Loading...
HomeMy WebLinkAbout20180035 Ver 1_RE B-5352 Rockingham Co NWP 23 SAW-2018-00198_20180413Carpenter,Kristi From: Harmon, Beth Sent: Friday, Apri) 13, 2018 2:48 PM To: Bailey, David E CIV USARMY CESAW (US); Mason, James S Cc: Norton, Apri) R; Dagnino, Carla S; Carpenter,Kristi; Kim Browning Subject: RE: [External] B-5352; Rockingham Co.; NWP 23; SAW-2018-00198 Attachments: B-5352 - STR - RO 03 (Warm) - Rockingham.pdf Dave -- Please see attached the signed mitigation responsibility transfer form for TIP B- 5352. Please let me know if you need anything else for this project. Beth Beth Harmon NCDOT Coordinator Division of Mitigation Services Department of Environmental Quality 919-707-8420 office beth.harmon@ncdenr.gov 1652 Mail Service Center Raleigh, North Carolina 27699-1652 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message----- From: Bailey, David E CIV USARMY CESAW (US) [mailto:David.E.Bailey2@usace.army.mil] Sent: Tuesday, January 30, 2018 11:28 AM To: Mason, James S <jsmason@ncdot.gov> Cc: Norton, April R<april.norton@ncdenr.gov>; Dagnino, Carla S <cdagnino@ncdot.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil> Subject: [External] B-5352; Rockingham Co.; NWP 23; SAW-2018-00198 CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. Jim, 1 I have attached the Nationwide Permit 23 verification including Special Conditions and terms and conditions for the above referenced project to this email. Please note the Compensatory Mitigation requirement. Please let me know if you have any questions or would like a hard copy mailed to you. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. U.S. ARMY CORPS OF ENGINEERS Wilmington District Com�ensator�y Mitigation Responsibilitv Transfer Form Permittee: NCDOT Action ID: SAW-2018-00198 Project Name: NCDOT / 85352 / Bridge 131 / US 220 northbound over Norfolk Southern Railroad / Rackingham County / transportation County: Rockingham Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to veri{y the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation wili occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2j. The Sponsor must also comply wi#h all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements Permitted Impa Stream Warm 77 near Cool 1 Cold HUC and Basin: 03010103, Roanoke River Basin Wetland Impacts ( Riverine Riparian Non-Riverine Coastal *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Requirements: 8-digit HUC and Basin: 03010103, Roanoke River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 154 Mitigation Site Debited: NCDMS {List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this�-ument (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site-identified-atinve—Further, I understand that if the Sponsor fails�to�r.ovide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: �U`��� �J'�� �.� ' _ ,� � _ Name of Sponsor's Authorized Representative: � )�- �� �-- ,9 '�' !''��� _ � _ __. . �f—�t` � � � � � a�+�'��(� 1.�, Signature of Sponsor's Authorized Y `r' �'�� � �'`J� Date Signat re --- Page 1 of 2 Form Updated 14 September, 2017 USACE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no Ionger responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. � Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. � If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must ohtain case-by-case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per turrent District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Onte signed, the Sponsorshould provide copies of this form a/ong with an updated bankledger to: iJ the Permi#tee, 2J the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation O�ce, Attn: Todd Tugwell, 3331 Heritage Trade Orive, Suite 105, Wake Forest, NC 27587 (email: todd.tugwell@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: David Bailey USACE Field Office: Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wak�est, NC Z7587 Email: Davi�.�.Bailev2�a�a�s�ce.armv.mil Digitally signed by BAILEY.DAVID.E.1379283736 DN: c=US, o=U.S. Government, ou=DaD, ou=PK1, �,��� ji� ou=USA, rn=BAILEY.DAV10.E.1379283736 Date: 2018.01.3011:17:50 -05'00' USACE Project Manager Signature Januarv 30. 2018 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location ancl avairbility, and credit classifications (including stream temperature and wetland groupings) is available at I°_�:p__�'r�a�-rG�s.�s�ac�.asu�=Y.�-���d. Page 2 of 2 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at to complete the survey online.