HomeMy WebLinkAbout20150205 Ver 1_Design/Maps/Site Plans_20150220,�
r
n.
F"
4
��
N
m
�
See Sheet 9A For Index of Sheets
See Sheet 98 For Conventlonol Plan Sheet Symbols
TOWN OF SOUTHERN SHORES: RACHEL PATRICK
(252) 261-2394
NCDOT CONTACT: MOHAMMED MAHJOUB, EI
' (919) 707-6275
����IE �IF �T��$�II� ��I��ICs��T�
�� V��y��� �� 11�L�`1..JJ� VV � Jl �l'
DARE CO U1�TY
9TATB 6CAT6 PROIECC RePERBNCe N6
�a�c� B-5417
dl'ATB PROl.NO. A.APROJ.N0.
45450.1.'1 BRZ-0154(3)
45450.2.1 8RZ-0154(3)
45450.3.1 BRZ-0154(3)
`:.�,;
,,�
.
LOCATI011t: BRIDGE 111O.17 OVER S11lOW GOO�S� CA11lAL NqoNB GR/p �
0111 SOUTH DOGWOOD TRAIL �SRS o�
TYPE OF WORK: GRADI11tG, PAVI11lG, DRAI11lAGE, A111D STRUCTURE
Tp US /�
TO E OW1Y000 TRAIL
s�sr '�'erw�
N0. 51�615
�
DPSCRIPI]ON
P.E.
W W 8 UTIL.
CONST.
Tms ao��ma�rwtooa*n� im ana o a ra anE Ee919na orece t a
na�ain, aa itno�t t"r+a� �Wno�i�aPioo d aaonon ov dl aP r-
xorn a a°ssaamre�inasna�os irnour naouiry fo K�miey-xom a
pssociotes,�nc.tor nicn ir o eo oeasarvse t a imoroaer
fo�r ihe speciflc Durpose an�C�cllent� * �"�16 �"}8"aea Ny
GRAPHIC SCALES DESIGN DATA PRO ECT LEIKGTH ■ HYDRAULICS E1�GIlYEER DIVISI011T OF HIGHWAYS
J PLANS PREPARED FOR Kimley>>> Horn STATE OF 11iORTH CAROLINA
ADT 2008 = <400 VPD THE NCDOT BY.•
20 l0 0- 20 40 ADT 2030 =<400 VPD O•�m� ,,,�h. ��,;,,,, o� �0�,q
DHV = WA PENo.Fqlp] � c
LENGTH OF ROADWAY T/P PROJECT B-5417 = 0.0476 MILE za�z sr,vm,vzn SPSCZFICA770NS �@` 490
D = WA 4 s
20 10 0 PLANS 20 40 V= 5p m h LENGTH OF STRUCTURE T/P PROJECT B-5417 = 0,0213 MILE src�vnruxs: P�� � 8
P RIGHT OF WAY DATE: CECIL MARRON, P.E. „ �
_ J DESIGN EXCEPTION: TOTAL LENGTH OF T/P POiOJECT 8-5417 = 0.0689 MILE OCTOBER 2014 PROJECT 6NGINEER ROAD�GINEER IGH �'�,�' o� �@°�a�
PROFILE (HORIZONTALj WA ppp9'
4 2 0 4 8 FUNCTIONAL CLASSIFICATION: LETI7NG DATE: MATTi�IEW WEST, P.E., AVS
LOCAL COLLECTOR
JANUARY 2015 PROJECZ DESIGN ENGIIVTiER
PROFILE (VERTICAL) ` InST i' DUAL) SIG���: P� STAT6 ffiGHWAY DESIGN SNGINGF,'R p��
�
i`
.
y
�
i�
�,
�
0
N
�
INDEX OF SHEETS
SHEET NUMBER DESCR/PTION
/A
IB
/C-/
2A-ITHRU 2A-5
2B-/
20-/
3
3B-1
3P-I
9
5
TMP-1 TNRU TMP-4
SIGN-I
EC-/THRU EC-2
EC-3 THRU EC-6
UTL-I
UC-ITHRU UC 2
X-0
X-lA
X-ITHRU X-6
X-7 THRU X-8
Sl THRU S29
SN
TITLE SHEET
INDEX OF SHEETS.GENERAL NOTES.AND
UST OF STANDARDS
CONVENTIONAL SYMBOLS
SURVEY CONTROL SHEET
TYPICAL SECTIONS, PAVEMENT SCHEDULE. AND
M�SCEL[arVEouS DETaLs
RDADWAY DEraL SHEEr
DRA/NAGE DETAIL SHEET
SUMMARY OF Ql/ANTITIES
EARTHWORK SUMMARY
PARCEL/NDEX SHEET
PLAN SHEET
PROFILE SHEET
TRAFFIC MANAGEMENT PLANS
SIGNING SHEET
EROSION CONTROL SHEETS
EROSION CONTROL DETAILS
EXISTING UTIUTY COORD/NATION SHEET
UTILifY CONSTRUCTION PLANS
CROSS SECTION INDEX
CROSS SECTION SUMMARY SHEET
-L- SOUTH DOGWOOD TRA1L CRO55 SECTIONS
-Y2- TALL PINE LANE CROSS SECT/ONS
STRUCTURE PLANS
STRUCTURES STANDARD NOTES SHEET
GENERAL NOTES
QUALITY OF WORK:
WORK /N THlS PROJECT SHALL CONFORM TO THESE PLANS.
THE LATEST EDlTIONS OF THE NORTH CAROUNA DEPARTMENT
OF TRANSPORTATION (NCDOTI ROAD STANDARDS AND
SPECIFICATIONS.THE NORTH CAI40UNA EROSION AND SEDlMENT
CONTROL HANOBOOK. THE NORTH CAROUNA EROSION AND SEDIMENT
CONTROL REGULATIONS.IN THE EVENT OF CONFUCT BETWEEN
ANY OF THESE STANDARDS SRECIFICATIONS.OR PLANS.THE
NCDOT GUIDELINES SHALL GO'VERN UNLESS OTHERWISE
NOTED IN THESE PLANS.
ANY DISCREPANCIES FOUND BETWEEN THE DRAWINGS AND SPECIFICATIONS
AND SITE CONDITIONS OR ANY /NCONSISTENCIES OR AMBIGUITIES lN
DRAWINGS OR SPECIFICATIONS SNALL BE /MMEDIATELY REPORTED
TO THE ENGINEER,IN WRITING.WHO SHALL PROMPTLY ADDRE55
SUCH /NCONSlSTENC/ES OR AMBl6UlTlES. WORK �ONE BY THE
CONTRACTOR AFTER HJS DISCOVERY OF SUCH DISCREPANClES,
INCONSISTENCIES.OR AMBIGUlfIES SHALL BE DONE AT THE
CONTRACTOR'S RISK.
GENERAL NOTES CONT/NUED
GENERAL NOTES: 2012 NCDOT SPECIFICATIONS
EFFECTNE: JANUARY 2012
DESCRIPTION OF WORK:
THE PROJECT CONSISTS OF THE REPLACEMENT OF THE SOUTN DW1�V000
BRIDGE fBRIDGE •l71 AND REMOVAL AND PLACEMENT OF BULKHEADS lN
SNOW GOOSE CANAL.A TRIBUTARY OF THE JEAN GUITTE CREEK lN DARE
COUNTY.SOUTNERN SHORES.NORTH CAROUNASPECIFIC IMPROVEMENTS
aRE DEratED HEREinr.
ALL WORK SHALL CONFORM TO NORTH CAROLINA DEPARTMENT OF
TRANSPORTATION STANDARDS AND SPECIFICATIONS.
CONSTRUCT/ON SURVEY/NG:
ALL SURVEY/NG WORK RE�UIRED FOR THE CONSTRUCTION OF
TNIS PROJECT AND VERIFICATION OF /N-PLACE EARTHWORK
OUANTITIES WILL BE PERFORMED BY A LICENSED NORTH
CAROLINA LAND SURVEYOR.IT IS THE RESPONS/BILITY OF THE
CONTRA(:TOR TO CONTRACT DIRECTLY WITH THE SURVEYOR
FOR AL[. SURVEYING SERVICES REQUIRED DURING CONSTRUCTION.
GRADE LINE:
GRADING AND SURFAC/NG:
THE GRADE UNES SHOWN DENOTE THE FlNISHED ELEVATION OF
THE PROPOSED ROADINAY SURFACE AT GRADE POINTS SHOWN ON TNE
TYPICAL SECTIONS. GRADE UNES MAY BE ADJUSTED AT THE/R BEGINNING
AND ENDING AND AT STRUCTURES AS D/RECTED BY THE ENGINEER /N
ORDER TO SECURE A PROPER TIE-lN.
CLEARING:
CLEARING ON TNIS PROJECT SHALL BE PERFORMED TO THE UMITS
ESTABLISHED BY METNOD ll.
SUPERELEVAT/ON:
ALL TRANSITIONS SHALL BE CONSTRUCTED AS SHOWN ON THE PLAN
AND CROSS SECTION SNEETS. CROSS SLOPE TRANSITIONS ARE TO BE
REVOLVED ABOUT THE GRADE POINTS SHOWN ON TNE TYPICAL SECTIONS.
CROSS SLOPE TRANSlfIONS OCCUR ON TALL PINE LANE AT THE
INTERSECTION OF SOUTH DO(,1�VOOD TRAIL AND THE BEGINNING AND
ENDING OF CONSTRUCT/ON ON SOUTH DOG'W000 TRAIL '
SIDE ROADS:
TNE CONTRACTOR W/LL BE REDUIRED TO DO ALL NECESSARY WORK TO
PROVIDE SUITABLE CONNECTlONS WITN ALL ROADS.STREETS.AND DRNES
ENTERING THIS PROJECT.THIS WORK WILL BE PAID FOR AT THE
CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS /NVOLVED. �
GEOTECHNICAL /NVEST/GATIONS:
SUBSURFACE PLANS:
UMITED SUBSURFACE /NVESTIGATIONS ARE AVAILABLE ON THIS PROJECT
AND ARE /NCLUDED IN THE CONTRACT SPECIFICATlONS. THE CONTRACTOR
SNOULD MAKE Hl5 OWN ADDITIONAL INVESTIGATION INTO SUBSURFACE
CONDITIONS AS NECESSARY,
END BENTS:
THE ENG/NEER SHAI1 CNECK THE STRUCTURE END BENT PLANS.
DETAILS,AND CROSS-SECTION PRIOR TO SETTING OF THE SLOPE STAKES
FOR TNE EMBANKMENT OR EXCAVATION APPROACHING A BRIDGE.
GENERAL NOTES CONT/NUED
UT/LIT/ES:
UTIUTY OWNERS ON THlS PROJECT ARE:
WATER fDARE COUNTY7 (252J 475-9296
POWER fDOM/NION POWER) 12521256-2888
TELEPHONE lCENTURY UNK1 (2521475-8265
CABLE fCHARTERJ 12521489-/l94
RE�U/R6D RELOCATIONS OR ADJUSTMENT OF EXISTING UTIUTIES ARE SHOINN
/N THESE PLANS fSHEETS UTL-I.UC-I AND UC-21 AND SHOULD BE
CQORDlNATED BY THE CONTRACTOR AS PART OF TH/5 PROJECT.
ALL RELOCATION OF UTIUTIES SHALL BE COMPLETED PRIOR TO BEG/NNING
CONSTRUCTION ON THE BRIDGE STRUCTURE.
WATERWAYACCESS:
CONTRACTOR SHALL RESTRICT ALL RECREATIONAL ACCESS TO SNOW GOOSE
CANAL WATERWAY DURING DEMO AND CONSTRUCTION ABOVE WATERWAY.
CONSTRUCTION IN-WATER MORATORIUM:
THE PROJECT AREA IS WITH/N AN INLAND PR/MARY NURSERY AREA AND TO THE
EXTENT OF WORK,AN /N-WATER MORATORIUM OF FEBRUARY l5 -
SEPTEMBER 30 wOULD BE REouESTED TO MrNiMIZE iMPACTs TO AOUATiC
RESOURCES.
LIST OF 2012 ROADWAY STANDARD DRAWINGS
THE FOLLOW/NG ROADWAY STANDAROS AS APPEAR IN 'ROAOWAY STANDARD DRAWINGS -
ROADWAY DESIGN UNIT - NC DEPARTMENT OF TRANSPORTATION- RALEIGH,N:C.
DATED JANUARY 2012 ARE APPLICABLE TO THIS. PROJECT AND BY REFERENCE HEREIN ARE
CONSIDERED A PART OF THESE PLANS. �
STD.NO. DESCRIPTION
ONIS/ON 2 - EARTNWORK
ZOOD2 NETHOD OF CLEARING - AfETH00 /I
225�2 GUIDE FOR GRAOING SUBGRADE - SECONDARY AND LOCAC
ONISION 4 - AIAIOR STRUCTURES
422J0 REINFORCED BRIDGE APPROACH F//1,S
DNISION 7- CONCRETE PAVEYENTS AND SHOULDERS
7QOD5 TYING PROPoSED PAVEAIENT TO EXISTING PAVENENT
DNlSION 8 - INCIDENTALS
848A2 DRNEWAY TURN�IT- RAD/US TYPE
84BA4 STREET TURNIXlT
6/6AI RlP RAP /N CHANNELS
ONISION 9 - 5/GNING
90320 WOOD SIGN PoST
9�09l0 OR/ENTATION OF GROf1ND AIOUNTED SIGNS
90450 AfAUNTING OF TYPE D'.'E' AND 'F' SIGNS ON 'U' CHANNEL PoSTS
ONISION ll - WORK ZONE TRAFFIC CONTROL
/IOLOI WORK ZONE AOVANCE WARNING S/GNS
/IOlA3 TENPoRARY ROAD CLOSURES
IlOIJI TRAF'PlC CONTROL OESlGN TAQLES
�I�OAI STaT�ONaRY wORK ZONE SrGNS - MQUNTrNG HE�GHT & LATERAL CLEaRaNCE
IIlOD2 PORTABLE WORK ZONE SIC,NS
Il30Dl DRUM
114501 BARRICADES - TYPE-ll/
ONISfON l2 - P�EMENT I/ARKfNGS.AIARKERS AND DEL/NEATION
/264D1 OBJECT NARKERS
126902 PLACEAIENT OF OBJECT A/ARKERS
ON/SION 15 - UTILITIES
1515A1 WATER AIETER
DN/SION l6 - EROSION CONTROL AND ROADSIDE DEVELOPNENT
1605A1 TEAIADRARY 5/LT FENCE
I63IAI MATTING INSTALLATION
.
R
w
� 1llote: Not to Scale
�
= *S. U.E. = Subsurface Utility Engineering
BOUNDARdES AND PROPERTY
State Line ----- -----
County Line ---- --
Township Line --- --
City Line -- --
Reservation Line — - — - —
Property Line
Existing Iron Pin �
�
Property Corner --K
Property Monument 0
Parcel/Sequence Number �2s
Existing Fence Line -x x x-
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence ^
Existing Wetland Boundary - - - -��8- - - -
Proposed Wetland Boundary ��B
F�cisting Endangered Animal Boundary �^B
Existing Endangered Plant Boundary EPB
Known Soil Contamination: Area or Site —�— '•'
Potential Soil Contamination: Area or Site -- �?, —�
BUILDINGS AND OTHER CULTURE.•
Gas Pump Vent or WG Tank Cap O
Sign �
Wel I °
Small Mine 'Sz
Foundation 0
Area Outline 0
Cemetery 0
Building �
School �
Church . �
Dam
HYDROLOGY.•
Stream or Body of Water ---- ----
Hydro, Pool or Reservoir �__= J
Jurisdictional Stream —�S .. _
Buffer Zone 1 sz i
BufFer Zone 2 sz z
Flow Arrow �---- ----
Disappearing Stream �--- ----
Spring p�-•.,�_. �
Wetland �
Proposed Lateral, Tail, Head Ditch �
� ��,
False Sump �
����IE �IF 1��II��]F�[ ��]Eg�IL��T�
�������� �� ���u�����
CONVENTIONAL PLAN SHEET SYMBOLS
RAILROADS.•
Standard Gauge CSX TRANSPoArAT/ON
RR Signal Milepost ,,,,�Po 3s
Switch �
SW/7CH
RR Abandoned � -�- -�- �
RR Dismantled -------
RIGHT OF WAY
Baseline Control Point .
Existing Right of Way Marker �
Existing Right of Way Line -
Proposed Right of Way Line
Proposed Right of Way Line with
Iron Pin and Cap Marker
Proposed Right of Way Line with
Concrete or Granite WW Marker
Proposed Control of Access Line with
Concrete C/A Marker
F�cisting Control of Access — `
��—
Proposed Control of Access
Existing Easement Line --E--
Proposed Temporary Construction Easement - E
Proposed Temporary Drainage Easement— T�E
Proposed Permanent Drainage Easement — r�e
Proposed Permanent Drainage / Utility Easement �ue
Proposed Permanent Utility Easement Pue
Proposed Temporary Utility Easement Tue
Proposed Aerial Utility Easement quE
Proposed Permanent Easement with O
Iron Pin and Cap Marker �
RDADS AND RELATED FEATURES.•
Existing Edge of Pavement -----
Existing Curb -----
Proposed Slope Stakes Cut --- �---
Proposed Slope Stakes Fill --- F---
Proposed Curb Ramp cR
Existing Metal Guardrail
Proposed Guardrail T T T T
Existing Cable Guiderail n n �
Proposed Cable Guiderail n n n n
Equality Symbol �
Pavement Removal �
T�EGETfITlON.•
Single Tree {�
Single Shrub d
Hedge
Woods Line �• �� • •� ��
Orchard
Vineyard
EXISTING STRUCTURES.•
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Drainage Box: Catch Basin, DI or JB
Paved Ditch Gutter
Storm Sewer Manhole
Storm Sewer
UTILITIES.•
POWER:
Existing Power Pole
Proposed Power Pole
Existing Joint Use Pole
Proposed Joint Use Pole
Power Manhole
Power Line Tower
Power Transformer
WG Power Cable Hand Hole
H-Frame Pole
Recorded U/G Power Line
Designated WG Power Line (S.U.E.*)
TELEPHONE:
f� €? Q Q
Vlneyard
CONC
— � CONC WW 1
�
CONC HW
�----------C
� CB
OO
5
•
•
O
�I
n
Existing Telephone Pole -♦
Proposed Telephone Pole -O-
Telephone Manhole OO
Telephone Booth ❑a
Telephone Pedestal ❑T
Telephone Cell Tower �
WG Telephone Cable Hand Hole HH
Recorded WG Telephone Cable *
Designated WG Telephone Cable (S.U.E.*) - - - - -T- - - -
Recorded WG Telephone Conduit T�
Designated WC Telephone Conduit (S.U.E.*j- - - - -T�- - - -
Recorded WG Fiber Optics Cable T FO
Designated WG Fiber Optics Cable (S.U.E.*}- - - - -T Fo- - - -
WATER:
Water Manhole OO
Water Meter o
Water Valve �
Water Hydrant �
Recorded WG Water Line •
Designated WG Water Line (S.U.E.*�— - - - -•- - - -
Above Ground Water Line A/G Water
N:
TV Satellite Dish C�
TV Pedestal ❑�
N Tower �
WG N Cable Hand Hole HH
Recorded WG N Cable TM
Designated U/G N Cable (S.U.E.*) - - - -T�- - - -
Recorded WG Fiber Optic Cable T� ��
Designated WG Fiber Optic Cable (S.U.E.*r-- - - - -T� �o- - -
GAS:
Gas Valve 0
Gas Meter �
Recorded WG Gas Line �
Designated WG Gas Line (S.U.E.*) - - - -�- - - -
Above Ground Gas Line A�c ca5
SANITARY SEWER:
Sanitary Sewer Manhole OO
Sanitary Sewer Cleanout �+
WG Sanitary Sewer Line 5=
Above Ground Sanitary Sewer A/G Sanitory Sewer
Recorded SS Forced Main Line �55
Designated SS Forced Main Line (S.U.E.*) - - - - -F55- - - -
MISCELLANEOUS:
Utility Pole �
Utility Pole with Base �
Utility Located Object p
Utility Traffic Signal Box ❑s
Utility Unknown WG Line ��T�
U/G Tank; Water, Gas, Oil �
Underground Storage Tank, Approx. Loc. — usr
A(G Tank; Water, Gas, Oil �
Geoenvironmental Boring �
WG Test Hole (S.U.E.*) � -
Abandoned According to Utility Records — AATUR
End of Information E.O.1.
t�
�
0
�
K
n
s
u
�
�
I
I
i �
i
i
i
i
i
i
I
� —GPS— l
I N:87770735 E:296204852
� ELEV.=l58'
� OFF PLAN SHEET LlMITS
DIST FROM —L— STAIO+OOAO = 425.34'
� BEARING = N 8E 26� ir E
�
�
�
I
I
I
I
I
I
1
I
I
I
I
�
� —ri+
J IN A - 4
� LOCAC/ZED PRQIECT COORU/NaTES
N ' 8T1�9995
� E - 25i624B29i
1
I
1
1
I
I
��-
� '� ��
`__��``�� S � �'
�`\ � �=
��
��
BM �l
N: 878242J1 E: 2962.393.46
ELEV.= 10.58'
—BL— STA7t939/=
—L— 15+2276 IOFF 423/' LTJ
—BL— 0/S 47A3'LT
_�_____ _
m
�
O�
. �.
���Q
�
��
POINT DESC.
1 GPS-1
2 GPS-2
5 BL-5
4 BL-4
,3 BL-3
�
SNOW GOI
CANAL
�"_r
� �
L__J_
�
1 SIIIOW GOI
CANAL
�
NORTH
—GPS— 2
N:878/0859 E:2362036.48
ELEV.=l.40'
—L— STA /4+68,36 fOFF 9/976' LTJ
V
EAST ELEVATION
877,707.35 2,962,048.52 1.58
878�108.54 2,962,036.48 1.90
877,959.02 2,962,495.63 11.38
878,116.55 2,962,449.29 12.05
878,308.89 2,962�436.04 11.11
��� T HlS SHEET NOT T 0 SCALE ���
nr —
E -
�o sas gi
abN
-�-
S. DOGWOOD TRAIL ---
L STATION OFFSET
OUT OF ALIGNMENT LIMITS
OUT OF ALIGNMENT LIMITS
12+25.35 11.96`
13+87.55 14.86'
15+78.25 13.49'
SEE SHEET NO. 4 FOR -L- PLAN
SEE SHEET NO. 4 FOR -Y2- PLAN
SEE SHEET NO. 5 FOR -L- PROFILE
SEE SHEET NO, 5 FOR -Y2- PROF/LE
TBM 1
BL STA 7+93.91
0/S 47.03' LT.
ELEV. =10. 58'
RR SPIKE IN BASE OF 36" OAK TREE
::
�
n
f
�;r
�
N
0
EXISTING
GROUND
� � SOUTH DOGWOOD TRA/L
,
�;
EX/ST ! EXIST 5' PS 3'
� i �
� �
i
i
i.
i
i
� I
I
I
j
C� ! C� C2 -
�
EGROUND EX lST i EX/ST 0.08
- - - �-------- ---- ---�--- --- --------- -� ,3 EX/STING
i . �• � GROUND
. i ------
i .
U V V U
TYPICAL SECTION NO. 1
—L — ST A 12 f66o08 T 0 ST A l2 f82o23
VAR/ES I 3'
VAR
I
1
� SOUTH DOGWOOD TRA/L
1
I •
' //� 5' PS 3'
i �
i
�
� � ,
I
1
1
� V�
i
I
� r_o�nc
GRADE TO THIS LINE J
TYP/CAL SECTION NO. 2
—L — STA l2 f82e23 TO ST A l3 f88e75 (BEGIN BRIDGE)
O—L — ST A l5 +0/025 l END BRIDGE� T 0 ST A l5 -f-86°00
EXISTING
' GROUND
FUTURE PLANS: NOTES:
THE TOWN OF SOUTHERN SHORES IS COORDINATING 1. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS
DESIGN ON A SEPARATE PROJECT FOR FAIRWAY DRIVE OTHERWISE NOTED
DUR/NG THE DESIGN OF THESE PLANS. PLEASE
COORDINATE WITH FIELD ENGINEER DURING 2. SEE PLANS FOR SPECIFIC TAPER LOCAT/ONS
CONSTRUCTION.
3. SEE MATCH LINE SECTIONS FOR EXCEPTIONS
TO STAT/ON LIMITS
4. PAVED SHOULDER LOCATIONS W/LL VARY.
SEE PLANS FOR SPECIFIC LOCATION DETA/LS.
� . PAVEMEIVT SCHEDULE
PROPOSED APPROX.I-l/2°ASPHALT CONCRETE SURFACE,COURSE TYPE S95B.AT
CI AN AVERAGE RATE OF l68 LBS. PER SQ. YD.
PROPOSED APPROX. 3' ASPHALT CONCRETE SURFACE COURSE TYPE S95B,AT
CZ AN AVERAGE RATE OF l68 LBS. PER S0. YD. lN EACH OF TWO LAYERS.
C+ PROPOSED VAR.DEPTN ASPHALT CONCRETE SURFACE COURSE,TYPE S95B,AT
3 AN AVERAGE RATE OF Il2 LBS. PER SQ. YD. PER 1' DEPTH. TO BE PLACED
IN LAYERS NOT LESS TNAN /5'1N DEPTH OR GREATER THAN 2'lN DEPTH.
PROPOSED APPROX. 4' ASPHALT CONCRETE INTERMED/ATE CbURSE 7YPE lI9AB,
D� AT AN AVERAGE RATE OF 456 LBS. PER Sa. YD.
D2 PROPOSED VAR. DEPTN ASPHALT CONCRETE INTERMED/ATE COURSE, TYPE ll9AB, AT
AN AVERAGE RATE OF ll4 LBS. PER SQ. YD. PER l' DEPTH TO BE PLACED
IN LAYERS NOT LESS THAN 25'OR GREATER TMAN 4°lN DEPTH.
E/ PROPOSED APPROX. 4'ASPHALT CONCRETE BASE COURSE 7YPE B25AB.AT
AN AVERAGE RATE OF 342 LBS.PER SQ.YD.
E^ PROPOSED VAR.DEPTH ASPNALT CONCRETE BASE COURSE,TYPE B25.OB,AT �
� AN AVERAGE RATE OF I14 LBS. PER SQ. YD. PER l' DEPTH TO BE PLACED
lN LAYERS NOT LESS THAN 3'OR GREATER THAN 55'lN DEPTH.
T EARTH MATERIAL
U EXlSTlNG PAVEMENT
`I MILUNG ASPNALT PAVEMENT,l5'DEPTH
w VARIABLE DEPTH ASPHALT PAVEMENT fSEE DEiAIL W7J
R
y
•
h
0
m
42" VERTICAL CONCRETE BARRIER RAIL
SEE STRUCTURES PLANS
ITYPICAU
CORED SLAB STRUCTURE �
EXIST/NG
GROUND
� SOUTH DOGWOOD TRAIL
�
ll @ 3' CONCRETE CORED SLAB UNITS = 33'
l5' i l8'
i
2�-��° ��, � ��, 5._9„
i
i
i
i
; �, _3„
I
0.02
0.02
� ,
i
i
TYP/CAL SECTION NO. 3
—L — ST A l3 +88a75 (BEGIN BRIDGE)
T 0 ST A l5 f0/o25 (END BRID�E)
2 BAR METAL RAIL
SEE STRUCTURES PLANS
ITYPICAU
� SOUTH DOGWOOD TRAIL
I
I
3' 9'-ll' ' 9'-ll' 3'
0 i �
I
1
I.I i
�I'i� i
I 1
�
0.08
��3�
�
TYPICAL SECTION NO. 4
—L — ST A l5 �86000 T 0 ST A l6 f30v00
EXISTING
GROUND
NOTES:
1. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS
OTHERWISE NOTED
2. SEE PLANS FOR SPECIF/C TAPER LOCAT/ONS
3. SEE MATCH L/NE SECTIONS FOR EXCEPT/ONS
TO STAT/ON LIMITS
4. PAVED SHOULDER LOCAT/ONS WILL VARY.
SEE PLANS FOR SPECIFIC LOCAT/OA! DETA/LS.
PAVEMENT SCHEDULE
PROPOSED APPROX. l-!/2' ASPHALT CONCRETE SURFACE COURSE TYPE S9.5B, AT
CI AN AVERAGE RATE OF l68 LBS. PER S0. YD.
CZ PROPOSED APPROX. 3' ASPNALT CONCRETE SURFACE COURSE TYPE S95B,AT
AN AVERA�E RATE OF l68 [BS. PER S0. YD. IN EACH OF TWO LAYERS.
C� PROPOSED VAR.DEPTN ASPHALT CONCRETE SURFACE COURSE,TYPE S95B,AT
AN AVERAGE RATE OF ll2 LBS. PER SQ. YD. PER l' DEPTH. TO BE PLACED
lN LAYERS NOT LESS THAN l5'lN DEPTH OR GREATER TNAN 2'lN DEPTH.
PROPOSED APPROX. 4° ASPHALT CONCRETE INTERMEDIATE COURSE TYPE ll9AB,
D� AT AN AVERAGE RATE OF 456 LBS. PER S0. YD.
D2 PROPOSED VAR. DEPTH ASPHALT CONCRETE lM'ERMEDIATE COURSE, TYPE ll9AB, AT
AN AVERAGE RATE OF ll4 LBS PER S0. YD. PER P DEPTN TO BE PLACED
lN lAYERS NOT LESS TNAN 25'OR GREATER THAN 4°lN DEPTH.
E� PROPOSED APPROX.4'ASPHALT CONCRETE BASE COURSE TYPE B25AB,AT
AN AVERAGE RATE OF 342 LBS. PER SQ. YD.
E2 PROPOSED VAR.DEPTH ASPHALT CONCRETE BASE COURSE,TYPE B25AB,AT
AN AVER,46E RATE OF ll4 LBS. PER S0. YD. PER 1' DEPTH TO BE PLACED
lN LAYERS NOT (FSS THAN 3'OR GREATER THAN 55'lN DEPTN.
T EARTH MATERIAL
U EXlST1NG PAVEMENT
{I MILLING ASPHALT PAVEMENT, l5' DEPTH
�/ VARIABLE DEPTN ASPHALT PAVEMENT fSEE DETAIL W?J �
:
+l
V
�J
� TALL PINE LANE
0.08
EXISTING 3 el �—
GROUND _ _
0.08
� 3� — — EXISTING
GROUND
TYP/CAL SECTION NO. 5
-Y2 - ST A l0 f48v00 T 0 ST A ll +03084
%
NOTES:
7. PAVEMENT EDGE SLOPES ARE 9:1 UNLESS
OTHERWISE NOTED
2. SEE PLANS FOR SPECIFIC TAPER LOCAT/ONS
3. SEE MATCH L/NE SEGTIONS FOR EXCEPT/ONS
TO STAT/ON LIMITS
4. PAVED SHOULDER LOCAT/ONS W/LL VARY.
SEE PLANS FOR SPECIFIC LOCATION DETA/LS.
�
,
•
�
N
�
MILL EXISTING PAVEMENT �GR�ESED
TO KEY lN
� ------ _ -
,_.
�-------------�-vz _
-L- MILL 20' - - - - - �
-Y2- MILL l0'
OR AS DIRECTED �
BY ENG/NEER
DETAIL W9 - MILLI111G DETAIL
I � l5' MlN 25' MlN 3' MlN �
IL -r - - - - - - - - - - - - - - - - - - - - - - - - - - - - -�
� E2
DET�IIL W2 - METHOD O�' UI/EDG/iVG
REBUILD ALL GRAVEL DRIVEWAYS
USING 6" ABC.
, -� Q , TIE TO EXISTING
� �� �
� �> �
i �p i
�*
*5' RADIUS 5' RADIUS * EDGE OF PAVED SHLD.
EDGE OF TRAVEL WAY
* OR AS SHOWN ON PLAN SHEEfS
DETAIL W3 (TYPICAL GRAVEL DRIVEWAY TURNOUT)
REBUILD ALL CONCRETE DRIVEWAYS
USING 6" REINFORCED CONCRETE "' }
OVER 6" ABC. � v� � TIE TO EXISTING
i Zj �
O�
i V 0 i
�*
� 5' RADIUS 5' RADIUS * ,�
OF PAVED SHLD.
EDGE OF TRAVEL WAY
* OR AS SFiOWN ON PLAN SHEEfS
DETAIL W4 (TYP/CAL CONCRETE DRII/EWi4Y TURNOUT)
I' M/N. M/LUNG LIMITS
MlN
MILL AND OVERLAY
TlE NEW PAVEMENT �� PROPOSI
TO EXISTING �PdVFMF,
----------------- �- ��2'�--
---------------------- �--�
EXISTING PAVEMENT J �
SAWCUT EXISTING
NEW PAVEMENT - FULL DEPTH
fSEE CORRESPONDING TYPICAL SECTION
FOR REOUIRED PAVEMENT STRUCTUREI
DETAIL 51 - SAWCUT DETAIL
ni ��c� u e�n nwn n� r.'.�r
AND INSTAl1. 30 DEGREE
BULKHEAD WALL BURRIED
2' lN PROPOSEO RlP RAP = NOTE: SEE PLANS FOR
BULKHEAD REMOVAL LOCATI
DEi�1IL 3 - Bl1LKHE�ID REMOVAL
PAVEMENT SCHEDULE
PROPOSED APPROX.I-l/2° ASPNALT CONCRETE SURFACE COURSE TYPE S95B.AT
C� AN AVERAGE RATE OF l68 LBS. PER SQ. YD.
PROPOSED APPROX. 3'ASPHALT CONCRETE SURFACE COURSE TYPE S95B,AT
CZ AN AVERAGE RATE OF /68 LBS. PER S0. YD. lN EACH OF TWO LAYERS.
C� PROPOSED VAR.DEPTH ASPHALT CONCRETE SURFACE COURSE,TYPE S95B.AT
AN AVERAGE RATE OF ll2 LBS. PER S0. YD. PER l' DEPTH. TO BE PLACED
IN LAYERS NOT LESS THAN l5'lN DEPTH OR GREATER THAN 2'lN DEPTH.
PROPOSED APPROX. 4' ASPHALT CONCRETE INTERMEDIATE COURSE TYPE Il9AB,
DI AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
D2 PROPOSED VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE. TYPE ll9AB, AT
AN AVERAGE RATE OF ll4 LBS. PER SQ. YD. PER l' DEPTH TO BE PLACED
IN LAYERS NOT LESS THAN 25'OR GREATER THAN 4'lN DEPTH.
E� PROPOSED APPROX.4' ASPHALT CONCRETE BASE COURSE TYPE B25AB,AT
AN AVERAGE RATE OF 342 LBS.PER SQ.YD.
EZ PROPOSED VAR.DEPTH ASPHALT CONCRETE BASE COURSE,TYPE B25.OB,AT
AN AVERAGE RATE OF Il4 LBS. PER SQ. YD. PER l' DEPTH TO BE PLACED
lN LAYERS NOT LESS THAN 3'OR GREATER THAN 55'lN DEPTH.
T EARTN MATERIAL
U EXISTING PAVEMENT
V MILLING ASPNALT PAVEMENT, l5' DEPTH
w VARIABLE DEPTN ASPHALT PAVEMENT (SEE DETAIL W2I
e
a
�
�
0
N
�
DETAIL 4- MODIF/ED CQNCRETE FLUME DETAIL
END CONCRETE OR RIP—RAP DITCH
AT CONSTRUCTION LIMITS �
SEE ROADWAY PLANS _ _
I
I
4 12' 6 �
DOWEL BARS !
CRETE FLUME
2'-4"
EDGE
OPTIONAL SEE RDY. PLANS
VARIABLE LENGTH
SEE PLANS C
SEE PLANS FOR PLACEMENT
OR BEGINNING
C
WATER
FLOW
DOWNGRADE OR SAG
OUTLET
S �
WATER /� �A � WATER
FLOW FLOW
FLOW DIVERSION
NOTES:
� I
-o" R. ' � q
2'-8" �
OUTLET� 3�� �
45' DEPRESSION 45'
A
PAVED SHOULDER��
15'-0"
MODIFIED CONCRETE FLUME
PAY LIMITS — PER EACH
SHOULDER BERM GUTTER
OPTIONAL SEE RDY. PLANS
PLAN V/EW
4'-0"
+� 2�_�n
� �
4" CONC.
PAVED DITCH SECTION C-C
RB DOWN AS
BRIDGE
APPROACH SLAB
8" X 4" LIP CURB
OUTLET
� �
C
� � WATER
FLOW DIVERSION � FLOW
OUTLET
I �
WATER � �' �
FLOW � FLOW DIVERSION
SAG FLOW DIVERSION EXAMPLES DOWN GRADE
- CONSTRUCT MODIFIED CONCRETE FLUME AND SHOULDER BERM GUTTER IN ACCORDANCE WITH THIS DETAIL.
- CONSTRUCT CONCRETE DITCH IN ACCORDANCE WITH STD. DWG. N0. 850.01.
- CONSTRUCT RIP RAP LINED DITCH IN ACCORDANCE WITH THIS DETAIL, IF CALLED FOR IN PLANS.
- CONCRETE OR RIP RAP LINED DITCH SHALL BE THE TYPE AND LENGTH SPECIFIED BY THE ROADWAY PLANS. THE DITCH SHALL
TERMINATE AS SHOWN ON THE PLANS. IF NO TERMINATION IS INDICATED PLACE RIP-RAP AT THE END OF THE DITCH AS INDICATED
BY STD. DWG. 876.02 FOR AN 18" PIPE. TRANSITIONS FROM THE DITCH TO TERMINATION SHALL BE AS DIRECTED BY THE ENGINEER.
- MODIFICATIONS SHALL BE AS DICTATED BY SITE CONDITIONS AND DIRECTED BY THE ENGINEER,
— REFERENCE NCDOT SPECIAL DETAIL MODFLMDTCH AND NCDOT SPECIAL PROVISION SP8 R10
. 8� `�' 2'-4" MIN. jg" RADIUS
` � I� - - �
� :. 4" °''� :o:. o .• .o: • o �.• �5„
' v '.
SECTION A-A
S,� 2�_$„ 8"
- �
��
� I:.�4".0•.�. •.o,•o.v,.'0��•��0���°.'o°•'.:I
SECTION B-B
�
� ��
.�
�`.,1L���'►L�-. �. ���ii��? '
� �E; f-��� ��
RIP-RAP LINED DITCH
�
�
!�
�.
�
O
�
�
, � JL � ll � �� LV �1L0 JL llJL `�L1l��ll-e�1V �
�l[�V][�][�1�T �]F �l][][Q�'slH[�t��'�
S UMMAR Y OF Q UA11tTITlES
Kimley>>> Horn
P.O.BOX 33068
RALEIGH, N.C. 27636-3068 __ __ _ ___
PROJECT REFERENCE NO.
B-5417
ROADWAY DESIGN
ENGINEER
\����u�w uian�
, �� CARpG%
��o.�o�Essib�••?.y -;
= •' 4 5��� :. :
= ` 029816 � _
'�9TlN�lN�`���,`';
,,, H.. . ;
,,,,EW���S�,,,"
SFiEEf NO.
3
� .. , _ . . . . ._. . �
,. . ._, . � .. . .. � ,, �. , � , : ... , . .. ,., . . ; .,..: , . > : • ,. .
femNurobcr . Scchon#: . S.Quantrt: Unn • Dcscn don i. ,�:. ;„„ . ... . . , • . ItcmNwnbcr Scchon#=,,.,., ianht Unih eDoscn hon .��'�w=" .,^ , ,:{�'-Y ; F ItcmNumbcr„ �'-5cction# ; uan�it �' Unit:.='. Dcscri'honi
Y. . F . _ , . . , .. � .. . . . . Qi Y P , ' �; '. •, ,: "��" ; . . . ": :• . Q . Y . P `.:, : � a r.. � .. ,_z �a .
. , �� ' ,. . , � ., � ; , , s, � � . . ., „ '. . � , . �. ,_ ,. , . . . . „ : , , . , . , � � ,. r, . , . � •
'. .', , ,`.,
1000100004N � � S00 ` � l , � LS �IviOBILIZATION , , ' : -,- - � 4�700000aN' � � ' 907 3 ; , EA' �STOCKBII.E SICdV D, E, OR F, ' ` , " 6084000004E ' ' , � . 1660 0:4 � � AC � �SEEDWG AND�MUI.CI-IING � :
. . , , ' � - ' . , . , , , , �, • ` .. ,, . ' . � � ; � ` , _ � . , . , i
• ► r , .. � , , � ,: , ., " , . . , . ��' '. � . . ", - , � � ; :� • , � �
?000400000-N : ' 801 ,1 LS , � GONSTRUCTION SURVEYING ; - . � � „ 4400000004E , , 1110 .- 185 SF � �'�ORKZONESIGNS.(STATIONARI�' ' , , ° = 6087W0000-E � , 1660 0.5 AC MOWING '„ , � < <
,. . .
, ,, , . , , . , , .
, . � �_ . . ., -' , . , . , .
� �,. ,. ,r , ....: , .��� �, .,.�, ._� �� . ' ' , . . . `- .,.�'��.,. � � '. �,'�. . . � " ,. . � .. _, , .,.. ., � ' - _ � . , , . .' , , ,. .,. ' ` �.r� . .. , , �
� - � , . ..., : , r.° � . .
�0101000¢N 200 .` , ' 1 „ F.A SELECI' TREE'RE[vIOVAL ' ' . , . . _ , , ` � `4'405000WaE .? , 11I0 . 96 SF' �WORKZONESIGNS (PORTABLE) � G09000000QE , ,, , IG61 u �SO � , r � . LHS' ,., SEID FORREE'AIRSEIDING , ,
�3000000.N � , 7Z6 ' � I � , LS ' `QtADING ' � 4410000000E , � 1,110 ' 185 .� SF, � �VORKZONESIINS(BARRICADE . - ,. b09300000QE � 1661 " . 0.25 � � TON �FERTII:IZERFORRFPAIRSEIDING '
, , ` , - � , , � , • . .. . . , . . . . NtOUNTED) ' ` , , " . . . . „ � .
. . , .
, . , ; � ' �_ . • , � �
� �
�
r
. . . , , , . .
�
« � . .� . „ , . . . . , ,
1 '
��� ��, - -: . .� .. .. ,.�.. �� . .. . . . ... . .. . >,
D057000004E ' � 226 - ' , '' 31 . � G7, .� , l7NDERCUT flXCA VATION - ` ' t • . ' � , 4430000004N ► ' ' 1130 ` , .. 30 , ► EA �pRUMS _ , , 6096000000-E, ' . ' 1662 � ' , 10 . � I$S �SEED EOR SUPPLEMENTAL SEIDIIVG �
, , , � , . , , ., . k ,
, , . , �. . .s .. . . „ , , .
. . . , ,
. , ., ,.� � �z . . , _ .
LL , , . , .. � . , , . „ ,
�,,
. .; .
,
;,
.. , ` .: � ,-i - � . . ,. . , . - . .. af , _ . . . . . .,
.
.
. , •
'.
. "; , � . . . . . , .. . ..
, . .� .
,
, . . , ... . - � . ., � . � . . , �, , .� . � , . � . 1
�, .
• . P
, . �: ,. ' : L . .- . ,. , . .. ; . . . � - _ . , - , , . , .. • , ,. , . , . . . . . . .. f
`, .. . . , ► , ' �: � . ,',�. .. ' , . . .�_ . � ... .: , , ' . , , .; ,.•,. :. i -� ► ' . ' '� . . ►, ► ' ' �
� `,., , ,i .. " � . . � t ;.,. . . > ... . ' 1
D194000004E , SR 40' CY � SELEC!'GRANULARMATE[21AL;CIASS ' � � 4445QOOOOO.E 1145 176 LF� BARRICADFS(TYPEIIn' , 6108000000.E .' 1665 ° • 0:1 TON �FERTILIZERTOPDRESSING .
` � . . III, , ' � � � , ` . ,,' , . , , � . ' ' .
„ � � ; � , . � . _ , , . . , - , � .
D196000004E � 270 ` , 70 �' SY"' �GEOTEXCII.EFORSOILSTABILIZATION • ,. _ , ` , . . 4915000000=E � . 1264 4 � EA �TU-CIIANNELPOSTS � ° . 8035000000-N . � 402 '. , '1 � LS �I2FMOVALOFFJCISTINGSTRUCTURE(a3
� , . . .. : ., ,
, � , . ; , . , � , .. ,� , - . �i . . . . , � -
,
,. , , ,� . �
� . . . ,„ . � , - . . : , . . , .
, ,
,,
., . : .. , , „ , . . ,
,,
. . , �; , . . , ; , , . .
„
. , ,. , . . ,
. . , L , , : . �, , 3 ,,. . , . . , ,, � . .
, ., , , . , . � , . . .
. .. . a , .. , . ,. , . . . , .
.., ..�'. ; : ..,, �. y , . ,.,.. :,. i. . .+, s ,�, , . .., � �,,. t_, . �•..:,� , . � . . _ . . . .
�- � ,� , i=� . r �< . � . �' �.�,.�. ,.; :..� , ,. , - .. �.
. . � , : � . ,� . n °� .
l07700000o-E� SP . 6 TON #5?STONE` , ' . a `� .� • . � ' , '4957000000-N , � 12b4 ` + , -. `4 . ' . EA �OB7EC1' IOIARKF-�25� TYPE 3 ' ` s�+ 8112730000-N .� � I . �� 450 , '� 4 � EA '. ' �PDA�TEST1 G f ^ .
s . . . , , ,, ,.,, . . . . � ,
,,
. , , . . , . .
, , � (, � . . . i� , . ,
. .. ,
. • „ „, . , , ., , , . . . .. . . � , - , . ',"
• �. ° , „� ,:. �. . . � . -. ,., � . .. , . . _
12200000060.E � 545 30 � TON �NCIDP.NTAL STONEBASE � O� SP - � 357 • � � LF ,'3" COMMIJNICATIONS CONDUIT , . - ' 8121000000.N � 412 ' ,.I � .LS �UNQASSIF�STRUCI`URE � �
- ' . " ' ` � , , . , , , ' , , , ; � ,. � � � ' , ' , . . FXCAVATION Q STA 14+45.00 � .
., r ,� . ''' : ` t �;. � , , •< <
1330000000.E. ' ' 607 , _ �130 rSY' �INC�ENI'ALMIILING �a � . , . „ 5325800000=,E' 1� .� 1510 ` , 54 ' r LF - �8". WA'fERT.INE� ' ' ' " 8175000006-E , � � , 420 `.69 , � CY �CLASS AA CONCREI'E �
,_ , . � . � , � _ -
,, , �
:,
, . . .. . . � . .
. , , � .
. . , . , . .' , , , , .. . - ,
; - .�.
,
�t .. , : , a'
� , , . . . , ,.,_ , , .., , , , , ' ' . . , ' - , .., � . , .
•. . , ', ' � . ' . . ,, r , ; : - ' , , . .,. , „ - , 3 � �' " �. t. , ' � .,,,
� .� ,i , _ ,,. . �'- � ... . . � �. . ' `' . ; ' • r..
1489000000-E � 610 3 :94 � TON ASPHALTCONCREI'EBASECOURSE, , " ' S326000000.E', ; � 1i10,, 334, �, IF . �Ip" WATQLLINE .� ' ` 8210000004N, _ ` � ..422 h . ;1 � I$ �•�BRIDGEAPPROACHSLIBS' � , -
' , . . , ' {, ; 7'YPEB25,OB . ; , _ , . , . , . , � . _ , �. � - . . , � . , -
1498000000-E � �610 I20 � TQN `` rASPHALT CONCRETEINTFRMEDIA7`E ' . 5534000000-E , � 1515 ' 3 ' � FA -. ' �8." UALVE' , , . .' 8224000000-E r ' 425 ' � 9720 , ► LBS -..��EPDXYCOATmRII1VFORCINGSTEQ: ;,.
, .1 ' , , ;.. ' ., COURSE,TYPEII9:OB. ,' , ` ; � ' ', � - ' ' :' . , . .. , � ..' , ` • '
, ,. ,. , , ,
. ,. , . , .
,..
, � „ ,�;, `. � , , . ; , . , _ ... ,. ; , , . ' :c. , .
,;, , ., ,, . ,�
_.-•. y , ; , �,� . �-.: , r: � - . _. �,,, , , , ,. �, .
^r , , -., u , x
1519000W¢E � � 610 � c ,,;160 � TO ASPHALTCONCRECESURFACECOURSE' +— .: � " 5648000004N . 1515•" . I ' r RA ;' �RELOCATEWA`PII2METER ° •� : ', �'` 3 'L- ;833600pp00.B: ,.' � . . 450 ;630 � LF � 20"'PRFSTRFSSEDCANCREI'EPILFS '
. . ,. . . ,. h,,, .. l. , , , , . . : � �. . - . �. . , , . , . . � � -
, .. . ,� - . . . , , .. . . . , . , .�. . .i
�. . . .. � � � � . . � . . . � � � � . , � � �.
. , TYPE S9.58 ' . . � ' , , ' , . � . , . , , .
. , . . . , . • . � .•' ',.' , , .
157500000o-E � 6?A ��20 . � TON �ASPHALTBINDER'FORPLANTMIX , 5649000000.N „ �, 1515,_. 2 � IS �[2E(;ONNECCWATQtNIETERS' ' , ' . e . � 8364000000-E ' r . 450 " 480 � 'LF �HP12X53STEEI;PILES ' .
' �. - ( � . � ,' . ' ' � �' . , , . . ' , .�� • . � ,' . . , .
2570000000-N �, SP ,.' ` , `.4 , � EA . �[v10DIEIED CONCRETE'FLUME � ' � ` M�,,'' . � . ,'` 5871200004E ; � 1550 ' 255 � LF �TRINCHI.ESS �INSTALLA;TION OF 3" IN' ," ,,' , , . • . ' 839300000o-N=° r 450 . 4 � , , EA " � �PILERFDRIVFS';;. , ' '
, . , �. . . . �
��. �< . . �. , . Y . � _
. , f ,. _ ; . , . . � � e � . � . � .. ' y . � � . " � • � ' �
a �
� ' � "�s , .. .t '� u ..
..
. . . . . . �. < < .. �. .� . , . i . . . � . . , . . . , . �
�,
i . �
• � ' . � : ., Mti .. .l. i , . , . � .. . �. _ .
.
� �
. . . . � . . . . a . . ,. . � . � � . .
f.r, , S��L; �' l t
, , . „
. , , . , ° .. , , , } .. , . , , � . . i, , .
.
, •„ � r ,
� , ,
, . .
612 � �0-E- ' �' gq8 ' .,• � �30 � S �6" REfEDRNb'W �:Y . ' . •' F ' • ;i -5871G00000-E . ' r 1550° 1`' 325 � LF '•�TRINCHLESS [N TALLATIONOF 10" IN ,. ` , � ', 84:5000000� ,�" •'� ' 4b0 � , '� �
2 00000 , Y . CONC . A �� S , . . ; - � ' S ,. , 102:75 � , LF TWOBARMEfALRAIti,
, - � . _ .. 7
. ' ` , ' , : , , ' , ' • , . � , , . ' , , SOIL " , r . , ` , ` " • , ' . - - .
� , , ', . � .
. . , , .
26190000QO�E � ,850 ''S _ � SY �4°CONCR$I'EPAVED'DITCH ' ;, ° , � ,, � . , � � 60000000Q0E � �. 1605" 1000 � LF �TEMPORARYSILTFINCE ` 8505000000-E � 460 .� ,I10.39 �. ' T�' �VERTICALCOCNREfEBARRIE[tRAIL,
, . , � �
. . , � . . � , . . ,
. .
. _ < < . . , : . , .
, ,. , . _ . , � � . �, . . - , � ' � , •
, . , _ , ' : . � . , . ,
� . .w...:_ . .. ' i .� . . .�. .'. ,.�.. ' � : • , , - .,�� . . �� � ., �� .. ^ .: . . �• � 'f .y ' , r: , . ' ' a I ' .� ,. � ..�., 1 i., ' �1 �� .
� .-_ �,.� .. ,..;�! , � ,., .-.,• - � ,� �, ,.. , . : . . • :.. . . _�,:.r ".,..,. � ,,. , . .. ,. � `.. . ,.'. ,�y.� - '�. � , � `.. � „► � i �, .r : .
28450000DO�N � 858 ., ,, ;1 EA , ADNSTMIIYT OF METER:BOXFS OR , • b147000000-E '= Sp , 200 LF ,TREEPROTECT[ON FFNCE ... � � 8517000000.E, ' 460 '� 710.25 1� 1 2„ X�2 9" CONGREi'EPARAPEI' •
_ . . . _ , . , . , , .. ,
VALVE BOXES = ' ' .. .
,. ,
a , , ,. ,
RESEC . . , ' �. , . . ,
35.74WO�U�E 867 30 LF GQVE2ICFINCEITFM,WOODEN�FENCE. - ' 601500000QE' � �1G15 0.5 � AC �TEMPORARYMULCHING , � . , � S608WOOOQE � 876 390 ��TON �tIPRAPQ.ASSil(2,0"'THICIC) � .
� r „ i •
� . oi � . ' . „ , . _ . . _ , i . _ � , - • .. � , . � , . . . � , - - . � , . ..
,�,r , • .. � .i ; , _. ' . . . ' . � . , , . . . . . . , . ,,. , . -
3649000000.E �' ,876', , ; E�10 � 'LON. �RIPRAP;CLASS'B : _ ' , ; ',.. ` �, 6018DOOOOQE- � � 1620 ` �p r I:BS �SEIDFORTEMPORARYSEEDING ' . � ' 8622000004E .• "� 876 '. `430., � SY' '�GEOTEXTILEFORDR?.INAGE
' i, .
, . , : , , ,
, , . ,.
, . � „ , . .. . . , , ,
, , .. ,
... , , ,, . , . . , . , , ,. , . , , ,. ,
, , .
, , .. . -
,
, , . , ,
.. . , � � : . , .. � , r ,. . . k . . . � .
_ . , , � � . . . - .. � � . .
.
�,,
�
„
�
, . . , � . . . , _ . � , . . . .. , . . . - . . � � . . . .
,
i . ...
'' ' - „ '�: • �' .� . ' . � . . , . . . . ' . . . . � . .
3656�00004E ' � 87G � 370 „ � ' SY �GEOTEXTILEFORDRAINAGE ` ' '. � , ' '�- � 6021000004E ' � � 16?0 "" 025 �� TON �FERTILIZERFORTEIvIPORARYSEEDING'� - 865700000aN , � 430 . ,. 1 � � IS .��ELASTOMEItICBEARINGS ,
� '' . - ' `, y : ' ., .., , ` , � . , . : ' ,' , ; : , . . , . ' • � .. ; , , ; . ,
4082000000�E, '� �' • `903 ' , �40 � LF' , �SUPPORTS, WOOD. `, �" � " - ,, � , " 6038000060.E r , '► SP 30 , � SY '�PERMANEN'f 50Q:RIINFORCEMENT ,' � . , , 8762000000-E .. � 430 ` ry 1210 � LE', :�3,_0„ X 1 9" PRESTRESSIDCOCNRETE
f- , .
, . . . . .
, . . . ` . . , , . , , , �
, , . ;
, , , , , �.
., • , � ,,. , • ,- �' . � z. ^ . . � � _ , ,
_ , ,
,
.. . , .� , . . , , .
�
T
.
, , , . � • , , .
. -. . . . - ; . � .....,-. .�... , ... .. ...... . . . , ,:..:� ..... ' :. ,.. - .. .. „ �, T'c. r.. i ... , , ."�. .
,.. . , , � �� , � , ,
. , � , . . .: . : . ��� � ,.,, , , r
. , MA CORED SLAB ,
. .r �� � . ., ., , ,. � �..,..,., A,�.. .�.' • - _ ,, '. �., � .� , , . , �-, . ., _... ;, . . , ..::' ..F r. "., .' ., '
,e. e. ., . ' � � , ,:... ��. .. _ . - , . � ;.
, �.. , .. , ..
411610O000-N" , 904 `:_ .., .,;g � 'EP;, SIGNERECCION%RELOCATE TYPEE ", : , ° � . , 604200000QE • ` , 1632" 30, . IF . .114"HARDWARECLOTH , �`°" ' " , °r - 0. `�SP ` `..180 SF': ��VINYLSI�'LTEILERETAININGWACLS.�.
. , , . , . , , , ,
, � : , .
, . : . ., ,
_ , . .� `(QtOUND MOUNTED)" . . , , . , . . . . . . � � k _ .
. ;i ' � • , ` � , • . . . , � � . ,
,, , , `.. , � , f' ' ': . ` " .' ;, . , . ' . • ; , ' . - ' ' ,� ; r
4238000004N � 907 °. ' -2 � EA 'DISPOSAliOFS1IND E,.'ORF ' , -� � ' -' . 604800000QE � ► ,SP ' 160 � SY 'FIAATINGTURBIDITYCURTAIN"' , , . ' . ' ' .. ,
, � , � _ . � , , , , . . . _ . ,
, ;'-'. � � ,�` �, ,. �' ..- , ; ' , , " " � . � `i' � ' . , , , . , , -, . . . . , � . , �
..,.,,.'.►, ..�' "'•�r 'i �' •.,.�' ''.: t:'., � , , .. � � ` • t� . , , . . ,. . � _ ..,
,._ , � ,, :. . .. ;. , .:.
.� �, . - : .. �-.:,,, � , .. . � :'� ' , � , � ' .. .. . � : . �n, �-. . .� '. i .: -..� � ' � t . - •,C ' "
414ip0000aN 907 - .,s 3 . .., . ; . ..'DISPOSALOF..SUPPORT`WOOD .. , , 607101000U-E �, �. �"^WAT'IZE ;.' ;c ;. _ t
, , , , . .. . , � r _.. ,
,� 60
SP_.
. . ,. . � . . ... ,.. . � . ... _ . _..,. . ... . , . .. . ,.,. . . .. . . ,.r . -
, , � �.._,: ., , - � . . -. ,.. . . . ,. � � , . , .,...
�_.. > .. ,. . , �_ . � . .. _ _....�,.- . . ...:_.�. . .. ,� ._._ . .,.._. . : ,:,...i ... . , , t' �F- ,t �:: . u
�.:. , ,: , , . . ..
. t.a {. �.., ,..,. .a=4 ..._....., . . .�. .., ., . i r. �,,.. . ...., ,.. �., �.... -n .. ....�. .... �" .. •t--•
. . � .. . � .. , . ., i < .., ... , A... . „ �,..�.: � 4 ,- .. ,.,...,, . . . _ ... . . . „ ,.. +i . , . _ .�,; :.. ,,..�.' �' �-.#�.' Fn..t. _
. . � �. .,. ._ . . w :s.. , �� ! d W .. .... , l. . . I ... .. . . �c .. . , �. �i �,<. � ' . . '::; ,. � r.. .� . .:. . . r i ..�": ..-�: •..�.1 �� F;�. `V -. '�a<]�. �..
�. 5 . . . . .. „e. . . , . '8� � ..��. . :...�.L" .. ,.1. . . � ... . . . ..., , .t '. .' . .; n-... w r�. . . �: ... .� .� � ..- . P . Tr' w'}i:. , �.Mj�
n ......�..i, .��- ., „�...... .�, , . t.... ,_.. �. ; .._ ,�..... r tl..:. ...t,.e' v: ,. , .. ... ,i l�: ! .�1L.t
. ... . �. . �. .. .... + ,,. :L � � . r . � . ... f t, .. ,. �.. _., .�� � . ,. .. . . . ., � . . , ,.,, , . ..5. J
. . E%d . . . .. ,. , k x. . . � : e rn . ...� ., . � . �: �.. 1 � . ., � ., � .� � . .: : . 1' ' 1 �� �' 1. '. .ti� ' �3
., . L .. . .. �. . . .. .. ,he. .._ � _ . .. « . , . .. �:, . _. ..' �.. . , . . . . � . r�-, � :� ;. ,. .,. ` y�.,:...a "'4 7
,..
..... : .., .', . ., � �i E �. : ,. . � , .. �.. ..i �. _ ,:: ...... . . .. .. , .'c ... S . ... ..�r:_ �.�- . � 'v-4:' �l
.-�� � i.; _. . S�. ... ... ,., �.. _ :d . , a r � '
� i, , . . . . ...•% �. . . � . . c. ...:.. i F� . . . H . , . .. �. � 1� .:' .. . l . -.y ,'.�;,
� �.. �t ..... ...4.i�,. ,, .. �. .�.s .. ,.: c.. _. :' ...r� . - ..� '... ��. , �-. �_ , t J "
t.. � �:.. .�5. r. .��.. :_. ., ... .� , .�.. . . . . ... :.:�u,.-� , ,.. .,.,. .. � t 1-
,.. ^.
... .,..., r�k � . 31 �._. .,. . . 3 ..� ...�. ..... ... a... , ., .t .,�� .. . . .,.x, �.� .. „ .. ._, �I .:3'
.. ..,�. . .<. .. .-. . . a ..c..�� _. ... ..�.�.. . .,. �,� _ _ . � , . _ .. -:, . . .s . . 1� ;
�.
._, ..n . � � ,.. i.a � t � .. T. .,. „ ,,... �� ..,. �, . . .�:.., . � .. �
... , ... . .. ,'.. .. . �. .. - , . .... _ . f.,, .. ... . .._. . .. .. - . �..,... � .. ,. r.' -.?' J
�a ... �, ,,,. . .... ...,...f . , .,. _. , .:: .:..., -.... ,,, .. ,.. e ,. � ., . �,.� ... ..... ;'n`�:
� �.
,.. �....} ..r'. _� .a.. �..� �..<. ..�. . ♦ _. .. �.r. ...a.. ... .> ..b � ,.,� .. .Ft.., ... .�, �: }
. � . ... .. _ .�� . ... , r.., .t... .i .. �.a, .v� ,� . _ , .,. ... ,_ .L. ., .. .�� ._.,..,.. �,,. ..,. _, - ''x�n , .
.i . . i � . , �. . . . . .., .. i �, . . . . . . . .... . . r . ,..... -�..Fa �. �:, . -. �. • ..,_, :;'. '. � 1, . � i . ,
....._.. .. .....a .i .�..��.:.i.. ..�. ... ai ... > i.-_... ....Z.�.. :._.. %.. ��....,..F._. ... .., _ .. +C.:.. a.. .. �. __.,...l.r... .._ � . . r .. . w. -_. ..._.... . ..... �.. {. ... ._ .�.. �. 'h. . .. ..... .... .. .. _ t� .../c... .,. . .. _i....v, .... . .. . ... . ..n.{. . re�. ._.e. .. ...w.,_.. +.. ...z -.r_ ,`�1'3 , . _.. .
�
;'
�
0
N
�
�°]CA7C]E �]F N�lfB�]E� �CA]EB�lL�1�i�
��`V����1�T �]F 1�[��]H[�A�Y�
EAI�THWORK S UMMAR Y
I11t CUBIC YARDS
LOCATION UNCLASSIFIED UNDERCUT �
EXCAVATION EMBT + /o BORROW WASTE
-L- STA 12+66.08 TO STA l3+88.75 (BEG/N BR1DGEl 16.5 98 81�
-L- STA /5+0125 (END BRIDGE! TO STA 16+30.00 14.4 70 55.6
-Y2- STA l0+25.00 TO STA 11t00.03 3.5 53 49.5 .
BULKHEAD STA 10+35 TO STA ll+l0 5532 0 0 5532
SUB-TOTAL 587 22/ 186.6 553.2
LOSS DUE TO CLEARING AND GRUBBING -5/ -51
EARTH WASTE TO REPLACE BORROW -�/6 -176
ADDlT10NAL UNDERCUT 3l q0
TOTAL 536.6 3/ 0 377.6
SAY 590 3/ 0 380
Notes:
1. Approximate quantities only. Unclassified Excavation, Borrow Excavation, Fine Grading,
Clearing and Grubbing, and Removal of Existing Pavement will be paid for at the
contract lump sum price for "Grading."
L
I
O
O
R
�
O
�6'
3
a
0
0
�
�
�i
Y
�
N
�
��A�]E �]F �T�][$�lE� �Al[$�][s�1vTA
�������l�T �IF ]H[�Qs�33[[�UA��
PARCEL I1�lDEX
PARCEL NO. SHEET NO. PROPERTY OWNER NAME
1 4 PATRICK F. PHELPS
2 4 VICTORIA A. JACKSON
3 4 SOUTHERN SHORES CIVIC ASSOCIATION
4 4 DAVID M. SHIELDS
5 4 JAMES F. STEPHENS
6 4 NICOLE CLOSE
7 4 ANN D. PALMER TRUSTEES
8 4 MEGAN C. BELL
9 4 RICHARD G. CARROLL
10 4 SUSANNA E. NORRIS
r
},
�n
0
�
�
PROJECT REFERENCE NO. SHEEf NO.
N - P SIO I'F % BM �I S 429"2 WW SHEEf NO.
o� N: 878292J1 E: 2962393.46 �0 S S Ki m I ey >>> H o r n ROADWAY DESIGN 4
ow
m� __ O E�V•- lO�� a�N P,O,BOX 33068 ENGINEER
-BL- STA7+9391= -- PpT Sto 10+00 0 RALEIGH, N.C. 276363068 ```� "11�AR lG!i
BEGIN ST.4TE P/tOJEGT 8-5417 -L- 15+22.76 �OFF 42.31' LTJ PE NO. F-0102 ���....... 0,
BEGIN CONSTRUCTION -BL- 0/5 47.03' LT '�`° ;� �� QpFFSS/0, �,��..!'.y%
BEGIN MILLING /WD RESURFACING -Y2- Sta. 10+48.00 = : $EAL `. _
T/E PROPOSED PAVEMENT TO EXISTING O BEGIN COIIISTRUCTION =' 029816 �_
SOUTHERN SHORES B G/A1 W/DEN/NG '�q�ly F WN S �`��'~�
CIVIC ASSOCIATION � BEG1N M/LLING �''
NO DEED REFERENCE
-L- Sta. u+82.23 PB z P� � � T/E PROPOSED
END RESURFACING � PAVEMENT TO EX/STING
BEGIN GRADE 'o. '
BEGIN WIDENING SEE SNEET NO. 5 FOR -L- PROF/LE
-Y - PC 51a. I0+5015 SEE SHEET NO. 5 FOR -Y2- PROF/LE
-L- STA 14+�9 SEE CROSS SECTIONS FOR
BEGIN REMOVAL OF 3� ����
_- � EXIST/NG BUUCNEAD (19' LTJ -Y2- CRO55 SLOPE TRANSIT/ONS
,� PLACE 6 LF PROPOSED BULKHEAD -Y2- S. 70+58 N SEE SNEETS NO. S-7 THRU 5-22
-4 .Z � 1 END M�LING OR O N o FOR STRUCTURE PLANS
'4 SEE SNEETS NO. UG1 THRU UG2
PATRICK F. PHE PS -- p, � � PAVEM T` -IN "'- �
�� DB ie49 PC 3 (l4,BE LTJ v` � DAVID M. SH LDS f _ FOR UT/LITYCONSTRUC7/ONPLANS
PB 3 PG ¢2 � \� �� I DBPB �G PC I 27 °t �
BEGIN BRIDGE o �r
\ � -L- Sto.13t88.75 w000 `� Z' -Y - PT St 10+78 �/j �
BLILKHEAD \� Z COf�C48 25FD O
\ �z� 15.63'
\ � SE TREE REMOVAL N%E9E'_�EP JAMES F,STEPHENS
\ I �sFo dlN A,PPROACH SLAB UB 1699 PG 66
ODIFIED CONCRETE FLUM� �� -L- OT /5+33.67= Pe c ac m O
I L Sta.�l3t77.75 SNOW GooSE EE SHEET 2D � YZ- POT i. Ilt/4B4
_ �
� i a � NICOLE CLOSE
� � CANAL CCAss �B' R��" �AP / ,
' � x� n po OB 1T48 PG 1T8
� ESi 2 TOl��KHEAD g• Wo PB 2 PC 220
� (� i � EST 7 SY PSRM � a �sa ��
WOOD STEPS � � -L- STA /4+7/ +60 � --�� _�,,,�
'lSi� I
�I O BEGIN REMOVAL OF cr �
R�w WaLI � C1A55 'B' RIP RAP �� �"
� EAT=11.2 EXISTING BULKHEAD (23'L7)
e�P VICTO A A. JACKSO i E5T 2 TONS PLACE 6 LF PROPOSED �-' � � � � LSA �, woao5
�B 48 PG 120 � Ey�i 7 SY PSRM BULKHEAD 0 � +85 y.
3 p� p2 w000 MODI�'(ED COMCRETE FL y' \T o o e
wQ�t � SEE SNEET �0 a � 0 60' LANE TAPER o --L- t 16+30.00
S �OG �_ '� 1� e Q. � SEAT=11.255, I 011 _ \ � +72 * END� P�E NB ' ON 3RAI
�Q
T o� � �_MeO CONSfRUCT PROPOSED � 19.85' �b / E/NG—� . Exisrws �w
�y 2,46 co,vc Q GRAVEL DRNE i sorL � F _ _
a,�j. __ SEE DEf�IL W3,SNEET 2A,4 �� __ o ��P __ END MILLING .4ND RESU Fi�i�11�G•
` E _ _ _ - � .R _ _ �� TIE PROPOSED PAVEMENT TO EXj57l
i ie�av �� i - _
` W ios� — -- - 15 - - - - - - - �_ - -L-
� ���� � � rl' u' E- o g � S. DOGWOOD TRAIL
� /a � BRI�GE •I7 � S N 1223 5lA'W
o ��' N l� 23 5/.0' W,� ���' �� —�o w 9' s.cu�v000 7rrac zaesr
x�sr�Nc eiw \ ` - - - - - __ I �
� ,5��as 16'OW / MB MB
1 � � ` MB . • SIGN = _ _ __ _ _ 5� l4'AN F �` �(
O M�N � 21 � (�� (Y� r � \ vf0
ANN D. PALMER e F - ,L )_ _F _} "1 _ ` _ F �,jq
TRUSTEES ��U� ��=- �`J� I RETAININ
DB 1752 PG 31T I ,.� CUr EXIST DR /
PBAPGW -
�'CN � 30 �p IXISTING P/W c � i S� DETa� 4 NE Po2A . MON MON �STWG RM
� � x TApER � +50 +60 +95 �� DIFIE CONCRETE FLUM
* 29.40' - �'�_
MOD/FIED CONCRETE FLUME 4 EaT=nz4' .+25.82 �( •� ) S E SNE 20 Ex T�NG R�
SEE SHEET 20 36� `�� • P si DC NSfRU �� SED
5 Y/OOD 'B' RlP���777 AP
�� �� I .
� � 1 EIP CLASS 'B'RIP RAP � EST TONS \ / SEE DETAIL 4,SH 2A J I
� ESr 2 TONS CLASS !lR1P R EST SY PSRM � LSA � / \
EST 7 SY PSRM SEE STRUCTURE S �� -L- a. 5+86.00 � coNc
- - E FOR MORE 1 MAT/ 57Ers �
o. � RyPic,w SEAT=11 9� END PR ACN SLAB En► G E
isFd//.96 RT1 � /\ w000 „ EG, RESURFACING �sa
� ,� � % Bl1LKHEAD .� —L— S a l5+/22�� � I
I \ o LSA / � �
_ _ a I I co,uc REMOVE AND REPLACE 30 LF. W END BRIDG J ` \
� 5'WOODEN FENCE � \ ; \
L POT Sto� l2+ .45 _ ISFD oap -L- Sta.l5 /25 �sA� � �—
-YI- POT StO. IO+�AO � �� � -L- A r4+25 BULKHEAD 5� sr U�crUs S / - �•
I � D REMOVAL OF TEPS FOR MORE INFORMA /ON --
r -L- S. 13+02.23 EXISTING BULKHEAD SNOW GOOSE m,P�CAU I 0 � �J ��Jf J Q ISFD
i I � EN M/LLING FOR P�E 6 t� PROPos u� CANAL I BRICK
I , 1 �va�� -L-.Sta.95+66.00 BRICK
I SEE D TNT 1 SHEET 28 BEGIN MILLING FOR wa��
a.00• DOCN PAVEMENT KEY-IN -
BRICK -L- STA 19+73 SEE DETAIL W1 SNEET 2B
WALL END REMOVAL OF .
iP \?LIGNMENf OF FAIRWAY DRNE WILL BE MODIFIED O EXISTlNG BUIXHEAD (48' RTJ
IXIE TO DESfGN OF A 5/MULTANEWS TOWN PROJECT. $ PLACE 26 LF PROPOSED BULKHEAD
_ASE COORDINATE W/1'H FIEI� ENGINEER.
MECAN C.BELL �
Q� N o2°sr DPBBA6PGG�05 - m
49' ly
� �Y�- PC Sf�. ��'�'%%� 180.28' � o
�: g � m 1
� $1� RICHARDOG. CARROLL SUSANNA�E. NORRIS
� OB 1679 PG 465 D PB 3zPG 99 Z
PB 3 PG 99
{� PROP LINE IS SKETCH OF BRIQGE lN RELATIONSHIP TO PAVEMENT
C/L OF BULKHEAD
BRIDGE HYDRAUUC DATA
T/DALLY-IHFLUEAM'ED COASTM '
OVERTOPPIAIG D/SCHARGE _ > � CFS
OVERTOPPING ELEVAT/ON � 8A FT
-Yl- PT Sto. 11t42 6 -L- -Y/- -Y2- ir is•
PI Sta 12+81.93 PI Sto l/+10.06 P/ Sto 10+64,67
�= l5' 03' 54P lLTJ �= l8' 3.3 04.4' lRTJ �= 2P 54' 11.3` IRTJ �Y ��.
5 8E l2' 44T E D= l0' 25' 02.7' D= 28' 38' 52.� D= 7E 23' 39T
L= 145bT L= 64J6' L= 28b'T
T= 7321' T= 3266' T= I45Y
R= 550A0' R= 200A0' R= 75.Qa' PR �� .... .,,
.
n
:
�
0
N
�
PLA1� FOR l'R Ol'OSED
TRAFFIC C01�TR OL, MARI�II�G £� DELII�EA T1011 t
DARE CO U1�T'�'
ROADWAY STA11lDARD DRAWI11tGS I11lDEX OF SHEETS
•THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" - SHEET N0. � TITLE
PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C., TMP-1 LIST OF APPLICABLE ROADWAY STANDARD DRAWINGS,
DATED JANUARY 2012 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE LEGEND AND INDEX OF SHEETS
CONSIDERED A PART OF THESE PLANS: '
STD. N0.
903.20
904.10
904.50
1101.01
1101.03
1101 .11
1110.01
1110.02
1130.01
1145.01
1264.01
1264.02
TITLE
WOOD SIGN POST
ORIENTATION OF GROUND MOUNTED SIGNS
MOUNTING OF TYPE 'D', 'E' AND 'F` SIGNS ON 'U' CHANNEL POSTS
WOflK ZONE ADVANCE WARNING SIGNS
TEMPORARY ROAD CLOSURES
TRAFFIC CONTROL DESIGN TABLES
STATIONARY WORK ZONE SIGNS
PORTABLE WORK ZONE SIGNS
DRUM
BARRICADES
OBJECT MARKERS - TYPES
OBJECT MARKERS - INSTALLATION
TMP-2
TMP-3
TMP-4
PROJECT NOTES
PHASE I
DETOUR
�
LEGE11lD
GENERAL
� DIRECTION OF TRAFFIC FLOW �
�--F�- NORTH ARROW
PROPOSED PVMT. --------• EXIST. PVMT.
� WORK AREA
REMOVAL OF EXISTING PAVEMENT
TRAFFIC CONTROL DEVICES
I TYPE I BARRICADE
II TYPE II BARRICADE
m TYPE III BARRICADE
. CONE
� DRUM O SKINNY DRUM
/ � FLASHING ARROW PANEL (TYPE C)
�-- STATIONARY SIGN
IQ PORTABLE SIGN
p STATIONARY OR PORTABLE SIGN
�r CRASH CUSHION
� CHANGEABLE MESSAGE SIGN
� TRUCK MOUNTED IMPACT ATTENUATOR (TMIA)
� POLICE _
� FLAGGER
PAVEMENT MARKINGS
� CRYSTAL/CRYSTAL PAVEMENT MARKER
. YELLOW/YELLOW PAVEMENT MARKER
� CRYSTAL/RED PAVEMENT MARKER
� (1� PAVEMENT MARKING SYMBOLS
MANAGEMENT STRATEG/ES
CONSTRUC!/ON SUMMARY:
PROPOSED -L- (SOUTH DOGWOOD TRAIL) W/LL BE CONSTRUCTE� USING AN OFFSITE
DETOUR. BARRICADES WlLL BE REQU/RED FOR PROTECT/ON OF THE WOItKAREA
AND CONSTRUC7ION OF THE BRIDGE OVER THE EXIST/NG CHANNEL.
j
J
a
n
J
�
3
0
0
�
�
GENERAL NOTES
CHANGES MAY BE REQUIRED WNEN PHYSICAL DIMENSIONS /N THE DETAIL
DRAWINGS, STANDARD DFlAILS, AND ROAD WAY DETAILS ARE flIOT A7TAINABLE
TO MEET FIELD CONDIT/ONS OR RESULT IN DUPLICATE OR UNDESIRED
OVERLAPPING OF DEV/CES. MOD/F/[AT/ON MAY /NCLUDE: MOV/NG,
SUPPLEMENT/NG, COVERING, OR REMOVAL OF DEV/CES AS DIRELTED BY TNE
ENGINEER.
THE FOLLOWING GENERAL NOTES APPLYAtALL TIMES FOR THE DURATION OF
THE CONSTRURION PROJECT EXCEPT WHEN OTNERWISE NO7ED /N THE PLAN
OR DIRECTED BY THE ENGINEER.
LANE AND SHOULDER CLOSURE REQUIREMENTS
A) REMOVE LANE CLOSURE DEVICES FROM TNE LANE WHEN WORK IS NOT BEING
PERFORMED BEN/ND TNE LANE CLOSURE OR WNEN A LANE CLOSURE IS NO
LONGER NEEDED OR AS DIRECTED BY THE ENGINEER.
B) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN 75 fT OF AN
OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN SHOULDER USING ROADWAY
STANDARD DRAW/NG NO. 1701.04 UNLE55 TNE WORK AREA IS PROTECTED BY
BARRIER OR GUARDRAIL OR A LANE CLOSURE IS INSTALLED.
C) WNEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON TNE SHOULDER
ADJACENT i0 AN UNONIDED FACILITY AND WITHIN 5 FT OF AN
OPEN TRAVEL LANE, CLOSE TNE NEAREST OPEN TRAVEL LANE USING ROADWAY
STANDARD DRAWING NO. 1101.02 UNLE55 TNE WORK AREA IS PROTECfED BY
BARR/ER OR GUARDRAIL.
WNEN PERSONNEL AND/OR EQUIPMEMARE WORKING ON TNE SHOULDER
ADJACENi T0 A DN/DED FAC/UTY AND WITNIN 10 FT OF AN OPEN
TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY
STANDARD D/L4W/NG NO. 7101.02 UNLESS THE WORK AREA /5 PROTECTED BY
BARRIER OR GUARDRAIL.
D) WHEN PERSONNEL AND/OR EQUIPMENT ARE INORK/NG WITHIN A LANE OF TRAVEL
OF AN UNDN/DED OR D1V/DED FAC/LITY, CLOSE TNE LANE ACCORD/NG TO .
THE TRAFF/G CONTROL PLANS, ROADWAY STANDARD DRAW/NGS, OR AS D/RECTED
BY THE ENGINEER. CONDUCT TNE WORK SO TNAT ALL PERSONNEL AND/OR
EQU/PMENT REMAIN W/TNIN THE CLOSED TRAVEL LANE.
E) DO NOT WORK 5/MULTANEOUSLY WITH/N 15 FT ON BOTH S/DES OF AN OPEN
TRAVELWAY, RAMP, OR LOOP W/TN/N THE SAME LOCAT/ON UNLE55 PROTECTED
WIiH GUARORAIL OR BARRIElt.
PAVEMENT EDGE DROP OFF REQU/REMENTS
� BACKF/LL AT A 6: f SLOPE UP TO THE EDGE AND ELEVATION OF EXIST/NG
PAVEMENT /N AREAS ADlACENT TO AN OPENED TRAVEL LANE TNAT NAS AN
EDGE OF PAVEMENT DROP-OFF AS FOLLOWS:
BACICFILL DROP-0FPS TNAT EXCEED 2 INCNES ON ROADWAYS W/TN
POSTED SPEED LIMITS OF 45 MPN OR GREA7ER.
BAC/ffILL DROP-OFFS TNAT EXCEED 3/NCHES ON R0,4OWAY5 WITH
POSTED SPEED LIMITS LE55 THAN 45 MPN.
BACKF/LL WITH SUITABLE COMPACTED MATERIAL, AS APPROVED BY THE
ENGINEER, AT NO IXPENSE TO THE DEPARTMENT.
G) DO NOT IXCEED A DIFFERENCE OF 2 INCHES IN ELEVATION BEIWEEN OPEN
LANES OF TR/IFF/C FOR NOM/NAL LIFTS OF 1.S INCHES. INSTALL ADVANCE
WARNING 'UNEVEN LANES S/GNS (W8-71) 100 FEET !N ADVANCE AND A
MINIMUM OF EVERY HALF MILE THROUGNO(1T THE UNEVEN AREA.
7RAFFIC PATlERN ALTERATIONS
H) NOT/FY THE ENGINEER 7WENTY ONE (21) CALENDAR DAYS PRIOR TO ANY
TRAFF/C PATfERN ALTERATION.
S/GN/NG
I) /NSTALL ADVANCE WORK ZONE WARNING SIGNS WHEN WORK /5 WITNIN
40 FT FROM TNE EDGE OF TRAVEL LANE AND NO MORE THAN THREE
(3) DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION.
J) PROV/DE SIGN/NG AND DEV/CES
REQUIRED TO CLOSE THE ROAD ACCORD/NG TO THE ROADWAY STANDARD
DRAWINGS AND TRAFF/C CONTROL PLANS.
PROVIDE SlGNING REQUIRED FOR
TNE OFFSITE DETOUR ROUiE AS SNOWN /N THE TRAFF/C CONTROL PLANS,
!Q CO VER OR REMOVE ALL SIGNS AND DEV/CES REQU/RED
TO ROSE THE ROAD WNEN ROAD CLOSURE IS NOT IN OPER.4TION.
COVER OR REMOVEALL SIGNS REQUIRED FOR TNE OFFSITE
DETOUR WHEN TNE DETOUR IS NOT IN OPERATION.
L) ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR 70 ALTERING AIYY
TRAFFIC PATTERRI.
TRAFFIC COMROL DEVICES
M) WHEN LANE CLOSURES ARE NOT IN EFFECT SPACE CHANNELIZ/NG DEV/CES IN
WORKAREAS NO GREA7ER /N FEET THAN 7WICE THE POSTED SPEED LIMIT
(MPH) EXCEPT, f0 Ff ON-CENTER /N RADII, AND 3 FI'OFF THE EDGE OFAN
OPEN TRAVELWAY. REFER TO STANDARD SPEC/FICATlONS FOR ROADS AND
STRUCTURES SECflONS 1130 (DRUMS), 1135 (CONES) AND 1180
(SKINNY DRUMS) FOR ADDlTIONAL REQUIREMENTS.
N) PLACE TYPE III BARR/CADES, WITH'ROAD CLOSED' SIGN Rl1-2
ATTACNED, OP SUFFICIENT LENGTH TO CLOSE ENTIRE ROADWAY.
GENERAL NOTES CONT/NUE�
PAVEMENT MARK/NGS AND MARKERS
O) T/E PROPOSED PAVEMEAIT MARKING LINES TO E1(IST/NG PAVEMENT MARKING
LINES.
CONSTRUCT/ON /N-WAiER MORATORIUM
P) TNE PROlECT AREA /S WITH/N AN INLAND PRIMARY NURSERY AREA AND TO THE
IXTENT OF WORl4 AN IN-WATER MORATOR/UM OF FEBRUARY 15 -
SEPTEMBER 30 WOULD BE REQUESTED TO MINIMIZE /MPACiS TO AQUATIC
RESOURCES.
MISCELLANEOUS
� COMRACTOR /S REQU/RED TO COORDINATE WITN THE TOWN REGARD/NG ANY
SPECIAL EVENTS TNAT MAY /MPACT THE PROJECT CONSTRUC!/ON AND TRAFF/C
CONTROL LOGIST/CS.
PHAS/NG NOTES
PHASE 7
IF WORK IS NOT PURSUED WITHIN 3 DAYS OF SIGN INSTAI.LATION, TNE
WORK ZONE ADVANCE WARNING SIGNS SHALL BE COVERED OR REMOVED
IN A METHOD APPROVED BY ENGINEER. THESE COVERINGS SHALL BE MADE
IN ACCORDANCE fMTH SECTION 1110.01 OF THE NCDOT STANDARD SPEC/FICAT/ONS.
STEP 1) PRIOR TO BEG/NNING ANY CONSTRUCTION ACTN/TY, iNE CONTRAC70R
SNALL INSiALL WORK ZONE ADVANCE WARNING S/GNS USIN6 ROADWAY STANDARD
DRAWING 1107.01, SHEET 3 OF 3,
57EP 2) WH1LE MAINiA/NING EXISTING TRAFF/C ON SOUTH DOGWOOD TRAIL, AND ACCE55
TO ALL /NTERSECfING ROAD WAYS AND DRIVEWAYS, TNE CONTRACTOR SHALL
USE NCDOT ROADWAY STANDARD DRAWING NO. 1707.02 (SHEET 1 OF 75) AND
PERFORM:
- CLEAR/NG AND GRUBBING
- UT/LITY WORK AS SHOWN ON SHEETS UG7 AND UC-2.
STEP 3) PLACE OFF-SITE DETOUR SIGN/NG ON SOUTH DOGWOOD TRAIL, US 158, OCEAN BOULEVARD,
DUCK ROAD, AND EAST DOGWOOD TRAIL AS SHOWN ON SHEE7 TMP-4.
STEP 4) CLOSE SOUTH DOGWOOD TRAIL TO THRU TRAFF/C BETWEEN TALL P/NE LANE AND
FAIRWAY DRIVE SEE SHEET TMP-4 FOR DETOUR PLAN. THE CONiRACTOR SNALL USE
NCDOT STANDARD DRAWING NO: 1101.03 (SHEET 1 OP 9) FOR ROAD CLOSURE DETAILS.
(SEE SHEET TMP-3) �
STEP 5) WHILE MAINTAINING ACCESS TO TNE RESIDENCES ON SOUTH DOGWOOD TRA/L FOR
LOCAL TR/IFFIC, TNE CONTRAGTOR SHALL:
- CONSTRUCT BRIDGE.
- COMPLETE PROPOSED ROADWAY /MPROVEMENTS.
- PLACE FINAL PERMANENT S/GN/NG.
STEP 6) OPEN SOUTH DOG WOOD TRAIL BACK TO THRU TRAFFIC. REMOVE OFFS/TE DETOUR SIGNS AND
RESTORE TALL P/NE LANE AND FAIRWAY DRNE TRAFFIC PATfERN.
STEP 7) REMOVE ALL WORK ZONE SIGNS AND DEV/CES.
�
�
R
�° s�s�
8 abN
t1
�
U
b
a
IOD TRAIL
�
�
J
��
� ����� OFF-SITE DETOUR ROUTE
ROAD
QA CLOSED
AHEAD WZ�
48" X 48"
OAD
�C CLOSED
000 W2��
4B" X 48"
ROAD
QE CLOSED
. ANEAD wzo-a
48" X 48"
NEXT RIGHT az zRtz„
O DETOUR
AHEAD
w2a2
48" X 48"
��
p� CLOSED
500 FT WZ�p
48" X 48"
ROAD
QF CLOSED
AHEAD wzo-3
48" X 48"
NEXT LEFf az z�iz„
������
O ���'��
� �
������
■ �
�' ..._ .� -
�""`
0 „""
� �
�""`
� ■
_ � -
S.DOGWOOD
24" X 21"
TRNL
OJ DEfOUR.
't' M4-9
30" X 24"
S. DOGWOOD 24� X 2r,
TRAIL
Q Dh70UR
�► M4-9
30" X 24"
R11-4
60"X30"
ROAD CLOSED
TO
THRU THAFFIC M4-10L
pTO11 48"X18"
TYPE III BARRICADE
R11-3
60"X30"
flOAD CLOSED
2 BILE9 AHEAD �
LOfAL TMFFIC ONLY M4-10R
� 48"X18"
TYPE III BARRICADE
S. DOGWOOD Z4, X Zr,
TRAIL
QK DETOUR
�--� M4-9
30" X 24"
O END
DETOUR � A
24" X 18"
.
e
K
,
T
O
O
�
'o
�
3
a
0
0
�
�
Y
401
OM3-L
12" X 36"
ONE "U" POST
PER SIGN
U �
� �
\ � i
1 I , �
� '
I ' ' �
i '
� � i
� � 1
� i OM3-L (
� i 12' X 36"
� i � ONE "U" POST
i � PER SIGN
I � i
1 �
i �
� ,
�
S, DpG� r.�j i ��
I `
%'t �� �MB O i �,`
� � \
I �
`` ` _ �
` I
� MB .
402
OM3-R
12" X 36"
ONE "U" POST
PER SIGN
WOOD
BULKHEAD
0
�
Q'
SIGN (2) SIGN
I
SIGN I
S DOGWOOD T�
FAIAWAY DA
�--
--- RETaN — r r �n� �s• woo�
�\ n�-� ,
�-� �cn1m
/ i � L _ �J
\ �a n �` �STOP � RELOCATE
RETAI � � � �
I � J
� ��
� I 12�" X3 6" 4�2
. �� � ONE "U" POST
_ � J PER SIGN
I I � �
I I
�
� �
�
`--�
�
�-�
�dO1S�
\ /
� _ �
RELOCATE
S DOGWOOD TR
�ALL NE LN
RELO ATE
� � T 1
��F��i ���
I���n� �T�
l �i �
REMO E
SNOW GOOSE
CANAL
� � X3�� 4�2
JE "U" OST
PER 51 N
WOOD W
BULKHEAD �
0
SNOW GOOSE
CANAL
�� S�ISf
8 QbN
G� O
WOOD
Bl1LKHEAO
� J
° 3, p1v 00
�m
LSA �
�I
1
�
�
�� LSA
MB
gw000s
�
�
'�'
� S. DOGWOOD TRA/L
\ / O MB
1
I
I
�
J
\
1
J
NOTES:
1. RELOCATED SIGNS:
REMOVE AND STOCf(PILE EX/STING S1GN5.
ERECT EXIST/NG SIGNS ON NEW WOOD PoSTS.
2. REMOVED SIGNS:
REMOVE AND DISPOSE OF EXIST/NG SIGNS AND WOOD POSTS.
3' Wtl
t
�
�
NARRATNE IMPERVIOUS AND PERVIOUS SURFACES IN
SOUTH DOGWOOD TRAIL DISTURBED AREAS
P�rct nc_scr(ptinn FROM FAIRWAY DRIVE TO TALL PINE LANE:
The purpose of 1Ns proJecf !s to rep/ace tM South Dogwoad Trall Brldge lBrldge •l71 PROPOSED IMPERVIOUS SURFACE = 0.04 AC
aer Snow Goose Caiwl,a trlbuJary of M� Jean Guife Creek !n Dore Couniy Soulfern PROPOSED PERVIOUS SURFACE = 0.24 AC
CLEARING AND GRUBB/NG PHASE.
SEE SHEET ERO-I FOR THEPOST GRAD/NG PHASE �I � I d 7>>> H or n
PROJECT REFERENCE NO.
e-san
WW SHEEf NO.
ROADWAY DESIGN
ENGINEER
SHEET NO.
EC-/
Slb�es,NC. This proJecf wll/ also consisf of new grading and pwing for ihe lmmedlate NoiEs:
�Y . P.O. BOX 33068 �p�mm��p�
surrou�ing locations fo t!e the new bAdge to il� exlsdng �oodway.The leng7h of tle RALEIGH, N.C.27636�068 �`�� �AR �
struciure Js OA2/3 mlles a� the lengfh of roodwoy�lmprovements !s OA476 mlles,resulfing Total Disturbed Area (shaded) = 0.28 OCf@5 � 1. REINFOFCEO SILTFENCEOUILETSMUSTBEADDEDINTHEFIELD PE NO.F-0702 ```�QQ�.. Q��•i�
in o praJec� le�th of opproxfmatery OA689 mlles. Approxlma�ery 028/4 acres wl!l be WHENEVER LOW PoIMS ARE ENCOUNTERED ALONG SILT FENCE RUNS. .<�,: QOF�O �'•..� %
dlsfurbed during the consirucflon of flds p�oJect. Also,opproxlmotely 02429 ocres w!lI �, � '��$EAL� `'
bevegefotiveystoblllzed wlthg�oss ond perma�ntplanll�s. O S. TNESTANDARDSILTFENCEOU7LETDETAILDEP/CTEDONERO-5 = � OZ9B�E �
South Dogwood 7'rollls locoled !n Dare Counfy.SoulAern Shores,NC.TIe praJect Tavn of Southern Shores Contact: � oeanraeeEPraeteairEwvarewrosrsesuemrurenwereorosEo ,�••. F, Q,:h`
sllebeglnsolFalrwayDrlvef36J18%5 N.-75740789' Eland proceeds Rocl�lPatrlck SOUTHERN SHORES SILTFENCES/NSMALLNATURALWATERCOURSESORDRAWS. %9J:•.,Ng�NEE;.���`,.�
!n an north/norfheast directlon cross/ng Snow Goase Carol befo�e end/ng Jusi rwrlh of 1/� 5375 N.Vlrglnlo Dore Tral/ CIVIC ASSOCIATION ''� lyE'W S�
lnie�secflon wlih iollPine Lane (36Jf9941' N,-75.740964 E). SoUthe�n Slp�es,NC 27949 NO UEED REFERENCE 3. DONOTBEGINGRAD/NGANOCONSlRUCTlOi11 UNT/LINSTALLATIONOFALL �����iiiii��������\\\
l252J 26/-2394 PB Z P� � EROS/ON CONi1tOL MEASURES IS COMPLEIE.
SltP na.ccrint/nn �
jo.o�' �
The slfe !s ger�erolly IeveL AIl Orolnage sheef flavs across ilzs slte and makes
!ts way Into Snav G�se Canal.
The s/fe 1s deve%/�d conlalnfng resldenilal areas wl�h a few pockets of culilvote0 3, Wpoo � � �
lond. Tl� maJor Oralnage way for !he area is Jean 6u/te Creek. TNs creek emptles info l� 1 \ �, �Q 9�5�' � � �
the CurrlJuck Sound,wh/ch flavs to tf� Albemarl5wnd,o�M u/tlmaJely to the ' � „
,Nlontic ocean. � � � ` O � N �, � � � 8 \ Qb � �
M�nnant P �rrnmrW � l � / � � � \ � � , 'N;,, N \ � � \ � \ � �\ \ � I ` � \ \ N � \ \ \ \
� 1 ) DAViD M. Sa LDS \ � \ � \ � � \ \ � � \
INSTALL TURBID/TY CURTA/N (ANCHOR EDED) � � -� � , � � B 1800 PG 27 � � � � � � \ � � ' � � � \
Land use in 1he vlciniry is generalry resldenllaL Areos a�Jocent tl� proposed roadwoy SEE ERO-6 FOR MORE /NFORM ' o , l_� �� � � •� � � PB G�PG I� .� � � � in � \\\ � � \ � � � � � �
conslsl of resldenfio! uses onry. Tle maJor ou1/et for runroff dlsc/n�ge _9��5�` \ • �� \ � M Q
Is Srmw Goose Conol. Snaw Goose Canol is a we!! establisl�d gent/y-flaving ._ — � i " I � � - � \ � � \ � �, � � \ 1 � � � \ � \ � � � \ � � � � 1 �
trlbutory fo fhe Jean GWte Creek. _ l � ` - �LK�EA\ \ / .' ' 4 coNc � ., PSF0. 1. � \ �� . � , 1 1 e \ � � � \ � � \ � � � r I l
� � � �S � � � � \ � �Qv � \ � �\ �\ -_ _� / � /
Snll.c - �i' � i � � - , "- ._ _ ` __ � � � i - \ � . ' __ ` � \ \ 1JAME5 `f.STEPHENS � � � � � � � � / /
� � `� � � -' -LIM/TSOP- _ .. \ \ \ \ � � ` \ � ` � ._ � � l �B\I6 PG 66 � � '' � _ - - - / � i
Tle so11s In 1Ns oreo are ge�re�ally c/asslfled as FrD (F�Ipp flrre son0,2 fo 30% slopesJ. ' � � i i � \ � �- � �� � � � � I \ n \ � _ � �� � ` '� , � i � \ � p �p�. � � � ` \ ` _ _ _ _ � = _ � i � i �
� �DISTURBED AREl1 1 . ; .i � � � \ \ � � � � � � � - �p� � �
� 1�i \ � -- - � - �_-_ ,� 1111 � i weo0. � � � � \ \ \ \\ � � � _ �'--���
i , � I �, ` I � � _ _ p -- � / ) �,� \ \ � � � �
� I I 1 / / I � I � 11NST�7Ll� TEMPORARY., \ . �1 � � I I I \ I / BULKHEAD � :^ \3' W��� � � � \ \ \ \ \ \ \ \ � � � .- PB 2 P 220 - � � ' � �
ex�n I � � / /Woo l� � 1 $EDI167�E�Vi'FEII�CE • I � � 6 I I 1 I cn \ � � � � � � � � � � - - - _ - - - - - � - �
,vc aiW I �11 ' / / I IWA` R O � i \ STEPS ' }(,uryCOpo`lFS�D:/1605.01 � \ ,� � � �I � ; ` I � 1 � � � - - - � � - - + �� S ��� i � � \�\ � � � \ � � � � � _ - _ _ - - - --15_ _ � � i � � % -
CIl: � � / ��� � � � � �
��� \ \4�P I 1�ICi0 A A.JACK50 �� - - � ' / � � SEATill.24' 1 I 'f'I I I � � � / .� . � � � � - - - - - - - - - - - - - �
\ \ UB 8 PG I20 � �� � � � I i �i � � / I � � � 1 1 a I I , - . - - , _ ✓ _ �sn h � � � � � � -woaoS -
, \� � � � I P 3 PC 11T WOOD � � � - � i / � I 1 � � , � I ; " - � -, . - -� - -� " . \ \ � � � � I � -1 - - - - � - � � � �
� _ . WAIL � � _ _ � / h � • lo � " I , 1 I ; � �. ` , \ \ - �_ _ - _ - _
_ � � � -- , _ /� j, �� � 1 ,� \' \ � I ��' ` ' -' _ _ ' \ \ � = � � - - - -- --- - - ---
- - - / . ' � : ��� - , � � � � � � l i . - - � - _ _ � J I / � � � �- - ; � - - �w
` _ = O �� � \ - - � �5 AT=11.25' � " - . MON �
i MB / � i �i - � � - � - �_ - EIP �' . , � l F%ISTMI�AlW ` � � - _RN
- / CONC � / i � " _ -. ` _- -_ � - - - � � �
` a° ' � ' = Y � ' ' - __ _ _ � i . � � ' - � _ _ `
\` � �` _ � \ ._ 2' PVC — - __ _' - 1 _ ' �." _ _ _- � 4 �� ,�
��O - - - - -_ � \ \ y % _ `� -
� \ , BRIDGE °❑ � �� ._ � � _ �
/ 1 � � i
� , � ' � _ �
G'/ST/NC q�N � � ` \ _ ' -- � / � � � _� ._ ` S.DOGWQ7D TRAIL 2dBSf
\ /I
� � \ - __ � " _ / _ _ - _ �! �M� �
�ANN D. PALMER M�a s• oip � ' J � _ � � � �\ _ _ � � � � � � - _ � �vo
� TRUSTEES I � � � � � -' �� - � i �
UB 1T52 PG 317 � � � i / � � � \� � � , � , � i � � R�TAININ
PBAPGIIO �
sic I exisrwc niw - - - '� -. 1 1 � 1 / � / / - 1 � - I � � l I
NO _ 1 I � 1, � `\ .\ \ ,� 1 I ` _ MQN / MON ` � I \ � Erisrwc niw I
a / 0 � � ' SEAT=11.24� � / 9 1 1 1 � R�w - _ i � � � , 1 \ 1 �
� � � � f _ � � i i � � 1 � POST � ex�snNc \ - � i i / � � - - � � � � l �
i -y-- � � � �s� wood I "' i , l � � � � � - _ .- � � / � � . � - � /
� \ \ � EIP � � / I ' I i � � I � \ � / � � � � / �� � , �� � � � ��,//
� � \ � 'Il � \ / � i i / � /
w � ` , � � , , i , �sn�, �� . - � , , ���---_ �� �-- � ,
y � � +1� _ � � ` \ ` �''� � I 1 � / � � I � � � corrc \� - - � i
�i is I � �0, n � �[\ ' - - - � � � ` � ` � ' � � � �� �s` T=11.29� ���� ` � / � \ \ I � ., / � STEPS � i , � _ _ � � '
o �° I o \\ . \ � � wo�Oo \ � ° 1 I� + 1� I 4'WOOD \ �� 1 � � � �� - \-C -
Q ` \ a 11 �jl - _ - � � \ B�1LgHE�AD ` I s 1 � � , � � L�SA I + / ` \ � - I- - �
V�' � � Y � �� ._/ � � � \ ` � � 1 � � � —� �_ / � _
p � 1 � II i � m,vc i ' � l INSTALL3YLI \ � � � ' 1 0 � � � i ' � I 1 � _ i.sa `/ � \ \ I I � / � / i \ 1 ��� � ` ' - - - � .
y � / II1 � � i � � FENCEOUTLET \ \ \ I � j � � I � ' � ✓1 \ � �1 � � \ i i � , � � �
� 1 � I / � � � isFo (TYP/CAL) � \ � . .� � / � � � f � � � � � / � � 1 / � � � �_ � � �
� � ��I I � ! � ' � . � i � i � � w � � � � , k5A �\ � \ i i � -
� � \ � ✓ �� \ � � ! _ _ _ / _ `1 1 , I � � ' � o0o r � .�O . � � � \� . � � ` , , � � � ' ; ,
o � � i � \ I � / � � � � " -- � \ I ' � I l � I B�LK� HEAQ ._ � / _ _ - . � / / / � � \ / � �= � ' _ �
� � � � � / I' s,TP3 � 1 I� I '-� � \ �' �;� '
/ /� � I � / 1 ! �� � . � � �� � �
� � � � � � I � , i ;"
� i � I 1 � � / 1- c � � ; _. _� � -- � �-I J � 1 � _ -- isFo
OQ / � I � � I i �� � _ _ _ ..I' _' . BRIC�_-..-. _ ' � - � .- _� �
J I � � I \ � \ _. _ � _ _ _ - � � � � 1 � 1 l \ 1, �1 � 1 � _.' - -: -- � . - - WALL BRICK
ai i l - - � � - - - - - - - - - - � � ` \ 1 1 1 � 11 \��` -� �1�TrKL J-HOOK SILT FENCE WALL
� �_\ ' <o.ao• � � � _ ' - - - - - - - \ � l � oacK � -� -- - qSSHOWN
g � � � ` � \ ' � eRICK � < < 1 � !% �' CONTRACTOR TO /NSTALL a
c ` � WA�r , � � � i ' _ - �� ADDITIONAL J-NOOKS AS NEEDED °�
� �
� ' P _ � L _ O �� �\ `� _ _ __ - -`� � f�rPlcnc)
0
� MEGAN C.BELL z
i
N DB i8B6 PG 25
�
O
\
�
�Z�S�'49• W PB A PC d0
180.Zg•
OSUSANNA�E. NORRIS
RICHARD G. CARROLL OB i482 PG 4�2
. OB 16T9 PG 465 PB 3 PG 99
' PROP LINE IS PB 3 PG 99
C/L OF BLILKHEAD
20 10 0 20 40
I�r-.-�f-.-r1�-f�
LEGEND fAPPUES TO ALL SHEETSJ
D(STURBED AREA — J-HOOK SILT FENCE
CONSTRUCTION UMl7' �--- F SILT FENCE OUTLET
TEMPORARY SILT FENCE --H{----�- wATTLE
���
S
1
9
►
//
�// �\
_ � � I //r/ \
PATRICK F. PHE P51 �!����
� DPB39PGu2 �I Il�o �\\
�I III �\
I��I�III 1 � ��f
� I���I�III I � 1\\
\ �II� I��� I ' � \ �
1 I������ � / � � _is�
� i�� �I������/ � �/ / � /
� � I I I 1I / / /, // /
I � i � �
nmc R,W I l � / / W'�A °q
11 � / I I ��� O
�11 \ �iP I �ICTO A A, JAC
� DB 3B GC�
\ \ � ` _ .
� �
S��` � `�--� i
G O
�� /=MBO _ � /
� CONC
MA/NTAIN TURBID/TY CURTAIN
(ADJUST AS NEEDED) \
SEE ERO•6 FOR MORE II�VFORMA
-L- STA l4+19
BEGIN REMOVAL OF
EXISTING B(ILKHEAD (l9' LTJ
PLACE 6 LF PROPOSED B(ILKHEAD
_ =-wo�e- l -
_ � -' - - 841LI�EAD \
�_ _ - - =��i � � � � _���"-_ ��� \\ \
� • SI _-- M IL�N TEIIi1PQRARK � � - _ - - � � � \ \ � 1
� /i!- - � ` � \ AD�/U5 �N�CESSARI4 - _D��R o— \ � I ti 1 \
� n►cqQ�;srrLtSys.nt_ � '� ��� � I I � �
� ��( �� � � f7YP�C�.1 i �� � � I I I � I I 1 �
`STEPS } , �� \ � I� I I � I 1
i$p ��� _- / �/ � ��� / l E57 2 TONS R�1 SEAT�ll.24'� � �� ���1'r' �
- woop\` \� �� �� �� E�T 7 SY PSRMi / � �� I � � � �
� � � �
�Yq���� �� M0�1{1(ED CONCRETE�L � � 1 1 �
- g - � SE'E SHEET �0 i /
� � •
� � � \ ( i � i � . ` ° 1
� � D''1 � ` � � i � / � 1
� \ _ �_ \ \ ' �,,,, 1 / ,., � \ \ =
/ � '� !
\ \\ �� �� � �1..� \
��O � ` - - -�
� _ ` '�—
� 1 \y \
'ISTINC p�N � \ \ -�
� 1 '
�-
'NON
�1NN D. PALMER ' '-
� TRUSTEES -
FINAL COMSTRUCTION PHASE.
SEE SHEET ERo-1 FOR THE CLEARING AND GRUBBING PHASE.
Kimley>>> Horn
PROJECT REFERENCE NO.
a-.san
WW SHEEf NO.
ROADWAY DESIGN
ENGINEER
SHEEf NO.
EC-2
NOTES: p,O.BOX 33068
� 1. REINFOR�D SILTFENCEOUlLETSMUSTBEADDED/NTHEFIELD ��E�GH,N.C.27636�068 pENO.FOIOY ��\�'`�1�AROG'�i
� WHENEVEF LOW POINTS ARE ENCOUNTERED ALONG SILT FENCE FUNS. `����•Q�F��Ory�•.?q'�
'� � `� SEAL T . �
2. THE STANDARD SILT FENCE OUTLET DETAIL DEPlClED ON ERO-5
O OR AM ACCEPTABLE ALTEFNATE MUST BE SUBSTITUTED FOR PROPoSED � � O29B�E � �
SOUTHERN SHORES SILTFENCESINSMALLNATURAL WATEFCOU/iSESORDRAWS. ��'�TTNCJNE`���,`'�~��\
CIVIC ASSOCIATION ���''ii yEW 5� ��`�
NO OEED REFERENCE 3. DONOTBEGINGRAD/NGANDCON57RUCTIONUMIL/NSTALlAT/ONOFALL �����iiiiii������
PB 2 PG 02 EROS/ON CONlROL MEASURES IS COMPLElE.
� \
30 �
3, W009 � \ \ .
� � ' � � � , � �� SaSf , � � �
c 8\ \ \
� � -► � ` � � � 4 , No �mm� � i � abN '� . �
` � �` \ � \ \ \ \ pAVID\ M.OSa LDS \ w N \ � � � \ \ \ � \ I I \ � � � \
/ � � � � � / / 1\ �\ 1 OBPB 0 PG I 27 � �� \ � in � � � \ \ \ \ \� � \ \\ I \ � \ � \ \ � \ �
/ �- i ��-� \ � \\ �\ � � 1 , � � \\ � \ � � � \ AA
/ \ te��! \ \ � � � � � � � , � 1 � � \ � � � \ \ � � ` � Ivi Q
/i ` ry coNc �\ �\sFo.\\�\ ��\i,�111 � `�\ �\ \ � � �\ � �\ ,y� � % � / /
� i - � � ` � INST�1 L TTLE�9REA�N-FWME' � � � \ \ � 1JAME5'F. STEPHENS� � � ` � � � _ _ _ � � � � / / /
� A ER L E CONSTRZlC�JON /5 COI�IP ' E� � � � 1 ��B\I649� PG 66 � � � � � - _ ^ - / � i � �
ODiF1E CONCRETE FEU N � _ �P� � � � \ � � ` 1 \ \ B�G \ •!u \ \ � \ � ` ` _ _ _ �-. _ � � i � / �
SNOW GO SE EE� SHEE7 2D � � � � � � � _ - � - _ .20�
CANAL � cyrdLcs 1 �B' R1�� _ p - � �/ ) � � � \ \ � � � � \ � ` � � _ - - - -N�COLF GC05E _ - _ , - i � �
ESI 2 TpfS�LKHEAD � / ~ r \ \3' W��� � i � � \ \ \ \ \ \ � \ \ � � � - - PB 2 AG-220 - - % � � �
'E9T7SY+PSRM ` � \ � �� � � � � ---_---- -- _ � _
-L-STAl4+7! I i-- � � � � \ `a ��� y� i � � �� ��� � \� -- __--- _I5--'�_ _
BEGIN REMOV,nL OF I +6o I ` � \ S�� -�-�-` �t,�� � \ � � � � \ � � � - - J � - - - - - . � '
EX/STING BULKHEAD !23' LT1 � � � �� � � � � � � � � - pl- - - - - - - - � �
PLACE 6 LF PROPO D • I I , - \ . � � _ - - LSA � � � � � � - - -O- - - - _waoo� _ _ �
I — •�� lF -'- - •������ �������e��•
OB 1752 PG 3i7 I ���'+����f� //�:•1�-
PBAPG�O
S��NO E%ISTING P/W ��� � � �
.� � I
o � � MODIFIED CON2RETE FLUME EAT=11.2q' / I y
' � SEE�SH€Ef 2D / � I
�\ � /� v' I
� �— � � \\ EiP � CLASS 'B'RIP RAP / 5 woo � i I 1
I 1 � � \ \�EST 7 SY PSRM CLA55 /I RlP R � ` �
SEE 57'RUCTURE S \ I
\ � � FOR MORE l MAT � �
r is �p 1 �O, � -- fFYP�(CALI � \ � 1 1
� � _--/ �-__ �, � �,�oao�, w
� 1 / �� �./ ' \ � � \ �LKHcAD 1 � o
/ �� \ ` o
� 1 � � ,� roNc i T � 1 MA/NTA/MSI�T \� \ 1 � o
\ � FENCE OUTLET � �
� \ l � � � /1 � / r � / isFo (TYPICay � \� \ � 1 � I
�-J l 1 � � _ � � � 1 � i �� �, �
i l� l� � - / � -L- . lqtz5 � , 1 I I
\ � \ � � _ �I I � � � � [T REMavac OF � 1 � 1 I I
/ / I \� � l �� �/ � EXIST/NG BULKHEAD T P§ � I I
\ I1 � � � � / -- � P[.A�E 6 LF PROPOS �
n�
�/ � ' \ � � 1 \ \ � \ � � ' � / _ _ � � _ - � � J/`\`�.�\1� �1 \
� ` � ` � � � ' - _ _ _ _. _ - - _ - _ � � \ � � �
� �� -� i o.00• � � - � � 1 1 � I �I 1
� � BRICK
� ` � � � � WALL- 1 \, I 1 � �
` �� L� O \1�\ �1 \
h
O
N
�
��
MEGAN C.BELL
OB 1886 PG 25
N �Z'S1'qg. W PB A PG �0
180,Z8•
BRIDGE HYDRAUUC DATA
T�OAILY-lNF[UEA�ED COASTAC
OVERTOPPING DlSCHARGE _ � � CFS
OVERTOPPING ELEVATfON � 8A FT
� � �I � �' O �l _ \ � \ ��_----� \ ��� � __-� _--10-----_'-_���
� \ --- � �. -
� I � ao �/ _ � \\ �� ___ / ' / \ �" �� i J__-_- �`__��
I �s � � � � _ � I / _-- � � --�w
...1.' SEA�f=I.Y25, ` _ - � _ _ � - - EIP -`- MON � � ' � � � � R
__�--- " . �a _ ` \ _ _ _ _ _ / Ew�ruis niw _ _ � �
\ \ w
1. ��°�� ������IA- F � � _ - - � `
e��r��r���� � - � _ ` � � _ �� 1 -
- - - -------- - �� - - - - � - - / = _- -_ ._ -
1//f// � �� ;_ ---
�ei�iii � _ � � � � _ _ -�-
BRIDGE _�� � � �� ' S. DOGWOOD TRAIL
I��'�/ / / � / / � - I .
I � I I / / i � / / � /
-- - ..... _.�vi�r�� --- -_-�-���r� ,�- _ --__� �=--/��___ �==-
^1�/----f/li* F ^ � i � � - � - � � _ � � � � � � ' � �w°.
�'}� � � � / i � � � � / i� �� 1 1 � / � / / � / — � � � � / / / � / , R�TAININ
! �� l � � 1 � � 1 � / I �
� �, �\\ `\� ` 1� � D1F1E CONCRETE FLUME I �_ MqN / � MON \ � � I - � exlsrwc eiw
t � t '� �� 1 I � aosi � 5 E SHE 2D ExaTmc a - _ - i � � � �/ � 1 _ � � \ _ I � /
� � � \ 'B'R!PllW((77AP \ I - - i / i / / � � / � / �\ � � � � �1 �/ /
� � � � I I � EST TONS \ ` / � � . i i � � / / _ _ � � � ` � / � /
\ E57 5Y PSRM � �sp� � � \ i / / � �� � - _ � � - � �
��� ` � \ �� ���� //l � (/\ � � / / _ co,vc\���--� /
� � � �SE,AT=IL29 � � I � l \ I � n / / STEF�S � / _ _ _ i /
� ��` 1 1 I 4' WOOD \� 1 \ I OSA I I � / / I I/ _�_ __
� 1 I � �� /� � � � / � �� � - '
�• � 'I I 1I 1� �I � ,I I � _ LSA \/�— \ � \\ �\ �1 �I �t 1 / / � � \���\� ` - _ _ _ � / / .
� � � I / � �� � �i i �� i � � � � I �
� I � � � � � � � l \ \ r ksa � �� � \ �� � ' i � � � �— -
� � � wtlo9 � �0' / i � ^ � � � \ ` � � � � � � � ,r
1 I �LI�HEAQ �Ll�'S !I R1P RAP - � / � \ \ � � �� � _ -
� I SEE SfRUCTURES S � i � � \ � � � �
SNODU GOOSE � i I � � � FOR M9R£" 1NFORMA lON �� i 1 � � �\ \` �� ���
CANAL 1 � � � � , �� - 1TYPJCAU -� - ee�cu-�l`-.� _ _ �� _`_ _ � - � � � 1l1� � _ -- isFo
`� � 1 MAINTA/N" J- I IOOK-SIL-T F Q{�' � ��� B R I C K
; �� � _ .�ON7RAG,JOR7Q7NSTALLANDMA/NTA/N WALL
1 oocK ' _= 7aQb/T/ONAL J-NOOKS AS NEEDED _
J , V — (rvr�ca�)
;- -L- STA 14+73
END REMOVAL OF
�� EXISTING BULKHE.aD (4B'RTI
���r� '�¢ PCACE 26 LF PROPOSED BULKNEAD
PROP LINE IS
C/L OF BIILKHEAD
O
RICHARD G. CARROLL
OB 16T9 PG 465
PB 3 PG 99
20 10 0 20 40
�
SUSANNA E. NORRIS
DB 1482 PG 4�2
PB 3 PG 99
LEGEND fAPPUES TO ALL SHEE7'S!
OlSTURBED AREA _
CONSTRUCTION UM/T C F
TEMPORARY SlLT FENCE °�-
J-NOOK S1LT FENCE
SILT FENCE OUTLET
WA7TLE
CONSTRUCTION SCHEDULE
CONSTRUCTION SPECIFICATIONS
l. Obtaln plan approval and other appllcable permlts Including
grading perm)ts for borrow slte. Refer fo Sectlon 230 'Borrow
Excwatlon°!n the 20/2 NCDOT Standard Speclflcatlons.
2. Flag ti� work llmlts for protectlon.
3. Hold preconst�uctlon conference atleostone week prlor
to sta�ting constructlon and Invlte NCDENR. NCDENR LOS contoct
number Is (9/91791-4200.
4. P�lor to any lond dlsturbing (lncluding demo!lflon) activltles.lnstall
g�wel and rlp �op basln,temporory dlverslon,fabrJc/block and
grovel drop !nlet protectlon,temporory grwel constructlon
entrance/exlts,check doms,tree protectlon fence,ond sJltfence
as shown on t!� eroslon conlro/p/ans.
S.In accordance wlth tl� eros/on controlplans and trafflc control
plans: Insto!! inlet profectlon and e�oslon control meosures. Afte�
Inlet protection ond eros/on confro! measu�es are ln place,grade
roodwoy,lnsiollsform drain system.Untilboxes are bulltona yard
lnlet devices lnstolled,lnstoll and malntoln stoim Cra1n under
constiuction at end of �ay or onset of raln. Ploce outlet protectfon
as shown on plans. Ploce additionol c/�ck dams ond stablllzed
dltches os 1ndlcated. Modlfy sllt fence placement around plpe Inlets
ond outlets as necessary,ploce silt fence a�ound top of
proposed heodwolls.
6. Complete final grading for roods and stablllze wlth g�wel.
7. Finlsh drainage Inlets,ploce cu�b and gufter and pavement,
and bu!ld shoulders.
8. Flnlsh grading of s/opes, topsoll crltical areos and permanently
vegetote, seed and mulch.
9. A/I graded areas w111 be seeded,fertillzed ond mulci�d
according to NCDOT speclflcatlons to mointaln a vlgorous,dense.
vegetative cove� wlthln 2/colendar doys or soone� of completlon
of any phase of grading.lf work on tl� proJect ceases for more
thon t!� oforemenllone� lengfh of flme,all dlsturbed o�eos sholl have
femporary vegetative g�ound cover establlshed and eros/on control
devlces maintoined.
I0. Afier seeding is establlshed.the controctor six�ll coll NCDENR
and arrange for a flnal slfe lnspection. Upon approva/,al/
temporory erosion control measures sholl be removed from tl�
proJect.
1/. Al! erosion ond sedlment contro! pracflces wlll be Inspected
weekly and after ralnfoll events. Needed repolrs wlll be made
lmmedlately.
12. All appicoble eroslon ond sedlment control must be molnfoine� untll
a vlgorous stand of permonent ground cover !s estobllshed.
Estlmated t/me before flnol stablllzotlon Is l2 months.
13. Site lncludes approxlmotely 0.2424 acre of permanent vegetatlon arf
14. After site !s stablllzed.gravel and rlp rop basln.tempo�ory
dlverslon,constructlon staging ond materlol oieo stxkpile areas,
ond allother e�oslon control devlces sfbllbe removed.restored os
exlsting,and permanently vegetated os descrl6ed !n t!� malntenance
and vegetotive plan.
MAINTENANCE
Follow ti� construcllon sequence througlbut proJect development.
Wl�n clbnges In construcllon acflvlfles are needed,amend the
sequence scl�dule ln odvance to mointaln monagement control.
Notlflcatlon of Land Resources Sedlment and Eroslon Control
Se/f-Inspectlon Program:
The Sedlmentatlon Polluflon Conf�o! Act was omended In 2006
to requJre that persons responslb/e for /ond-disturbing activltles
inspect o proJect ofter eoch phase of the proJectto make
sure ti�tfhe approved eroslon and sedimentotlon controlplan is
being followed. Rules deta111ng tl� documentatlon of these
lnspections took effect October I.20I0. Ti� self-lnspection
program is separate from the weekly self-monitoring program of
tl� NPDES Stormwafer Permlt for Construction Activltles. Ti�
focus of tl� self-inspectlon reportis 1he Insta!lotlon and
malntenonce of eroslon and sedlmentatlon control measures
according to tl� opproved plan. The Inspectlons must be
conducted ofter each phase of the proJect,ond contlnue unt!!
pe�monent ground cwer Is estob/Isl�d !n occordance wlth NCGS
II3A-54J and 15A NCAC 48.013/. The Self -Inspection Report
form is wollable os on Excel spreodsheet from
http://www.dlr.enrstate.nc.us/poqes/sedlmetnolton�ew.html. !f you
have questlons or cannot access the form, please contact NCDENR
Dlvlslon of Lan� Resouroes of (919J 79I-4200.
MAINTENANCE PLAN
l. Tl� Contractor slnll cl�ck all eroslon ond sedlment
control proctices for stoblliiy and operation follaving every
runoff producing ralnfallbutln no case less tiwn once every
week. My needed repairs wlll be made lmmedlately by ti�
Contractor to malntaln all practices as deslgned. Also per
Natlonol Pollutont Dlscharge EIlminatlon System INPDESI
general stormwater perm/t,a rain gouge must be Installed
on site. Tl� roin gauge must be kept onsite and inspectlons
by the cont�acto� must 6e ma0e and logged ofter every half
Inch of ralnfoll and once a week.
2. The Contractor sholllnspectthe curtaln,flotation,and ballost
of tl� floating turbldlfy cuitaln to ensure t!� work orea Is
securely partltloned from the streom flow. T!� Contractor sholl
remove accumulated sedlmentand AebrJs.
3. The Contractor slx7// remove sedlment from behlnd silt
fence wl�n !t becomes 05 feet deep at tl�
fence. Sllt fence w1ll be repaired os necessary
to molnto/n a barrler.
4. Tf� Contracfor shall inspeci Ilning and motting for dJslocofion
or foJlure every 7 calendar aays and within 24-ipurs ofter
eoch storm thot produces %2-lnch or more of ro1n. Tl�
Contracto� shollconductregulo� inspections untllgrasses are
firmly establlsi�d.
5.T1� Contractor sho!lfertllize,reseed as necessory,and
mulch alI seeded areas according to speclflcatlons !n 1/�
vegetative plan to malntaln a vlgorous.dense vegetative
cove�.
6. T!� Contractor shollprovlde ground cover on exposed s/opes
o� other areas witl�in 21 calendar days of completlon of ony
phase of grading.Permonentground cover !s to be provlded for
al! dlsturbed oreos within 2! colendar days or sooner fo!lowing
completlon of construction or development.
LAND GRADING (6.02)
CONSTRUCTION SPECIFICATIONS
RlP RAP (6.15)
CONSTRUCTION SPECIFICATIONS
Subgrade Preparatlon - P�epare the subgrode for �Ip�ap and f!lter to tl� requlred
Ilnes and grades slbwn on ti� plans. Compoct arry flll requlred ln ti� subgrade
to o denslfy opprox/matlng tiat of t!� surrounding und/sturbed mater/o/ or overfl/I
depressJons wllh r1prop. Remove brush,trees,stumps and otl�r ob /ecflonal
moterlal. Cut the subgrade sufflciently deep tlwt the flnlshed grade of tl� rlprap
w!1/ be ot the elevotlon of ti� su��ounding oreo. Cix�nnels slauld be excovoted
sufflclently to ollow placement of the rlprop in a monner such tin�t the finisl�d
inslde dlmenslons ond grade of fhe rlprap meetdeslgn speclflcotlons.
Sand and gravel fllter b/ankef - Place fhe f1/ter blonket lmmedlotely after ti� ground
foundaflon Is prepored. For grwel.spread fllfe� sfone !n a unlform layer fo fhe
I�ers�with minlmo1%mlxinge thon one /aye� of fllter moteriolls used,spreod tl�
Synti�tic fllfer fobrlc - Place ii� cloth fllter dlrectly on tl� p�epared foundoilon.
Overlap t!� edqes by otleosfl2 lnches,and space onciro� pins every 3 ft olong
the overlap. 8ury the upstreom end of t!� cloth a minlmum of l2 Inches below
ground ond where necessory.bury the lower end of the cloth or ove�lop wlth tl�
next sectlon as �equlred. Take care notto domage tl� cloth wi�n placing rlprap.
If damage occurs remove ti� riprap ond repaJr the sheet by adding onotl�r layer
of fllter materlal wlth a minimum overlop of l2 lncl�s around the domaged area.
lf extenslve domage is suspected.�emove and replace the entl�e sheet.
Where large stones a�e used or mochine placementls dlfflcult,a 4-lnch layer of
flne g�avel or sond moy be needea to protect tl� fllter clofh.
Stone Placement - Placement of riprap should follow lmmedJately after plocement
of the fllter. Place rlprop so lhat If forms o dense,wel!-g�aded moss of stone wlth
a minimum of volds. The deslred dlsbribullon of sfones thioughout the mass may
be obtolned by se/ective Iooding at the quorry and control/ed dumping during
flnalp/acement. Ploce rlprop to Ifs fullth/ckness In one operatlon. Do not p/ace
riprap by dumping through chutes or otl�r methods tlbtcause segregotlon of
stone s/zes. Toke care notto dislodge the underlying bose or fllter wben placing
the stones.
Ti� finlshed slope should be free of pockets of smoll slone or clusters of lorge
stones. Nond plocln� may be necessary to achieve ti� proper dlstribution of
sione slzes to produce o relatively smooth,unlform surface. The finlsl�d graae
of the riprop slpuld b/end with t!� surrounding area. No overfallor prot�uslon of
rlprap shoul� be apparent.
MAINTENANCE
Inspect c/bnnels ot regu/ar Intervols as well os offer ma lor rolns, and moke repolrs
promptly. Glve specla! oltentlon fo the outlet ond Inlet sectlons and other polnts
wl�re concentroted flow enters. Co�efully check stablllly at rood cross/ngs and
look for lndlcotions of pIping,scour lbles,or bonk fa!lures. Make repaIrs
Immedlately. Molntain olI vegefatlon ad Jacent to t/� chonnel in a hea/fh�,
vigo�ous condltion to protectthe a�ea from e�oslon and scour during out-of-bonk
flow. Control of weed and b�ush growth may be needed in some locatlons.
l. Construct and malntoln olI eroslon an0 sedimentotlon control proctices and
measures in accordance wlth the approved sedimentatlon controlplan ond
constructlon scf�dule.
2. Remove good topsollfrom areas to be groded and fJlled,and preserve
It for use In flnlshing the grading of all c�ltica! oreas.
3. Scarlfy areas to be topsolled to a minlmum depth of 2 incl�s before
plocing topsoll.
4. Clear and grub areas 10 be f!lled to remove t�ees,vegetotlon.roots,or
othe� obJectlonable materlal that would offect the planned stabfllry of the f1!l.
5. Ensure that f11! materlal Is free of b�ush, rubbish, rocks, logs, stumps,
bu!/ding debrls,ond other maferials inappropria/e for construct/ng sfab/e fi//s.
6. Ploce all fillln layers notto exceed 9 Inci�s 9n thlckness,ond compact
ti� layers as required to reduce eroslon,slippoge.se#lement,o� otl�r
relaied problems.
7. Do notlncorporofe frozen malerJolo� soft or high/y compresslble
mate�lals lnfo fll! slopes.
8. Do nof place flll on o frozen foundotion.due to possible subsidence and
sIIPPa9e•
9. Keep diverslons ond otl�r woter corn�eyance measures free of sediment
during olI phoses of development.
l0. Hondle seeps or sprl�s encounfered during cons7�uction In accordance
wlth opproved methods.
ll. Permanently stablllze all graded oreas Immedlately ofter flnol grading ls
completed on eoch areo In the groding plan. Apply temporary stablllzatlon
measures on a!lgraded areos wi�n work !s to be lnlerrupted or deloyed for
l5 working days or longer.
l2. Slpw topso!! stockpi/es, borrow areas, and spoll areos on the plons, ond
moke sure they are odequotely protected from eroslon.lnclude flnal
stabillzatlon of these areos ln ths plan.
MAINTENANCE
Perlodlco/Iy check a!/graded oreas and the supporting eroslon ond
sedimentatlon controlpractices.especlally after heavy �alnfolls. Promptly
remove allsediment from dlve�sion an0 other water-disposolpractices.lf
waslbuts o� breaks occur,repalr them lmmedlote/y. Prompt
moinfenonce of small eroded oreas before tl�y become s1gnlflcant gullles
!s an essenilalport of an effective e�oslon ond sedJmentation cont�olplan.
VEGETATIVE PLAN (6.l1)
SEEDING SCHEDULE
Shoulders,Slde Dlfches.5lopes (3:I)
Date Type Planting Rate
Aug.lS-Nov.! Tall Fescue 250 Ibs./acre
Nov.l-Ma�.l TallFescue 25016s./acre
& Abruzzl Rye 25 Ibs./acre
Mar.l-Apr.lS Toll Fescue 250 Ibs✓ocre
Ap�.l5-Jun.l5 Nulled Common Bermudagross l2 Ibs✓acre
Jun.l5-Aug.15 ToilFescue 601bs✓acre
� & B�owntop MIllet =_= 35 /bs✓ac�e
or Sorglwm-Sudon Hybrids =_= 30 /bs✓acre
. . S/ooes (3:l to 2:I)
f�ar.l-Jun.! 6erlcea Lespedezo fscarlfledJ 50 /bs./acre
ond
lMor.l-Apr.l51 Add Tall Fescue 60 lbs./acre
(Mor.!-Jun.301 or Add Weeping Lovegrass 5!bs✓acre
tMa�.l-Jun.301 or Add Nulled Common Bermueagross 8 Ibs✓ocre
Jun.l-Sep.l Tall Fescue =_= 60 Ibs./acre
& Browntop MIllet =_� 35 /bs✓acre
o� Sorgiwm-Sudan Hybrlds =_= 30 /bs✓ocre
6ep.l-Mar.! 6erlcea Lespedeza
(unhulled-unscarified) 70 /bs✓acre
& TaII Fescue 50 lbs./acre
lNov.l-Mor.lJ Add Abruzzl Rye 25 /bs✓acre
Consult Conservation Englneer or So// Conservotlon Servlce
for addltlonallnformation concerning otl�� o/ternatives for
vegetotion of denuded areas. The above vegetotlon rates ore
tlx�se which do wel! under local condltlons: other seeding rate
combinatlons a�e posslb/e.
���Temporary.- Reseed according to optimum season for
deslred pe�manent vegetotion. Do not allow temporary cover to
g�av over l2 incl�s Jn height before mowing.otherwlse,fescue
may be slx�ded out.
SEEDING SPECIFICATIONS
/) After rough grading Is completed,till soll !n areas to be
seeded and plonted to a depth of slx Inches.
2) App/y agrlcultural llme,fertlllzer,and superplbsphaie to
disturbed areas to be vegetated.
90 lbs.11meslone/1000 sq.ff.l2 tons/acrel
35 /bs.l0-l0-10 fertlllzer/1000 sq.ft.!1500 Ibs/ocrel
40 Ibs.50% superplpsphate/1000 sq.ft.f1750 /bs/acreJ
3) Dlsk nutrlents lnto soTl to a depth of slx lnches unlil
surfoce !s uniform and f�ee of lorge dJrt clods.
4J 6eeding permonentgrass.
3.0 /bs. KY-3/ toll fescue/l000 sq. ft. (130 Ibs✓acre) During
February 15 through May l5 or Augustl5 through
November l5.
-OR-
3.0 /bs.KY-31fa1lfescue ond 2.0 lbs.annuolryegrass/1000
sq. ft. during November 15 through February /5.
51 Mulch seeded area with smallqraln straw at90 Ibs/l000
sq.ft.l2 tons/acre). Spread unlfo�mly. Approxlmately/Z
of ground surface sibuld be vlsible io ovold blocking
sunllghf to seedlings. On areos wl�e�e the g�ound
surface equols or exceeds a 3:lslope,ond in t!� lrn�erts
of all drainage swales,tack mulch wlth aspholt emulsion
at a rate of 450 gallons emulsJon per acre of straw.
6) Mulch a�ound shubbery ond trees with pine straw to depth
of 3 Inci�s.
7J Temporory cover
l.0 /bs.6rown fop mlllel/I000 sq. fi. Moy fhrough August 25.
-OR-
1.0 /bs. annuol ryegrass//000 sq. ft. August 25 through Aprll.
�
I
j
�
n
�
0
0
0
�
,ri,
�
IXCELSIOH
WATTLE DETAIL
9LOPE
�
ISOh1ETRIC VIEW
�oT�:
USE tlINIYUY 72 IN. DIAtlETEH FXCEL810q 'MTTLE.
USE 2 FT. MWOEN 6TN1�5 MITH A 2 IN. 9Y 2 IN, tNMiIlW_
CH059 6ECTION.
ONLY INBiALL WATTLE(9� TO A HEIpHt IN DITCH 60 FLOW PlILL IAT
W/3N MWNO MTTLE IWU BWIIN OITqI BlAPE9 INO A9 OIIIECfm.
OF PAVEYENT IN9TALL A YINIYUY OF 2 UPBLOPE BT�KEB Alal 4 W�9NBLOPE
gTql(ES pT AN ANOLE TO WF116E WATfLE TO BOTTOY OF OI1G.
PROVIDE 6iAPLE6 WUE Oi 0.125 IN. DIAYETEII 6TEEL WIPE
FOPYm INTO A U eNAPE N0T LEBB TIWI 12° IN LENOTH.
INYMLL BTMLE9 IPPflOXIWTELY EYEIiV 1 LINEM F00T ON
BOTH 81OE3 OF Y/ATTLE ANO AT EAtl1 ENO TO BECUHE IT TO lNE SOIL.
. IN3TFlL WTTINO IN PCCUPMNCE WIiH 8E4TION 1611 OF TNE
BTAtl�SRO SVECIFIGTZRIB.
p'(yp)(,� 2' UPSLOPE
BTA1� 7ANHAL GFOUNO
��..; �
MATTIN� �2' DOWNSLOPE
STAKE
CROSS SECTION
VEE DITCH
2 IN. 2' UPSLOPE FLOIY �
STAKE NATUNAI. GPOUND
T.
WTTIH� ' �2' OOWNSLOPE
CHOSS SECTION srn�
TRAPEZOIDAL DITCH
��'w` $) .�\�.:':'�ii:
,. .. .. _ _'_
�
TOP VIEW
TOPSOILING 16.04)
CONSTRUCTION SPECIFICATIONS
MATERIALS '
Determine wi�ther the quallfy ond quantlly of avolloble topso!l Justlfles selective Temporary seedJng - Protecttopsollstockplles by tempororlly seedlng as soon
ix�ndling. Quolify topsoil has the following choracterlstics: as posslble, no more than 30 working days or !20 calendor days ofter the
formatlon of tl� sfockplle.
Te�ure - loam, sandy loam, and sllf loam are best; sandy clay loom, silly clay
loam, clay loam, and loamy sond are folr. Do not use heavy clay ond orgonlc Permonent vegetatlon -!f stockplles w111 not be used wlthln l2 monlhs ti�y
so!!s such as peot or muck os topsoil. must be stoblllzed wlth pe�manent vegetotion to control eroslon and weed
growth:
Orgonic motter content -(someflmes referred to as "humlc motter"! slpuld be
greoter tiwn l5% by weigM. SITE PREPARATION
Acld1� - pH sfbuld be greater than 3.6 before Ilming.and llming !s requlred if
it Is less thon 6.0.
Soluble salts - should be less than 500 ppm.
Sodlum - sodlum odsorption rotlo slauld be less thon l2.
Tl� depth of materlol meeting the obove quollflcotJons slbuld be ot least 2 Incl�s.
Sollfactors such as rock fragments.slope.depth to water table.ond laye�
thlckness affect t!� ease of excwatlon ond spreading of topsoll.
Gene�ally ,the upper part of the soil.which Is rlchest In organlc mo#er,Is most
deslrable; howeve�,materlal excwated from deeper layers moy be wo��h storing
!f lt meets the otl�r crlferia llsted above.
Orgonlc soils such os mucks and peats do not make gaod topsoll. Tl�,ry can be
ldentlfied by thelr extremely IIgM welght wl�n dry.
STRIPPING
butddePPdln9•lescd �nd1�g Son tl�islte.Oter !ne depthhof sP�lpnp9 gP� ts�� � mon.
soll cores ai severol locotlons wlthln each area to be str!pped Topsoll depth
generolly varles along a grodlent from h/lltop to toe of the s%ope. Put sediment
boslns.dlverslons,and otl�r conirols lnto place before strlpping.
STOCKPIUNG
Selecf stockpTle locotlon to woid slopes and notu�a! dralnogeways,avolding
trafflc roufes. On large sltes,respreading !s easler ond more economlcol wi�n
1opsoll Is stockpl/ed In smol! piles /ocated near areos where they w1/I be used.
Al/ stockplle areos used shall be stabillzed wlth sl/t fence ond seeded.
Sedlment barrlers - Use sedlment fences or oti�r ba�rlers where necessary to
refaln sediment.
Before sp�ea0ing topsoil,estobllsh eroslon ond sedlmentation controlpractices
suchasdlversions.berms,dlkes,waterwoys,and sedlmentbaslns.
Groding - Molntoin grades on the areas to be topsoiled occording to t1�
opproved plon and do not olter tl�m by adaing topsoil.
Uming of subsoll - Whe�e fhe pH of t!� exlsting subsoll !s 6.0 or /ess, o� the
sollls compo sed of heavy clays,lncorporate ogricultu�alllmestone In omounts
recommended by solltests or speclfled for the seeding ml�ure to 6e used.
lncoiporote llme to o depth of at leost 2 lncl�s by disking.
Roughening - lmmedlotely prlor to spreading the topsoll.loosen tl� suborade
by dlsklng or scarlfying to o depth of at/east 4 Inches.to ensure bonding of
fl� topsoll and subsoll. lf no amendments hove been incorpoiated.loosen
ti� sollto a depth of otleasf 6 incl�s before spreoding fopsoll.
SPREADING TOPSOIL
Do not spread topsoil while It Is frozen or muddy or when subgrade Is
wet or frozen. Correct ary Irreguloritles !n tl� surface that result from
topsol!!ng or otl�r operations io preventihe formatlon of dep�esslons or
wafer pockets.
Compact ti� topsoll enough to ensure good contoct wlth the underlyIng so1l.
but woid excessive compactlon,as !tlncreases runoff and Inhiblts seed
germinarion. Llght packing with a roller Js recommended where
h/gh-malntenonce turf !s to be estobllsi�d.
On slopes and areas that w11/ not be mowed,tl� surface moy be left rough
after spreodi� topsoll. A dlsk may be used to promofe bonding atthe Interface
beiween fopsoll and subsoll.
After topsoll appllcatlon.follow p�ocedure for seedbed preparatlon.toking care
to ovold excesslve mlxing of topsoil lnto the subsoil.
MIN.lO GA
LINE WIRES
in n r uariuuu
SIDE VIEW
qp NOTES
WFRNING 5/GNS TO BE AfADE OF DURABLE,WEATHERPROOF MATERIAL
� LET!'ERS TO BE 3'N/GH MINIMUM,CLEARLY LE6IBLE AND SPACED AS DETA/LED.
SIGNS SHALL BE PLPGED AT 5d MAXIMUM IA?EAVALS.
4 PLACE A SIGN AT EACN ENO OF LINEPR TREE PROTECTION AND 50'ON CENrER THEREAFTER.
FOR TREE PROTECTlON AREAS LE55 THAN 200'IN PERIMETER,PROVIDE NO LE55 THAN ONE
3' TREE PROTECTION AREA S/GN PER PROTfCTION AREA
4 18. AT7ACH S/GNS SECURELY TO FENCE P0575 AND FABR/C.
MAIMA/N TREE PROTECT/ON FENCE THRWGNO!? OURATION OF PROJECT.
,7• DO NOT ENTER A00/iIONAL SIGNS MAY HE REO(IIRED BY TOWN OF WAKE FOREST OR NCDENR.
BASEO ON ACTUPL fIELO COND?IONS.
4 S/GN5 SHALL BE INCIDEN!'AL TO THE FENCE.
WARNING SIGN DETAIL
TREE PROTECTION DETAIL
m'
�
O
N
�
MINIMUM 10
LINE WIRES
STEEL FENCE POST
WIRE FENCE�
HARDWARE CLOTH-
FILTER OF 1 INCH DIAMETER
# 57 WASHED STONE�
8'-0" MAXIMUM
VARIABLE AS DIRECTED BY THE ENGINEER
FRONT VIEW
STEEL POST
WOVEN WIRE FABRIC
SILT FENCE FABRIC
o �
� � FILL SLOPE
M N � _ sf,�:
`6" MINIMUM COVER
OVER SKIRT *
0
� ANCHOR SKIRT AS
`V DIRECTED BY ENGINEER *
SIDE VIEW
STANDARD TEMPORARY SILT FENCE
FILTER OF 1 INCH DIAMETER
# 57 WASHED STONE o�
° � � ° °°po d�°e
NOTE: a° o � � �o
SILT FENCE FABRIC TO OVERLAP ° o�
HARDWARE CLOTH BY 12 INCHES � °� oo°n°9:
� � ' • � 4: jY^'� I
.t:�:':i]:1:5:1 i � ��•'� I ' �
n.=.�i.=.u.=.i�=n=n=u=.i�=ii-i � =11-. .
-11�.11:11."�.II."II ; . �=
�
NOTE:
USE SILT FENCE OUTLETS ONLY WHEN
DRAINAGE AREA DOES NOT EXCEED t/4
ACRE AND THERE IS A LOW AREA. USE
AS A REPAIR OF SILT FENCE FAILURES.
Kimley>>> Horn
P.O.BOX 33068
RALEIGH, N.C.27636�068
PE NO.
SILT FENCE J-HOOK PLACEMENT
12�,� GAUGE ��.� ��
iIATE WIRES J-NpOK / y��F,� J-HQpK / ���
f f h
f � ��
I40-80'SPACING I
r� (AS NEEDEDJ `
* FOR REPAIR OF SILT FENCE FAILURES
USE REINFORCED SILT FENCE OUTLET DETAIL
NOTE:
USE SILT FENCE ONLY WHEN DRAINAGE AREA
DOES NOT EXCEED i/4 ACRE AND NEVER IN
AREAS OF CONCENTRATED FLOW.
�i�i rClVl.t tHtlKll.
ON WIRE FENCE
ON WIRE FENCE
PLAN VIEW
� STEEL FENCE POST SET �
f �,,..,�„� �,. ., ���r ..,.., �1
STEEL FENCE POST
CONSTRUCTION SPECIFICATIONS
MATERIAL$
l. Use o syMA^tic filter fobrlc or o pervlws sAed ot� ypraq/ene,�rylon,Fntyesier,
o� pdyetfylene yam.wNch !s cerflfled dv l!e manufaclure� a supplle� os conforMng
lo tha reqW�emenis sfuvn 7n lle fable below.
Synf/nJ1c fllter fab�lc shw10 aMoln ul�rwlNd �ay InNbitors and stabfllzers fo provlde a
Mnlmum of 6 morAhs of erpec7ed usable conslrudlon Ilfe at a lem�rofwe roiqe af 0
to 120 degrees F.
2 Ensure 1/M pasts fo� sedlmenf fences ore l33 Ib/IJnear fI sfcel wlth a minimum
leig7h of 4 f1.Make sure thof siee/pasJs hwe proJedlons lo facilffate fosVen/ng 1/e fobrlc.
3. For rel�arcemeni of stoiMarA strenglh flller (obrfc,use wl�e fexe wltA o mfMrtwm
14 gouge oM o moxlmum mesh spacing af 6 1�Aes.
CONSTRUCTION
l. Cwislrucf tle sedlmeN borrler of stonda�d sfrerglh or ex}ra sirenglh synthvtic fNfer fo6rlcs.
2. Ensu�e lA1f 7le lelght of Jhe sedimenf fence does rot exceed 18 lncfgs abae !Ae
ground surface. lHlg/er fences may ImpounG vofumes of wate� sufflcfeN Jo couse fallure
of de sfrucfu�eJ.
_ . _..__. ..___......- -- _,
FRONT VIEW AND SILT FENCE FABRIC 6 INCHES INTO
THE TRENCH
STANDARD SILT FENCE OUTLET
3. Cans}ruct tAe fllter fabrlc f�om o contlnuous rWl cullo JAs lenpfh af �M 6orrfer
to wold folnts. Wlen /oinfs ore necessary,secure/y foslen 1fs f!I/er c1WA anly at a
suppor7 �.nst wqh ae�lop to !he neM posi.
ie �'�r� r�s��5 �� a� wlre1 stod�r� � I lrch� secu�ey Jo ife upslope
Exlend !le wl�e mesh supporl io M bopom of )ha irench ��or �le wlres.
5. Wfen a wlre mesh sup�r! fe�e !s useO.spoce pasts a moxlmum o� 8 fl apart.
SuppoK pasJs sAould be d�fven secure/y !Mo fM ground 10 a Mnlmum of 1B lxl�s on !he
davrulope slde of tAs lrexh
su�fence S�aae or wlrertle�fllterffa�c diceciry�o �s.require wlre mesh
7. Excovole o irexh a�proxlmaleIv 4 lnclrs wlde oM 8 I�hes deep along !le proposed
llne of pasts aM uqslope from fAe DarAe�.
8. Pdfust s�cing !o place pufs Nlow polnis along 1he fexe Ilne,
9. Backtll! ll� ��ench wfth crompacle0 soll a� grwel placed wer fAe flfler fobrlc.
/0. �Do rroi olFach flBel fabrlc !o exlsting irees.
NETAL STAKE
J-HOOK DETAIL
C0� % UOUS FENCE ��
� `�
��,Fy
` PLACE PoSTS tSTAKESJ
ADJACEMTLY AND BIND AT
CONSlRUL7lON TOP WITH W/RE.
Use sll/ fence J-Nmk plocement os shnvn In p/ons ond as needeG to dlrect �un-off
to s/lt ferre oullets an0 prevent accumu/allon and uMe�MN�q of s1/l fence.
MF/NfENAIlCE
InspeciJ-Haoks olleasioxe a week ond ofter eoch rolnfolL Moke oiry requfred
repol�s lmmedlale/y.
Remwe oll(encing moferials IncluOing J-Hooks and bring ihe o�ea ta qraCe
ond sfaWllze !1 o(!er iM contrldAing d�alnage o�ea has Deen properry siabl/Ized.
IL Fasfen sup�r/ wl�e ferKe fo upslope s/de o7' pufs, axlending 6/ncles In�o !fB trench.
12 A+lach cwdinuous /englh of fabrfc to upslope s/de of fence posls.Avofld Jolnls,
s�rey p��sna� ae 1 p ot�� ��IMs are xce.ssory.fosten fobAc
13. AIlach wa�Mrg slgn (see Tree Prolecllon Detal!) fo fence wfnre fe�e !s loca�ed
odJacen}to and In buffer a�eos.Warnfrq sfgn 1s lnclden}o/10 slllferxe.
MAINTENANCE
Mak�o� i�u/�ed r�Ir�lm da�fefs al leasf once a week oM afler each raln(oll.
S a�ce �1 pr�p�ry. Repfo� ��lop�ry � days�(•da.rompose a 6�ome fimSf�tiva.
Remove sedfinent Oepos/fs as necessory fa prwlde adequafe stwage volume for fle nexf
raM ond fo �educe pressure on !fe fence. Take cora !o woiA unde�MNng the fenca
du�ing deaiaN.
Renave alf (exing ma�erlals aM unsfoble sedlment depqslfs ond Drl fhe area to grode
oM stob/Uze it after iM conid6u71�q drolrage areo hos been� pro/��� stabUfzeA.
PROJECT REFERENCE NO. SHEEf NO.
8-5417 EC-5
WW SHEEf NO.
ROADWAY DESIGN
ENGINEER
\\\J�uuubq��
:°�D�QEFSSIO;y'•��'q''-,
' !¢ SEAL ': _
= ` 029876 � =
''%y j,y�J NE��F,`�'``,
'�,, H . :
�"��f W���S�„`"
VARIOUS LINING CONSTRUCTION SPECIFICATIONS
/n chonrrels, rol/ out strlps of netti� porallel to ti�
dl�ection of flow and a✓er fhe protecilve mulch.
CONSTRUCT/ON SPECIFICATIONS
SYNTNETIC ROVING
Use Norfh Amerlcan Green PS 300 permanent eroslon contro/ mariing
or equivolent pro0uct opprwed 6y englneer.
Synti�tic rwing Is wound Into a cyllndrlcol pockage so thol lt can be
conilnuous/y wltMrawn from the center using o compressed o!r eJecfor.
Rrning expor�s lnfo o mat or glass flbers as I! contacts tl� soll surface.
lt ls often used wer a straw mulch buF must sti!! be tacked with osphalf.
Spread roving unlformly over the area ot a role of 0.25 to 0.35
16/sq yd. AncMr wlth aspholf lmmediaJely after oppllcatlon,at o
rafe of 450 gollons per ocre. -
As o channe!llning,anG ototl�r slfes of concentrated flow,lhe rwing
mat must 6e furfher anclpred to prevent underminl�. /t may be secured
wlth stokes placed al lntervols no greoter fhan /0 ft olong tl�
drolnageway.and randomly throughout Its wldth.but not more tlbn
10 ff opart. As on optlon to stoking, tl� rovlrn� con be burled to a
depth of 5 lxles at fl� u�iade end and at Intervols of 50 f! alo�
fl� length of fhe chan�l.
NETS AND MATS
Neis olone generolly prwlde lltlle molsture conservatfon beneflls and
on/y llmlted eroslon profectlon. Tl�refore,ll�y ore usual/y used !n
conJuxtlon wlth an orgonlc mulch such os st�aw.
Except wl�n wood flber slu�ry !s used, netting s/bu/d o/ways be
lnslal/ed ove� the mulch WooO flber moy be sprayed on fop of on
Insialled nef.
Mals,ixluding'exce/slor'(wood flberlblankets,are consldered
proiective mulchVs ond may be used olone,on e�odJble soils,ond
du�ing all times of tl� yeor. Place tle matfing !n flrm contoct with
�he solland staple secure/y.
�����������
• i i iZ!��i�
♦�♦ � �
I � __ � ��
•♦
��
� - .�� �
INSTALLATlON Of NETTING AND MATTING
Producfs deslgneC to confrol e�aslon slbuld be InstolleC In accorCance
wlrh monufoctu�er's lnslrucflons. My maf or 6lonket-rype p�oducf used
as a protective mulch shou/d provlde cover of ot /east 30% of fhe
surface wl�re !t ls opplled. lnstallatJon !s 1llusiraled belovr.
1. App/y !lme,fertllJzer ond seed befoie lay/ng tl� nef or ma�. If
open-weove netling is used,llme moy be Incorpoiated before lnsial/Ing
fhe net ond ferli!lzer o� seed sprayed on ofierword.
2. SfaA loying tlx� net from tl� top of ilu ctbnnel or slope and unroll lt
Qown the g�ade. Allaw netling fo lay loasely on tl� soll but withoul
wrink/es-Do noi sfrefch.
3. To secure fhe net, bury fl� upslope end !n a slof or french no less
tfnn 6 lnches deep,co✓er w!!h so!l,and tomp fl�m/y. Sfople the net
every 12 lnd�s across fhe fop end and every 3 ff a�ound t1e edges
and boftom. Wl�re 2 sfrips of net are laJd slde by slde,the odJacent
edges sMulO be overlopped 3 lncf�s ond stapled together. Eoch
strip of �fling sAwld also be stapled davn ihe center,every 3 f1.
Do not stretch f1� nef when opp/ying stoples.
4. To Joln ivro sfrlps, cut o f�ench Io anch�r ihe end of t1e nevr net.
0✓erlop tl� end of tle prevlous rolll8 Inches,as slpwn below,and
slaple every l2 Incies Just below th2 onchor slo1.
MA/NTENAlJCE
lnspect all mulches perlodlcolly, and after raJnstorms fo cf�ck for r!l!
erosion,dlslocallon,or fallure.Wl�re eraslon !s obvserved,app/y
addlflonalmulch.lf wosMiAoccurs.repalr the slope grode,reseed,
ond relnsto!l mulchConilnue Inspectlons unlll vegetatlon !s flrmly
esiobllshed.
�,
j
�
n
�
�
0
0
0
�
�
Y
FLOATING TURBIDITY CURTAIN
USE TH1S DEVICE FOR CONSTRUCTION OF THE PROPOSED
BULKNEADS WITHIN THE EXISTING WATERWAY.
MATERIAL AND INSTALLATION REFERENCES:
NCDOT — °BMP'S FOR CONSTRUCTION AND
MAINTENANCE ACTNITIES°
(AUGUST 2003.PAGES 74 AND 75l
SECTION 5.25 TURBIDlTY CURTAIN°
�Mtp://www.ncdot.org/doh/ope�otlons/BMP�nonual/
download/BMP�fanual.pdfl
5.2 — Flow Diversion
5.2.5 Turbidity Curtain
Purpose Used as insiream ero�on control flltration deviceto isolate Uie
sVeambank work from the normal flow of the stream. This device
is normally used in open waters fw containment in work zones.
May also be used across channelswith very low flow for shwt-
term work when anchored properly.
Cond"Rions Where
Practice Applies
Conditions Where
Practice Does Not
APP�Y
Construction
✓ When paforming work on a stream bank in a small localized
area.
✓ 4Vhen the repair or construction activities will not require an
extended period of time to complete.
✓ Across flowing streams. Turbidity curtains are not de�gned
as prefabricated dams.
The curtain should be made of a tighlly woven nylon, plastic or
other non-deteriorating material. The material shall meet the
following specifications:
NorthCerolinaDepartmentofTranspatatlon BMPsforConstructlonendMain[enanceAc[ivitles �
Augus[ 2003 Pege 74
Maintenance
Typical Problems
5.2 - Flow Diveision
Pro e Value
Grab tensile strength 'md-370 Ibs. (1.65 Kn) *cd-2501bs. (1.11 Kn)
Mullen burst strength 480 psi (3307 kpa)
Trapezoid tear strength 'md-100 Ibs. (0.45 Kn) `cd-60 Ibs. (0.27 Kn)
Apparent opening size 70 us standard sieve (0210 mm)
Percent open area 4% permittivity 0.28 seo-1
'md — machine direction
*cd —cross machine direction
• Aflotation material with over291bs1ft. (43 kg/m) buoyancy
shall support the curtain material. A 5/16 inch (7.8 mm)
galvanized chain shall act as ballast for the floating curtain.
Dual 5l16 inch (7.8 mm) galvanized wire ropes with a heavy
vinyl coating shall be used as the load lines.
• Inspect the curtain, flotation and ballast to ensure the work
area is securely partitioned from the stream flow.
• Remove accumulated sediment and debris.
• Does not permanently remove sediment.
. Improper anchoring of curtain on channel bottom.
• Tidal flows requiring frequent repositioning
North �Ceroline Depertment of Transportatlm BMPs for Construetlon end Maintenance AcfiNlies
August 2003 Page 75
NCDOT SPECIAL PROVISION —
"FLOATING TURBIOlTY CURTAIN°
lhttp://www.ncdot.org/doh/operatlons/dp_chlef_eng/
roodside/soll_woter/pdf/Flootl�TurbldliyCurtaln.pdfl
�e � .: �n . a �.
Descrlptlon
This work conslsts of furnishing a Float/ng Turb/dlty CurtoJn to deter silt suspension and
movement of sl/t portic/es during cons�ructlon.Tie f/ooting furbldlly curfaln siall be
constructed ot locatlons as dlrected.
Moterlals
The curtofn mote�lal shn// be made of o tightly woven nylon,plostic or otl�r nondeterloroting
moterlal meeting fhe following speclflcatlons:
Properiy Value
G�ob tenslle strength =me-370 Ibs •cd-250 /bs
Mullen burst stength 480 ps1
Trapezold tear strength =md-100 Ibs =cd-60 /bs
Appo�ent opening slze 70 US stondo�d s/eve
Percent open area 4% permittivify 028 sec—1
=md — machine dlrection
•cd — c�oss machlne dlrectlon
ln the event thot more firon one wldth of fob�ic Is requlred, a 6° overlap of fhe maferlol
shallalso be required.
Tl� curtain mate�lol sholl be supported by a flotatlon materlal having ove� 29 Ibs/ft
buoyoncy.The floating curtain shall have a 5/l6" galvanlzed ch�in as ballast and dual
5/16' galvanized wlre ropes wlth o heavy v/rnl cooting as lood /lnes.
Construction Methods
The Cont�actor s/wll mointo/n t/� Flooting Turbldlty Curtoln In o sot/sfoctory condition .
until !ts �emovol Is requesled by the Enginee�.The curtoln slall extend to tl� botlom of
the Jurisdlctlonalresource.Ancho� the curtaln according to manufacturer
recommendotlons.
Meosurement and Payment
Flootfng Turbldlry Curtaln wifl be measured and pald for as the actuol number of squo�e
yords of curtain furnlsl�d os speclfled and occepted.Such prlce ond payment w)lI be fu!l
compensotion for ihe work os descrlbed in lhls s�tlon lncluaing but notlimited to
furnlshing o!lmateriols,tools,equlpment,and a!Ilncldentals necessary to complete tl�
work.
Payment w!l1 be made under:
Pay ltem
Flooting Tu�bldify Curtaln
c
0
ti
�
�
t
�
0
0
0
0
'v
u�
e
�
�
�
'�;
•
t
�
0
N
�
rrwca� secnor+
iEE OR �ND
0222114
cU� 9 pA4 B ,.
�� ��%� Cdlfl�'IE
70 / ! � U18115Nfi9ED / �'3't�"�
� �.-.., � eaan� �
:.e.°:.; ;�:,� '`� `�
_� _'� ^ �:'�y�
_ _ _ - �`f`�c�i
�/ � \� �/.
� I � � I
PLAN - lEE THRUST BLOCKS PLAN - BEND
(gE N07E 1j
��L � OS
VALVE 60% TOP IN UNPAVED
sEcnaa w�n� ,�
COVER 3/4' CHANFQ2
TPICAL ALL AROl1ND
PAYEMENT FlNISHm
gC710N GRAOE
lv
.8'.:::; ,`.::�•;;;; �:'
:: �.: �.. : .
. - m
m . .;.�.::...� '........... 'v
CENTER SECTIOFI 1RACER
IENCTH /S RE00) MARE LOOP
�
MMKQt TME OVQi �
FN71RE PIPELINE �
�
7RACER
X1RE �I
GAlE
VALVE
AIEWANICAL .. TRACQt N1RE
TAPm TO PIPE
JOINT, TP. \� �\�� �N 0 Ff SPAONC
CANCREIE TME BAND
BLOCK VALYE
SUPPOR7 y�� BOX
0264000R
i
12-Y BMS
(SPA(iD AS 910MN) -
rra�cw coxa� niRusr
CCLLAR WN OF (A� INTO
UNqSNRBE.D YA7FItlA1
ALL /JiOUXD
Tf2FNW
PROPOSEO HDPE
et�vanoN
HEAT Fl
JqNT,
• ''d '. . ' • .
n•
.' , .: a
o.
��.. n. .
� V' . � d� . `PROPOSED HDPE
° � • � �• � d a ECCFNTRIC RmUCa2
niausr croww
s� oerN� ozasnea
NOIE: SLOPE iRAN9ilON ASSEA/BLY AND PE WALL ANCHOfi SIZE
PROPOSE➢ PIPINC UPWARD TO CANNECTION P� MANUFACNRE3iS
Ni7H D05TIN0 PIPE TO PREVENT HIFH SPOT.
RECOMNENOA710NS
fiDPE TRANSI'f10N ASSEMBLY
025200�
1HRUST COLLAR
P�E 9g % 6AfS Y BMS A B
8�-78' /5 H` 1'-4' 1'-T
4YR > /e /8 1'-B' 1'-e'
0222119R
�
� friH+ACiFD BAd61LL
�
�
\
g1ECT BAf761LL
YATFldl�l. (NO YA7EAIAL
IARf�Ft 7HU1 2�
CRU91m SfONE - 1/B RPE
0.�. BF10W NPE (1@L 67
Atm UP TO PIPE IODPqNT
iYPE B
�Z�� �2
YJ GA7E VALVE
W/ BUR�D gANCE
ACTUATON, 7YP,
S� A1ID YATFHAL
PFR WAllS �
iNAWi NiRE �
oia
NOIE: NO QICASFIIENT NEp111�D FOR
�ACE (REAIFA ifIAN 1Y
� �/ � ��� ' � ���� '
/\�����\ /\���%�\ \��j� \��\
PROPOSED PIPELINE OVER EXIST PIPE PROPOSED PIPEUNE UNDER EmST PIPE
0222118
N
VALOi BO% AIID
S� AND W7EAIAL YMIQR TME FNME P� SfftEW TPE VALVE 80%
PER PLANS
W 1FE �
�5� PkA PLANS
SIXDQt ifUWi 9ZE AND NAIEPoAL
� WRE AT 7EE 1RA�t WJiE 7APFD 70 PFA RANS TYP.
vwE an� a�¢u�e
/-��� � YIN 10 Ff �ACMG HJ TFE
oa�os -
� -- � — — — a . _�.
YJ GA7E VALYE W/ BUF�D YJ CAIE VAU�E
gRNCE AC1UAlOR
5� PQt PLANS
1. CAIE VALVES SHALL BE RA1ED FIXt 250 P9 RESIl1ENT SEITED
IN ACCORDANCE N7TH AWWA C515.
2 CONTRACTOR SHALL DE7EFtMWE 7HE WLTAGE OF ALL NEARBY
unun uNEs �wu FaLow �u as� aEcuunoris
3 WAIERLINE IN5TALLAiION MUST BE IN ACCORDANCE X11H 1HE
NCDOT POLIdES AND PRO(FDIIRES FOR ACCOAIODATINC U7R171ES ON
HIqiWAY RIGHT OF WAY.
4. ALL BmDINC FOR DIRECT BURY PIPINC SHALL 6E 7YPE B, SEE
. OETAIL 0222102
5. CONiRACTOR SMALL NOIIFY THE FlRE DEPARTMENT AND PUBLIC
U1ILITIES PRIOR TO CLOSING VALVES IXi SHUTiWC OOWN
WA7QiLINES OR H19RAN7S
6. CON7RACTOR SHN.L NOTIFY 7HE ENGINEER IMMEDUTELY SHd1LD
M1Y FlF]D CON�I710N5 BE ENCOUN7FAE0 7HAT VARY FAOM 7HE
INFORNA710N PRONDm IN iHE CONiRACT OOWMEN7S -
7. DENA710N FRqA iHESE PLANS K11HWT PPoOR NR21TfEN CANSQJT
OF 7HE OWNQt OR ENtlNFER YAY BE CAUg FOR THE WORK TO BE
UNACCFPTABLE
& DEfECTOR TME AND N1RE IS REWIRFD FOR ALL BURIED PIPE
e. CONiRACTOR SHALL PROVIDE A MEANS TO KEII' ALL NEW PIPINC
ISOLA7ED FROM ElOSi1NG PIPING UN71L ALL. NEW PIPING HAS BEEM
PPESSURE 7ES7FD, FLll91m, AND ACCEY7ED BY iHE CFPUA FOR
SD2VICE CONiRACTOR SHALL RECONNECT ALL gRVICES �
10. CON7RACTOR SHALL. PLAN AND CON57ftUCT WORK SO AS iq GUSE
MININUM INCONYENIENCE TO THE OWNQi AND PUBLIC. 7ME
WN7RACTOR 51ALL PRONDE 7RAFFlC CONTROL AND EF�CT AND
MAINTAIN AT ALL 71ME5 WPoNG 7HE PROGRE.4 OR TEAIPORARY
SUSPENSION OF NDRK �11TABLE BARRIERS, FFNCES, 9CN5 OR
O1HQi ADEWAIE PROlECTION, INCLUDING FUG MEN AND WATCHA�N
AS NECESSMY TO INSURE TiE SAFETY OF 1HE PUBLIC AS Hfl1 AS
7HOSE EHGAGED IN 1HE CONSIRUCTON N9RK CONSTFtUCTION
SICNAGE 91ALL BE IN ACCOROANCE N77H iHE LAIEST EUI110N OF
'CANS7RUCIION AND MAINIENANCE OPFRA710N5 SUPPLENENT 70 1HE
MANUAL OM UNIFORII 7RAFFlC CONTROL DENCES' BY THE NCAOT.
11. THE CONTRAC70R 91ALL FURNISH AND INSTALL ALI. SHEE7ING
aEauiRm r-ae nie iNsuu.�noN oF 1xe unun �u
DfCAVA710N5 SIALL BE KEPT WI7HIN 7HE OESCNAlEO
RIqiT-OF-WAY ANO/OR EASEMENT HiDhiS. IXCAVATION MITHIN
PAVED MEAS SHALL BE KEPi 70 A NININUY. 7HE MNOMU4 TRENCH
VAO7H5 91ALL BE IN ACCORDANCE N17H 7HE 'THEHCH IXCAVA710N
LINITS' AS PROVIUm IN �ETAIL 0222110R SHEEIINC 91ALL BE
INSTALLm AS REWIRm TO PROlEC7 E)OSfINC U1ILITIES MID
STRUCIURES
12 BURIED 7ElEPHONE AND CAN CA9LE5 (FlBQt OP71CS AND
WNVfN710NAL) ARE KNOWN TO VMY WE TO INSfALLA71�N
'fECHNI�UES. WNiRACTOR 91ALL COORUINA7E WORK N1iH
CONFlJCTINC TELEPHONE AND CAN CABLES AS NECESSMY FOR
INSTALIA710N OF 7HE PROPOSm WATER AND SElV6i. U1ILITY
CWRDINA710N SHALL BE INCLUUm IN THE PROJECT SCHEDUIE AND
IT IS 7HE EXPLIC7T RESPON991LIN � 7HE CONTRACTOR TO
ASSURE 7HAT lHE PROJECT SGimULE INCUJD6 7HE NECESSARY
RELOCATION. lHE CON7RACTIX2 91AIL NOT BE ENTTIED TO
ADOI710NAL COMPENSA710N FOR 7HI5 COOROINAlION.
13. LOCATONS OF DOSTING SHOHN UiILI11E5 ME MPROXIMA7E.
IT IS 7HE RESPON9BILltt OF iHE CON7RACTOP TO OETFRAUNE THE
9ZE, OEP1H, MA7EPoAL, AND LOCA710N �F ALL E)OSIINO
UNDEftGRWND U711JTES PRIOR TO CANSIRUC710N AND TO TAKE
YrtiATEVER S1EPS ME NECESSARY TO PRONDE FOR 7H�H
PROTEC71W1. 7HE ENpNEER HAS AT7EMP7ED TO LOCA7E AND
INOICAiE ALL DaS71NG U7ILITIES ON THE PLANS; HOWEVER, 7HIS
INFOPMAlION IS SHOYM FOR 7HE CON7RACTOR'S CONVENIENCE ONLY.
THE ENtlNEER AND 7HE ONNER ASSUNE NO RESPIXJ981LITY FOR iHE
LOCATIONS OF U7WTIES SHONN OR N0T SHOWN. PRIOR TO
�IGGINC ON OR OFF 517E, 7HE CONTRACfOR SIALL HAVE ALL
U11L111E5 LOCAIED BY 'NC ONE-CALL' 1-BOo-eJ2-4848. 7HE
COM7RACTOR SHALL CONTACT ANY U71Iltt CAMPANY XHOg
U1R1T16 ME N0T LOCA7E0 BY 'NC Ot� CALL' FOR EXACT
LOCAiION OF 7H�R U7W716 PRIOR 7O STAR7ING CONSiRUC710N.
IT 3iALL BE 7HE SOLE RE4+ON99NT' OF 7HE CON'IRACTOR TO
REPAIR AND/OR REPUCE- ANY AND ALL DAl1AGE MAOE 10 UTR17IE5
BY 7HE coNTRACTOR 70 EXI57ING CON�IlI0N5 AT THE
WN7FiACTOR'S EXPENSE
11iRU5f BLOCX
s� orw� oaszioe
SECTION A-A
NOT TO SCALE
um wmmu • ALL JqNTS SHALL BE I�SiRA1NED 1911H NECALUC OR EOUAL RESiRAINT
rwis
tEE �u+n vuve es�r
1510901R3
4'
DARE COUNTY SOUTH DOGWOOD TRAIL BI�IDGE
CROSS SECTION / NDEX
-L- (SOUTH DOGWOOD TRAIL)
-�2- (TALL P/NE LANE)
X-1 THI�U X-6
X-7 THR U X-8
� PROJ. REFERENCE NO. SHEET NO.
��U�uunqi
STATE OF leTORT�I CAR4LINA 8-54�� X-1A ,.���,�.�AROU�..
oEFSs/0'~%.y �
� . �4Q SEAL� �'� =
Pr.iratiF,�ullSize PnniHalfSize ]�IVISION OF HIG�IWAYS = � =
C�� KimleyHom P.o. eax 3�e =� 029876 `;
� and Associates, Inc: r��sh, N.c: ns�os9� `•FyC� NE�Q'�,`�,'
CROSS �ECTION SUMMARY '°" Tyfw ��s �°°�
_ -,,,,,,���,,,,,,
UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED
EMBANKMENT EMBANKMENT EMBANKMEfVT" EIVIBANKMENT
STATION EXCAVATION VOLUMES (CU. STATION EXCAVATION VOLUMES (CU. STATION EXCAVATION VOLUMES (CU. STATION EXCAVATION VOLUMES (CU.
VOLUMES (CU. VOLUMES (CU. VOLUMES (CU. VOLUMES (CU.
YARDS) YARDS) YARDS) YARDS) YARDS) YARDS) YARDS) YARDS)
SECTION I SECTION I
-L- -Y2-
11+15 0.0 0.0 10+37 0.0 0.0
»+25 0.7 0.5 10+50 2.7 0.1
11+50 4.0 2.2 10+60 3.4 0.4
��+75 3.8 4.2 10+70 1.8 72
12+00 2.2 13.3 10+80 0.9 22.8
12+25 1.0 18.0 10+90 0.4 18.9
�2+z9 0.0 1.3 11+03 0.1 3.6
12+g1 0.0 0.0
13+00 0.0 31.5
13+25 0.1 59.7
13+50 0.4 32.2
13+75 1.0 19.1
14+00 1.3 7.9
14+05 0.1 0.3
Approxima4e quantitles only. Uraclassified excavation, borrow -
excavation, shoulderborrowr, fine grading, clearing and grubbing,
breaking of existing pavement and removal of existing pavement
will be paid for at the lump sum price for "Grading".
� X-7