Loading...
HomeMy WebLinkAbout20160294 Ver 4_401 Application_20180418Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 4/12/2018 5:02:06 PM (Supplemental Submital) Accept by Montalvo, Sheri A 4/13/2018 9:43:07 AM (NON -DOT Project) • Strickland, Bev reassigned the task to Montalvo, Sheri A 4/13/2018 9:03 AM • Montalvo, Sheri A reassigned the task to Strickland, Bev 4/13/2018 8:56 AM * Bev, not sure what this is. Must have been someone trying to submit something and stopped or messed up. Please delete this task for me. Thanks Sheri The task was assigned to Montalvo, Sheri A. The due date is: April 17, 2018 5:00 PM 4/12/2018 5:02 PM Staff Review ID#* 20160294 Version* 4 Is this project a public transportation project?* r Yes r No Reviewer List:* Select Reviewing Office:* Submittal Type:* 401 Application Zan Price:eads\gaprice Asheville Regional Office - (828) 296-4500 Does this project require a request for payment to be sent?* r• Yes r No How much is r $240.00 owed?* r $570.00 Project Submittal Dated 4/12/2018 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* r New Project r Pre -Application Submittal r More Information Response r Other Agency Comments f Courtesy Copy New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Project Contact Information Name: Mike Dale Who is subrritting the information? Email Address:* mdale@anchorgea.com Project Information Project Name:* Meadowmont Homes Expansion Phase 3 Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)?* r Yes' No r Unknown County (ies)* Buncombe Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach docurrent DEQ_PCN-SidewalkCulvert-S.pdf 2.25MB Only pdf or Wm files are accepted. Describe the attachments: PCN submittal for modification of an existing permit to install culvert in an unnamed tributary to the Swannanoa River; Hard copies of the submittal have been provided to USACE Asheville Regional Office. * V By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the online form." Signature: (l- Submittal Date: April 12, 2018 Anchor QEA of North Carolina, PLLC 231 Haywood Street Asheville, North Carolina 28801 828.281.3350 \\asheville1\asheville\Projects\Givens Highland Farms\16ac Site Development Phase 3\Permitting\DEQ\Sidewalk Culvert\180412-Lr-DEQ Cover.docx Water Quality Permitting N.C. Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Pre-Construction Notification Submittal for Culvert Installation Given Highland Farms – Meadowmont Homes Expansion Phase 3 Buncombe County, North Carolina Attached is one copy of the permit application for the above-referenced project. It is understood that this will be a modification to the existing Nationwide 29 Permit with the Action ID #2015-01579. The permit package includes the Pre-Construction Notification (PCN) form and associated supporting documents. Per the PCN instructions, we have reduced the plan sheet size down to 11 x 17 inches. We appreciate your assistance with this project. Please do not hesitate to contact me at (828) 771-0324 if you have any questions or need additional information. Sincerely, Mike Dale, PLA Anchor QEA of North Carolina, PLLC Enclosures: Pre-Construction Notification Cc: Ken Partin, Givens Communities Ken Kramer, Givens Highland Farms, LLC Jim Boyer, Givens Highland Farms, LLC Page 1 of 10 PCN Form – Version 1.4 January 2009 Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: 2b. County: 2c. Nearest municipality / town: 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Meadowmont Homes Expansion - Phase 3 Buncombe Black Mountain Givens Highland Farms LLC 5045/1294 Jim Boyer 200 Tabernacle Road Black Mountain NC 28711 828-357-1046 29