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80143
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Pilot Travel Centers LLC
is hereby authorized to discharge stormwater from a facility located at:
Pilot Travel Centers LLC #56
2825 Lane St
Kannapolis
Cabarrus County
to receiving waters designated as Little Cold Water Creek, a class C waterbody in the Yadkin
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Brian Potter
Potter Oil Company Inc
24250 NC Hwy 33 E
Aurora, NC 27806 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Potter Oil Company Incorporated
COC Number NCG080153
Beaufort County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Brian Potter
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Washington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCG080153
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Potter Oil Company Inc
is hereby authorized to discharge stormwater from a facility located at:
Potter Oil Company Incorporated
24250 NC Hwy 33 E
Aurora
Beaufort County
to receiving waters designated as Durham Creek, a class C;NSW waterbody in the Tar -Pamlico
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Stephen Williams
AT Williams Oil Company
PO Box 7287
Winston Salem, NC 27109-7287
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
A T Williams Oil Co -Wilco
COC Number NCG080170
Iredell County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Stephen Williams
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCG080170
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
AT Williams Oil Company
is hereby authorized to discharge stormwater from a facility located at:
A T Williams Oil Co -Wilco
1006 Charlotte Hwy
Troutman
Iredell County
to receiving waters designated as Kerr Creek, a class WS-II;HQW waterbody in the Yadkin
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Chadwick Seymour
C S Henry Transfer
PO Drawer 2306
Rocky Mount, NC 27802 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
C S Henry Transfer -Rocky Mount S
COC Number NCG080207
Nash County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Chadwick Seymour
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80207
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
C S Henry Transfer
is hereby authorized to discharge stormwater from a facility located at:
C S Henry Transfer -Rocky Mount S
2440 N Church St
Rocky Mount
Nash County
to receiving waters designated as Horn Beam Swamp, a class C;NSW waterbody in the Tar -
Pamlico River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCGO80000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Epes Transport Systems Inc
3400 Edgefield Ct
Greensboro, NC 27409 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Epes Transport Systems Incorporated
COC Number NCG080259
Guilford County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80259
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Epes Transport Systems Inc
is hereby authorized to discharge stormwater from a facility located at:
Epes Transport Systems Incorporated
3400 Edgefield Ct
Greensboro
Guilford County
to receiving waters designated as Brush Creek, a class C waterbody in the Cape Fear River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Charles Rooks
Rooks Farm Service Inc
PO Box 245
Burgaw, NC 28425-0245
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Rooks Farm Service - Rocky Point
COC Number NCG080264
Fender County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Charles Rooks
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80264
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Rooks Farm Service Inc
is hereby authorized to discharge stormwater from a facility located at:
Rooks Farm Service - Rocky Point
19390 NC Hwy 210
Rocky Point
Pender County
to receiving waters designated as Rileys Creek, a class C;Sw waterbody in the Cape Fear River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Public Transport Corp
PO Box 327
Troutman, NC 28166 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Public Transport Corporation
COC Number NCG080269
Iredell County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80269
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Public Transport Corp
is hereby authorized to discharge stormwater from a facility located at:
Public Transport Corporation
589 N Main St
Troutman
Iredell County
to receiving waters designated as Hicks Creek, a class WS -IV waterbody in the Catawba River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
H Brown
Lee Properties SC LLC
1515 W Green St
High Point, NC 27260 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Tucker Street Industrial Park
COC Number NCG080316
Alamance County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
H Brown
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80316
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Lee Properties SC LLC
is hereby authorized to discharge stormwater from a facility located at:
Tucker Street Industrial Park
2742 Tucker St Ext
Burlington
Alamance County
to receiving waters designated as Little Alamance Creek (Gant Lake, Mays Lake) (Alamance
County), a class WS-V;NSW waterbody in the Cape Fear River Basin in accordance with the
effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III,
and IV of General Permit No. NCGO80000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Institution Food House Inc
PO Drawer 2947
Hickory, NC 28603 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Institution Food House Incorporated
COC Number NCG080354
Catawba County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80354
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Institution Food House Inc
is hereby authorized to discharge stormwater from a facility located at:
Institution Food House Incorporated
543 12th St Dr Nw
Hickory
Catawba County
to receiving waters designated as Frye Creek, a class WS -IV waterbody in the Catawba River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Cornelia Butler
Allied Systems Limited
160 Clairemont Ave
Decatur, GA 30030 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Allied Systems Limited
COC Number NCG080398
Forsyth County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Cornelia Butler
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80398
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Allied Systems Limited
is hereby authorized to discharge stormwater from a facility located at:
Allied Systems Limited
3625 Williston Rd
Walkertown
Forsyth County
to receiving waters designated as Frazier Creek (Winston Lake), a class C waterbody in the
Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCGO80000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
James Bailey
James A Bailey Inc
5201 Beryl Rd
Raleigh, NC 27606 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
James A Bailey Incorporated -Wake
COC Number NCG080445
Wake County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
James Bailey
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80445
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
James A Bailey Inc
is hereby authorized to discharge stormwater from a facility located at:
James A Bailey Incorporated -Wake
5201 Beryl Rd
Raleigh
Wake County
to receiving waters designated as Simmons Branch, a class C;NSW waterbody in the Neuse
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Stephen Williams
AT Williams Oil Company
PO Box 7287
Winston Salem, NC 27109-7287
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
A T Williams Oil Co -Alamance
COC Number NCG080455
Alamance County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Stephen Williams
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCG080455
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
AT Williams Oil Company
is hereby authorized to discharge stormwater from a facility located at:
A T Williams Oil Co -Alamance
Jimmy Kerr Rd i85
Graham
Alamance County
to receiving waters designated as Back Creek, a class WS-II;HQW,NSW waterbody in the Cape
Fear River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Robert Barbour
A C Widenhouse Inc
PO Box 5010
Concord, NC 28027-5010
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Concord, NC Terminal
COC Number NCG080467
Cabarrus County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Robert Barbour
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80467
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
A C Widenhouse Inc
is hereby authorized to discharge stormwater from a facility located at:
Concord, NC Terminal
400 Old Charlotte Rd
Concord
Cabarrus County
to receiving waters designated as Irish Buffalo Creek, a class WS -III waterbody in the Yadkin
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Jeff Sexten
Con -Way Freight Inc
2211 Old Earhart
Ann Arbor, MI 48103 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Con -Way Freight-NRD
COC Number NCG080476
Wake County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Jeff Sexten
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80476
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Con -Way Freight Inc
is hereby authorized to discharge stormwater from a facility located at:
Con -Way Freight-NRD
400 Southport Dr
Morrisville
Wake County
to receiving waters designated as Crabtree Creek, a class C;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Larry Campbell
Larry Campbell's Towing & Recovery Inc
7327 Old Statesville Rd
Charlotte, NC 28269 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Larry Campbell's Towing & Recovery, Inc
COC Number NCG080584
Mecklenburg County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Larry Campbell
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80584
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Larry Campbell's Towing & Recovery Inc
is hereby authorized to discharge stormwater from a facility located at:
Larry Campbell's Towing & Recovery, Inc
7327 Old Statesville Rd
Charlotte
Mecklenburg County
to receiving waters designated as Long Creek, a class C waterbody in the Catawba River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Merle Dillinger
Sea Lane Express Inc
7254 Mount Holly Rd
Charlotte, NC 28214 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Sea Lane Express, Inc.
COC Number NCG080613
Mecklenburg County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Merle Dillinger
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80613
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Sea Lane Express Inc
is hereby authorized to discharge stormwater from a facility located at:
Sea Lane Express, Inc.
7254 Mount Holly Rd
Charlotte
Mecklenburg County
to receiving waters designated as Gum Branch, a class WS -IV waterbody in the Catawba River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
John Kenneally
Roadrunner Dawes Freight Services
6416 Lakeview Rd
Charlotte, NC 28269 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Roadrunner Dawes Freight Services
COC Number NCG080652
Mecklenburg County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
John Kenneally
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80652
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Roadrunner Dawes Freight Services
is hereby authorized to discharge stormwater from a facility located at:
Roadrunner Dawes Freight Services
6416 Lakeview Rd
Charlotte
Mecklenburg County
to receiving waters designated as Long Creek, a class C waterbody in the Catawba River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Joseph Moore
City of Brevard
95 W Main St
Brevard, NC 28712 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Brevard City -Public Works Facility
COC Number NCG080679
Transylvania County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Joseph Moore
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80679
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
City of Brevard
is hereby authorized to discharge stormwater from a facility located at:
Brevard City -Public Works Facility
405 Cashiers Vly Rd
Brevard
Transylvania County
to receiving waters designated as Nicholson Creek, a class C;Tr waterbody in the French Broad
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Douglas Linn
Town of Landis
312 S Main St
Landis, NC 28088 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Landis Public Works Department
COC Number NCG080695
Rowan County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Douglas Linn
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80695
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Town of Landis
is hereby authorized to discharge stormwater from a facility located at:
Landis Public Works Department
704 W Blume St
Landis
Rowan County
to receiving waters designated as Flat Rock Branch (South Branch Grants Creek) (Lake
Corriher), a class WS-IV;CA waterbody in the Yadkin River Basin in accordance with the
effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III,
and IV of General Permit No. NCGO80000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Lee Smith
City of Hendersonville
PO Box 1670
Hendersonville, NC 28793-1670
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Hendersonville Garage
COC Number NCG080697
Henderson County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG080000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Lee Smith
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80697
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
City of Hendersonville
is hereby authorized to discharge stormwater from a facility located at:
Hendersonville Garage
312 Williams St
Hendersonville
Henderson County
to receiving waters designated as Mud Creek, a class C waterbody in the French Broad River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Scott McClellan
Capital Area Transit
4104 Poole Rd
Raleigh, NC 27610 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Capital Area Transit
COC Number NCG080725
Wake County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Scott McClellan
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO8072S
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Capital Area Transit
is hereby authorized to discharge stormwater from a facility located at:
Capital Area Transit
1430 S Blount St
Raleigh
Wake County
to receiving waters designated as Rocky Branch, a class C;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Bill Davis
Rolling Frito-Lay Sales LP
725 Progress Industrial Blvd
Lawrenceville, GA 30043 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Hayesville Bin
COC Number NCG080730
Clay County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Bill Davis
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80730
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Rolling Frito-Lay Sales LP
is hereby authorized to discharge stormwater from a facility located at:
Hayesville Bin
Rt 2 Box 57a
Hayesville
Clay County
to receiving waters designated as South Fork Blair Creek, a class WS -IV waterbody in the
Hiwassee River Basin in accordance with the effluent limitations, monitoring requirements,
and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as
attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Bill Davis
Rolling Frito-Lay Sales LP
725 Progress Industrial Blvd
Lawrenceville, GA 30043 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Murphy Bin
COC Number NCG080732
Cherokee County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Bill Davis
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80732
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Rolling Frito-Lay Sales LP
is hereby authorized to discharge stormwater from a facility located at:
Murphy Bin
Hwy 64 W
Murphy
Cherokee County
to receiving waters designated as HIWASSEE RIVER, a class WS -V waterbody in the Hiwassee
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Bill Davis
Rolling Frito-Lay Sales LP
725 Progress Industrial Blvd
Lawrenceville, GA 30043 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Andrews Bin
COC Number NCG080754
Cherokee County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Bill Davis
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80754
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Rolling Frito-Lay Sales LP
is hereby authorized to discharge stormwater from a facility located at:
Andrews Bin
Tatham Gap Rd hwy 129
Andrews
Cherokee County
to receiving waters designated as Valley River, a class C;Tr waterbody in the Hiwassee River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Walter Woodall
Florida Rock & Tank Lines Inc
501 Riverside Ave
Jacksonville, FL 32202 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Florida Rock & Tank Lines - Navassa
COC Number NCG080765
Brunswick County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Walter Woodall
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80765
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Florida Rock & Tank Lines Inc
is hereby authorized to discharge stormwater from a facility located at:
Florida Rock & Tank Lines - Navassa
1265 Cedar Hill Rd
Navassa
Brunswick County
to receiving waters designated as Cartwheel Branch, a class SC;Sw waterbody in the Cape Fear
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
William Bell
City of Durham
101 City Hall Plz
Durham, NC 27701-3329
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
City of Durham -Department of Solid Waste Mgmt
COC Number NCG080773
Durham County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
William Bell
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80773
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
City of Durham
is hereby authorized to discharge stormwater from a facility located at:
City of Durham -Department of Solid Waste Mgmt
1833 Camden Ave
Durham
Durham County
to receiving waters designated as Goose Creek, a class WS-IV;NSW waterbody in the Neuse
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Stephen Williams
AT Williams Oil Company
PO Box 7287
Winston Salem, NC 27109-7287
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
WilcoHess #396 - Rocky Point
COC Number NCG080775
Fender County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Stephen Williams
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80775
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
A T Williams Oil Company
is hereby authorized to discharge stormwater from a facility located at:
WilcoHess #396 - Rocky Point
8221 US Hwy 117S
Rocky Point
Pender County
to receiving waters designated as Turkey Creek, a class C;Sw waterbody in the Cape Fear River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Drew Isenhour
Republic Services of North Carolina LLC
1220 Commerce St S W
Conover, NC 28613 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Garbage Disposal Service -Davie
COC Number NCG080787
Davie County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Drew Isenhour
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80787
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Republic Services of North Carolina LLC
is hereby authorized to discharge stormwater from a facility located at:
Garbage Disposal Service -Davie
131 Industrial Blvd
Mocksville
Davie County
to receiving waters designated as Elisha Creek, a class C waterbody in the Yadkin River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Thomas Morgan
Mountain Energy Corporation -Asheville
352 Georgia Ave
Waynesville, NC 28786 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Mountain Energy Corporation
COC Number NCG080797
Buncombe County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Thomas Morgan
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80797
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Mountain Energy Corporation -Asheville
is hereby authorized to discharge stormwater from a facility located at:
Mountain Energy Corporation
288 Lyman St
Asheville
Buncombe County
to receiving waters designated as FRENCH BROAD RIVER, a class B waterbody in the French
Broad River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Roger Stancil
Town of Chapel Hill
405 Martin Luther King Jr Blvd
Chapel Hill, NC 27514 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Chapel Hill Municipal Operations
COC Number NCG080800
Orange County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Roger Stancil
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80800
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Town of Chapel Hill
is hereby authorized to discharge stormwater from a facility located at:
Chapel Hill Municipal Operations
1099 Airport Rd
Chapel Hill
Orange County
to receiving waters designated as Old Field Creek, a class WS-V;NSW waterbody in the Cape
Fear River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCGO80000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
William Barfoot
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
City of Winston-Salem/Fleet Services Department
PO Box 2511
Winston Salem, NC 27107-9998
Dear Permittee:
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Fleet Services Department -Building #3
COC Number NCG080801
Forsyth County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
William Barfoot
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80801
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
City of Winston-Salem/Fleet Services Department
is hereby authorized to discharge stormwater from a facility located at:
Fleet Services Department -Building #3
650 Stadium Dr
Winston Salem
Forsyth County
to receiving waters designated as Salem Creek (Middle Fork Muddy Creek), a class C
waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring
requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No.
NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Craig Miller
City Of Charlotte- Stormwater Services
600 E 4th St
Charlotte, NC 28202 -
Truck Shop
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
City of Charlotte Central Yard -Solid Waste/Heavy
COC Number NCG080822
Mecklenburg County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
1S, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCGO80000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One -
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwaterguality.org �atlfra!ll,�
An Equal Opportunity \ Affirmative Action Employer
Craig Miller
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections 8, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80822
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
City Of Charlotte- Stormwater Services
is hereby authorized to discharge stormwater from a facility located at:
City of Charlotte Central Yard -Solid Waste/Heavy Truck Shop
829 Louise Ave
Charlotte
Mecklenburg County
to receiving waters designated as Little Sugar Creek, a class C waterbody in the Catawba River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
C R McDaniel
Norfolk Southern Railway Company
1200 Peachtree St Box 13
Atlanta, GA 30309 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Gastonia DTL Fuel Site
COC Number NCG080832
Gaston County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG080000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
C R McDaniel
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80832
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Norfolk Southern Railway Company
is hereby authorized to discharge stormwater from a facility located at:
Gastonia DTL Fuel Site
350 Hancock St
Gastonia
Gaston County
to receiving waters designated as Catawba Creek, a class C waterbody in the Catawba River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Richard Moffatt
Moffatt Oil Company
610 N James St
Goldsboro, NC 27530 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Moffatt Oil Company
COC Number NCG080864
Wayne County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCGO80000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG080000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Richard Moffatt
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Washington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG080000
CERTIFICATE OF COVERAGE No. NCGO80864
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Moffatt Oil Company
is hereby authorized to discharge stormwater from a facility located at:
Moffatt Oil Company
610 N James St
Goldsboro
Wayne County
to receiving waters designated as Big Ditch, a class C;NSW waterbody in the Neuse River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG080000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Chemcraft International Inc
PO Box 669
Walkertown, NC 27051 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Chemcraft International Incorporated
COC Number NCG090017
Forsyth County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG090000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG090000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG090000
CERTIFICATE OF COVERAGE No. NCG090017
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Chemcraft International Inc
is hereby authorized to discharge stormwater from a facility located at:
Chemcraft International Incorporated
3950 New Walkertown Rd
Winston Salem
Forsyth County
to receiving waters designated as Frazier Creek (Winston Lake), a class C waterbody in the
Yadkin River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Brent Jewell
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Engineered Polymer Solutions D/B/A Valspar
1717 English Rd
High Point, NC 27261 -
Dear Permittee:
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Valspar Coatings
COC Number NCG090020
Guilford County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG090000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG090000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Brent Jewell
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG090000
CERTIFICATE OF COVERAGE No. NCG090020
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Engineered Polymer Solutions D/B/A Valspar
is hereby authorized to discharge stormwater from a facility located at:
Valspar Coatings
1717 English Rd
High Point
Guilford County
to receiving waters designated as Payne Creek, a class C waterbody in the Yadkin River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Richard Pasin
Coatings and Adhesives Corporation
PO Box 1080
Leland, NC 28451-1080
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Coatings and Adhesives Corp - Leland
COC Number NCG090028
Brunswick County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG090000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG090000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Richard Pasin
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG090000
CERTIFICATE OF COVERAGE No. NCG090028
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Coatings and Adhesives Corporation
is hereby authorized to discharge stormwater from a facility located at:
Coatings and Adhesives Corp - Leland
1901 Popular St NE
Leland
Brunswick County
to receiving waters designated as Sturgeon Creek, a class C;Sw waterbody in the Cape Fear
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG090000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Walter Hanley
Lkq Corporation
120 N LaSalle St
Chicago, IL 60602 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
LKQ City Auto Parts
COC Number NCG100034
Durham County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Walter Hanley
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100034
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Lkq Corporation
is hereby authorized to discharge stormwater from a facility located at:
LKQ City Auto Parts
1301 S Miami Blvd
Durham
Durham County
to receiving waters designated as Little Lick Creek (including portion of Little Lick Creek Arm
of Falls Lake), a class WS-IV;NSW,CA waterbody in the Neuse River Basin in accordance with
the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II,
III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
James Roper
Roper Motor Co
PO Box 430
Grover, NC 28073 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Roper Motor Co
COC Number NCG100044
Cleveland County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
James Roper
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100044
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Roper Motor Co
is hereby authorized to discharge stormwater from a facility located at:
Roper Motor Co
1418 Long Branch Rd
Grover
Cleveland County
to receiving waters designated as Lick Branch, a class C waterbody in the Broad River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Fouad Bou Chahine
E Z Auto Sales & Salvage LLC
1400 Phelps Rd
Hillsborough, NC 27278 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
E Z Auto Sales & Salvage, LLC
COC Number NCG100045
Orange County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Fouad Bou Chahine
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100045
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
E Z Auto Sales & Salvage LLC
is hereby authorized to discharge stormwater from a facility located at:
E Z Auto Sales & Salvage, LLC
1400 Phelps Rd
Hillsborough
Orange County
to receiving waters designated as Eno River, a class C;NSW waterbody in the Neuse River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Hubert Jones
Mack's Used Cars & Truck Parts
1191 Sweeten Creek Rd
Asheville, NC 28803-1870
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Mack's Used Cars & Truck Parts
COC Number NCG100048
Buncombe County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Hubert Jones
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100048
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Mack's Used Cars & Truck Parts
is hereby authorized to discharge stormwater from a facility located at:
Mack's Used Cars & Truck Parts
1191 Sweeten Creek Rd
Asheville
Buncombe County
to receiving waters designated as Sweeten Creek (Busbee Reservoir), a class C waterbody in
the French Broad River Basin in accordance with the effluent limitations, monitoring
requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No.
NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
James McKinney
J & T Auto Parts Inc
241 Major Conley Rd
Marion, NC 28752 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
J & T Auto Parts Inc
COC Number NCG100071
McDowell County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
James McKinney
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100071
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
J & T Auto Parts Inc
is hereby authorized to discharge stormwater from a facility located at:
J & T Auto Parts Inc
241 Major Conley Rd
Marion
McDowell County
to receiving waters designated as CATAWBA RIVER, a class C;Tr waterbody in the Catawba
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. N CG 100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Randy Parker
Parker Motor Company
PO Box 596
Oakboro, NC 28129 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Parker Motor Company
COC Number NCG100087
Stanly County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Randy Parker
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100087
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Parker Motor Company
is hereby authorized to discharge stormwater from a facility located at:
Parker Motor Company
331 W 2nd St
Oakboro
Stanly County
to receiving waters designated as Rocky River, a class C waterbody in the Yadkin River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
LKQ Raleigh Auto Parts Corp
PO Box 126
Garner, NC 27529 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
LKQ Raleigh Auto Parts Corp
COC Number NCG100095
Wake County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100095
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
LKQ Raleigh Auto Parts Corp
is hereby authorized to discharge stormwater from a facility located at:
LKQ Raleigh Auto Parts Corp
2928 US Hwy 70 E
Garner
Wake County
to receiving waters designated as White Oak Creek (Austin Pond), a class C;NSW waterbody in
the Neuse River Basin in accordance with the effluent limitations, monitoring requirements,
and other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as
attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Lemon's Auto Parts Inc
185 Cody Ln
Madison, NC 27025 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Lemon's Auto Parts Incorporated
COC Number NCG100104
Rockingham County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atlfra!!1�
An Equal Opportunity \ Affirmative Action Employer
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100104
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Lemon's Auto Parts Inc
is hereby authorized to discharge stormwater from a facility located at:
Lemon's Auto Parts Incorporated
185 Cody Ln
Madison
Rockingham County
to receiving waters designated as Little Creek, a class C;Tr waterbody in the Roanoke River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. N CG 100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Thomas Jackson
Jackson Auto Salvage, Inc.
7120 Poole Rd
Raleigh, NC 27610 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Jackson Auto Salvage, Inc.
COC Number NCG100124
Wake County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Thomas Jackson
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100124
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Jackson Auto Salvage, Inc.
is hereby authorized to discharge stormwater from a facility located at:
Jackson Auto Salvage, Inc.
7120 Poole Rd
Raleigh
Wake County
to receiving waters designated as NEUSE RIVER, a class C;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Bashir Ahmady
Bashir Ahmady & Shokria Razai
6322 Hwy 231
Middlesex, NC 27557 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Johnston's Used Auto Parts
COC Number NCG100126
Johnston County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Bashir Ahmady
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100126
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Bashir Ahmady & Shokria Razai
is hereby authorized to discharge stormwater from a facility located at:
Johnston's Used Auto Parts
6322 Hwy 231 S
Middlesex
Johnston County
to receiving waters designated as Moccasin Creek (Bunn Lake), a class C;NSW waterbody in the
Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Robert Young
109 U Pull It Used Auto
3459 Thomasvillle Rd
Winston Salem, NC 27107 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
109 U Pull It Used Auto
COC Number NCG100136
Forsyth County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Robert Young
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100136
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
109 U Pull It Used Auto
is hereby authorized to discharge stormwater from a facility located at:
109 U Pull It Used Auto
3459 Thomasvillle Rd
Winston Salem
Forsyth County
to receiving waters designated as Fiddlers Creek, a class C waterbody in the Yadkin River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, I1I, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Gary Bryant
L & M Used Auto Parts Inc
2408 Hunters Ln
Kernersville, NC 27284 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
L & M Used Auto Parts Inc
COC Number NCG100138
Forsyth County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Gary Bryant
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100138
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
L & M Used Auto Parts Inc
is hereby authorized to discharge stormwater from a facility located at:
L & M Used Auto Parts Inc
178 Stanley Ave
Winston Salem
Forsyth County
to receiving waters designated as Lowery Mill Creek, a class WS -III waterbody in the Yadkin
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Doanld Pack
Pack's Garage - Body Shop - Salvage
1139 Pack Rd
Walnut Cove, NC 27052 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Pack's Garage - Body Shop - Salvage
COC Number NCG100143
Stokes County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Doanld Pack
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100143
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Pack's Garage - Body Shop - Salvage
is hereby authorized to discharge stormwater from a facility located at:
Pack's Garage - Body Shop - Salvage
1139 Pack Rd
Walnut Cove
Stokes County
to receiving waters designated as Coolico Creek (Fulp Creek) (Morgan Pond), a class C
waterbody in the Roanoke River Basin in accordance with the effluent limitations, monitoring
requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No.
NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Joyce Elliott
Elliott Auto Salvage
1010 Harvest St
Durham, NC 27704 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Elliott Auto Salvage
COC Number NCG100151
Durham County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Joyce Elliott
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100151
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Elliott Auto Salvage
is hereby authorized to discharge stormwater from a facility located at:
Elliott Auto Salvage
1010 Harvest St
Durham
Durham County
to receiving waters designated as Ellerbe Creek, a class WS-IV;NSW waterbody in the Neuse
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. N CG 100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Ben Fuller
Fuller's Auto Parts
1036 Harvest Dr
Durham, NC 27704 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Fuller's Auto Parts
COC Number NCG100155
Durham County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Ben Fuller
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100155
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Fuller's Auto Parts
is hereby authorized to discharge stormwater from a facility located at:
Fuller's Auto Parts
1036 Harvest Dr
Durham
Durham County
to receiving waters designated as Ellerbe Creek, a class WS-IV;NSW waterbody in the Neuse
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. N CG 100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Ricky Young
Youngs Auto Center & Salvage
2500 NC 242 S
Benson, NC 27504 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Young's Auto Center & Salvage -Dudley
COC Number NCG100182
Wayne County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Ricky Young
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Washington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100182
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Youngs Auto Center & Salvage
is hereby authorized to discharge stormwater from a facility located at:
Young's Auto Center & Salvage -Dudley
4172 US Hwy 117 S Alt
Dudley
Wayne County
to receiving waters designated as Poplar Branch, a class B;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Ira Leonard
Davidson Auto Salvage
5790 Old Salisbury Rd
Lexington, NC 27292 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Davidson Auto Salvage
COC Number NCG100190
Davidson County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Ira Leonard
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100190
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Davidson Auto Salvage
is hereby authorized to discharge stormwater from a facility located at:
Davidson Auto Salvage
5790 Old Salisbury Rd
Lexington
Davidson County
to receiving waters designated as Swearing Creek, a class C waterbody in the Yadkin River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
John Bolton
Central Recycling LLC
1597 Kennedy Rd
Thomasville, NC 27360 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
C&W Cores, Inc.
COC Number NCG100192
Davidson County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
John Bolton
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100192
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Central Recycling LLC
is hereby authorized to discharge stormwater from a facility located at:
C&W Cores, Inc.
1597 Kennedy Rd
Thomasville
Davidson County
to receiving waters designated as Little Uwharrie River (Wheatmore Pond), a class WS -III
waterbody in the Yadkin River Basin in accordance with the effluent limitations, monitoring
requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No.
NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
K Harper
Harper Auto Crushers Inc
2921 Hwy 55 W
Kinston, NC 28504 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Harper Auto Crushers, Inc.
COC Number NCG100196
Lenoir County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
K Harper
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Washington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100196
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Harper Auto Crushers Inc
is hereby authorized to discharge stormwater from a facility located at:
Harper Auto Crushers, Inc.
2921 Highwy 55 W
Kinston
Lenoir County
to receiving waters designated as NEUSE RIVER, a class C;NSW waterbody in the Neuse River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Ray Roland
Rolands Used Cars
61 Ray Roland Dr
Marion, NC 28752 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Rolands Used Cars
COC Number NCG100211
McDowell County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Ray Roland
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Asheville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100211
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Rolands Used Cars
is hereby authorized to discharge stormwater from a facility located at:
Rolands Used Cars
61 Ray Roland Dr
Marion
McDowell County
to receiving waters designated as North Muddy Creek, a class C waterbody in the Catawba
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. N CG 100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Brenda Lilly
Lilly's Recycling & Auto Salvage LLC
125 Transit Ave
Thomasville, NC 27360 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Lilly's Recycling & Auto Salvage LLC
COC Number NCG100213
Davidson County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Brenda Lilly
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100213
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Lilly's Recycling & Auto Salvage LLC
is hereby authorized to discharge stormwater from a facility located at:
Lilly's Recycling & Auto Salvage LLC
125 Transit Ave
Thomasville
Davidson County
to receiving waters designated as Kennedy Mill Creek, a class C waterbody in the Yadkin River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Dorothy Uchman
Lewis Auto Parts
9897 Blackwell Rd
Leland, NC 28451 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Lewis Auto Parts
COC Number NCG100217
Brunswick County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG100000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG100000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Dorothy Uchman
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG100000
CERTIFICATE OF COVERAGE No. NCG100217
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Lewis Auto Parts
is hereby authorized to discharge stormwater from a facility located at:
Lewis Auto Parts
9897 Blackwell Rd
Leland
Brunswick County
to receiving waters designated as Jackeys Creek, a class C;Sw waterbody in the Cape Fear River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. N CG 100000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Richard Wells
Randolph County
PO Box 4728
Asheboro, NC 27204 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Randolph Co PWD - Henley County Road
COC Number NCG120003
Randolph County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG120000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG120000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Richard Wells
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Winston-Salem Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG120000
CERTIFICATE OF COVERAGE No. NCG120003
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Randolph County
is hereby authorized to discharge stormwater from a facility located at:
Randolph Co PWD - Henley County Road
1254 County Land Rd
Randleman
Randolph County
to receiving waters designated as DEEP RIVER, a class C waterbody in the Cape Fear River
Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Jeffrey Hudson
Onslow County
4024 Richlands Hwy
Jacksonville, NC 28540 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Meadowview Road County Landfill
COC Number NCG120023
Onslow County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG120000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG120000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Jeffrey Hudson
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
t5 _ej l" 6
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Wilmington Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG120000
CERTIFICATE OF COVERAGE No. NCG120023
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Onslow County
is hereby authorized to discharge stormwater from a facility located at:
Meadowview Road County Landfill
415 Meadowview Rd
Jacksonville
Onslow County
to receiving waters designated as Blue Creek, a class SC;NSW waterbody in the White Oak
River Basin in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Robert Murphy
Nash County
120 W Washington St
Nashville, NC 27856 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Nash Co -Landfill
COC Number NCG120049
Nash County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG120000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG120000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Robert Murphy
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Raleigh Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG120000
CERTIFICATE OF COVERAGE No. NCG120049
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Nash County
is hereby authorized to discharge stormwater from a facility located at:
Nash Co -Landfill
Sr 1411 3057 Duke Rd
Nashville
Nash County
to receiving waters designated as Pigbasket Creek, a class B;NSW waterbody in the Tar -
Pamlico River Basin in accordance with the effluent limitations, monitoring requirements, and
other conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Chambers Development of NC
Chambers Development of NC
375 Allied Rd
Polkton, NC 28135 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Anson Waste Mgmt Facility
COC Number NCG120064
Anson County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG120000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG120000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Chambers Development of NC
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections e, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Fayetteville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG120000
CERTIFICATE OF COVERAGE No. NCG120064
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Chambers Development of NC
is hereby authorized to discharge stormwater from a facility located at:
Anson Waste Mgmt Facility
375 Allied Rd
Polkton
Anson County
to receiving waters designated as Brown Creek, a class C waterbody in the Yadkin River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Barry McKinnon
Lincoln County
115 W Main St
Lincolnton, NC 28092 -
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Lincoln County Landfill
COC Number NCG120081
Lincoln County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG120000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG120000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwatergualitv.org �atllra!!l�
An Equal Opportunity \ Affirmative Action Employer
Barry McKinnon
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections B, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
%�. ei _e �J v'
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Mooresville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG120000
CERTIFICATE OF COVERAGE No. NCG120081
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Lincoln County
is hereby authorized to discharge stormwater from a facility located at:
Lincoln County Landfill
5291 Crouse Rd
Crouse
Lincoln County
to receiving waters designated as Indian Creek, a class C waterbody in the Catawba River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set
forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 12th day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
A�
4
NCDENR
North Carolina Department of Environment and Natural Resources
Beverly Eaves Perdue
Governor
Randy Gould
Moore County Public Utilities
PO Box 1927
Carthage, NC 28327-1927
Landfill
Dear Permittee:
Division of Water Quality
Charles Wakild, P. E.
Director
December 12, 2012
Dee Freeman
Secretary
Subject: NPDES Stormwater Permit Coverage Renewal
Moore County Construction and Demolition
COC Number NCG120084
Moore County
This letter serves as your notification that the Division of Water Quality (DWQ) has reissued General Permit
NCG120000 and that your facility's coverage will continue under the conditions of the reissued general permit.
Please review the new permit to familiarize yourself with the changes in the reissued permit. This permit is
reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of
Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
1S, 2007 (or as subsequently amended).
The following information is included with your permit package:
• A new Certificate of Coverage (COC)
• A copy of General Permit NCG120000
• A copy of the Technical Bulletin for the General Permit
• Two copies of the Discharge Monitoring Report (DMR) Form
• Two copies of the Qualitative Monitoring Report Form
The General Permit authorizes discharges of stormwater, and it specifies your obligations for discharge
controls, management, monitoring, and record keeping. Please review the new permit to familiarize yourself
with all the changes in the reissued permit. Your facility has six (6) months from the time of receipt of the
permit to update your current SPPP to reflect all new permit requirements.
The first sample period of your permit begins January 1, 2013. Your facility must sample a "measureable
storm event" beginning during the periods beginning January 1 and July 1 of every year (or, if applicable,
report "No Flow," as outlined in Part III, Section E). Also, please note that Tier 3 Actions in Part II of your
permit are triggered by benchmark exceedances on four occasions beginning on the effective date of this
permit and do not count prior exceedances.
The more significant changes in the General Permit since your last COC was issued are noted either in the
Draft Permit Fact Sheet that accompanied the public notice (http://portal.ncdenr.org/web/wq/ws/su/current-
notices), or in the Response to Comments / Summary of Changes and Technical Bulletin documents that are
posted on the Stormwater Permitting Unit's website with the new General Permit. Please visit
http://Portal.ncdenr.org/web/wq/ws/su/npdessw (click on 'General Permits' tab) to review that information
for your specific General Permit carefully.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 One -
Phone: 919-807-6300 \ FAX: 919-807-6492 NorthCarolina
Internet: www.ncwaterguality.org �atlfra!ll,�
An Equal Opportunity \ Affirmative Action Employer
Randy Gould
December 12, 2012
Page 2 of 2
Some of the changes include:
• Part II:
• Section A: The Stormwater Pollution Prevention Plan (SPPP) section, if applicable, has been updated
to the most current language of our permits. Additional conditions for specific industry sectors have
been added to the SPPP requirements in some cases.
• Sections 8, C: Failure to perform analytical stormwater monitoring may result in the Division requiring
that the permittee begin a monthly sampling scheme.
• Sections 8, C: A lower TSS benchmark of 50 mg/I for HOW, ORW, PNA and Tr Waters applies to these
more sensitive waters.
• Sections 8, C. The monitoring parameter Oil & Grease (O&G) has been replaced by the parameter
Total Petroleum Hydrocarbons (TPH) for vehicle maintenance areas, and in some cases, other
analytical monitoring requirements.
• Sections 8, C, D: Inability to sample due to adverse weather must be recorded in the SPPP, or in
separate on-site records if your General Permit does not require an SPPP. Adverse weather is defined
in the "Definitions" section of the permit.
• Sections 8, C. The term "Representative Storm Event" has been replaced by "Measurable Storm
Event." A measurable storm event is defined in the permit.
• Section D: If the permittee fails to respond effectively to problems identified by qualitative
monitoring, DWQ may require the permittee to perform corrective action.
Please review Parts III and IV to understand the Standard Conditions of your new NPDES General Permit,
including Compliance and Liability, Reporting, Monitoring and Records requirements; Operation and
Maintenance obligations; and Definitions. Please note that all samples analyzed in accordance with the terms
of this permit must be submitted to the Division on Discharge Monitoring Report (DMR) forms available on
the Stormwater Permitting Unit's website above. DMR forms must be delivered to the Division no later than
30 days from the date the facility receives the sampling results from the laboratory. Also note that existing
permittees do not need to submit a renewal request prior to expiration unless directed by the Division.
Your coverage under the General Permit is transferable only through the specific action of DWQ. This permit
does not affect the legal requirements to obtain other permits which may be required by DENR, nor does it
relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,
rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit
package, please contact the Division's Stormwater Permitting Unit at (919) 807-6300.
Sincerely,
for Charles Wakild, P.E.
cc: DWQ Central Files
Stormwater Permitting Unit Files
Fayetteville Regional Office
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG120000
CERTIFICATE OF COVERAGE No. NCG120084
STORMWATER
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Moore County Public Utilities
is hereby authorized to discharge stormwater from a facility located at:
Moore County Construction and Demolition Landfill
Turning Leaf Way
Aberdeen
Moore County
to receiving waters designated as Horse Creek (Pinehurst Lake), a class WS-II;HQW waterbody
in the Lumber River Basin in accordance with the effluent limitations, monitoring
requirements, and other conditions set forth in Parts I, II, III, and IV of General Permit No.
NCG120000 as attached.
This certificate of coverage shall become effective December 12, 2012.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this 121h day of December, 2012.
for Charles Wakild, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission