Loading...
HomeMy WebLinkAbout20081775 Ver 2_More Info Letter_20090402Pay-WA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary April 2, 2009 CERTIFIED MAIL: #7007 3020 0001 8861 9152 Inner Banks Development, LLC. Attn: Zane Buckman 206 Crescent Drive Windsor, NC 27983 DWQ Project # 08-1775 vs 2 Beaufort County Subject Property: Shady Shores UT to Pamlico River, Tar-Pamlico Basin, 030407, SC, NSW REQUEST FOR MORE INFORMATION Dear Mr. Buckman: On March 17, 2009, the Division of Water Quality (DWQ) received your application dated March 2, 2009 to impact 1.03 acres of waters, 0.092 acres of wetlands, 3011.02 square feet (ft) of Zone 1 protected riparian buffers and 2040.39 square feet (ft) of Zone 2 protected riparian buffers for the purpose of developing a 27 lot subdivision on the subject property. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and 15A NCAC 2B .0259 (8) and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Wetland Connectivity Within your application you indicate that 1823.93 square feet of wetland fill will be required to access lot 22. There is no indication of culvert placement to North Carolina Division of Water Quality Internet: www.ncwaterquality.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer - 50% Recycledl10% Post Consumer Paper NorthCarohna Naturally Page 2 of 2 maintain wetland connectivity. Please provide information indicating an appropriately sized culvert and engineered plans showing culvert placement. 2. Docking Facility Within your application and project narrative a docking facility is indicated but no facility is indicated on the associated project plan. Please provide information indicating whether or not you intend to build such a facility or provide dockage on the subject property. Please respond in writing to the DWQ within four weeks of the date of this letter with the requested information. If we do not hear from you within four weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Kyle Barnes of the Washington Regional Office at 252-948-3917or Ian McMillan of the DWQ Central Office at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Coleen H. Sullins cc: 401 Oversight/Express Permitting Unit USACE Washington Regulatory Field Office File Copy CAMA: Doug Hugget/Morehead CAMA, WaRO Warren Eadus, Quible & Associatess, P.C. PO Drawer 870, Kitty Hawk, NC 27949 Filename: 08-1775 vs2