HomeMy WebLinkAbout20170413 Ver 2_Approval Letter_20180416Enviral men 1 u I
Quality
Site
Totals
ROY COOPER
�,.,��r,��n,��
MICHAEL S. REGAN
�rc ��rnn�r
LINDA CULPEPPER
�,���„�„ n„ �, �,,,
April I6, ?018
Durham Counn
D�4'R Pruject No. 30170413 ver. 3
Bridge 30 on SR 1616
I�IP No. B-4943
MODIFICAT'ION of APPROV.4L of a01 WATfR QUALITV CERTIFIG4TION and NEIISE 13UFFF.R
ALiTHORI'LATION, with ADDITIOti.4L CONDITIONS
Mr. Joe� Hupkins. P.E.. Division Engineer
NCDC)i, Division �
2613 Nonh Duke Street
Durham. NC 37704
Dear Mr. Hopkins:
You have our approval, in accordance �vi[h the conditions listed below. ti�r the fiAlowin, Additional impacts for the
purpose of replacin, Bridee ?0 in Durham Count<-:
Additional Ncux Ri arian 13uffer Im acts
Zone I Impact Zone 1 Buffer MitiKn�ion Zone 2 Impact Zone? Buffer Mitigation
(s� (t) Re uireJ (using3:l rAliu) (s ft) Re uircd(using I.5:1 rati�
1221 N/A 693 N/A
* n'a — Total for Site is less than I'3 acre and 1�0 line�r feet of impact, no miti;ation required
Total .4dditional Buffer Impnct for Project: 191J syuare feet.
The project shall be cnnstructed in accordance with your moditicatiun reques� roceived April 13. 2018. Afler
reviewin!, your applica�ion. we have decided tha� these impacts are covercd by General Water Quality Cehification
Numbers 11 ;�1. -1I�30. and d IJ L This certiticaiion corresponds to the Nationwide Permits I.. ?:, and 3; issued by
the Curps of Enginrers. This approral is also valid for Ihe Neuse Riparian [3ufl�er Rules ( 15A NCAC ?B.02++). In
addition. you should aequire any other federal, state or local pernii[s before vou proceed w�ith your pro,ject including
�but not limited ro) Sediment and Frosiun Control. Non-Discharee and Water Supph� V✓atershed regulations. This
approval will e�pire ��idi the accompairyin�� �lOd permii.
This approval is valiJ solel� lor �he purpuse and dcsi_n dcxribed in ��our application (unlzss moditiecl below).
ShoulJ your project change, you must notih� the NCDW R aod submit a new application. If the propem� is sold, die
neN� owner must be eiven a copy ofthis Ceniticatiun and approval letter, and is thereby responsible 1'or complying
with all the conditions. I I'total Hetland lills lix ihis pn�ject Inow or in the fumre) zsceed one acre, or uf tutal
impacts to streams (now or in the future) e��ceed I50 linear feet. n>mpensatory mitigation ma} be required as
described in I�A NCAC 31-I .0506 (h) (6) and (7). Addilional bul�er impacts may require compensatory mitigation
as described in I�A NCAC 2B.033+. For this approval to remain valid, you must adhere to the condilions lisred in
the General Cenitications and anv additional condilions listed b�lo�e.
tiuntuf�urlhC�nJin� Bi�irunmcntalpu;dil�
I o I 7 Mai I Scn icc Ctnter I Rulcieh_ North Cnroiinu '_7fi�)9-I � 1 7
Condition of Certification:
1. All wnditions in the Original Water Qualiry Certification for this project, dated May 4, 2017, still apply.
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative heazings. You must file the petition
with the oftice of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Heazings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of B:OOam and S:OOpm, except
for official s[ate holidays. The original and one (1) copy of the petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the fa�ced transmission.
The mailing address for the Oftice of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919) 431-3000, Facsimile: (919) 431-3100
A copy ofthe petition must also be served on DEQ as follows:
Mr. Sam M.Hayes, General Counsel
Department of Environmental Qualiry
1601 Mail Service Center
This letter completes the review of the Division of Warer Resources under Section 401 of the Clean Water Act. If you
have any questions, please contact Rob Ridings at 919-707-8786.
Sincerely,
/�N�f// ������
Linda Culpepper, Interim Director
Division of Water Resources
Electronic copy only distribution:
James Lastinger, US Army Corps of Engineers, Raleigh Field Office
Chris Murray, Division 5 Environmental Officer
File Copy
Environmen(ul
Quality
NCDN'K Project No.:
Applicant:
Project Name:
Date of Issuance uf a01 Water QuAlity Certification:
Couniv:
ROY COOPER
r„���.,�,��,-
MICHAEL S. RCGAN
`,,,��,���
LINDA CULPEPPER
i„�,�,��, n„„�,,,
Cer[ificate of Completion
Upon comple[ion of all work approved �cithin the �101 W'ater Quality Certification or applicable Buffer Rules. and
any subscyuent modifications, the applicant is required to retum this certiticate to the 401 Transportation Perniit[in�,
UniL North Carolina Division of Water Resources, 1617 Mail Service Centcr. Raleigh. NC'_7G99-1617. "fhis form
may be returned tu NCDWR by �he applicant, the applicant's authorized a;ent, or the project en,ineer. I[ is no�
necessarv to send certilicares from all uf thes'e.
.-I pplirnn!'s Cerlrficn/ion
I, . hereby state that. to the best of m} abilities. Jue care and dili�_encz
was used in the observation of the construction such Ihat the construclion was obs�rved to be buih within substantial
compliance and inteni uf the a01 W'ater Qualih� Certiflcation and Bid'fer Rules, the approved plans and
specifications, and other supporting materials.
Sienature: Date:
.-iken!'s Cerfificnlion
I. , hereby sta�e that. to the besY of my abilities, due care and dili�ence
wes used in the observation ofthe consCrucCion such that die construction was observed io be built within substantial
compliance and intent of �he �01 Water Quality� Cehitication and Buf fer Rules, the approved plans and
specifications, and other suppurting materials.
Si�nahire:
Eirgiueer's Cer�ificu�iou
Partial
Final
Date:
I. , as a duly regist�red Professional �ngineer in the State of North
Carolina, havine been au[horized to observe (periodicallg�. wee6ly. full [ime) the construrtion of the pr�ject for Ihe
Perniittee hereby state [haL to the bes[ of my abilities, due care and diligence was used in thz observation of the
construc[ion such that lhz cunstruction �sas obstrved �o be buih within substantial compliance and intent uf Ihe 401
Water Qualitp Certification and Buli�er Rules, ihe approvzd plans and specitications, and other supponing materials.
Signawre
Date
Registration No.
Sl.na ol"N��rth Carohn:i I Fnvunnmtnlal Quahi)�
I�+17 Mml titn mt Ccnlar i R�la eh_ Nonh Caml ina �7h941 n 17