Loading...
HomeMy WebLinkAbout20180434 Ver 1_Approval Letter_20180413Envirvnmentul Quali[y ROY COOPER � �„„ „�,,, MICHAEL S. REGAN �, „. ����, LINDA CULPEPPER i,��„�n„ u�„�<<,,,� April I ..'_018 Tti�rrell Count�� NCDW'R Projcct No. 30180-134 SR I'_"_'9shouldersl'abilitation State Project No. I?0891 I APPROVAL of J01 WATER QU.ALITY CERTIFICA7'ION H�ith ADDI7lON.4L CONDITIONS Mr. Paul W'illiams NCDOT. Dioisiun I I I S Airport Drive Edenton. NC 37933 DearMr. Williams: You have our approval, in accordance �sidi thz conditions listed below. for �h� fulluwin�_ impacts for the purpose of road shoulder and stream bank stabilization on a roadside canal edjscent to SR I?29 �Old US 6d� in Tyrrell Counry: O en Water Im �acts in Ihe Pas uolank River Basin Site O enWater(ac) BankStabilizationQQ SR 1229 0.09 5�0 The projuct shall be constructed in aceordance with your application d�ted received Mard� ?6. 3018. Atiar revie�+�in� your applicatiun. we have decided that these impacts are cooered b� General Water Qualih Certification Numbers 413d. This certificetion correspunds to tlie Natiom��ide Permit 13 issued bc the Corps ot F_n��ineers. In addition. qou shuuld acyuire am� o[her tideral, state or lucal p�rmits before yuu proceed with }our project includinu (but not limited to) Sediment and Erosiun Control, Nun-Dischar�,e and Water Supply Wa[ershed reuula[iuns. This approval ti�ill e�pire �viih th� accompain in, 30�1 permit. l�his approval is valid solcly for the purpose and design described in your application (unless modi�ied below). Should your project change, you must nu�ify the NCDWR and submit a ne�e� applica[ion. Ifdie propem� is sold. [hr new uwner nuist be given a copc of this Certitication and approcal letter, and is thereby� responsible ibr complcin, with all the conditions. I(total wetland lills fur this �roject Inow or in Ihe IiiWre) e�ceed une acre, or ol tutal impacts lu straams (no�s or in the Yuturel e�ceed I50 linear feet, compensaiory mitigation may be required u describcd in 15A NCAC "_'fl A5061M l6) and �7). Additional bu(fer impacts may require compensator�� mili�ation as describzd in I�A NCAC'_6.0?59. For this approval to remain valid, yuu mus� adhere to die conditions listed in the attached certification(s) and am additiunal conditions listed below. Condi�ion(s) of Certification: The issuance ot this cenification does no� esempt iha Permittee from compkine with any and all statutes, rules. regulations, or ordinances that ma} be impused b} othcr �ovemment a�encies (i.e. local, state, and tederal) havin� jurisdiction, includin, but nut limitcd to applicable buffer rules. stormwater manaeemem rulzs, soil erosion and sedimen[ation convol requiremen[s, elc. The Permittee shall ensurc [hat the tinal design drawings adhere to the permit and tu [hc pennit drawin,s submitted tbr approvaL [ I iA NCAC 02H .0�07(c1 and 15A NCAC 0?H .0506 �bl(_' 1 and (c)(�)� Sl:ne ul Vpnh CaruLna I �-��Funmm�ntal Qualit� I n 17 Matl S<n icc Cunta' i Ralci �h. tinnh Corol inu'_7nB�)- I �� R 3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)] 4. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream warers from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] 5. When applicable, all construction activities shall be perFormed and maintained in full compliance with G.S. Chapter I 13A Article 4(Sediment and Pollution Control Act of 1973). Regardless of applicability of the Sediment and Pollution Control Act, all projects shall incorporate appropriate Best Management Practices for the control of sediment and erosion so that no violations of state water quality standards, statutes, or rules occuc [I SA NCAC 02H .0506{b)(3) and (c)(3) and 15A NCAC 026.0200] a. Design, installation, operation, and maintenance of all sediment and erosion control measures shall be equal to or exceed the requirements specified in the most recent version of the North Carolrna Sedrment and Erosion Contro[ Manual, or for linear transportation projects, the NCDOT Sedrment and Erosron Control Manual. b. AII devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) sites, including contractor-owned or leased borrow pits associated with the project. Sufticient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. c. For borrow pit sites, the erosion and sediment control measures shall be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolrna Surjace Mrning Manual. Reclamation measures and implementation shall comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Conhol Act and the Mining Act of 1971. d. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), SA, WS-I, WS-1 l, High Quality Waters (HQW), or Outstanding Resource Waters (ORW), thenthe sedimentation and erosion control designs shall comply with the requirements set forth in 15A NCAC 04B .0124, �esrgnStandards inSensitive Watershed. [15A NCAC 02H.0506(b)(3) and (cx3); GC 4135] 6. A turbidity curtain will be installed in the stream if excavation or ground disturbing activities ocwr within the stream channel, on the stream bank, or within 5 feet of the top of bank. This condition can be waived with prior approval from the NCDWR. [ISA NCAC 02H .0506(b)(3) 7. If placement of sediment and erosion control devices in wetlands and warers is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands, stream beds, or banks, adjacent to or upstream and downstream of the above strucmres. All sediment and erosion control devices shall be removed from wetlands and waters and the natural grade restored within two (2) months of the date Ihat the Division of Energy, Mining and Land Resources (DEMLR) or localty delegated program has released the specific area within the project. [ I SA NCAC 02H.0506(bx3) and (cx3)] 8. Erosion control matting in riparian areas shall not contain a nylon mesh grid which can impinge and entrap small animals. Matting should be secured in place by staples, stakes, or wherever possible live stakes of native trees. Riparian areas are defined as a distance 25 feet from top of stream bank. [ I SA NCAC 026.0201 j 9. 7'he permittee and its authorized agents shall conduc[ its activities in a manner consis[ent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR detertnines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [ISA NCAC 026.0200] 10. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours ofdiscovery. [ISA NCAC 026.0506(b)(2)] I I. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in [he 401 Certification has been completed. [ISA NCAC 02H.OS02(�] 12. A copy ofthis Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Qualiry Certification and all subsequent modifications, ifany, shall be maintained with the Division Engineer and the on-si[e project managec [ 15A NCAC 02H .0507(c) and I SA NCAC 02H .0506 (b)(2) and (c)(2)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition fortn from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixry (60) days of receipt of this notice. A petition is considered filed when it is received in the o�ce of Administrative Heazings during normal office hours. The Office of Administrative Hearings accep[s filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one ( I) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Oftice of Administrative Heazings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone:(919)431-3000,Facsimile:(919)431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Bill F. Lane, General Counsel Department of Environmental Qualiry 1601 Mail Service Center This letter completes the review of the Division of Warer Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Garcy Ward at (252)946-6481 or garcy.ward@ncdenr.gov. Sincere����� r Linda Culpepper, lnterim Director Division of Water Resources Electronic copy only distribu[ion: Kyle Bames, US Army Corps of Engineers, Washington Field Office Garry Ward, NC Division of Water Resouroes Washington Regional Oftice File Copy i� , Environmenia( Quality NCDWR Pmject No.: _ Applican[: _ Projec[ Name: Date of Issuance of �Ol Water Quali[y Certification: Coun[v: ROY COOPER �,,,�:,�,�„�� MICHAEL S. REGAN �r� ,�, r�n�i I.INDA CULPEPPER i,�r„�;,�, n„��,��,��� Cerfificate ol'Comple[ion Upon completiun of all work approved within die 401 W'ater Qualiry Certiflcatioo or applicable Butter Rules. and an}� subsequeni moditications. thr applicant is required to return [his cenilicale [o Ihe -101 Transportatiun Permittin_ Unit, North Carolina Division of Water Resources, 1617 Mail Service Cen�er. Raleigh. NG'_7699-1G17. l'his form may be returned to NCDWR b� the applicant, the applicant's auihorized agent, or �he pre�ject cngineer. II is not necessar. to send cenificates frum all ol thase. : t pplicnnl's Cer/ifica(ian I. . herebti� state that. tu �he best of� m� abililies. due care and dili�ence was used in the ubservation of dm cunstruction such that lhe construction was observed to bz built within sub,tantial compliance and in[ent uf the d01 W'ater Qualit�� Cenification and Butler Rules, thz approved plans and specifications, and utlier suppurtin<, maierials. Sicna[ure: Uare: -Ige�rt's Cerlif[c•atiu�� �, . her�by sta�e �hat. to die best of my abilitizs. due care anJ diligence was used in the ob�erva[ion of the cunstruction such that ihe construction was observed lo he huilt within substantial compliance and inten[ of �he -101 �4'ater Quali[y Crrtilicatiun and F3uffer Rides, lhe approved plans and specifica�ions. and olher suppurtin� materials. Si<_na�ure: Date: F_ngixeer's Certi�culion Partial Final I, , as a duly re_istered Prolessiunal Engineer in Ihz State ot North Carolina, havin, beeo authorized to observe (periudicall��. weeklc, full time) the construction of the pruject lor diz Pcrmittee hereby state that. to �he best of im� abilitizs, due care and dili,cnce ���s used in the observation of thz construction such that the cunstruction was observed ro be buill within substantial compliance and inient ol the d01 Water Qualit}� Czrtiticatiun and Buffer Rules, th� approved plans anJ specitications, and other supportin, ma[erials. Si�,naturc Date Re<,is[ration No. �taLe ui Norlh Curolinu I I m irumm�uul Ou�Jm 1617M�,ul�en�icnC.nler Raleit6.NnnhCurnlinu'_7n�19-Inl�