HomeMy WebLinkAbout20090454 Ver 1_Application_20090422ANK 22
o'R.4:!1T
or . :ay?`r^fRQ?AU
FM
090454
office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification C Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps:
®Section 404 Permit El Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? N Yes ? No
1d. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ® Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ®No For the record only for Corps Permit:
? Yes ® No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the"project located in any of NC's twenty coastal counties. If yes, answer 1h
below. ® Yes ? No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ? No
2. Project Information
2a. Name of project: Replace Bridge No. 42 on NC 304 over Gale Creek
2b. County: Pamlico
2c. Nearest municipality / town: Bayboro
2d. Subdivision name: n/a
2e. NCDOT only, T.I.P. or state
project no: B-5129E
l/J135
3. Owner Information
3a. Name(s) on Recorded Deed: NC Department of Transportation
3b. Deed Book and Page No. n/a
3c. Responsible Party (for LLC if
applicable): n/a
3d. Street address: 105 Pactolus Highway (NC 33)
3e. City, state, zip: Greenville, NC 27835
3f. Telephone no.: 252-830-3490
3g. Fax no.: 252-830-3341
3h. Email address:
Page 1 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ® Other, specify:
4b. Name: Jay B. Johnson, Division 2 Environmental Officer
4c. Business name
(if applicable):
NC Department of Transportation
4d. Street address: 105 Pactolus Highway NC 33
4e. City, state, zip: Greenville, NC 27835
4f. Telephone no.: (252) 830-3490
4g. Fax no.: (252) 830-3341
4h. Email address: jbjohnson@ncdot.gov
5. Agent/Consultant Information (if applicable)
5a. Name: Cindy Carr
5b. Business name
(if applicable): Mulkey, Inc.
5c. Street address: 6750 Tryon Road
5d. City, state, zip: Cary, NC 27518
5e. Telephone no.: (919) 858-1871
5f. Fax no.: (919) 851-1918
5g. Email address: ccarr@mulkeyinc.com
Page 2 of 11
P.CN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): n/a
1b. Site coordinates (in decimal degrees): Latitude: 35.20050457
Longitude: - 76.6791466
(OD. DDDDDD) (-D D. DDDDDD)
1 c. Property size: n/a acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: Gale Creek
2b. Water Quality Classification of nearest receiving water: SA HOW - NSW
2c. River basin: Neuse
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
NC304 is a two-lane state highway. Land surrounding Bridge No. 42 is privately owned rural residential and undeveloped
land comprised of tidal freshwater marsh bordered by pine (planted timber) flatwoods.
The existing bridge is a 6 span, 101 foot 5 inch long structure with a reinforced concrete floor structure on timberjoists '
and bents that are timber caps on timber piles. Relic wood piles are located in the water at the bridge and have been cut
to water surface level. Land use in the vicinity includes timber production, agriculture, and rural residential.
3b. List the total estimated acreage of all existing wetlands on the property:
Approximately 0.51 acre is located within the study area. Site is part of a larger adjacent wetland system.
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
Approx. 120 linear feet are within the study area. Site is part of a longer adjacent stream system.
3d, Explain the purpose of the proposed project:
Replace a deficient bridge structure with a new safer facility that meets new design standards.
3e. Describe the overall project in detail, including the type of equipment to be used:
The project will remove all components of Bridge No. 44 without dropping any pieces in the water and will remove relic
wood piles in the water by pulling them straight out using cable tied to the timber. Sediment curtains will be used around
piles to reduce sediment in the water.
The new bridge will have 2 spans of pre-cast concrete cored slabs, concrete and steel substructure on concrete piles,
and will be approximately 80 feet long with a clear roadwa
width of 33 f
t
B
id
e
y
ee
.
r
ge replac
ment and roadway approach
construction will use typical equipment such as track hoes, excavators, dump trucks, paving machines, and rollers.
4. Jurisdictional Determinations -
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all pr or phases) in the past? ?
? Unknown
Comments: ;
E
4b. If the Co ps made the jurisdict onal determination, what type
of determination was made? ry ?
Fnal
4c
. If yes, who delineated the jurisdictional areas? Ans,
ltant Company: N CDOT Div. 2
Name (if known): Jay Johnson, Cindy Car Other: Mulkey, Inc.
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
February 2006, September 2008
Page 3 of 11
PCN Form -Version 1.3 December 10, 2008 Version
S. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? Yes ? No ® Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
Page 4 of 11
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
la. Which sections were completed below for your project (check all that apply):
N Wetlands N Streams - tributaries N Buffers
N Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this questio n for each wetland area impacted.
2a. 21b. 2c. 2d. 2e. 2f
Wetland impact
Type of jurisdiction .
number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Tem ora T
W1 N P ? T
Roadway fill
nprap Tidal Freshwater F_] Yes N Corps 0.015
, Marsh M No ?DWQ (C (6,6O square
feet)
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0.015
(660 sq.tt.)
2h. Comments: Impacts are for fill placement at new bridge end bent location s and are necessary for guard rail installation.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then com plete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 311
.
33
Stream impact Type of impact Stream name Perennial Type of juri
pact
number -
Permanent P or (PER) or
i
i (Corps
- 4
ngth
Temporary (T) nterm
ttent
(INT)? DWQ - no near
other et)
S1 N P ? T. Fill (bridge end Gale Creek ®PER N Corps 11
bent) ? INT N DWQ
S2 N P ? T Fill (b
ridge end Gale Creek N PER N Corps % 3
b ? INT N DWQ
S3 N P ? T Fill (bridge end
Gale Creek N PER N Corps
4
bent) ? INT N DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 El PEI T El PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ?DWQ
31i. Total stream and tributary impacts
- 18
Ti. Comments:
Stream impacts include placement of riprap along the stream ba nk for stabilization at the new end bent locations and are as
follows: S1: 118 sq.ft. S2: 92 sq.ft. S3: 17 sq.ft.
Page 5 of 11
PCN Form - Version 1.3 December 10, 2008 Version
I
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number - (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P)
or Temporarv (T)
01 N P ? T Gale Creek Fill (bridge pier) Perennial Stream 0.003
(110 square feet)
02 N P ? T Gale Creek Fill (bridge pier) Perennial Stream 0.003
(110 square feet)
03 ?P?T
04 ?P?T
4f. Total open water impacts 0.006
(220 sq.ft.)
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID
b Proposed use or purpose of (acres)
num
er pond
Flooded Filled Excavated Flooded Filled Excavated Flooded
P1
P2
5f. Total None
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes N No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
Page 6 of 11
PCN Form -Version 1.3 December 10, 2008 Version
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
® Neuse ?Tac-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number- Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) for Stream name mitigation (square feet) (square feet)
or Temporary impact required?
B1 ?P?T ?Yes
? No
B2 ?P?T ?Yes
? No
63 ®P ? T Roa p Gale Creek ® Nos 501 428
ray
6h. Total buffer impacts 501 428
6i. Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la.. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Avoidance Measures: Existing roadway and bridge alignment will be maintained during staged construction and an on-site
detour will avoid need for a temporary detour bridge by using a portion of the existing bridge to maintain traffic flow. The new
structure will be constructed using pre-cast concrete components which avoids potential impacts from live concrete. During
demolition, components of the existing bridge will not be dropped in the water. Sediment curtains will be used around relic
wood piles to prevent sediment from entering the water column.
Minimization Measures: Wetland impacts have been minimized to the extent feasible, with impacts occurring only where new
location of bridge bents and piers are required to support the structure and installation of safety guard rails. Existing roadway
and bridge alignment have been maintained to minimize impacts.
lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Use of the existing roadway to maintain traffic on-site during construction of the new bridge. Use of existing'roadway to
operate construction equipment, no equipment will enter wetlands or waters. Use of pre-cast concrete bridge components
avoid use of live concrete.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ? Yes ® No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? corps
? Mitigation bank
2c. If yes, which mitigation option will be used for this project? ? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
Page 7 of 1,1
PCN Form - Version 1.3 December 10, 2008 Version .
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
6. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation? ? Yes ? No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone 6c.
Reason for impact 6d.
Total impact
(square feet)
Multiplier 6e.
Required mitigation
(square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required: None
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
pennittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Page.8 of 11
PCN Form -Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ) , I
1a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules? ? Yes ®No
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: Bridge replacement project covered by NCDOT Statewide NPDES ? Yes ® No
permit
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? n/a (roadway/bridge project) %
2b, Does this project require a Stormwater Management Plan? ? Yes, ®No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Covered by NCDOT Statewide NPDES
Permit .
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan? ® Certified Local Government
[I DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? Pamlico County
? Phase 11
3b. Which of the following locally-implemented stormwater management programs ® NSW
apply (check all that apply): E) USMP
? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No
attached?
4. DWQ Stormwater Program Review
® Coastal counties
4a. Which of the following state-implemented stormwater management programs apply
®HQW
El ORW
(check all that apply):
? Session Law 2006-246
El Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes
® No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 9 of 11
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
la. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ? No
use of public (federal/state) land?
11b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ? Yes ? No
Comments: A Programmatic Categorical Exclusion (PCE) was completed for this
project
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H.0500), Isolated
Wetland Rules (15A NCAC 2H.1 300), DWQ Surface Water or Wetland Standards, ? Yes ®No
or Riparian Buffer Rules (15A NCAC 213.0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes N No
additional development, which could impact nearby downstream water quality?
31b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
n/a
Page 10 of 11
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ® Yes ? No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No
impacts?
Raleigh
®
5c. If yes, indicate the USFWS Field Office you have contacted.
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
NCNHP GIS element occurrence maps (including NCNHP Virtual Workroom); on-site habitat investigation by qualified
biologist; scoping letter comments
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ® Yes ? No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NMFS list of managed species occurring in the area; comparison of area measurements of existing and proposed
structures in water (piers); use of turbidity control measures (sediment curtains) during construction, scoping letter comments.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ®No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site.would impact historic or archeological resources?
Scoping letter comments from NCSHPO.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No
8b. If yes, explain how project meets FEMA requirements: Bridge designed to no-rise standards.
8c. What source(s) did you use to make the floodplain determination? FEMA Firm maps:
Jay B. Johnson ?A/? March 26, 2009
Applicant/Agent's Printed Name Appli• nt/P en? ignature Date
(Agents signature is vali only n authorization letter from the applicant
rovlldded.
Page 11 of 11
PCN Form - Version 1.3 December 10, 2008 Version
® DENOTES IMPACTS TO
BUFFER ZONE I
® DENOTES IMPACTS TO
BUFFER ZONE 2
FILL REMOVAL
NOTE: GALE CREEK IS A BLUE LINE
STREAM AS SHOWN ON THE
VANDEMERE USGS QUAD MAF
BI T B'
B21 Il IP All 0 sf '
FILL REMOVAL 0 sf
BZ2 IMPACT = 0 sf'\\\
FILL REMOVAL = 0 sf
V"r a
_ z...
_ MODIFIED CONC.
-_ f
Ne
- 304 23'BS7
'WE
T E.
EXISTING BRIDGE:
SPANS: 1016'-G'; I41G'-II'; I@I6'-8':
1416'-9'; 1@17'-2'; 1@17'-G"
LENGTH: 101'-6'
WIDTH: 28' CLEAR ROADWAY
TIMBER CAPS. PILES, AND JOISTS INE
CROWN TO BED: 7'
MATER DEPTH: 3'
BZI IMPACT O of ( L
REMOVAL - 0 sf
FILL
PROPOSED BRIDGE:
SLAB
21' CONCRETE CORED BZ2 PRACT - 0 sf
WIDTH: 33' CLEAR ROADWAY FILL REMOVAL = 0 sf
LENGTH: I@30';1450';1@30
NO DECK DRAINS ALLOVIED
PLAN VIEW FOR PERMITTING
SCALE: 1" :50' NOT FOR CONS'
TAAIr ICBICFFB IuaACTS ZONE 2 BUFFER
0
MODIFIED CONC.
FLUME
(TOTAL I 501SOUARE FEET NTOTAL I 4Zb aUUAnL rLLl1
A? ? oFECP?
Ln
CT,p
x
A
T
t
TB ,
N` DOT
DIVISION OF HIGHWAYS
PAMLICO COUNTY
PROJECT: B-5129E
REPLACE BRIDGE U42
ON NC 304 OVER
GALE CREEK
SHEET 9 OF 10 3-3-09
W
_Z
J
x
U
r
a
w
J
x
U
H
Q
M E°] HOD 11 C L]EAf ING
F Z
PROJECT No. B-5129E
DATE: 7-21-2005
ROAD: NC 304
ROAD NAME: NC 304 OVER
GALE CREEK
COUNTY: PAMLICO
/O/'-5"
PROPOSED 21" CONCRETE CORED SLAB
PROPOSED LENGTIP 3 SPANS 1 @ 30 1 @ 50; 1 @ 30'
33' CLEAR ROADWAY
NO DECK DRAINS ALLOWED
NO, 1
30' T 50' T 30' 1
NC 304
I1'I HMG-H, TIDE Lq00'
ww no L_
\I7, 5,
r
NOT TO SCALE
CROSS SECTION
OF BRIDGE No. 42
EXISTING BRIDGE
I @ 76'-6"
1 @ 16L11-
I @ 16'--8"
1 @ ML9"
I @ 17'-2"
1 @ 17'--6"
28'CLEAR ROADWAY
NOT TO SCALE
30,4
Sheet 6 of 10
0.5'
MATCHLINE MATCHLINE
O
'?
D N
W N
N N
-
V1
?
f
IT1 (
r
C
A3 I :J
O
•? I
o
J
N
m 4 3b9 37y9
I_. ,.
? _'. 9
p
._.?.._ I W .?
m
N
I .?`
m I i
I
(
T!
?
11
t
f
O I 1
? I
i
I
'
0 0 p < ? \ I
!!!
3
r ( 1 ?
5
? 1 '
I
Z ,? \ li
O - O O H ii I II ?1
O O O 0 A _ I 17
D V1
O N
O
N
O
Z
O
I
I?
fl
N T
~ ill
~ A
N
? to
?
I rl I I^
?
?
'
I , i
N
II
,....
... { II m
\.. 1 1 I I + A z
I
I I m
r
y
I ?1
F ..
T
I I
I IL i
1 ?
o i
I I I m
? II
I ?Z
I I
I
I?
I I 1
?1
I
1
?1 li ? I I Y
I
? 'I
II
I i
FiFiFf
II
I I
I
ZO (
I i I I
1
I r II
11
I(?
li I
I1
I ! i ! I I i
J
y m t
M
e <1nc? cum mrn Oom MCC
?
O D
p
b
z r 9
'?
? y
O
1
" z
r
Omm zr?NV ?O-I?r v+m
Om0 ]J nA??m Sx
O t.
Z
0
'
O .
["
Z' .
Kin
Zmtni
z
cz OO m
°
.
C
m 0 71 ?
A
O
al fn m
om
.. zo ?•• v._
u
F wOm
00
n 0 O 'sl mNm \ o
oeWmo m0Dmo???
w
a? yA
_
o a TJ y A
®
O Otim y v0-
A
M
o
°
'
o ^M
pP
BOO N C
Z x N=N EO ?
??
560 `°•a'
p
-
ovn
z
nmo
tnNz?m W
em
A
W C+7 ..
,
p D ? p
-1m (1?
a m E zm ?. Im.. No y° ZZ
n'> .>.? ?0 roe OV, Zo
.. y(,1
y
DZC m EWr
mo;D °:iE
A
c
O
r
o t
)
Z
V
DRIZ
? ?W Or
?
ti
a
0
ml I?
ZO
OA
T
Om
z
p
Z Y
CID
QZ
O?
Z
MATCHLINE MATCHLINE
m m N I
Z
m
F?
-'mac- 11 •-^ I___. i- I
l i,.?
/
//
9
0 0 " - m 1 i, 1 11
?(d
®
....... .._ ?,..,_
OT w Il i'
..
D D .y
O
{
D Qi J
.
D D p ??.. r •1 {
,
l m I
I
0
o
c
?
`
mm rm
m .? , I
:
;:
i ?+
n A f ?> if', ?i r I II I l 17
I
ll
n ? ? oma?
" , 1
lm
r
D
''i m rq j: a
m -. 1
' II.
? m N c1 ;i?j o
o-?'?.
Hb N i 1:
j.. li ?q0
I tl I I
'?
1 ?
I'? f
Nm
?
2
It
h
Y
P° h dJ
r
O <`
T
zl
0
ml
A
GZIr
Omm
m?A
?UAm
mN?
C-
O _
(A:>
ozcD
C
mC
AZ
fi=r-
nmm'
' d
ro
O
r t'q?
~ ?
W ® 'yy?
rz?
n?
?
n
rz y
"?999
cn
w ps y 't7
mao
>
N N
q IimT
- I I N I _' i4-----I?
?I Y
Im? i? ;metr
o
...? I j I I net rN CO
?I I II I ?? ?_ N
e I ! ? v
II I i 4
II I' ?. I t 1~ I I
Ij i) i I i II ?I
19
II I I I: .. i!
R, ri n?rp ?; n 1
mm
Zr ?N? ffl "1Er ;net
Oz? ?A np?om UX
y?,o -?omyz D?
v0ipv m?mx0 z?
mom.. ZO ?ZA•• ~ NZ
f-]SWC1N NI.
?" WAm O-?Om-p?R?O
r Oq m0 mOy O-??
r m o AOmf~'1m
r ? mm z z >.? m F m
? xm? memo
mo w0 z-Dpo vFn ••o
m mm mm N Am ?r lB?••
3 m ra noAm•• 0
N ?m
3 rp 49 p o p N_
t?I.Ei>9'J n p 3 p t'
0 0 mOnn OD V3?
zn zn o K? ?< yet
(' f Ny
n v o
N y V mm
O ~
O N
0
0
r
O
r
0
r
0
0
d'
r
O O O
? r
I
N C1DOT
DIVISION OF HIGHWAYS
PAMLICO COUNTY
P ?L p O FI L E PROJECT: B-5129E
REPLACE BRIDGE n42
SCALE: I":50'MORIZONTAL) ON NC "s04OVER
1":10'(VERTTCAL) GALE CREEK
SHEET 5 OF 10 4-25-05
OI ?.' Ih_ _ ? ?11_? I I ? ? I i I .?r '-1 ? 1 - I ?I i
?I ? I I 1 ? I. 1-I 'F' i I'I 1 Tt rl I 1?1 ? 1
?i 11T?1 !?i ? I _I? i I
?? t? ? I\ i .t I ?L"I I I I l i t ?"i 1 I
?Q ?' i -o i I? 1I111 I ??.?Ir 1 r' I
V) tl I -.@1 D I 1 ? -.L I I Ia t 1{ 1 j? LI I i I! I
T-j I Wt"T I Itl I I .(2 L I j- I?_ {.
??-1 1?? ? TI .{ Ij .L Ia Y I ? I ?,? ? I- J I
IL_ .? I I O w- I ' ' UT 1 f I 1_ ! 1 1 I ?I L_.J
1 1!: 1 ?1 I J I ?:Z wl r 1 XQ? I 1 I I 1 1 _i
L ! a r -' I-o;? c? ? I? - ?- -111 '1-I? I . I 1?`
I ?. ? i ?pa??:l/10 ?1? -_ 11 1 L?? tt+1.01, 1-? I ? 1
I _I o g Z I I I I ITII I I 1 1 I I ? 1 --i"
plyyp_W O Q{ i t ' 1 _I! 1 TLS 7 N I I i 1
? I\IIi I a ?. j I I I f_c.??_W I r .I '
O? ??O''\ 11 t S?W N?II
i 1 ?
? I ? 1 QX1.I _I ? ?J__{ 11. 1 I
_?? ??yl?,?LiJ i_? ? I ?_SI/1._ 1 ! i ! kk?It L_I - ? Iii
??'J.?U? I i I I i i I t 1 _I 1 I?rl I.
Ql1.ITiJ? I I ? L? ? I??T?-? I I i I _? ? ? ?I ? ?t??
F?j '?SGJ 1 p IIi ? - ?? t I I ?1 1 t. .-( !
VI Vir?N F`1 Z I- ?-'? p I! I_ 1 -. I I_?I?.? _j I I I I I
1 1 1 1 itl t '1 O III _? ?_? 1 _j_ I ?' 1
?I 1' ( ti_ I `_ iltt _?-1? I?I? I (i
I I' 1 -?- 1 I ?( ?1. ? i i I1
I i l f I t' I I l?i I I t i i I ? }-I I'.._ 1 _?L.'
I ? ".L
U? l i I t !-i j II 1. _ r r- _i i .' i i l l l 1
.11 itll it T?II f ll??,rill l.i
?Q I I _ II: ? I 1 -I- I 1 11?I"
I I I _I I I I i l , 11 I 1_L
l i 1 / {I L? 1.1.. I-t 17 I I
I T I I I ? 1 1 ? ?! -' 1
_I ? I? 1? t t N t l-{ I
I I w.o I' + 1 1 1
1 V' II ( ?12•? 1 1 I If I \t '- ? I IT II ?? ? i
! - t 1 1LOLly I 1! l i !! I I I I
t I I T I I ! I ??? I? i ?-..I
1 1 ! 1 ?Q,Q' 1 1 I ' T-I `I I I l t?3'rQj I I t,.
11 1? I 4a. (?_I I I 1. ? I I I I (.V pl I I I
11 1 I ?I f l It .- A I I ?IJW I ?i I
I I i? l 1 I 1 I I I I I t .i_ ! I I 4 I
?? I I 1 ?. ? ?I 1 ? I ? (
I lti F O I 1 I r i 1)1 J=1 i! j I? I ?i ? I
I l i l II t I I alb I l j D i l l l 0 1
I ?? f: t 1 ? ,_- i 1 I .Z-. L 1 I?_ I rl IJ
I I V-'Ww? ??, I I QI?U I I L I I I I' I_I
I N, j.?S 6 Z?! r 1! I-r-??{2Crl.d.. ? -..r, I ? ' I I 1 f
I i J? O'er S iTl -? I t 1 1 1 t l 11 1 1
??' C7 ???? I L 1 I I I '' I .J? I _?
L_I[LO VL I it I I1I 1.t
07?GJ LJiY C? I ??-1 ? I I I I l i l
0
I VS11. (Ll?l t I - I a0 1{ I I f_L
I !?1 1 1 1 1 1 1 1 1 I 1 ??F? r i I I i t
I !! I ?, 1 1 I I I
1 1,
Y
Bit
f
_ II
- // tEk H
S
?., _$
\
,
BRIDGE 842
=
= Z
I _-
i!
i
o
1o-vJ
2.i
i
/ L
5CA LL: P' : MM'
.?
\\ f tDay
DIVISION OF HIE;HR•ASS
PAMLHA) COUNTY
PROJ F.C T: R-5127f`;
M."PLACIL BR1Uf.:R 2
ON NC :d1( OVER
GALE C'REE-K
I
U N _i,
BRIDGE #42
COOu cum mum
r 1 ? ]a] ? M•Yi
'^
i Ll, Y
y
Pot.
?o
G E_`.LL t f, Bm. ...
HOLLYVIDE 1
co?
ror o
I
o Y ? ]m y+..? m
ly
ANDEMERE °? NEB` T?'OO '
,
u ^l?l \ .? A /fiI rl l???Ql?. 1 1\1 iOJ /. `?``t`
NCDO LL
DIVISION OF HIGHWAYS
VICINITY
VICINITY PAMLICO COUNTY
PROJECT:B-5129E
?/(?
MAPS REPLACE BRIDGE 79 42
_ ON NC 30-1 OVER
GALE CREEK
SHEET 1 OF 1Q 4-25.05
NORTH CAROLINA
Figure 1
Project Vicinity
B-5129 B through E, B-4594
Bridge Replacement Projects on NC 304
Pamlico County, North Carolina
B-51298 Bridge No. 31 over Vandemere Creek
B-5129C.Bridge No. 35 over Little Vandemere Creek
B-5129D Bridge No. 40 over Bear Creek
B-5129E Bridge No. 42 over Gale Creek
B-4594 Bridge No. 44 over UT to Jones Bay
0 ??* k. North Carolina
1E' Department of Transportation
LEGEND
-IILB WETLAND BOUNDARY ?
I PROPOSED BRIDGE.
WETLAND
333??? PROPOSED BOX CULVERT
DENOTES FILL IN
L?LLILC.L/ WETLAND PROPOSED PIPE CULVERT
12 48
T? DENOTES FILL IN (DASHED LINES DENOTE PIPES
SURFACE WATER .
EXISTNG STRUCTURES) -54' PIPES
& ABOVE
DENOTES FILL
IN
R
WATER
[!-LLLLLLd
(POND) SINGLE TREE
pp?/77777--?//
DENOTES TEMPORARY
FILL IN WETLAND WOODS LINE
DENOTES EXCAVATION
IN WETLAND
?!/_/_llld ® DRAINAGE INLET
DENOTES TEMPORARY
FILL IN SURFACE
PATER
DENOTES MECHANIZED
CLEARING
ROOT1dAD
-> > FLOW DIRECTION
TB
?- TOP OF BANK'
WE EDGE OF WATER RIP RAP
- C PROP. LIMIT OF CUT
ADJACENT PROPERTY OWNER
- F- PROP
LIMIT OF FILL
OR PARCEL NUMBER
O
. IF AVAILABLE
PROP.RIGHT OF WAY
NG - NATURAL GROUND LEVEL. SPREADER 0..S)
PL - PROPERTY LINE V -?I
'
- TEMP. DRAINAGE
-TOE
DITCH
GSS SWALE
- PDE - PERMANENT DRAINAGE
EASEMENT
DENOTES IMPACTS TO
EAB - EXIST. ENDANGERED BUFFER ZONE I
ANIMAL BOUNDARY -'
- EPB - EXIST. ENDANGERED DENOTES IMPACTS TO
PLANT BOUNDARY BUFFER ZONE 2
-5?- - - WATER SURFACE -
x x x
x
z
LIVE STAKES
.
x
x
x ?7
A ®' C DOT
BOULDER D
IVISION OF HIGHWAYS
--- CORE FIBER ROLLS PAMLICO COUNTY
PROJECT: B-5129E
"'::=rte= FILL REMOVAL REPLACE BRIDGE u42
ON NC 304 OVER
GALE CREEK
4 OF