Loading...
HomeMy WebLinkAbout20061649 Ver 1_More Info Received_20061201o~-~I~yq CONSULTING & DESIGN L L C November 30, 2006 Cyndi Karoly 401 Oversight/Express Review Permitting Unit 2321 Crabtree Boulevard, Suite 250 Raleigh NC 27604 Subject: Towns of Southgate Dear Cyndi Karoly, This is a written explanation of the extended detention wetland device designed for the Towns of Southgate project located in Raleigh, Wake County, North Carolina.. In the Stormwater BMP Manual. it says the difference between a wet detention basin and an extended detention wetland is the allocation of surface area. 70% is marsh and 15% is a small micropond to prevent sediment interfering with the outlet structure. The other 15% can be distributed flexibly with respect to depth. The extended detention «~etland surface areas breakdown as follows: Main Pool Forbay Micrapool: 522.6 SF = 542.6 SF = 13% Marsh 18"-9": 1630.1 SF' + 415.5 SF = 2025.6 SF = 46% High Mar 9"-0": 128 7.1 SF + 476.1 SF = 1763.2 SF = 41 Total extended detention wetland surface area = 4331.4 SF Impervious area = 31% of 7.03 acres ~~~/ ~ Assuming 3 foot depth of permanent pool and interpolate from SA/DA chart: 1.38 = SA/DA therefore the required surface area. of the permanent pool is 4,225 SF. From my understanding, that surface area is adequate for this size tract of land «-ith the amount of impervious area: One area. of misunderstanding may have been the profile view of the pond. It has been revised. If you have any questions, please contact me. Sincerely, ~ Robert Wingate ~-'` Project Engineer Clear«~ater Engineering ~ Design, PLLC 9I9-848-8506 rtwingate@bellsouth.net p,,a 3 ~~~i ~ .~ D~.~:I LO~E~ _~. VYk I Ct~f'' a i r,.i•~f, ~. ` •~ ~' } ; 3ie l.,f, Location Raleigh NC Vilatershed Area 7.03 acres C Value Pre-Const 0.25 C Value Post-Const 0.54 Cn for soils type 75 10yr storm 5 min Duration 7.20 in/hr 25 yr storm 24hr Duration 0.27 inlhr Qpost 27.33 cfs Qpre 12.65 cfs Volume of Runoff 10 yr 5 min 4403.59 ff Convert to flow rate over 2 days 0.03 cfs p 1.00 in Q~ 0.030 in Volume of Runoff from 1" Storm 773.30 ft Time to Peak Tp 0.34 min Ks 1581 40 b Cd 0.61 Diameter 1.00 in Routing Results for 1" Rainfall 0.025 0.020 V 0.015 3 O 0.010 0 0.005 I 0.000 i 00 00 00 00 ~O "O "O O~ ~~ h~ ~~ O. O. O. O. O• d9• O. O. O. O~• 1 Time (Days) 2000.00 a 1500.00 U ~ 1000.00 7 I > 500.00 0.00 Stage Storage Function I~, 0 0.25 0.5 0.75 1 Stage (ft) l___. __. ___ _.. _ _. ___. _.._- ___._ __... Inflow Hydrograph 30.00 25.00 ~ 20.00 C1 15.00 0 10.00 LL 5.00 0.00 0.00 Computation of First Inch of Rainfall 1.0 2.0 3.0 4.0 5.0 Time Time Inflow Storage Staga Outflow Da s min cts ft3 H cfs 0 00 0.00 0.0o a.oo o.oo o.aooo 0.03 0.67 1.36 0.00 0.0018 0.07 2.61 6.67 0.02 0.0033 0.10 5.63 18.13 0.03 0.0048 0.14 9.44 37.34 0.06 0.0064 0.17 13.87 65.14 0.09 0.0079 0.20 17.89 101.54 0.12 0.0093 0.24 21.70 145.69 0.16 0.0107 0.27 24.72 195.99 0.20 0.0120 0.31 28.66 250.23 0.24 0.0132 0.34 27.33 305.84 0.28 0.0142 0.37 26.66 360.08 0.32 0.0157 0.00 0.41 24.72 410.37 0.36 0.0159 0.44 21.89 454.89 0.39 0.0166 0.47 19.22 493.98 0.41 0.0171 0.51 16.88 528.30 0.43 0.0175 0.54 14.82 558.42 0.45 0.0179 0.58 13.01 584.68 0.47 0.0182 0.61 11.43 608.10 0.48 0.0185 0.64 10.03 628.48 0.49 0.0187 0.68 8.81 646.38 0.50 0.0189 0.71 7.74 662.09 0.51 0.0191 0.75 6.79 675.87 0.52 0.0193 0.78 5.97 687.98 0.53 0.0194 0.00 0.81 5.24 698.60 0.54 0.0195 0.85 4.60 707.92 0.54 0.019G 0.88 4.04 716.10 0.55 0.0197 0.92 3.55 723.28 0.55 0.0198 0.95 3.11 729.58 0.55 0.0198 0.98 2.73 735.10 0.56 0.0199 10.98 0.00 723.17 0.55 0.0198 20.98 0.00 711.31 0.54 0.0196 30.98 0.00 699.52 U.54 0.0195 40.98 0.00 687.81 0.53 0.0194 50.98 0.00 676.17 0.52 0.0193 60.98 0.00 664.61 0.52 0.0191 0.05 70.98 0.00 653.12 0.51 0.0190 80.98 0.00 641.72 0.50 0.0189 90.98 0.00 630.38 0.50 0.0188 100.98 0.00 619.13 O.A9 0.0186 110.98 0.00 607.95 0.48 0.0185 120.98 0.00 596.85 0.47 0.0184 130.98 0.00 585.83 0.47 0.0182 140.98 0.00 574.88 0.46 0.0181 150.98 0.00 564,02 0.45 0.0180 160.98 0.00 553.23 0.45 0.0178 17o.se o.oo saz.s2 o.4a 0.0177 160.98 0.00 531.89 0.43 0.0176 0.13 190.98 0.00 521.34 0.43 0.0174 200.98 0.00 510.88 0.42 0.0173 210.98 0.00 500.49 0.42 0.0172 zzo.se o.o0 4so.t6 o.a1 0.0170 230.98 0.00 479.96 0.40 0.0169 240.98 0.00 469.82 0.40 0.0168 250.98 0.00 459.76 0.39 0.0166 260.98 0.00 449.76 0.38 0.0165 270.98 0.00 439.89 0.38 0.0163 280.98 0.00 430.08 0.37 0.0162 290.98 0.00 420.35 0.36 0.0161 300.98 0.00 410.71 0.36 0.0159 0.22 310.98 0.00 401.75 0.35 0.0158 320.98 0.00 391.68 0.34 0.0156 0.23 330.88 0.00 382.30 0.34 O.D155 340.98 0.00 373.00 0.33 0.0154 350.98 0.00 363.79 0.33 0.0152 360.98 0.00 354.67 0.32 0.0151 370.98 0.00 345.63 0.31 0.0149 380.98 0.00 336.69 0.31 0.0148 390.98 0.00 327.83 0.30 0.0146 400.98 0.00 319.06 0.29 0.0145 0.29 410.98 0.00 310.38 0.29 0.0143 420.98 0.00 301.60 0.28 0.0142 430.98 0.00 293.30 0.28 0.0140 440.98 0.00 284.90 0.27 0.0138 450.98 0.00 276.59 0.26 0.0137 460.98 0.00 268.37 0.26 0.0135 470.98 0.00 260.25 0.25 0.0134 480.98 0.00 252.22 0 25 0.0132 490.98 0.00 244.29 0.24 0.0131 500.98 0.00 236.46 0.2.3 0.0129 510.98 0.00 228.72 0.23 O.D127 520.98 0.00 221.08 0.22 0.0126 0.37 530.98 0.00 213.53 0.22 0.0124 540.98 0.00 206.09 0.21 0.0122 550.98 0.00 198.75 0.21 0.0121 560.98 0.00 191St 0.20 0.0119 570.98 0.00 184.37 0.19 0.0117 580.98 0.00 177.33 0.19 0.0176 590.98 0.00 170.40 0.18 0.0114 600.98 0.00 163.57 0.18 0.0112 610.98 0.00 156.84 0.17 0.0110 620.98 0.00 150.23 0.17 0.0108 630.98 0.00 143.72 0.16 0.0107 640.98 0.00 137.32 0.15 0.0105 0.45 650.98 0.00 131.04 0.15 0.0103 660.98 0.00 124.86 0.14 0.0101 670.98 0.00 118.80 G.14 0.0099 680.98 0.00 112.85 0.13 0.0097 690.98 0.00 107.01 0.13 0.0095 700.98 0.00 101.30 0.12 0.0093 710.98 0.00 95.70 0.12 0.0091 720.98 O.OD 90.22 0.11 0.0089 730.98 0.00 84.87 0.11 0.0087 740.98 0.00 79.63 0.10 0.0085 750.98 0.00 74.53 0.10 0.0083 7so.se o.oo ss.55 o.os o.ooal o.sa 779se o.oo sa 70 0 os o.oo7s 760.98 0.00 59.96 0.08 0.0076 7so.s6 0.00 ss.ao o.oe o.oo7a 800.98 0.00 50,96 0.07 0.0072 810.98 0.00 46.65 O.U7 0.0069 820.98 0.00 42.a9 0.06 0.0067 830.98 0.00 38.4 % 0.06 0.0064 640.98 0.00 34.60 0.05 0.0062 650.98 O.OC 30.89 0.05 0.0059 860.98 0.00 27.33 C.05 0.0057 870.98 0.00 23.94 0.04 0.0054 (• , 880.98 0.00 20.71 0.04 0.0051 ~ ~/ 0.62 890,98 O.OU 17.66 0.03 0.0048 ~ N~~~~ 900.9A 0.00 14.79 0.03 0.0045 1 7i• 910.98 0.00 12.70 0.02 0.0041 ~ [ [ : 920.98 0.00 9.62 0.02 0.0038 , ~ 930.96 0.00 7.34 0.02 0.0034 A 940 98 0.00 5,29 0.01 0.0030 1 ~1 1 ~ . 950.98 0.00 3.48 0.01 0.0026 V 960.98 0.00 1.93 0.01 0.0021 ~~\ n 67 970 98 0.00 0.70 0.00 0.0014 V 0.34 0.68 1.02 1.36 1.70 Time t (min) ,,~ o~- i~~q DWQ Project No. DIVISION OF WATER QUALITY -401 EXTENDED DETENTION (and POCKET'S WETLAND WORKSHEET I. PROJECT INFORMATION {please complete the following information): Project Name: Townes of Southgate Contact Person: Robert Wingate Phone Number. {919} 848-8506 For projects with multiple basins, specify which basin this worksheet applies to: NA Permanent Pool Elevation ft 295' (elevation of the orifice invert out) Temporary Pool Elevation ft. 296' (elevation of the outlet structure invert in) Permanent Pool Surface Area sq. ft. 3,440 SF (water surface area at permanent pod elevation) Drainage Area ac. 7.03 ac. (on-site and off-site drainage to the basin) Impenrious Area ac. 3.04 ac. (on-site and off-site drainage to the basin) Forebay Surface Area sq. ft 1,057 SF (at permanent pool elevation approximately 15%)« Marsh 0°-9" Surface Area sq. ft. 1,287 SF (at permanent pool elevation approximately 35°r6)« Marsh 9"-18" Surface Area sq. ft. 1,331 SF (at permanent pool elevation approximately 35%)« Micro Pod Surface Area sq. ft 523 SF (at permanent pool elevation approximately 15°~)« Temporary Pool Volume cu. ft 4,783 cu. ft. (volume detained on top of the permanent pod) SAIDA used 1.52 % (surface area to drainage area ratio)« Diameter of Orifice in. 0.75 in. (draw down orifice c~ameter) II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been mef, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project Applicants Initials: W The temporary pool controls runoff from the 1 inch rain. BQ ~/ The basin side slopes are no steeper than 3:1. R Iti/ A planting plan for the marsh areas with plant species and densities is provided. /~ Lt/ Vegetation above the permanent pool elevation is specified. ~ ~,ti/ An emergency drain is provided to drain the basin. /~° w The temporary pool draws down in 2 to 5 days. R K/ Sediment storage is provided in the permanent pod. ~W A sediment disposal area is provided. ~.-/ Access is provided for maintenance. ~j~/ A site specific, signed and notarized operation and maintenance agreement is provided. K 4~ The drainage area (including any offsite area) is delineated on a site plan. ~~ Access is provided for maintenance. ~ ~..i Plan details for the wetland are provided. ~` / Plan details for the inlet and outlet are provided. it°c~/ A site specific operation and maintenance agreement, signed and notarized by the responsible party is provided (seehttp://h2o.ehnr.state.nc.us/ncwetlandsloandm.doc). « Pocket Wetlands have different design parameters and are only assumed to remove 35% TSS -See pp. 19 and 20 of the NC DENR Stormwater BMP Manual, April 1999. 10% open water, 50% high marsh, 40% low marsh. WETLAND DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wetland detention basin system is defined as the wet (wetland] detention basin, pretreatment including forebays and the vegetated filter if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wetland detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wetland detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wetland detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 292' feet in the main pond, the sediment shall be removed. For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks. When the permanent pool depth reads 292.75' feet in the forebay and micro-pool, the pediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 295 Sediment moval EI. 292.5 75% --------------*-- Bottom E vation 292 ( 25% FOREBAY 5 Sediment Removal Elevation -------------------------------- E~IAIN POND 92 75% Wetland planting densities in the marsh areas should be maintained by replanting bare areas as needed. Wetland plants should be encouraged to grow in the marsh areas. Pa~~e 1 of 2 .+ ~6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wetland detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: ,Ui9t~~ P~c~S Title: /~i4~i//S ~1~~ Address: /.~ ~O,S ~'~~ Phone Signat~ Date: ~E/~ /~l, ~/. C . Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, ~IiS~'~ ~ ~~'S`~1-4 ~ ~~ , a Notary Public for the State of ~~ County of Get ~'~ , do hereby certify that ~~ !~C'~ !-'-~ I) ~ ~) n-7 personally appeared before me this ~~ day of ~~~~~ {~'~@~ , ~'_.,l'J~ ,and acknowledge the due execution of the forgoing wet (wetland] detention basin maintenance requirements. Witness my hand and official seal, ~~~~C~~~-~ ~~~%'~--'~'~--~'~-~ ~,,...o........w..... ,~~'~~P~ L~~I~~~~G,` ~ ~ m •= m 2-12-20pg. G;.• SEAL .-~ _ ~ ` My commission expires ~` ~ ~ ~~-- ~° ~'~ ~ Page 2 of 2 Q PLANT SCHEDULE N BOTANICAL NAND CONNVION NAME ~ NOTES SHRUBS 31 ACORCUS CALAMUS swEEr FLAG t GAL. 110 CARER SFP. SEDGE 1 GAL. 9 CEPHALANTHUSOCCIDBJTALIS BUTTON BUSH 3GAL. 9 MYRIC4 CERIF62A WAX MYRTLE 3 GAL. 85 ELEOCJ•IAPoSOU4DRANGIA.ATA SFi~RUSH 1 GAL. 14 HBISCUS MOSCHEIlTOS - MARSH HBO 1 GAL. 21 JUNCOS EFFESUS SOFT RUSH 1 GAL. 26 PANICUMVERGATUM SWITCHGRASS tGAL. CONSULTING & D [SIGN L l G November 30, 2006 Cvndi Karoly 401 Oversight/Express Review Permitting Unit 2321 Crabtree Boulevard, Suite 250 Raleigh NC 27604 Subject: Towns of Southgate Dear Cyndi Karoly, This is a written explanation of the extended detention wetland device designed for the Towns of Southgate project located in Raleigh, Wake County, North Carolina. In the Stormwater BMP Manual it says the difference between a ~~~et detention basin and an exrtended detention wetland is the allocation of surface area. 70% is marsh and 15% is a small micropond to prevent sediment interfering with the outlet structure. The other 15% can be distributed flexibly with respect to depth. The extended detention wetland surface areas breakdown as follows: Main Pool Forba_v Micropool: 522.6 SF = X42.6 SF = 13% Marsh 18"-9": 1630.1 SF + 415.5 SF = 2025.6 SF = 46% High Mar 9"-0": 1287.1 SF + 476.1 SF = 1763.2 SF = 41 Total extended detention wetland surface area = 4331.4 SF Impervious area = 31% of 7.03 acres Assurning 3 foot depth of permanent pool and interpolate from SA/DA chart: 1.38 = SA/DA therefore the required surface area of the permanent pool is 4,225 SF. From my understanding, that surface area is adequate for this size tract of land with the amount of impervious area. One area of misunderstanding may have been the profile view of the pond. It has been revised. If you have any questions, please contact me. Sincerely, i Robert Wingate Project Engineer Cleartivater Engineering & Design, PLL-C 919-848-8506 rtwingate@bellsouth. net Location Raleigh NC ' Watershed Area 7.03 acres C Value Pre-Const 0.25 C Value Post-Const 0.54 Cn for soils type 75 10yr storm 5 min Duration 7.20 in/hr 25 yr storm 24hr Duration 0.27 in/hr Qpost 27.33 cfs Qpre 12.65 cfs S Volume of Runoff 10 yr 5 min 4403.59 ff° Convert to flow rate over 2 days 0.03 cfs P 1.00 in Q' 0.030 in Volume of Runoff from 1" Storm 773.30 ft Time to Peak Tp 0.34 min Ks 1581.40 b Cd 0.61 Diameter 1.00 in Routing Results for 1" Rainfall 0.025 0.020 ,~ 0.015 3 O ~ 0.010 0.005 0.000 Time (Days) Stage Storage Function 2000.00 ~,^, 1500.00 V ~ 1000.00 > 500.00 0.00 Inflow Hydrograph 30.00 -- 25.00 20.00 CI 15.00 0 10.00 LL 5.00 0.00 0.00 Computation of First Inch of Rainfall 1.0 2.0 3.0 4.0 5.0 Time Time InSow Storage Stage Outflow Da s min cfs ft3 ft cfs 0.00 0.00 0.00 0.00 0.00 0.0000 0.03 0.67 1.36 0.00 0.0018 0.07 2.61 6.67 0.02 0.0033 0.10 5.63 18.13 0.03 0.0048 0.14 9.44 37.34 0.06 0.0064 0.17 13.67 65.14 0.09 0.0079 0.20 17.89 101.54 0.12 0.0093 0.24 21.70 145.69 0.16 0.0107 0.27 24.72 195.99 0.20 0.0120 0.31 26.66 250.23 0.24 0.0132 0.34 27.33 305.84 0.28 0.0142 0.37 26.66 360.08 0.32 0.0151 0.00 0.41 24.72 410.37 0.36 0.0159 0.44 21.89 454.89 0.39 O.D166 0.47 19.22 493.98 0.41 0.0171 0.51 16.88 528.30 0.43 0.0175 0.54 14.82 558.42 0.45 0.0179 0.58 13.01 584.88 0.47 D.0182 0.61 11.43 608.10 0.48 0.0185 0.64 10.03 628.48 0.49 0.0187 0.68 8.81 646.38 0.50 0.0189 0.71 7.74 662.09 0.51 0.0191 0.75 6.79 675.87 0.52 0.0193 0.78 5.97 687.98 0.53 0.0194 0.00 0.81 5.24 698.60 0.54 0.0195 0.85 4.60 707.92 0.54 0.0196 0.88 4.04 716.10 0.55 0.0197 0.92 3.55 723.28 0.55 0.0198 0.95 3.11 729.58 0.55 D.D198 0.98 2.73 735.10 0.56 0.0199 10.98 0.00 723.17 0.55 0.0198 20.98 0.00 711.31 0.54 0.0196 30.98 0.00 699.52 0.54 0.0195 40.98 0.00 687.81 0.53 0.0194 50.98 0.00 676.17 0.52 0.0193 60.98 0.00 664.61 0.52 0.0191 0.05 70.98 0.00 653.12 0.51 0.0190 80.98 0.00 641.72 0.50 0.0189 90.98 0.00 630.38 0.50 0.0188 100.98 0.00 619.13 0.49 0.0186 110.98 0.00 607.95 0.48 0.0185' 120.98 0.00 596.85 0.47 0.0184 130.98 0.00 585.83 0.47 0.0182 140.98 0.00 574.88 0.46 0.0181 150.98 0.00 564.02 0.45 0.0180 160.98 0.00 553.23 0.45 0.0178 170.98 0.00 542.52 0.44 0.0177 180.98 0.00 531.89 0.43 0.0176 0.13 190.98 0.00 521.34 0.43 0.0174 200.98 0.00 510.88 0.42 0.0173 210.98 D.00 500.49 0.42 0.0172 220.98 0.00 490.18 0.41 0.0170 230.98 0.00 479.96 0.40 0.0169 zao.sa o.ao 469.82 o.ao o.olse 250.98 0.00 459.76 0.39 0.0166 260.98 0.00 449.78 0.38 0.0165 270.98 0.00 439.89 0.38 0.0163 280.98 0.00 430.08 0.37 0.0162 290.98 0.00 420.35 0.36 0.0161 300.98 0.00 410,71 0.3fi O.U159 0.22 310.98 D.00 401.15 G.35 0.0158 320.98 0.00 391.68 0.34 0.0156 0.23 330.98 0.00 382.30 0.34 0.0155 340.98 0.00 373.00 0.33 0.0154 350.98 0.00 363.79 0.33 0.0152 360.98 0.00 354.67 0.32 0.0151 370.98 0.00 345.63 0.31 0.0149 380.98 0.00 336.69 0.31 0.0148 390.98 0.00 327.83 0.30 0.0146 400.98 0.00 319.06 0.29 0.0145 0.29 410.98 0.00 310.38 0.29 0.0143 420.98 0.00 301.80 0.28 0.0142 430.98 0.00 293.30 0.28 0.0140 440.98 0.00 284.90 0.27 0.0138 450.98 0.00 276.59 0.26 0.0137 460.98 0.00 268.37 0.26 0.0135 470.98 0.00 260.25 0.25 0.0134 480.98 0.00 252.22 0.25 0.0132 490.98 0.00 244.29 0.24 0.0131 500.98 0.00 236.46 0.23 0.0129 510.98 0.00 228.72 0.23 0.0127 520.98 0.00 221.08 0.22 0.0126 0.37 530.98 0.00 213.53 0.22 0.0124 540.98 0.00 206.09 0.21 0.0122 550.98 0.00 198.75 0.21 0.0121 560.98 0.00 191.51 0.20 0.0119 570.98 0.00 184.37 0.19 0.0117 580.98 0.00 177.33 0.19 0.0116 590.98 0.00 170.40 0.18 0.0114 600.98 0.00 163.57 0.18 0.0112 610.98 0.00 156.84 0.17 0.0110 620.98 0.00 150.23 0.17 0.0108 630.98 0.00 143.72 0.16 0.0107 640.98 0.00 137.32 0.15 0.0105 0.45 650.96 0.00 131.04 0.15 0.0103 660.98 0.00 124.86 0.14 0.0101 670.98 0.00 118.80 0.14 0.0099 680.98 0.00 112.65 0.13 0.0097 690.98 0.00 107.01 0.13 0.0095 700.98 0.00 101.30 0.12 0.0093 710.98 0.00 95.70 0.12 0.0091 720.98 0.00 90.22 0.11 0.0089 730.98 0.00 84.87 0.11 0.0087 740.98 0.00 79.63 0.10 0.0085 750.98 0.00 74.53 0.10 0.0083 760.98 0.00 69.5.5 0.09 0.0081 0.54 770.98 O.OD 64.7D 0.09 0.0079 780.98 0.00 59.98 0.08 0.0076 790.98 0.00 55.40 0.08 0.0074 800.98 0.00 50.96 0.07 0.0072 810.98 0.00 46.65 0.07 0.0069 820.98 0.00 42.49 0.06 0.0067 830.98 0.00 38.47 0.06 0.0064 840.98 0.00 34.60 0.05 0.0062 850.98 0.00 30.D9 0.05 0.0059 0.98 0.00 27.33 0.05 0.0057 870.98 0.00 23.94 0.04 0.0054 880 98 0 00 20 71 0 04 0 0051 0.62 . 890.98 . 0.00 . 17.66 . 0.03 . 0.0048 900.98 0.00 14.79 0.03 0.0045 • 910.98 0.00 12.10 0.02 0.0041 ~~ 920.98 0.00 9.62 0.02 0.0038 ~ 930.98 0.00 7.34 0.02 0.0034 940.98 0.00 5.29 0.01 0.0030 950.98 0.00 3.48 0.01 0.0026 960.98 0.00 1.93 0.01 0.0021 0 0.25 0.5 0.75 1 Stage (ft) 0.34 0.68 1.02 1.36 1.70 Time t (min) ,,,~