Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20140802 Ver 1_More Info Requested_20180314Moore, Andrew W
From: Moore, Andrew W
Sent: Wednesday, March 14, 2018 2:08 PM
To: 'wedsel@anchorqea.com'
Cc: 'David.W.Brown@usace.army.mil'; Leslie, Andrea J
Subject: Request for Additional Information, North Pacolet River Reach 4, Polk County (DWR
Project #20140802V2)
Wyatt,
On February 26, 2018, the Division of Water Resources (Division) received your application dated February 26, 2018,
requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that
your application is incomplete and cannot be processed. The application is on hold until the following items are
addressed:
Please provide construction details for the Longitudinal Peaked Stone Toe (LPST), LPST Tie-back/keyway, and
Stream Barb.
Please clarify the design approach for approximate station 38+50 to 42+50. Two Sheet C-6.0 were provided with
the Pre -Construction Notification, which appear to show two separate designs within the same area.
Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the
proper consideration of the application. If all of the requested information is not received within 30 days, the Division
will be unable to approve the application and it will be returned.
Feel free to contact me if you have any questions or would like to discuss further.
Andrew W. Moore, P.G.
Environmental Specialist — Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
828 296 4684 office
email: Andrew.W.Moore@ncdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.